Attachment G - Quality Assurance Surveillance Plan.doc
DOC document 78 KB Posted
- Attached to
- Mainframe Peripheral and Software Maintenance Recompete Federal contract opportunity
- Solicitation number
- TIRNO15R00017
About this file
Attachment G Quality Assurance Surveillance Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| TIRNO15R00017-A0002.rtf | RTF text file | |
| TIRNO15R00017-A0002.zip | ZIP file | |
| MP_and_SM_Solicitation_040115_-_fullandopen_-_SF1449 1 .rtf | RTF text file | |
| TIRNO15R00017-A0001.rtf | RTF text file | |
| Attachment E - Price Table and Inventory.xls | XLS spreadsheet | |
| Attachment I - IRS HSPD.doc | DOC document | |
| Attachment F - Past Perf Questionnaire.doc | DOC document | |
| Attachment C - PDM Equip List.doc | DOC document | |
| MP_and_SM_Solicitation_031915_-_fullandopen_-_SF1449 1 .rtf | RTF text file | |
| Attachment D - Repair Parts Storage .doc | DOC document | |
| Attachment H - Non-Disclosure Agreement.doc | DOC document | |
| Attachment B - ECC SOP v2.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IV.7
Attachment G - Quality Assurance Surveillance Plan
For Mainframe Peripheral and Software Maintenance (MP&SM) Contract Number: TIRNO< upon award, enter contract number> Contract Description: < enter contract description >
Contractor’s name: < upon award, enter contractor name > (hereafter referred to as the contractor).
1. PURPOSE.
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Updates shall ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
The following FAR clauses may apply depending on contract type:
52.246-4 Inspection of Services – Fixed-Price,
2. Government Roles and Responsibilities.
The following personnel shall oversee and coordinate surveillance activities.
A. Contracting Officer (CO) - The CO will ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and will safeguard the interests of the United States in the contractual relationship. The CO will also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Laura E. Edmondson Organization or Agency: IRS/AWSS/Enterprise Support Systems Branch/Tier 1 Telephone: (240) 613-8110 Email: Laura.E.Edmondson@irs.gov B. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR will keep a quality assurance file. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation to the CO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the CO for action.
Assigned COR: Saundra Bostick-Stewart Organization or Agency: IRS/AWSS/Enterprise Support Systems Branch/Tier 1
Telephone: (240) 613-8100 Email: Saundra.J.Bostick-Stewart@irs.gov C. Government Task Manager (GTM) - The GTM, located in Enterprise Computing Center (ECC)-Memphis, TN (MEM), ECC-Martinsburg, WV (MTB) and New Carrollton Federal Building (NCFB), is a position assigned by the Project Manager. The GTM assists and acts as a representative for the COR for the duration of the contract, including during equipment delivery and hardware/software maintenance or repair. The GTM’s duties and responsibilities include, but are not limited to, technical administration of the contract and proper Government surveillance of the contractor’s performance, including visual inspection, whenever the COR is not available. The COR shall keep a quality assurance file based on findings and communications submitted by the GTM. At the conclusion of the contract or when requested by the CO, the COR shall provide documentation provided by the GTM to the CO. The GTM is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes requested by the GTM they deem may affect contract price, terms, or conditions to the CO for action.
Title: <enter title> Telephone: <enter number> Email: <enter address>
3. Contractor Representatives:
The following employees of the contractor serve as the contractor’s Project Manager, On-Site Task Manager and Contract Administration for this contract.
a. Project Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
b. On-Site Task Manager - <upon award of Task Order, enter name> Telephone: <enter number>
Email: <enter address>
c. Contract Administration – Laura E. Edmondson Telephone: (240) 613-8110 Email: Laura.E.Edmondson@irs.gov
d. Other Contractor Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
4. Performance Standards.
Performance standards define desired quality for services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
The Performance Requirements Summary Matrix, section I.24 in the Performance Work Statement includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
5.
INCENTIVES
This is will be a ID/IQ - Firm Fixed Price contract. There will be no incentives.
6.
Methods of QUALITY ASSURANCE Surveillance.
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
Regardless of the surveillance method, the COR shall always contact the contractor's project manager and/or on-site representative when a defect is identified and inform the government’s project manager and/or business unit manager of the specifics of the problem. The COR, with assistance from the government’s GTM, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard/AQL.
A. DIRECT OBSERVATION
There may be the possibility of such direct observation of the services provided at some point in the future.
B. MANAGEMENT INFORMATION SYSTEMS (MIS) (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.)
Requirement
Service Technical Performance
Standard Monitoring Method(s)
| 2 |
| Schedule and Perform EC/FC Microcode Changes Within 30 Days of Notification |
(Section I.4.5)
| Zero Outstanding EC/FC Due to Fault of Contractor |
| The Government will review the Quarterly EC/FC Status Report for compliance. |
| 3 |
| Maintain PMSL and Schedule and perform PM Services on all Equipment |
(Section I.5.1)
| 100% of PM Services per Month Unless Deferred by IRS |
| The Government will review the Monthly Status Report for compliance. |
| 7 |
| Repair Equipment to OEM Level Operating Specifications (Section I.6.3) |
| 100% of all RM Service Calls per Month Within Six Hours After IRS Notification |
| The Government will review the Monthly Status Report for completion. |
| 8 |
| Maintain OEM Operating Specifications for All Relocated Equipment |
(Section I.13)
| 100% for all relocated equipment |
| The Government will review the Monthly Status Report for compliance. |
| 9 |
| Maintain All Software in Accordance with OSM Standards (Section I.19) |
| All Software Products 100% Operational and Current in Accordance with OSM Standards |
| The Government will review the Monthly Status Report for compliance. |
| 10 |
| Timely Provision of All OSM-Sponsored Changes Correcting Software Errors |
(Section I.19.1)
| All Changes Provided to the IRS NLT Seven (7) Calendar Days from Date of Release |
| The Government will review email notifications and the Monthly Status Report for completion. |
| 11 |
| Timely Provision of Other Than OSM-Sponsored Changes (Section I.19.1) |
| All Changes Provided to IRS NLT Thirty (30) Calendar Days Subsequent to IRS Approval |
| The Government will review email notifications and the Monthly Status Report for completion. |
| 12 |
| Timely Provision of All Authorization Codes or Keys |
(Section I.19.1.5)
| Delivered to IRS NLT Twenty-One (21) Calendar Days Prior to Current Code Expiration Dates |
| The Government will review email notifications and the Monthly Status Report for completion. |
| 13 |
| Disaster Recovery Testing Support (Section I.19.5) |
| Support for Up to Four Annual Scheduled IRS DR Exercises per Site |
| The Government will review email notifications; the Monthly Status Report and Completion Report for completion. |
| 14 |
| Disaster Recovery Support |
(Section I.19.5
| Provision of Required Software Authorization Codes to Designated IRS Official Within 8 Hours of Notification of IRS Declared Disaster. Provision of up to Five Days of 7 X 24 Hour Daily On-Site Software Support Each Year, Per Site |
| The Government will review email notifications and the Disaster Recovery Testing Completion Report for completion. |
C. PERIODIC INSPECTION (Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
Requirement
Service Technical Performance
Standard Monitoring Method(s)
| 15 |
| Performance Testing |
(Section I.18.6)
| Support for One Annual Scheduled IRS Performance Testing |
| The Government will review email notifications and the Performance Testing Completion Report for completion. |
D. VALIDATED USER/CUSTOMER COMPLAINTS (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)
Requirement
Service Technical Performance
Standard Monitoring Method(s)
| 1 |
| Maintain Help Desk |
(Section I.4.3)
| Maintain Help Desk 24 X 7 With Toll Free Number and live support |
| The Government will review the Information Technology Asset Management System (TROUBLE TICKET SYSTEM) Ticket Report to validate mean time to repair times for each ticket. |
| 4 |
| Provide PDM on all Applicable Equipment |
(Section I.6)
| 100% for All Equipment With This Capability |
| The Government will review the Information Technology Asset Management System (TROUBLE TICKET SYSTEM) Ticket Report to validate mean time to repair times for each ticket. |
| 5 |
| Respond To and Repair Malfunction as Identified by Call Home/Remote Support |
(Section I.6.3)
| 100% of all system generated calls |
| The Government will review the Information Technology Asset Management System (TROUBLE TICKET SYSTEM) Ticket Report to validate mean time to repair times for each ticket. |
| 6 |
| Respond to RM Service Calls |
(Section I.6.2)
| 100% of all RM Service calls per month within two hours |
| The Government will review the Information Technology Asset Management System (TROUBLE TICKET SYSTEM) Ticket Report to validate mean time to repair times for each ticket. |
E. 100% INSPECTION (Evaluates all outputs. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)
F. Progress or Status Meetings G. Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)
Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the CO’s actions.
8.
Ratings Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
| Exceptional: |
| Performance significantly exceeds contract requirements to the Government’s benefit. |
| Satisfactory: |
| Performance meets contractual requirements. |
| Unacceptable: |
| Performance does not meet contractual requirements. |
9.
DOCUMENTING PERFORMANCE
A. ACCEPTABLE Performance.
The Government shall document positive performance. A report template is attached. Any report may become a part of the supporting documentation that will become part of the COR permanent contract file.
B. UNACCEPTABLE performance.
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the CO. The CO will notify the contractor's project manager, contract administration personnel or on-site representative of the unacceptable performance. A CDR template is attached to this QASP.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for contract payment deductions or other actions deemed necessary by the CO.
10.
Frequency of Measurement
A. Frequency of Measurement.
During contract/order performance, the COR shall take periodic measurements, as outlined in the PWS as specified in the AQL column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
Prepared by: Saundra Bostick-Stewart
Signature – Contracting Officer’s Representative
Performance Report
1. CONTRACT NUMBER: <insert number>
2. Prepared by: (Name of COTR) <insert name>
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.> Prepared by: <Enter COTR’s name>
Signature – Contracting Officer’s Technical Representative
Date Contract Discrepancy Report (CDR)
1. Contract Number: <insert number>
2. TO: (Contractor Task Manager or on-site representative) <insert name>
3. FROM: (Name of COTR) <insert name>
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments.>
5. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than < # days after receipt of this
CDR. >
Prepared by: <Enter COTR’s name>
Signature – Contracting Officer’s Technical Representative
Date
Received by:
Signature - Contractor Project Manager or On-site Representative Date
< The COTR may initiate a CDR at any time, including whenever the number of monthly recorded defects for a performance standard exceeds the allowable number of defects; anytime unacceptable performance is determined critical in nature and requires formal corrective action; and whenever an unfavorable trend is detected in contractor performance.>
File details come from the government source that posted it. Updated .