UPDATED TECHNICAL SPEC CPLS MANIFOLDS- .pdf

PDF 1 MB Posted

Attached to
CPLS MANIFOLDS
Solicitation number
SPMYM126Q4101
Issued by

About this file

This is a technical specification for a Continuous Purge Layup System (CPLS) Condenser Manifold, a portable dry air layup system designed for use on CVN-class nuclear aircraft carriers (NIMITZ and FORD CLASS) undergoing overhaul at Norfolk Naval Shipyard (NNSY).

The manifold is a fully enclosed, portable system contained in a Pelican or equivalent carrying case designed to be transported by one or two individuals. The system accepts dried air through a male 3/4" JIC 37-degree flare fitting inlet and distributes it through an isolation valve, regulating valve, two pressure gages (0-200 psi inlet, 0-60 psi outlet), relief valve (set to 30 psi), and analog flowmeter (0-200 SCFM). Outlet connections include double isolation valves with male 3/4" JIC 37-degree flare fittings. All components must be rated for 150 psi minimum and utilize 3/4" diameter piping. Key component specifications include Norgren R74G series regulators, Kunkle Model 1 safety relief valves, and Ashcroft 1006 series pressure gages. Materials must be steel, stainless steel, copper, or copper alloy, with prohibited items including halogens, sulfur compounds, lead, cadmium, and brazing or soldering connections. Components must meet cleanliness standards per STR-4P37 and STR-4P38. The contractor must deliver fifteen (15) manifolds to NNSY no later than 28 October 2026, provide as-built engineered drawings in both hard copy and .dwg format with bill of materials, conduct air tests and valve operational tests, provide comprehensive documentation including operations manuals and spare parts lists, and honor a one-year standard commercial warranty from delivery/acceptance date. Two months prior to delivery, the vendor must submit the estimated physical delivery date to NNSY.

View the file

Other files

File Type Posted
Combined Synopsis - Manifolds - 6148C122.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONCEPT PROVIDED FOR ILLUSTRATIVE PURPOSES ONLY

SHEET 1/8

CONTINUOUS PURGE LAYUP

SYSTEM (CPLS)

CONDENSER MANIFOLD

TECHNICAL SPECIFICATION

SHEET 2/8

A OVERVIEW

1. Purpose: This Technical Specification titled: CONTINUOUS PURGE LAYUP SYSTEM (CPLS) CONDENSER MANIFOLD provides all the detailed technical requirements for a portable dry air layup manifold.

2. Concept: The CPLS system is designed to introduce dried air to major components to halt or eliminate the formation of corrosion during periods of maintenance when the components are not in use. The CPLS manifold is to be fully enclosed (with the exception of the inlet/outlet connections and the isolation valves) utilizing a Pelican (or equivalent) case. Access cuts and windows are provided to observe gages as required. The system accepts dried air via a male 3/4” JIC 37 degree flare fitting, where it is sent through an isolation valve, regulating valve, two pressure gages, relief valve and analog flow meter. The outlets contain double valves for the purpose of isolation of the system drying maintenance of ship’s components. The outlets are fitted with a male 3/4” JIC 37 degree flare fitting downstream of the valves. Brackets and hangers are to be utilized as required to mount the CPLS components to the case. Connections between components can be either via hoses or hard pipe.

Components enclosed in this system shall not utilize materials detrimental to the ship’s system, such as lead, sulfur (“thio-“ or “sulf-“ compounds), cadmium, or halogens (“chloro-“, “fluoro-“, or “bromo-“ compounds listed as part of the item’s contents). Teflon products are acceptable, however any Teflon tape is not to enter the fluid boundary. Contractor is to utilize requirements from the STR-4P37 and STR-4P38 regarding cleanliness of components. Components may be screwed together or welded, brazing and/or soldering SHALL NOT be utilized to join piping or components. A manifold example is provided herein; however, the contractor is free to pursue an alternate configuration to suit the requirements set out in this technical specification.

3. Abbreviations: The CPLS Condenser Manifold will be referred to as the manifold for brevity. Military Standard 12D (MIL-STD-12D, dtd 15 June 1968 or later) titled: ABBREVIATIONS FOR USE ON DRAWINGS, AND IN SPECIFICATIONS, STANDARDS AND TECHNICAL DOCUMENTS can be used as a guide for determining a standard abbreviated identifier besides those previously determined in this specification.

4. Pricing: A proposal shall be quoted to the requestor based on a single order for the construction and purchase of fifteen (15) manifolds. The proposal shall include the lead time and estimated time of delivery to the Government's destination of Norfolk Naval Shipyard (NNSY). The qty. 15 manifolds purchased herein must arrive at NNSY no later than 28 OCT 2026.

5. Terminology: This Technical Specification uses the term "Contractor" as the one single party ultimately responsible for complying with the Contract. The term "Original Equipment Manufacturer” or “OEM" refers to manufacturers other than the Contractor for various complex devices or sub-assemblies that are critical components of the machine and hence, may include a separate Warranty, but, are not necessarily or at least directly responsible for meeting the conditions as set forth by the Contract (e.g. OEM of a fan or electrical components). The term "Vendor" can refer to parties other than the Contractor for such matters (i.e. shipping, repairs) in case those responsibilities have been delegated or sub-contracted to others. Nevertheless, the Contractor shall ultimately be responsible for compliance with all specification requirements.

6. IDENTIFIERS: The Identifiers below shall be prominently displayed on the manifolds (see Section C, paragraph 9).

a. NNSY Identifier – Unique identifiers for each manifold (e.g. “1 Main” and “4 Main”, etc).

b. ABC Identifier – As determined by the Contractor (e.g. ABC, Inc.) such that the type, size, and the particular machine in the fleet as well as the OEM, type, capacity, and other characteristics of the manifold can readily be identified by the Contractor.

SHEET 3/8

B DESIGN (SYSTEM CAPABILITIES)

1. ALL CARRIER CLASS: The manifold is designed to accommodate all CVN class nuclear aircraft carriers (i.e. NIMITZ and FORD CLASS) overhauled at Norfolk Naval Shipyard (NNSY).

2. PORTABILITY: The manifold is intended to be light enough to be carried by one or two people and compact enough to be moved through the ship with relative ease.

3. CASE: A suitably durable carrying case (i.e. Pelican or equivalent) will contain all piping and instrumentation on the manifold with the exception of the inlet/outlet connections and isolation valves. The case will be equipped with a handle for portability, wheels are optional. The case shall be able to be latched shut securely enough to remain closed during transportation and operation. Clear windows shall be installed on the case to allow the pressure gages and flowmeters to be read without opening the case.

Case is to be as small as reasonably achievable while still supporting all necessary equipment.

4. SHUTOFF VALVES: One shutoff valve on the inlet of the manifold allows isolation of the entire manifold.

Two shutoff valves on either outlet allow double valve isolation of a single leg in the event of ship’s maintenance. These valves may remain outside the case to aid in minimizing the case size.

5. REGULATORS: The regulators shall have a minimum pressure of 5 psi. The regulators shall be a Norgren R74G series pressure regulator or equivalent.

6. PRESSURE RELIEF VALVES: The relief valves shall be a Kunkle Model 1 safety valve or equivalent, factory set to relieve at 30 psi. The relief valves shall be oriented to safely direct the flow of air away from the opening of the case.

7. PRESSURE GAGES: The pressure gages are to have a range of 0 to 200 psi at the inlet and 0 to 60 psi at the outlet. The gages shall be Ashcroft 1006 series or equivalent.

8. FLOWMETERS: The flow meters shall be 3/4” NPT RCM Industries 0-200 SCFM gages or equivalent.

9. DESIGN: Manifold is to be designed utilizing 3/4” diameter components/piping. All components/piping in this system shall be rated for 150 psi minimum.

SHEET 4/8

C CONSTRUCTION REQUIREMENTS

1. MECHANICAL:

a. Flowmeters – In order to operate correctly, flowmeters must be positioned in line with the flow as indicated on the flowmeter. The flowmeter should be positioned with a straight run of pipe at least ten times the pipe’s diameter upstream.

2. DURABILITY: Each manifold shall be capable of continuous year-round unmanned operation while exposed to ambient conditions. The equipment shall meet all state and federal requirements for its type.

3. FASTENERS: Fastening devices subject to removal or adjustment shall not be permanently installed (for example, not swaged, peened, nor staked). Such fasteners (e.g. screws, pins, and bolts) shall be installed by which the degree of tightness is not altered because of normal operation or from vibration.

Screw type fastening devices shall be tightened to defined torque limits as established by the manufacturer's standard. The bolts provided by a manufacturer for mounting its components may not protrude excessively (proper thread protrusion should be a minimum of 2 threads), lack the necessary strength (such as insufficient diameter or material for the application), or be prone to loosening from vibration (requires application of an appropriate threading compound such as Loctite®).

4. FUNCTIONALITY: Regardless of the stipulations or requirements set forth in this specification, ultimately, it is the Contractor's responsibility for the manifold to operate and satisfy the design conditions of its intended purpose. The unit shall be a single integrated assembly to include all components necessary to perform the function for which it was designed. The equipment shall be portable such that one or two individuals can transport it. Manifolds must be of similar design and construction.

5. MANUFACTURING: All components shall be manufactured to defined measurements, standards, tolerances, and clearances in order that such parts can be easily replaced without modifying the original part or equipment either by document reference or by substitution with the same part from a duplicate manifold. The equipment shall be constructed of parts, which are new, not defective, and free of repair.

Welding shall be employed only where those operations are originally intended for its fabrication and not as repair measures for defective parts. Any loose or spattered metal chips, insulation, scrap, or other foreign material shall be thoroughly removed from the equipment. The surfaces of parts shall be cleaned and free from sand, dirt, fins, spurs, or other harmful or extraneous materials. External surfaces shall be smooth and all edges shall be rounded or beveled unless sharpness is required to perform its function.

6. MATERIALS: All areas of piping and components in contact with the fluid boundary shall be constructed of any combination of steel, stainless steel, copper, or copper alloy. If hoses are used to joint components, the inner tube shall not be constructed of or contain halogens or sulfur, with the exception of polytetrafluoroethylene. Materials containing halogens or sulfur can be identified by the prefixes “chloro”, “fluoro”, “bromo”, “thio” or “sulf”.

7. PROHIBITED ITEMS: Halogens or sulfur, with the exception of polytetrafluoroethylene. Materials containing halogens or sulfur can be identified by the prefixes “chloro”, “fluoro”, “bromo”, “thio” or “sulf”.

Connections formed by brazing or soldering.

8. CLEANLINESS: Contractor is to ensure all components meet the cleanliness standards outlined in the STR-4P37 and STR-4P38.

SHEET 5/8

D CONTRACT REQUIREMENTS

1. DRAWINGS: The Contractor shall furnish the following to the cognizant Contracting Officer / Contract Specialist for approval:

a. As-Built Drawing – Engineered drawings shall be provided to reflect the actual As-Built condition soon after the manifolds have been constructed. Both hard copies (paper) and electronic copies (.dwg file extension) are required. The As Built Drawing(s) shall include a Bill of Materials that contains the qty., manufacturer, part description, part number or equivalent, and material composition of all components utilized for the manifolds.

After approval, the hard copies shall be delivered to the Technical Liaison / Engineer. As built drawings shall be released to the government for future solicitation and future procurement use.

2. TESTING:

a. Air Test – Once manifolds are fully assembled, gag pressure relief valves and plug gage connections. Perform an air test on all new equipment (flowmeters and adapters). Perform test at 150 (+10/-0) psig for a minimum of 10 minutes and long enough thereafter to inspect equipment for damage. No leakage or permanent deformation is allowed.

b. Pressure Relief Valve Operational Test – Test each relief valve. Slowly apply air to the inlet side of the relief valve to 30 (+0/-1 psig). Valve should lift off the seat at 30 (+0/-1) psig. Repeat test two additional times. No binding allowed. After 3 each successful valve cycles, record results.

c. Valve Operational Test: Slowly cycle all shutoff valves on each manifold from a fully open to fully shut to fully open three times. Valve should operate smoothly with no binding.

3. CONTACTS: The Contractor shall inform: (i) the Engineering & Planning Department, Technical Liaison: John Simmonds / Code 269 – 757-396-3792. Display a point of contact and a telephone number for requesting warranty repair and/or coordinating transport on each manifold.

4. DELIVERY: The equipment shall arrive at the government's designated worksite (a.k.a. destination) on or prior to the requested date in a ready-to-use condition. The Contractor shall coordinate the estimated date and time of delivery with the REQUESTING CONTRACTING OFFICER or their designee. The Government can provide forklift services during normal work hours for removing the equipment from the Vendor’s transport. The Contractor shall be responsible for all costs, insurance, and freight associated with shipping the unit(s) and its associated equipment to its final destination. Two months’ prior to delivery, the vendor will submit to NNSY a date of physical delivery of the units.

5. DOCUMENTATION: For each unit ordered, one (1) electronic (.pdf) and two (2) paper sets of documentation shall be prepared in which each set is in its own notebook binder. The Contractor will ship one binder with each unit in its weather-resistant document case and ship the remainder to the TECHNICAL LIAISON for eventual re-issue to an appropriate interested party. The documentation shall be in the English language and, as a minimum, shall consist of: (i) isometric Renderings and/or Photographs of the manifold titled CONTINUOUS PURGE LAYUP SYSTEM (CPLS) CONDENSER MANIFOLD that depict the notable features and capabilities; (ii) Technical Instructions (TIs) such as an Operations & Maintenance Manual, Controls Manual, with applicable schematics; (iii) the Government's Contract Number; (iv) a complete & current copy of the Technical Specification; (v) simple Operating Instructions, if not in the Technical Instruction; (vi) OEM / Vendor / Contractor Test Reports (vii) a component Parts List and a suggested Spare Parts List; for requesting repair, (viii) Points of Contact with telephone numbers; and (ix) a signed & dated statement as to the Termination Date of the Warranty with the assumed Delivery and/or Acceptance Date noted.

6. REVISIONS: No changes to the contract specification are authorized without written approval in the form of a contract modification issued by the cognizant Contracting Officer or the designate Contract Specialist. This shall not prohibit communication between the Technical Liaison and the Contractor to clarify issues that do not alter the specification nor amend its final cost.

7. SUBMITTALS: If the technical specification suggests a particular manufacturer (may include a Model No.) or equal for an item and the Contractor's proposal is not as recommended, then product brochures or submittals are mandatory for a technical review and evaluation of the product's proposed merits prior to acceptance.

8. WARRANTY: The Contractor shall honor a standard commercial warranty for a period of one year (1 yr) from the date of expected delivery and/or acceptance, whichever is later. The Vendor shall place and/or provide sticker(s) indicating the termination date of the warranty.

SHEET 7/8

SHEET 8/8