This is an Invitation for Bid (IFB) issued by the City of Beaumont Public Works Department for Traffic Signal Smart Technology project designation R26-05 located along the Highland Springs Avenue corridor in Beaumont, California. The project involves implementing an improved traffic signal network system utilizing artificial intelligence technology along the Highland Springs Avenue corridor, including I-10 Caltrans ramp signals, to enable unified corridor operation and improve traffic mobility. The work includes traffic signal improvements at nine primary intersections (Highland Springs & 1st Street, 2nd Street, 6th Street/Ramsey Street, Paseo Beaumont, 8th Street/Wilson Street, Patriot Way, and Starlight Avenue) plus the Enterprise MyCity Traffic Management System licensing for nine units and one spare NoTraffic Video Detection Camera and Nexus Unit. A mandatory pre-bid meeting is scheduled for August 19, 2026 at 10:00 a.m. at City Hall Gym, with questions due by August 25, 2026 at 11:00 a.m. Bids must be received by September 7, 2026 at 11:00 a.m. through electronic submission on the Planetbids platform. The bid opening is scheduled for September 7, 2026 at 11:30 a.m., with anticipated contract award on October 6, 2026 and notice to proceed on October 19, 2026. The contract duration shall not exceed 60 calendar days after procurement of long-lead materials, with liquidated damages assessed at $2,000 per calendar day for non-completion. Bids remain valid for 90 calendar days following the bid opening date.

The City will award the contract to the lowest responsive and responsible bidder based on the base bid. A bid bond equal to ten percent (10%) of the total bid price is required, with performance and payment bonds each equal to 100% of the successful bid amount required prior to contract execution. Bidders must possess California Class "A" and/or Class "C-10" contractor licenses and must perform at least 51% of the total contracted work with their own forces. Three additive alternate bids are included: Additive A for two northern signals (Highland Springs & Sundance Drive and Oak Valley Parkway), Additive B for two Caltrans signals (I-10 EB and WB ramps), and Additive C for CMU upgrades at nine locations. Subcontractors performing work exceeding one-half of one percent of the prime contractor's total bid or $10,000, whichever is greater, must be designated. Prevailing wage requirements apply under California Labor Code Section 1773, with contractor and subcontractor registration with the California Department of Industrial Relations required. The City reserves the right to reject any or all bids and has made contract documents available on its website and the Planetbids e-bidding platform at no cost.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB 26-20 INVITATION FOR BID

FOR:

TRAFFIC SIGNAL SMART TECHNOLOGY

CIP R26-05

CONTACTS:

Barbara Mason

Purchasing Manager bmason@beaumontca.gov

IFB AVAILABLE:

City of Beaumont PlanetbidsBids Portal https://vendors.planetbids.com/portal/66785/bo/bo-detail/144726

Website:

http://beaumontca.gov

Address:

550 E. 6th Street Beaumont, CA 92223

Phone:

951.769.8520 mailto:bmason@beaumontca.gov

City of Beaumont Invitation for bid

TRAFFIC SIGNAL SMART TECHNOLOGY CIP R26-05

TABLE OF CONTENTS

NOTICE INVITING BIDS

INSTRUCTIONS TO BIDDERS

BID FORM

BASE BID

ADDITIVE ALTERNATE BID A

ADDITIVE ALTERNATE BID B

ADDITIVE ALTERNATE BID C

BID CERTIFICATION

IRAN CONTRACTING ACT CERTIFICATION

FLEET COMPLIANCE CERTIFICATION

CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION

BID BOND

DESIGNATION OF SUBCONTRACTORS

INFORMATION REQUIRED OF BIDDERS

NON-COLLUSION AFFIDAVIT

PERFORMANCE BOND

THIS IS A REQUIRED FORM

PAYMENT BOND

02 GENERAL CONDITIONS

03 SPECIAL CONDITIONS

04 TECHNICAL SPECIFICATIONS

05 CONTRACT DRAWINGS

06 PUBLIC WORKS AGREEMENT

07 BID PLANS

NOTICE INVITING BIDS

The City of Beaumont, Public Works Department (“City”) is soliciting bids for:

R26-05 TRAFFIC SIGNAL SMART TECHNOLOGY

BID DATES, TIMES, & LOCATIONS:

Bid Published: August 4, 2026, 2026 Mandatory Pre-Bid Meeting: August 19, 2026 10:00 A.M. (City Hall

Gym

Questions Due by: August 25, 2026 @ 11:00 A.M.

Bids & Bonds Must Be Received By: September 7, 2026 @ 11:00 A.M.

Place of Bid and Bid Bond Receipt: Online electronic submission on

Planetbids:

https://vendors.planetbids.com/portal/66 785/bo/bo-detail/144726

Bid Opening Date: September 7, 2026 @ 11:30 A.M.

Bid Opening Location: Online electronic submission on

Planetbids:

https://vendors.planetbids.com/portal/66 785/bo/bo-detail/144726

Anticipated Contract Award: October 6, 2026 Anticipated Notice To Proceed: October 19, 2026

Bids or Bid bonds received after this time will be deemed non-responsive. Bids shall be valid for 90 calendar days after the bid opening date. Bids must be submitted on the City’s Bid Forms. Bids must be prepared on the approved Bid forms and in the manner prescribed in the Instructions to Bidders. Bids must be submitted with the following subject:

LOCATION OF WORK:

The work to be completed is located along the Highland Springs Ave. corridor.

DESCRIPTION OF WORK:

The proposed work shall be performed in accordance with the contract documents, including but not limited to the general conditions, special conditions, technical specifications, contract drawings, permits, and all other reference documents.

https://vendors.planetbids.com/portal/66785/bo/bo-detail/144726 https://vendors.planetbids.com/portal/66785/bo/bo-detail/144726

In general, the work includes, but is not limited to:

The project will implement an improved traffic signal network system (AI) along the Highland Springs Ave corridor which includes the I-10 Caltrans ramp signals for a unified corridor operation. This improvement is designated to provide greatly improved traffic mobility along the corridor.

CONTRACT LENGTH:

The work for this contract shall not exceed 60 calendar days after the procurement of long lead material and supplies. Contract time shall commence upon issuance of the Notice to Proceed from the City. If The Work is not completed as stated in the Contract Documents, there will be liquidated damages in a sum of $2,000 per calendar day as stated in General Conditions, Article 43.

AWARD OF CONTRACT:

The City shall award the Contract for the Project to the lowest responsive, responsible bidder as determined from the base bid. The City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.

The City of Beaumont hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit Bids in response to this Notice, and that minorities nor minority business enterprises will not be discriminated against on the basis of race, color, national origin, ancestry, sex, or religion in any consideration leading to the award of contract. For further information, please see the form titled “Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246)” within the Bid Documents.

CONTRACT DOCUMENTS AND SPECIFICATION:

Copies of the Contract Documents and Specification are available and can be downloaded from the City’s Website https://www.beaumontca.gov/949/Bids-and-RFPs and on Planetbids Ebidding platform:https://vendors.planetbids.com/portal/66785/bo/bo-detail/144726 and reviewed at no cost.

BID & BIDDER:

A Bid Bond in favor of the City in an amount not less than ten percent (10%) of the submitted Total Bid Price is required for this project. Bid Bonds must be delivered to Beaumont City Hall, Attn: Purchasing, 550 E Sixth Street, Beaumont, CA 92223 or electronically through Planetbids on or before the bid due date.

Each bid shall be accompanied by the security referred to in the Contract Documents, the non-collusion affidavit, the list of proposed subcontractors, and all additional documentation required by the Instructions to Bidders.

The successful bidder will be required to furnish the City with a Performance Bond equal https://www.beaumontca.gov/949/Bids-and-RFPs to 100% of the successful bid, and a Payment (Labor and Materials) Bond equal to 100% of the successful bid, prior to execution of the Contract. All bonds are to be secured from a surety that meets all of the State of California bonding requirements, as defined in Code of Civil Procedure Section 995.120, and is admitted by the State of California.

Each bidder shall be a licensed contractor pursuant to the Business and Professions Code and shall be licensed in the following appropriate classification(s) of contractor’s license(s), for the work bid upon, and must maintain the license(s) throughout the duration of the Contract:

• California Class “A” and/or required Class “C-10” licenses

Contractors shall perform most of the work or at least fifty-one percent (51%) of the total contracted work.

FOR FURTHER INFORMATION CONTACT:

Barbara Mason E-mail: bmason@beaumontca.gov mailto:bmason@beaumontca.gov

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS

AVAILABILITY OF CONTRACT DOCUMENTS:

Bids must be submitted electronically on the City’s electronic bid platform Planetbids on the Bid Forms which are a part of the Bid Package for the Project.

EXAMINATION OF CONTRACT DOCUMENTS:

The City has made copies of the Contract Documents available, as indicated above.

Bidders shall be solely responsible for examining the Project Site and the Contract Documents, including any Addenda issued during the bidding period, and for informing itself with respect to local labor availability, means of transportation, necessity for security, laws and codes, local permit requirements, wage scales, local tax structure, contractors’ licensing requirements, availability of required insurance, and other factors that could affect the Work. Bidders are responsible for consulting the standards referenced in the Contract. Failure of Bidder to so examine and inform itself shall be at its sole risk, and no relief for error or omission will be given except as required under State law.

INTERPRETATION OF CONTRACT DOCUMENTS

Discrepancies in, and/or omissions from the Plans, Specifications or other Contract Documents or questions as to their meaning shall be submitted as a question on the Planetbids bid platform for an interpretation or correction to the City by the deadline stated herein. Any interpretation of the Contract Documents will be made only by written addenda through the Planetbids platform. The City will not be responsible for any explanations or interpretations provided in any other manner. No person is authorized to make any oral interpretation of any provision in the Contract Documents to any bidder, and no bidder should rely on any such oral interpretation. Bids shall include complete compensation for all items that are noted in the Contract Documents as the responsibility of the Contractor.

INSPECTION OF SITE:

Each prospective bidder is responsible for fully acquainting itself with the conditions of the Project Site (which may include more than one site), as well as those relating to the construction and labor of the Project, to fully understand the facilities, difficulties and restrictions which may impact the cost or effort required to complete the Project.

ADDENDA:

The City reserves the right to revise the Contract Documents prior to the bid opening date.

Revisions, if any, shall be made by written Addenda. All addenda issued by the City shall be included in the bid and made part of the Contract Documents. Pursuant to Public Contract Code Section 4104.5, if the City issues an Addendum which includes material changes to the Project less than 72 hours prior to the deadline for submission of bids, the City will extend the deadline for submission of bids. The City may determine, in its sole discretion, whether an Addendum warrants postponement of the bid submission date.

Addendum will be posted on the Planetbids bidding platform stated herein. .

ALTERNATE BIDS

If alternate bid items are called for in the Contract Documents, the lowest bid will be determined on the basis of the base bid only. However, the City may choose to award the contract on the basis of the base bid alone or the base bid and any alternate or combination of alternates. The time required for completion of the alternate bid items has been factored into the Contract duration and no additional Contract time will be awarded for any of the alternate bid items. The City may elect to include one or more of the alternate bid items, or to otherwise remove certain work from the Project scope of work, accordingly each Bidder must ensure that each bid item contains a proportionate share of profit, overhead and other costs or expenses which will be incurred by the Bidder.

COMPLETION OF BID FORMS

Bids shall only be prepared using copies of the Bid Forms which are included in the Contract Documents. The use of substitute bid forms other than clear and correct photocopies of those provided by the City will not be permitted. Bids shall be executed by an authorized signatory as described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting “N/A” where applicable) and initial all interlineations, alterations, or erasures to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms nor make substitutions thereon. Deviations in the bid form may result in the bid being deemed non- responsive.

MODIFICATIONS OF BIDS:

Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents. Unauthorized additions, modifications, revisions, conditions, limitations, exclusions or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms, nor make substitutions thereon. Oral, telephonic and electronic modifications will not be considered, unless the Notice Inviting Bids authorizes the submission of electronic bids and modifications thereto and such modifications are made in accordance with the Notice Inviting Bids.

DESIGNATION OF SUBCONTRACTORS:

Pursuant to the funding regulation, the Bidders must designate the name and location of each subcontractor who will perform work or render services for in excess of one-half of 1 percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater, as well as the portion of work each such subcontractor will perform on the form provided herein by the City. No additional time will be provided to bidders to submit any of the requested information in the Designation of Subcontractor form.

LICENSING REQUIREMENTS:

Pursuant to Section 7028.15 of the Business and Professions Code and Section 3300 of the Public Contract Code, all bidders must possess proper licenses for performance of this Contract. Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Section 7028.5 of the Business and Professions Code, the City shall consider any bid submitted by a contractor not currently licensed in accordance with state law and pursuant to the requirements found in the Contract Documents to be nonresponsive, and the City shall reject the Bid. The City shall have the right to request, and Bidders shall provide within five (5) calendar days, evidence satisfactory to the City of all valid license(s) currently held by that Bidder and each of the Bidder’s subcontractors, before awarding the Contract. Please also note that, pursuant to Public Contract Code Section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code Section 2717(b) in order to supply mined material for this Contract.

SIGNING OF BIDS:

All Bids submitted shall be executed by the Bidder or its authorized representative.

Bidders may be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom. If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid; and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom. The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.

BID GUARANTEE (BOND):

Each bidder shall send in a Bid Bond to Beaumont City Hall, Attn: Purchasing, 550 E Sixth Street, Beaumont, CA 92223 or electronically through Planetbids on or before the bid due date. Acceptable Bid Bonds may be in the form of: (a) cash; (b) a certified check made payable to the City; (c) a cashier’s check made payable to the City; or (d) a bid bond payable to the City executed by the bidder as principal and surety as obligor in an amount not less than 10% of the maximum amount of the bid. Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. The cash, check or bid bond shall be given as a guarantee that the bidder shall execute the Contract if it be awarded to the bidder, shall provide the payment and performance bonds and insurance certificates and endorsements as required herein within ten (10) calendar days after notification of the award of the Contract to the bidder. Failure to provide the required documents may result in forfeiture of the bidder’s bid deposit or bond to the City and the City may award the Contract to the next lowest responsive, responsible bidder, or may call for new bids.

SUBMISSION OF BIDS:

Once the Bid and supporting documents have been completed and signed as set forth herein, and uploaded to Planetbids. No oral or telephonic bids will be considered. No forms transmitted via facsimile, or any other electronic means will be considered unless specifically authorized by City as provided herein.

DELIVERY AND OPENING OF BIDS

Bids will be received by the City via Planetbids as denoted in the Notice Inviting Bids up to the date and time shown therein. It is the Bidder’s sole responsibility to ensure that its Bid is received as specified. Bids may be submitted earlier than the dates(s) and time(s) indicated.

Bids will be released electronically at the date and time stated in the Notice Inviting Bids The City may in its sole discretion, elect to postpone the opening of the submitted Bids.

City reserves the right to reject any or all Bids and to waive any informality or irregularity in any Bid. In the event of a discrepancy between the written amount of the Bid Price and the numerical amount of the Bid Price, the written amount shall govern.

WITHDRAWAL OF BID:

Prior to bid opening, a Bid may be withdrawn by the Bidder only by means of a written request signed by the Bidder or its properly authorized representative.

BASIS OF AWARD; BALANCED BIDS:

The City shall award the Contract to the lowest responsive, responsible Bidder submitting a responsive Bid. The City may reject any Bid which, in its opinion when compared to other bids received or to the City’s internal estimates, does not accurately reflect the cost to perform the Work. The City may reject as non-responsive any bid which unevenly weights or allocates costs, including but not limited to overhead and profit to one or more particular bid items.

DISQUALIFICATION OF BIDDERS; INTEREST IN MORE THAN ONE BID:

No bidder shall be allowed to make, submit or be interested in more than one bid.

However, a person, firm, corporation or other entity that has submitted a subproposal to a bidder, or that has quoted prices of materials to a bidder, is not thereby disqualified from submitting a subproposal or quoting prices to other bidders submitting a bid to the City.

No person, firm, corporation, or other entity may submit subproposal to a bidder, or quote prices of materials to a bidder, when also submitting a prime bid on the same Project.

INSURANCE REQUIREMENTS:

The successful bidder shall procure the insurance in the form and in the amount specified in the Contract Documents.

AWARD PROCESS:

Once all Bids are opened and reviewed to determine the lowest responsive and responsible Bidder, the City Council may award the contract. The apparent successful Bidder should begin to prepare the following documents: (1) the Performance Bond; (2) the Payment (Labor and Materials) Bond; and (3) the required insurance certificates and endorsements. Once the City notifies the Bidder of the award, the Bidder will have ten

(10) consecutive calendar days from the date of this notification to execute the Contract and supply the City with all of the required documents and certifications. Regardless whether the Bidder supplies the required documents and certifications in a timely manner, the Contract time will begin to run ten (10) calendar days from the date of the notification.

Once the City receives all of the properly drafted and executed documents and certifications from the Bidder, the City shall issue a Notice to Proceed to that Bidder.

FILING OF BID PROTESTS

Bidders may file a “protest” of a Bid with the City’s City Engineer. In order for a Bidder’s protest to be considered valid, the protest must:

• Be filed in writing within five (5) calendar days after the bid opening date;

• Clearly identify the specific irregularity or accusation;

• Clearly identify the specific City staff determination or recommendation being protested;

• Specify, in detail, the grounds of the protest and the facts supporting the protest; and

• Include all relevant, supporting documentation with the protest at time of filing.

If the protest does not comply with each of these requirements, it will be rejected as invalid. If the protest is valid, the City’s City Engineer, or other designated City staff member, shall review the basis of the protest and all relevant information. The City Engineer will provide a written decision to the protestor. The protestor may then appeal the decision of the City Engineer to the City Manager.

WORKERS COMPENSATION:

Each bidder shall submit the Contractor’s Certificate Regarding Workers’ Compensation form.

SUBSTITUTION OF SECURITY:

The Contract Documents call for monthly progress payments based upon the percentage of the work completed. The City will retain five percent (5%) of each progress payment as provided by the Contract Documents. At the request and expense of the successful Bidder, the City will substitute securities for the amount so retained in accordance with Public Contract Code Section 22300.

PREVAILING WAGES:

Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates, including the per diem wages applicable to the work, and for holiday and overtime work, including employer payments for health and welfare, pension, vacation, and similar purposes, in the County of Riverside in which the work is to be done, have been determined by the Director of the Department of Industrial Relations, State of California. These wages are set forth in the General Prevailing Wage Rates for this project, available from the California Department of Industrial Relations’ Internet web site at www.dir.ca.gov. Future effective prevailing wage rates which have been predetermined, and are on file with the California Department of Industrial Relations, are referenced but not printed in the general prevailing wage rates. Pursuant to SB 854, which amended the Prevailing Wage Laws, this Contract is subject to compliance monitoring and enforcement by the DIR. Beginning March 1, 2015, with very limited exceptions, no contractor or subcontractor may be listed on a bid proposal for this Contract unless registered with the DIR pursuant to Labor Code section 1725.5. Beginning April 1, 2015, no contractor or subcontractor may be awarded this Contract unless registered with the DIR pursuant to Labor Code section 1725.5. The DIR registration number for each contractor and subcontractor must be identified on the bid proposal - failure to identify this number could result in the bid being rejected as non-responsive. It is each bidder’s responsibility to ensure that they have fully complied with SB 854. The City will report all necessary contracts to the DIR as required by the Prevailing Wage Laws.

DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS:

In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Section 1777.1 or Section 1777.7 of the Labor Code. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.

PERFORMANCE AND PAYMENT BOND REQUIREMENTS:

Within the time specified in the Contract Documents, the Bidder to whom a Contract is awarded shall deliver to the City four identical counterparts of the Performance Bond and Payment (Labor and Materials) Bond in the form supplied by the City and included in the Contract Documents. Failure to do so may, in the sole discretion of City, result in the forfeiture of the Bid Guarantee. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. The Performance Bond and the Payment (Labor and Materials) Bond shall be for one hundred percent (100%) of the Total Bid Price.

http://www.dir.ca.gov/

REQUEST FOR SUBSTITUTIONS

The successful bidder shall comply with the substitution request provisions set forth in the Special Conditions, including any deadlines for substitution requests which may occur prior to the bid opening date.

SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES

Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the work will be located, unless otherwise expressly provided by the Contract Documents.

EXECUTION OF CONTRACT

As required herein the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. The City may require appropriate evidence that the persons executing the Contract are duly empowered to do so.

END OF INSTRUCTIONS TO BIDDERS

BID FORM

NAME OF BIDDER:

The undersigned, hereby declare that we have carefully examined the location of the proposed Work, and have read and examined the Contract Documents, including all plans, specifications, and all addenda, if any, for the following Project:

We hereby propose to furnish all labor, materials, equipment, tools, transportation, and services, and to discharge all duties and obligations necessary and required to perform and complete the Project for the following BASE BID TOTAL BID PRICE:

BASE

BID

BASE BID PRICE

(IN WRITTEN FORM)

BASE BID PRICE

(IN NUMBERS)

TOTAL

BID PRICE

ADDITIVE A

(Two Northern

Signals)

ADDITIVE B

(Two Caltrans

Signals)

ADDITIVE C

(CMU Upgrades)

TOTAL

BID PRICE

BASE BID

BID SCHEDULE

ITEM

NO.

DESCRIPTION OF ITEMS

EST.

QUANTITY/

UNIT

UNIT PRICE

(FIGURES)

TOTAL COST

(FIGURES)

1 Mobilization 1 LS

2 Traffic Control 1 LS

Traffic Signal Improvements at Highland Springs & 1st St

1 LS

Springs & 2nd St

Springs & 6th St /Ramsey St

Traffic Signal Improvements at 2nd St & Paseo Beaumont

Springs & 8th St / Wilson St

Springs & Patriot Way

Springs & Starlight Ave

Enterprise MyCity Traffic Management System (TMS) Licensing

9 EA

One (1) spare NoTraffic Video Detection Camera and One (1) spare NoTraffic Nexus Unit.

PROJECT BASE BID SUBTOTAL:

ADDITIVE ALTERNATE BID A

Additive Bid A is for two additional signals at the northern end of the corridor. Some or all of the items may be awarded. Items awarded will only be used if needed.

ITEM

NO.

DESCRIPTION OF ITEMS

EST.

QUANTITY/

UNIT

UNIT

PRICE

(FIGURES)

TOTAL COST

(FIGURES)

Traffic Signal Improvements at Highland Springs & Sundance Dr

1 LS

Traffic Signal Improvements at Highland Springs & Oak Valley Pkwy

PROJECT ADDITIVE BID A SUBTOTAL:

ADDITIVE ALTERNATE BID B

Additive Bid B is for the two Caltrans signals. Some or all of the items may be awarded.

Items awarded will only be used if needed.

ITEM

NO.

DESCRIPTION OF ITEMS

EST.

QUANTITY/

UNIT

UNIT

PRICE

(FIGURES)

TOTAL COST

(FIGURES)

Traffic Signal Improvements at Highland Springs & I-10 EB Ramps

1 LS

Traffic Signal Improvements at Highland Springs & I-10 WB Ramps

PROJECT ADDITIVE BID B SUBTOTAL:

ADDITIVE ALTERNATE BID C

Additive Bid C is for additional CMU upgrades. Some or all of the items may be awarded. Items awarded will only be used if needed.

ITEM

NO.

DESCRIPTION OF ITEMS

EST.

QUANTITY/

UNIT

UNIT

PRICE

(FIGURES)

TOTAL COST

(FIGURES)

Remove and Salvage Existing CMU.

Furnish and Install New CMU.

9 EA

PROJECT ADDITIVE BID C SUBTOTAL:

In case of discrepancy between the unit price and the item cost set forth for a unit basis item, the unit price shall prevail and, shall be utilized as the basis for determining the lowest responsive, responsible bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the “Item Cost” column, then the amount set forth in the “Item

Cost” column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the unit price.

In case of discrepancy between the written price and the numerical price, the written price shall prevail.

BID CERTIFICATION

Bidder certifies that it is licensed in accordance with the law providing for the registration of Contractors, License No.

Expiration Date

Class of license

If the bidder is a joint venture, each member of the joint venture must include the above information.

The undersigned acknowledges receipt, understanding and full consideration of the following addenda to the Contract Documents:

1. Addenda No. __________ thru _____________

2. Attached is the required bid security in the amount of not less than 10% of the Total

Bid Price.

3. Attached is the fully executed Non-Collusion Affidavit form.

4. Attached is the completed Designation of Subcontractors form.

5. Attached is the completed Bidder Information Form.

6. Attached is the completed Contractor’s Certificate Regarding Workers’

Compensation form.

Bidder acknowledges and understands that, pursuant to Public Contract Code Section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code Section 2717(b) in order to supply mined material for this Contract.

I hereby certify under penalty of perjury under the laws of the State of California, that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.

Name of Bidder

Signature

Name and Title

Dated

IRAN CONTRACTING ACT CERTIFICATION

As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:

The Contractor is not:

identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature:______________________________

Printed Name:___________________________

Title:__________________________________

Firm Name:_____________________________

Date:__________________________________

Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years.

FLEET COMPLIANCE CERTIFICATION

Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:

The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.

The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).

The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).

The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.

Firm Name:_____________________________

Signature:______________________________

Printed Name:___________________________

Title:__________________________________

Date:__________________________________

CONTRACTOR’S CERTIFICATE REGARDING

WORKERS’ COMPENSATION

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.

Name of Bidder

Signature

BID BOND

The makers of this bond are, as Principal, and

, as Surety and are held and firmly bound unto the City of Beaumont, hereinafter called the City, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to CITY for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated __________________, 2026, for

If the Principal does not withdraw its bid within the time specified in the Contract Documents; and if the Principal is awarded the Contract and provides all documents to the City as required by the Contract Documents; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.

Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall in affect its obligation under this bond, and Surety does hereby waive notice of any such changes.

In the event a lawsuit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and expenses.

IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this _______ day of ________________, 202, the name and corporate seal of each corporation.

(Corporate Seal)

Principal

By

Title

(Corporate Seal) Surety

By

Attorney-in-Fact

(Attach Attorney-in-Fact Certificate) Title

STATE OF CALIFORNIA )

) ss.

CITY OF ___________ )

On this ________ day of ___________________, in the year 2026, before me, ___________________________, a Notary Public in and for said state, personally appeared _________________________________, known to me to be the person whose name is subscribed to the within instrument as the Attorney-In-Fact of the (Surety) acknowledged to me that he subscribed the name of the ___________________________ (Surety) thereto and his own name as Attorney-In- Fact.

Notary Public in and for said State

(SEAL)

Commission expires: _______________

NOTE: A copy of the Power-of-Attorney to local representatives of the bonding company must be attached hereto.

DESIGNATION OF SUBCONTRACTORS

In compliance with the Subletting and Subcontracting Fair Practices Act of the Public Contract Code of the State of California, each bidder shall set forth below: (a) the name and the location of the place of business and (b) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Contractor in excess of one-half of 1 percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater.

Portion of the Work Subcontractor Location of Business % of Work

Portion of the Work Subcontractor Location of Business % of Work

INFORMATION REQUIRED OF BIDDERS

A. INFORMATION ABOUT BIDDER

[**Indicate not applicable (“N/A”) where appropriate.**]

NOTE: Where Bidder is a joint venture, pages shall be duplicated and information provided for all parties to the joint venture.

1.0 Name of Bidder: ___________________________________________

2.0 Type, if Entity: ___________________________________________

3.0 Bidder Address: ___________________________________________

Facsimile Number Telephone Number

4.0 License Information:

License No. Class of License Expiration Date

DIR Registration No.

5.0 How many years has Bidder’s organization been in business as a Contractor?

5.1 How many years has Bidder’s organization been in business under its present name? ________________________

6.0 Under what other or former names has Bidder’s organization operated?

7.0 If Bidder’s organization is a corporation, answer the following:

7.1 Date of Incorporation: ________________________________

7.2 State of Incorporation: ________________________________

7.3 President’s Name: ________________________________

7.4 Vice-President’s Name(s): ________________________________

7.5 Secretary’s Name: ________________________________

7.6 Treasurer’s Name: ________________________________

8.0 If an individual or a partnership, answer the following:

8.1 Date of Organization:

8.2 Name and address of all partners (state whether general or limited partnership):

9.0 If other than a corporation or partnership, describe organization and name principals: ___________________________________________________________

10.0 List other states in which Bidder’s organization is legally qualified to do business.

11.0 What type of work does the Bidder normally perform with its own forces?

12.0 Has Bidder ever failed to complete any work awarded to it? If so, note when, where, and why:

13.0 Within the last five years, has any officer or partner of Bidder’s organization ever been an officer or partner of another organization when it failed to complete a contract?

If so, attach a separate sheet of explanation:

14.0 List Trade References:

15.0 List Bank References (Bank and Branch Address):

16.0 Name of Bonding Company and Name and Address of Agent:

B. LIST OF CURRENT PROJECTS (Backlog)

[**Duplicate Page if needed for listing additional current projects.**]

Project Description of

Bidder’s Work

Completion

Date

Cost of

Bidder’s Work

Contact Name &

Phone

C. LIST OF COMPLETED PROJECTS - LAST THREE YEARS

[**Duplicate Page if needed for listing additional completed projects.**]

Please include only those projects which are similar enough to demonstrate Bidder’s ability to perform the required Work.

Project Client Description of

Bidder’s Work

Period of

Performance

Cost of Bidder’s

Work

Contact Name

& Phone

D. EXPERIENCE AND TECHNICAL QUALIFICATIONS QUESTIONNAIRE

Personnel:

The Bidder shall identify the key personnel to be assigned to this project in a management, construction supervision or engineering capacity.

1. List each person’s job title, name and percent of time to be allocated to this project:

2. Summarize each person’s specialized education:

3. List each person’s years of construction experience relevant to the project:

4. Summarize such experience:

Bidder agrees that personnel named in this Bid will remain on this Project until completion of all relevant Work, unless substituted by personnel of equivalent experience and qualifications approved in advance by the City.

Additional Bidder’s Statements:

If the Bidder feels that there is additional information which has not been included in the questionnaire above, and which would contribute to the qualification review, it may add that information in a statement here or on an attached sheet, appropriately marked:

E. VERIFICATION AND EXECUTION

These Bid Forms shall be executed only by a duly authorized official of the Bidder:

I declare under penalty of perjury under the laws of the State of California that the foregoing information is true and correct:

NON-COLLUSION AFFIDAVIT

NON-COLLUSION AFFIDAVIT

I,___________________________, being first duly sworn, deposes and says that he is of ______________________ the party making the attached bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Name of Bidder

Signature

PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, ___________________________ (hereinafter referred to as “City”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ________________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and

WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:

(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or

(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

(3) Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable.

The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the CITY, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.

[Remainder of Page Left Intentionally Blank.]

IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 2026

CONTRACTOR/PRINCIPAL

Name

By_______________________________________

SURETY:

By: ______________________________________ Attorney-In-Fact

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.

(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM

Any claims under this bond may be addressed to:

(Name and Address of Surety) ___________________________________________

(Name and Address of Agent or ___________________________________________ Representative for service of process in California, if different ___________________________________________ from above)

(Telephone number of Surety and ___________________________________________ Agent or Representative for service of process in California

STATE OF CALIFORNIA )

) ss.

CITY OF ___________ )

On this ________ day of ___________________, in the year 2026, before me, ___________________________, a Notary Public in and for said state, personally appeared _________________________________, known to me to be the person whose name is subscribed to the within instrument as the Attorney-In-Fact of the (Surety) acknowledged to me that he subscribed the name of the ___________________________ (Surety) thereto and his own name as Attorney-In- Fact.

Notary Public in and for said State

(SEAL)

Commission expires: _______________

NOTE: A copy of the Power-of-Attorney to local representatives of the bonding company must be attached hereto.

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS That

WHEREAS, the City of Beaumont (hereinafter designated as the “City”), by action taken or a resolution passed ___________ , 2026 has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:

______ (the “Project”); and

WHEREAS, said Principal is required to furnish a bond in connection with said contract;

providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .