Tuckaseege Road Sidewalk.pdf
PDF 210 KB Posted
- Solicitation number
- EB-5912
- Issued by
- Durham County, North Carolina
About this file
This is a Request for Letters of Interest (RFLOI) issued by the City of Mount Holly, North Carolina, for design services on the EB-5912 Tuckaseege Road Sidewalk project. The City is soliciting responses from qualified consulting firms to provide design, environmental documentation, and utility coordination for sidewalk construction on the south side of SR-2044 (Tuckaseege Road) from NC-273 (Beatty Drive) and on the west side of SR-2044 from Marina Village Drive to Broome Street. The RFLOI was issued on July 8, 2026, with letters of interest due electronically by 10:00 a.m. on July 29, 2026, to elizabeth.bell@mtholly.us. Questions must be submitted by 10:00 a.m. on July 22, 2026, with a final addendum issued by July 24, 2026. Firm selection and notification is anticipated for August 2026, with a Notice to Proceed also expected in August 2026. The proposed contract is a lump-sum agreement with a two-year term.
Subconsultants are permitted under this contract, which will be partially reimbursed with Federal-aid funding through the North Carolina Department of Transportation (NCDOT). All primary and subconsultant firms must be pre-qualified by NCDOT to perform the required discipline codes, which include bridges, categorical exclusions, erosion and sediment control, right-of-way services, surveys, utility engineering, environmental studies, traffic management, roadway design, utility coordination, permitting, structure investigation, multi-use trail design, and hydrologic/hydraulic design. Respondents must be registered with the Office of the Secretary of State and the North Carolina Board of Examiners for Engineers and Surveyors, with responsible engineers holding current North Carolina Professional Engineer licenses. Selected firms must provide Professional Liability insurance coverage of at least $1,000,000 and demonstrate financial ability to undertake the work. Letters of interest are limited to fifteen pages and will be evaluated based on firm experience (35%), staff/team qualifications (25%), technical approach (25%), and availability of key staff (15%). SPSF (Small Professional Services Firm) participation is encouraged and will receive priority consideration in cases of equal qualifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version: 2026.03.04 MTM
Advertised: July 8, 2026
CITY OF MOUNT HOLLY, NC
REQUEST for LETTERS of INTEREST (RFLOI)
CONTRACT TYPE (DESIGN )
TITLE: EB-5912 TUCKASEEGE ROAD SIDEWALK
ISSUE DATE: July 8, 2026
SUBMITTAL DEADLINE: July 29, 2026
ISSUING AGENCY: CITY OF MOUNT HOLLY, NC
SYNOPSIS
SUBCONSULTANTS ARE PERMITTED UNDER THIS CONTRACT.
This contract shall be partially reimbursed with Federal-aid funding through the North Carolina Department of Transportation (hereinafter referred to as the Department). The solicitation, selection, and negotiation of a contract shall be conducted in accordance with all Department requirements and guidelines.
The primary and/or subconsultant firm(s) shall be pre-qualified by the Department to perform ALL of the Discipline Codes listed below for the CITY OF MOUNT HOLLY.
Discipline Codes required are:
• 024 – Bridges – Spans Under 200’
• 032 – Categorical Exclusions
• 070 – Erosion and Sediment Control
• 193 – Right of Way Appraisals
• 194 – Right of Way Negotiators
• 199 – Route Location Surveys
• 235 – Subsurface Utility Engineering (SUE)
• 243 – Threatened and Endangered Species Survey & Studies
• 247 – Traffic Management Plan - Level 3 and 4
• 269 – Urban Roadway Design
• 270 – Utility Coordination
• 280 – Wetland and Stream Delineation
• 287 – Wetland, Stream, and Buffer Permitting
• 295 – Structure Foundation Investigation and Design
• 316 – Multi-Use Trail Design, Survey, & Layout
• 360 – Topographic Surveying
• 361 – Boundary Surveying
• 362 – Easement Surveying
• 433 – Tier I Basic Hydrologic and Hydraulic Design
• 434 – Tier II Complete Hydrologic and Hydraulic Design
WORK CODES for each primary and/or subconsultant firm(s) SHALL be listed on the respective RS-2 FORMS (see section ‘SUBMISSION ORGANIZATION AND INFORMATION
REQUIREMENTS’).
This RFLOI is to solicit responses (LETTERS of INTEREST, or LOIs) from qualified firms to provide professional consulting services to:
Provide design services to construct a sidewalk on the south side of SR-2044 (Tuckaseege Road) from NC-273 (Beatty Drive) and on the west side of SR-2044 from Marina Village Drive to Broome Street.
Electronic LOIs should be submitted in .pdf format using software such as Adobe, CutePDF PDF Writer, Docudesk deskPDF, etc.
LOIs SHALL be received ELECTRONICALLY no later than 10:00 A.M., July 29, 2026
The address for electronic deliveries is: elizabeth.bell@mtholly.us
LOIs received after this deadline will not be considered.
Except as provided below any firm wishing to be considered must be properly registered with the Office of the Secretary of State and with the North Carolina Board of Examiners for Engineers and Surveyors. Any firm proposing to use corporate subsidiaries or subcontractors must include a statement that these companies are properly registered with the North Carolina Board of Examiners for Engineers and Surveyors and/or the NC Board for Licensing of Geologists. The Engineers performing the work and in responsible charge of the work must be registered Professional Engineers in the State of North Carolina and must have a good ethical and professional standing. It will be the responsibility of the selected private firm to verify the registration of any corporate subsidiary or subcontractor prior to submitting a Letter of Interest. Firms which are not providing engineering services need not be registered with the North Carolina Board of Examiners for Engineers and Surveyors. Some of the services being solicited may not require a license. It is the responsibility of each firm to adhere to all laws of the State of North Carolina.
The firm must have the financial ability to undertake the work and assume the liability. The selected firm(s) will be required to furnish proof of Professional Liability insurance coverage in the minimum amount of $1,000,000.00. The firm(s) must have an adequate accounting system to identify costs chargeable to the project.
SCOPE OF WORK
The City of Mount Holly is soliciting responses (LETTERS of INTEREST, or LOIs) for the services of a firm/team for the following contract scope of work:
The City of Mount Holly (hereafter referred to as the “City”) is soliciting written letters of interest from qualified consultants to establish a contract to provide design, environmental documentation, and utility coordination for the EB-5912 Project which consists of sidewalk on the south side of SR-2044 (Tuckaseege Road) from NC-273 (Beatty Drive) and on the west side of SR-2044 from Marina Village Drive to Broome Street.
PROPOSED CONTRACT TIME: 2 YEARS
PROPOSED CONTRACT PAYMENT TYPE: LUMP SUM
SUBMITTAL REQUIREMENTS
All LOIs are limited to FIFTEEN (15) pages (RS-2 forms are not included in the page count) inclusive of the cover sheet, and shall be typed on 8-1/2” x 11” sheets, single-spaced, one-sided.
Fold out pages are not allowed. In order to reduce costs and to facilitate recycling; binders, dividers, tabs, etc. are prohibited. One staple in the upper left-hand corner is preferred.
LOIs containing more than FIFTEEN (15) pages will not be considered.
Firms submitting LOIs are encouraged to carefully check them for conformance to the requirements stated above. If LOIs do not meet ALL of these requirements they will be disqualified. No exception will be granted.
SELECTION PROCESS
Following is a general description of the selection process:
• The LGA’s Selection Committee will review all qualifying LOI submittals.
• For Limited Services Contracts (On-Call type contracts), the LGA’s Selection Committee MAY, at the LGA’s discretion, choose any number of firms to provide the services being solicited.
• For Project-Specific Contracts (non-On-Call type contracts), the LGA’s Selection Committee MAY, at the LGA’s discretion, shortlist a minimum of three (3) firms to be interviewed. IF APPLICABLE, dates of shortlisting and dates for interviews are shown in the section SUBMISSION SCHEDULE AND KEY DATES at the end of this RFLOI.
• In order to be considered for selection, consultants must submit a complete response to this RFLOI prior to the specified deadlines. Failure to submit all information in a timely manner will result in disqualification.
TITLE VI NONDISCRIMINATION NOTIFICATION
The LGA in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all RESPONDENTS that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit LETTERS of INTEREST (LOIs) in response to this ADVERTISEMENT and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
SMALL PROFESSIONAL SERVICE FIRM (SPSF) PARTICIPATION
The Department encourages the use of Small Professional Services Firms (SPSF). Small businesses determined to be eligible for participation in the SPSF program are those meeting size standards defined by Small Business Administration (SBA) regulations, 13 CFR Part 121 in Sector 54 under the North American Industrial Classification System (NAICS). The SPSF program is a race, ethnicity, and gender-neutral program designed to increase the availability of contracting opportunities for small businesses on federal, state or locally funded contracts. SPSF participation is not contingent upon the funding source.
The Firm, at the time the Letter of Interest is submitted, shall submit a listing of all known SPSF firms that will participate in the performance of the identified work. The participation shall be submitted on the Department’s Subconsultant Form RS-2. RS-2 forms may be accessed on the Department’s website at NCDOT Connect Guidelines & Forms.
The SPSF must be qualified with the Department to perform the work for which they are listed.
PREQUALIFICATION
The Department maintains on file the qualifications and key personnel for each approved discipline, as well as any required samples of work. Each year on the anniversary date of the company, the firm shall renew their prequalified disciplines. If your firm has not renewed its application as required by your anniversary date or if your firm is not currently prequalified, please submit an application to the Department prior to submittal of your LOI. An application may be accessed on the Department’s website at Prequalifying Private Consulting Firms -- Learn how to become Prequalified as a Private Consulting Firm with NCDOT. Having this data on file with the Department eliminates the need to resubmit this data with each letter of interest.
Professional Services Contracts are race and gender neutral and do not contain goals. However, the Respondent is encouraged to give every opportunity to allow Disadvantaged, Minority-Owned and Women-Owned Business Enterprises (DBE/MBE/WBE) subconsultant utilization on all LOIs, contracts and supplemental agreements. The Firm, subconsultant and sub firm shall not discriminate on the basis of race, religion, color, national origin, age, disability or sex in the performance of this contract.
https://connect.ncdot.gov/business/consultants/Pages/Guidelines-Forms.aspx https://connect.ncdot.gov/business/Prequal/Pages/Private-Consulting-Firm.aspx
DIRECTORY OF FIRMS AND DEPARTMENT ENDORSEMENT
Real-time information about firms doing business with the Department, and information regarding their prequalification’s and certifications, is available in the Directory of Transportation Firms. The Directory can be accessed on the Department’s website at Directory of Firms -- Complete listing of certified and prequalified firms.
The listing of an individual firm in the Department’s directory shall not be construed as an endorsement of the firm.
SELECTION CRITERIA
All prequalified firms who submit responsive letters of interest will be considered.
In selecting a firm/team, the selection committee will take into consideration qualification information including such factors as:
1. FIRM’S EXPERIENCE 35% = Firm’s experience, knowledge, familiarity and past performance with curb & gutter and sidewalk design, pedestrian bridge design, flood studies, environmental permitting and specifically with regard to other municipal or governmental type work funded with federal money.
2. STAFF/TEAM QUALIFICATIONS 25% = Experience and qualifications of proposed key staff to perform the work.
3. TECHNICAL APPROACH 25% = Project understanding, methodology, and approach.
4. AVAILABILITY OF KEY STAFF 15% = Availability of proposed key staff to perform the work based on current and projected workload.
After reviewing qualifications, if firms are equal on the evaluation review, then those qualified firms with proposed SPSF participation will be given priority consideration.
SUBMISSION ORGANIZATION AND INFORMATION REQUIREMENTS
The LOI should be addressed to Elizabeth Bell, Senior Administrative Support Specialist/ Project Initiation and must include the name, address, telephone number, and e-mail address of the prime consultant’s contact person for this RFLOI.
The LOI must also include the information outlined below:
https://www.ebs.nc.gov/VendorDirectory/default.html
Chapter 1 - Introduction The Introduction should demonstrate the consultant's overall qualifications to fulfill the requirements of the scope of work and should contain the following elements of information:
▪ Expression of firm’s interest in the work;
▪ Statement of whether firm is on register;
▪ Date of most recent private engineering firm qualification;
▪ Statement regarding firm‘s(’) possible conflict of interest for the work; and
▪ Summation of information contained in the letter of interest.
Chapter 2 - Team Qualifications
This chapter should elaborate on the general information presented in the introduction, to establish the credentials and experience of the consultant to undertake this type of effort. The following must be included:
1. Identify recent, similar projects the firm, acting as the prime contractor, has conducted which demonstrates its ability to conduct and manage the project. Provide a synopsis of each project and include the date completed, and contact person.
2. If subconsultants are involved, provide corresponding information describing their qualifications as requested in bullet number 1 above.
Chapter 3 - Team Experience
This chapter must provide the names, classifications, and location of the firm’s North Carolina employees and resources to be assigned to the advertised work; and the professional credentials and experience of the persons assigned to the project, along with any unique qualifications of key personnel. Although standard personnel resumes may be included, identify pertinent team experience to be applied to this project. Specifically, the Department is interested in the experience, expertise, and total quality of the consultant's proposed team. If principals of the firm will not be actively involved in the study/contract/project, do not list them. The submittal shall clearly indicate the Consultant’s Project Manager, other key Team Members and his/her qualifications for the proposed work. Also, include the team’s organization chart for the Project / Plan. A Capacity Chart / Graph (available work force) should also be included. Any other pertinent information should also be listed in this section.
Note: If a project team or subconsultant encounters personnel changes, or any other changes of significance dealing with the company, NCDOT should be notified immediately.
Chapter 4 - Technical Approach
The consultant shall provide information on its understanding of, and approach to accomplish, this project, including their envisioned scope for the work and any innovative ideas/approaches, and a schedule to achieve the dates outlined in this RFLOI (if any project-specific dates are outlined below).
APPENDICES-
CONSULTANT CERTIFICATION Form RS-2
Completed Form RS-2 forms SHALL be submitted with the firm’s letter of interest. This section is limited to the number of pages required to provide the requested information.
Submit Form RS-2 forms for the following:
• Prime Consultant firm
➢ Prime Consultant Form RS-2 (Contract Solicitations ONLY); and
• ANY/ALL Subconsultant firms to be, or anticipated to be, utilized by your firm.
➢ Subconsultant Form RS-2 (Contract Solicitations Only)
➢ In the event the firm has no subconsultant, it is required that this be indicated on the Subconsultant Form RS-2 by entering the word “None” or the number “ZERO” and signing the form.
Complete and sign each Form RS-2 (instructions are listed on the form).
The required forms are available on the Department’s website at:
Prime Consultant Form RS-2
Subconsultant Form RS-2
All submissions, correspondence, and questions concerning this RFLOI should be directed to
Elizabeth Bell at elizabeth.bell@mtholly.us.
IF APPLICABLE, questions may be submitted electronically only, to the contact above.
Responses will be issued in the form of an addendum available to all interested parties.
Interested parties should also send a request, by email only, to the person listed above to be placed on a public correspondence list to ensure future updates regarding the RFLOI or other project information can be conveyed. Questions must be submitted to the person listed above no later than 10:00 AM July 22, 2026. The last addendum will be issued no later than July 24, 2026.
https://connect.ncdot.gov/business/consultants/_layouts/download.aspx?SourceUrl=/business/consultants/Roadway/PRIME%20Form%20RS-2%20(Contract%20Solicitations%20ONLY).xlsx https://connect.ncdot.gov/business/consultants/_layouts/download.aspx?SourceUrl=/business/consultants/Roadway/SUBCONSULTANT%20Form%20RS-2%20(Contract%20Solicitations%20ONLY).xlsx
SUBMISSION SCHEDULE AND KEY DATES
RFLOI Isuue – July 8, 2026
Deadline for Questions – 10:00 AM July 22, 2026
Issue Final Addendum – July 24, 2026
Deadline for LOI Submission – 10:00 AM July 29, 2026
Firm Selection and Notification ** - August, 2026
Anticipated Notice to Proceed – August 2026
** Notification will ONLY be sent to selected firms.