Trash Dumpster SOW.pdf

PDF 279 KB Posted

Attached to
Purchase and Delivery of Trash Container
Solicitation number
31090PR26000348
Issued by

About this file

This is a Statement of Work (SOW) for the acquisition and installation of one 40-yard roll-off container with a rolling lid at USCG Base Alameda, California.

The contractor shall fabricate, deliver, and install a 40-yard radius body container with specifications including approximate dimensions of 8 feet wide by 21 feet long by 5.5 feet high, a rolling lid capable of opening in either direction, a liquid-tight door seal, durable steel construction, and compatibility with Alameda County Industries (ACI) hauling systems. Paint color will be determined by USCG at the time of order. The contractor must conduct a site survey before installation, provide delivery and offloading using necessary equipment such as forklifts, and ensure installation meets all applicable safety standards. The Government will provide a designated clear area for offloading, a concrete foundation, and identify the paint color prior to fabrication. The Required Delivery Date is no later than 120 days from contract award, with work beginning upon contract award and estimated lead time determined by the contractor's production schedule. Deliverables include the installed container, manufacturer's standard warranty documentation, and final inspection and acceptance by USCG. Contractor personnel must comply with USCG Base Alameda security procedures, which may include access badges and vehicle inspections. Excluded from the contract scope are permitting, inspections, special compliance requirements such as OSHPD, additional trips outside the scheduled installation date, and rush delivery unless specifically authorized.

View the file

Other files

File Type Posted
Trash Container Questions and Answers.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Acquisition of One (1) 40-Yard Radius Container with

Rolling Lid USCG Base Alameda, CA

1. Scope

The Contractor shall provide all labor, materials, and equipment to fabricate, deliver, and install one (1) 40-yard roll-off container with a rolling lid at U.S. Coast Guard Base Alameda, CA.

The container shall be designed to accommodate operational waste management requirements and must be compatible with Alameda County Industries (ACI) hauling equipment.

2. Background

USCG Base Alameda historically operated two (2) 20-yard covered roll-off containers to manage operational waste. The first of these 20-yard containers became unserviceable and was recycled; it has already been replaced by a 40-yard capacity container.

The second, remaining 20-yard container is non-compliant with environmental regulations and may leave the base with a critical capacity shortage for waste collection. To resolve this deficiency, restore full operational readiness, and ensure environmental compliance, USCG Base Alameda requires a second 40-yard capacity container to replace this unserviceable 20-yard unit.

3. Requirements

3.1. Equipment Specifications

3.1.1. Container Size: 40-yard radius body container

3.1.2. Dimensions: Approximately 8 ft wide x 21 ft long x 5.5 ft high (per site needs and manufacturer’s design)

3.1.3. Lid: Rolling lid, overlapping and capable of opening in either direction

3.1.4. Door Seal: Must include a liquid-tight door seal

3.1.5. Paint Color: To be determined by USCG at time of order

3.1.6. Compatibility: Must be compatible with ACI hauling systems

3.1.7. Construction: Fabricated from durable steel, suitable for outdoor industrial use

3.2. Installation & Delivery

3.2.1. Contractor shall conduct a site survey before installation

3.2.2. Contractor shall provide delivery, offloading, and placement of the container at the designated USCG Base Alameda location

3.2.3. Contractor shall provide all equipment (e.g., forklift) necessary for placement

3.2.4. Installation must meet all applicable safety standards

3.3. Government Responsibilities

3.3.1. Provide a designated clear area for offloading and forklift operation

3.3.2. Provide concrete foundation

3.3.3. Identify paint color prior to fabrication

3.4. Exclusions

The following are not included under this requirement unless specifically contracted:

3.4.1. Permitting, inspections, or special compliance requirements (e.g., OSHPD)

3.4.2. Additional trips outside scheduled installation date

3.4.3. Rush delivery unless specifically authorized

4. Deliverables

4.1. One (1) 40-yard roll-off container with rolling lid and liquid-tight door seal, delivered and installed at USCG Base Alameda

4.2. Manufacturer’s standard warranty documentation

4.3. Final inspection and acceptance by USCG

5. Schedule

5.1. Work shall begin upon contract award

5.2. Estimated lead time: as determined by the Contractor’s production schedule

(subject to workload fluctuations).

5.3. Contractor shall notify the USCG of any delays

6. Required Delivery Date

The Required Delivery Date (RDD) is no later than 120 days from contract award.

7. Security & Access

Contractor personnel shall comply with all USCG Base Alameda security procedures. Access badges and vehicle inspections may be required.