Trang_Const._ODOT_Traffic_Sign_and_Support_Installation_Project.pdf
PDF 100 KB Posted
- Attached to
- Competitive Selection OH|DOT14725-3
- Contract number
- DOT14725-3
- Issued by
- Ohio
About this file
This document is a multiple award contract for sign installation and removal services issued by the Ohio Department of Transportation (ODOT). The contract is awarded to Trang Construction Co. and provides unit pricing for various sign-related installation, removal, and maintenance services across different highway and support infrastructure categories.
The contract covers 14 distinct service groups, including furnishing and installing ground mounted posts, pipe supports, structural beam supports, and solid wood supports; erecting ODOT-furnished signs on various support types; installing sign attachment assemblies; and removing and disposing of existing signs and supports. Pricing is provided for both standard and rush completion options, with unit prices ranging from approximately $159 to $5,061 depending on the specific service. The contract allows vendors to submit pricing for any items and locations, with all submitted pricing to remain effective for the entire contract duration. Maintenance of traffic services are also included, with pricing for lane and shoulder closures on different highway types, demonstrating a comprehensive approach to sign-related infrastructure services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Signature__38_.pdf | ||
| Affirmation_and_Disclosure__33_.pdf | ||
| 147-25spec.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard $267.89
Rush $367.89
Standard $499.19
Rush $599.19
Standard $599.19
Rush $699.19
Standard $267.89
Rush $367.89
Standard $367.89
Rush $467.89
Item Item Unit of Completion Unit Bid Price
Standard $3,830.56
Rush $4,230.56
Standard $342.02
Rush $442.02
Standard $2,200.29
Rush $2,700.29
Item Item Unit of Completion Unit Bid Price
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Group 3 - Furnish and Install Ground Mounted Structural Beam Support
Each
Each
3-8
Furnish and Install Ground Mounted Structural Beam Support, W6x9 Foot
3-6 Furnish and Install Breakaway Structural Beam Connection, W6x9
Group 1 - Furnish and Install Ground Mounted Post
Group 2 - Furnish and Install Ground Mounted Pipe Support
1-4
1-5 Furnish and Install Ground Mounted Support, No. 4 Post, Square Foot
Items 1-4 & 1-5: Furnish and install ground mounted yielding square post support in anchor base foundation in accordance with Item 630 of the ODOT Construction and Material Specifications and
Standard Construction Drawings TC-41.20, TC-42.10 and TC-42.20. Unit bid price includes furnishing and installation of anchor base.
Foot
Each
Furnish and Install Triangular Slip Base Connection
3-9 Furnish and Install Breakaway Structural Beam Connection, W10x12
Foot
Furnish and Install Ground Mounted Pipe Support Foundation
Furnish and Install Ground Mounted Support, No. 3 Post, Square
3-7
3-10
Furnish and Install Ground Mounted Structural Beam Support Foundation, W10x12
2-1
1-3
3-4 Furnish and Install Ground Mounted Structural Beam Support Foundation, W6x9 Each
Foot
3-3 Furnish and Install Breakaway Structural Beam Connection, S4x7.7
Furnish and Install Ground Mounted Structural Beam Support, S4x7.73-2
This is a multiple award contract. Vendors may submit pricing for any of the items and locations below. Bidders should submit descriptive literature in accordance with Section 7 of the Specifications and Requirements for items bid. All pricing submitted shall be effective for the entire duration of the contract.
2-3
3-1 Furnish and Install Ground Mounted Structural Beam Support Foundation, S4x7.7 Each
Furnish and Install Ground Mounted Support, No. 6 Post, Piggyback U-channel
147-25 SIGN INSTALLATION, SIGN REMOVAL
2-2 Furnish and Install Ground Mounted Support, Pipe Foot
Furnish and Install Ground Mounted Support, No. 4 Post, Piggyback U-channel Foot
Vendor Name
Foot
Each
Trang Construction Co.
Each
Furnish and Install Ground Mounted Support, No. 3 Post, U-channel1-1
Group 3 Items: Furnish and install ground mounted structural beam support in concrete foundation in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard
Construction Drawings TC-41.10, TC-42.10 and TC-42.20. Furnish and install slip base connection when specified on the purchase order.
Group 2 Items: Furnish and install ground mounted pipe support in concrete foundation in accordance with Item 630 of the ODOT Construction and Material Specifications, Standard Construction
Drawings TC-42.10 and TC-42.20, and Plan Insert Sheet 204115. Furnish and install slip base connection when specified on the purchase order.
1-2
Foot
Each
3-5
Furnish and Install Ground Mounted Structural Beam Support, W10x12
Furnish and Install Ground Mounted Structural Beam Support Foundation, W8x18 Each
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard $159.57
Rush $259.57
Standard $168.47
Rush $268.47
Standard $174.82
3-16
Furnish and Install Breakaway Structural Beam Connection, W12x303-18
3-17
Group 4 Items: Furnish and install ground mounted solid wood support in accordance with Item 630 of the ODOT Construction and Material Specifications and Traffic Engineering Manual Section 221-5 and Figure 298-26.
3-12 Furnish and Install Breakaway Structural Beam Connection, W8x18 Each
Furnish and Install Ground Mounted Structural Beam Support Foundation, W12x30
3-15 Each
3-13 Furnish and Install Ground Mounted Structural Beam Support Foundation, W10x22 Each
Each
Each
Foot
Furnish and Install Ground Mounted Structural Beam Support, W12x30
Furnish and Install Breakaway Structural Beam Connection, W10x22
Furnish and Install Ground Mounted Structural Beam Support, W10x22 Foot
Foot
Group 4 - Furnish and Install Ground Mounted Solid Wood Support
3-11 Furnish and Install Ground Mounted Structural Beam Support, W8x18 Foot
3-14
Furnish and Install Ground Mounted Support, Solid Wood 4x4 (nominal)
4-2
4-1
Furnish and Install Ground Mounted Support, Solid Wood 4x6 (nominal) Foot
4-3 Furnish and Install Ground Mounted Support Solid Wood 6x6 (nominal) Foot
Rush $274.82
Standard $187.36
Rush $287.36
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard
Rush
Standard
Rush
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard
Rush
Standard
Rush
Standard
Rush
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Standard
Rush
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard
Rush
Each
Group 7 - Erect ODOT-furnished sign assembly on breakaway support Group 7 Item: Furnish and install breakaway support and foundation in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard Construction Drawings HL-10.13, HL-20.11, and TC-87.10.
7-6
7-7 Sign Assembly Erected, Hard-Wired Sequential Flashing Chevron Sign assembly, on Breakaway
Support Foot
7-4 Sign Assembly Erected, Solar Powered LED Beacon Sign assembly, on Breakaway Support Foot
7-5 Sign Assembly Erected, Speed Feedback Sign assembly, on Breakaway Support Foot
Group 5 - Erect ODOT-furnished sign or sign assembly on Ground Mounted Support
Sign Erected, Extrusheet, on Ground Mounted Support
Square
Foot
Sign Erected, Flat Sheet, on Overhead Span Wire Support
Sign Erected, Flat Sheet, on Ground Mounted Support (standard)
Square
Foot
Square
Foot
Square
Foot
Group 6 Items: Erect ODOT-furnished flat sheet or extrusheet sign or plaque on rigid or span wire overhead support in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard Construction Drawings TC-17.11, TC-51.11 and TC-51.12. Unit bid price includes picking up the sign or plaque at the ODOT District Office or other location within the District as specified on the purchase order, and transporting to the work site.
6-2 Sign Erected, Flat Sheet, on Rigid Overhead Support
Group 6 - Erect ODOT-furnished sign or sign assembly on Overhead Support
5-1
Group 5 Items: Erect ODOT-furnished flat sheet or extrusheet sign or plaque on ground mounted post, pipe or structural beam support in accordance with Item 630 of the ODOT Construction and
Material Specifications, Standard Construction Drawings TC-41.20, TC-51.11 and TC-51.12, and Plan Insert Sheet 204115. Unit bid price includes picking up the sign or plaque at the ODOT District Office or other location within the District as specified on the purchase order, and transporting to the work site.
5-2
Group 8 Item: Furnish and install sign attachment assembly in accordance with Item 630 of the ODOT Construction and Material Specifications and Standard Construction Drawing TC-22.20.
Foot
6-1
Group 9 - Remove and Dispose Flat Sheet or Extrusheet Sign
Group 8 - Furnish and Install Sign Attachment Assembly
8-1 Furnish and Install Sign Attachment Assembly
4-3 Furnish and Install Ground Mounted Support, Solid Wood 6x6 (nominal) Foot
4-4 Furnish and Install Ground Mounted Support, Solid Wood 6x8 (nominal)
6-3
Sign Assembly Erected,Solar Powered Sequential Flashing Chevron Sign assembly, on Breakaway
Support Foot
Sign Erected, Extrusheet, on Rigid Overhead Support Square
Foot
7-1 Sign Assembly Erected, RRFB, on Breakaway Support Foot
7-2 Sign Assembly Erected, School Flasher, on Breakaway Support Foot
7-3 Sign Assembly Erected, LED enhanced solar powered sign assembly, on Breakaway Support Foot
Item
Unit of
Measure Completion Unit Bid Price
Standard
Rush
Standard
Rush
Standard
Rush
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard $242.67
Rush $342.67
Standard $342.67
Rush $442.67
Standard $342.67
Rush $442.67
Standard $342.67
Rush $442.67
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard $606.06
Rush $706.06
Standard $406.06
Rush $506.06
Standard $306.06
Rush $406.06
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard $3,061.91
Rush $3,561.91
Standard $3,061.91
Rush $3,561.91
Standard $4,061.91
Rush $4,561.91
Standard $4,061.91
Rush $4,561.91
Standard $5,061.91
Rush $5,561.91
Standard $5,061.91
Rush $5,561.91
Group 13 - Remove and Dispose Ground Mounted Solid Wood Support
Group 11 Items: Removal and disposal of ground mounted pipe supports are in accordance with Item 630 of the ODOT Construction and Material Specifications.
11-2
Group 11 - Remove and Dispose Ground Mounted Pipe Support
Remove and Dispose of Ground Mounted Support, No. 4 Post, Piggyback U-channel or Square
Each
Group 12 - Remove and Dispose Ground Mounted Structural Beam Support
11-1 Remove and Dispose Ground Mounted Pipe Support Foundation
Remove and Dispose Triangular Slip Base Connection Each
12-4 Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W8x18 Each
12-3 Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W10x12 Each
Remove and Dispose of Ground Mounted Support, No. 3 Post, U-channel or Square
9-3 Remove and Dispose Sign, Extrusheet, On Overhead Support
Group 10 - Remove and Dispose Ground Mounted Post
Each
11-3
Each
12-2 Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W6x9 Each
12-1 Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, S4x7.7 Each
Each
Each
Remove and Dispose Sign, Flat Sheet, On Ground Mounted Support
10-1
Each
Group 9 Items: Removal and disposal of ground mounted and overhead mounted signs are in accordance with Item 630 of the ODOT Construction and Material Specifications.
9-2
10-2
10-4
10-3
Each
Group 10 Items: Removal and disposal of ground mounted sign support posts are in accordance with Item 630 of the ODOT Construction and Material Specifications.
Remove and Dispose of Ground Mounted Support, No. 6 Post, Piggyback U-channel or Square
Remove and Dispose of Ground Mounted Support, No. 6 Post, Piggyback U-channel or Square
9-1
Remove and Dispose Sign, Extrusheet, On Ground Mounted Support Each
Group 12 Items: Removal and disposal of ground mounted structural beam supports are in accordance with Item 630 of the ODOT Construction and Material Specifications.
Remove and Dispose Ground Mounted Support, Pipe Each
12-6 Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W12x30 Each
12-5 Remove and Dispose Ground Mounted Structural Beam Support, Connection, and Foundation, W10x22 Each
Item
Unit of
Measure Completion Unit Bid Price
Standard $728.82
Rush $828.82
Standard $728.82
Rush $828.82
Standard $928.82
Rush $1,028.82
Standard $928.82
Rush $1,028.82
Item
Number Item
Unit of
Measure Completion Unit Bid Price
Standard $5,000.00
Rush $6,000.00
Standard $4,000.00
Rush $5,000.00
Standard $3,000.00
Rush $4,000.00
Standard $3,000.00
Rush $4,000.00
13-4 Remove and Dispose Ground Mounted Support, Solid Wood 6x8 (nominal) Each
14-3
14-4 Maintenance of Traffic, Shoulder Closure on Any Highway Each
Group 14 - Maintenance of Traffic and Mobilization
14-1
13-3 Remove and Dispose Ground Mounted Support, Solid Wood 6x6 (nominal) Each
Group 13 Items: Removal and disposal of solid wood supports are in accordance with Item 630 of the ODOT Construction and Material Specifications.
13-1 Remove and Dispose Ground Mounted Support, Solid Wood 4x4 (nominal) Each
13-2 Remove and Dispose Ground Mounted Support, Solid Wood 4x6 (nominal) Each
14-2 Maintenance of Traffic, One Lane Closure on a Four Lane Undivided Highway Each
Maintenance of Traffic, One Lane Closure on a Four Lane or Greater Divided Highway Each
Maintenance of Traffic, One Lane Closure on a Two Lane Highway Each
Group 14 Items: Maintain traffic in accordance with Item 614 of the ODOT Construction and Material Specifications, the Maintenance of Traffic Standard Drawings, the 2012 Ohio Manual of Uniform
Traffic Control Devices, and the District Permitted Lane Closure schedule. Payment will be for each set-up required to complete the work.
File details come from the government source that posted it. Updated .