TMP Reference Drawings.pdf

PDF 13 MB Posted

Attached to
Tenkiller, Keystone, and Eufaula Turbine Maintenance Platforms
Solicitation number
W912BV20R0047
Issued by

View the file

Other files

File Type Posted
TMP Specs (Supply).pdf PDF
W912BV20R0047.pdf PDF
TMP Contract Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME 1

REFERENCE DRAWINGS

TENKILLER POWERHOUSE

VOLUME 2

KEYSTONE POWERHOUSE

VOLUME 3

EUFAULA POWERHOUSE

Draft Tube 24x36 1310-FB-1
Draft Tube 5846-FM-1
Draft Tube Liner 5846-FN-2
Draft Tube_Turbine Walk Way 5854-BB-1
SMorganSmith_Turbin_3829-U0-1
SMorganSmith_Turbin_5112-H-1
SMorganSmith_Turbin_5123-A-1
SMorganSmith_Turbin_5840-IK-1
SMorganSmith_Turbin_5840-IL-1
SMorganSmith_Turbin_5846-FN-2
TK_1310-DA-1
TK_3995-IM-1
TK_5123-A-1
TK_5846-FK-1

File details come from the government source that posted it. Updated .