Thomasville Lift Station Final Drawings 2022 07 18.1677514794005 (1).pdf
PDF 33 MB Posted
- Attached to
- Construct Sewage Lift Station
- Solicitation number
- 47PE0223Q0005
About this file
This document provides details for a federal contract opportunity to construct a sewage lift station. The General Services Administration Public Buildings Service Region 4 is seeking to identify potential contractors interested in repairing and renovating rooms 118, 122 and 120 at the MERS Building in Thomasville, Georgia. The selected contractor will be responsible for removing and replacing doors, repairing walls, floors, and installing carpeting. The purpose of these modifications is to bring the spaces up to Top Secret Open Storage accreditation standards. The result of this market research will help determine the procurement method for the project involving construction of a sewage lift station at the Federal Building located at 436 Pinetree Boulevard in Thomasville.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR
NTS
LOCATION MAP
CIVIL ENGINEER
PROPERTY AREA: 37.66 ACRES
LIMITS OF DISTURBANCE: 0.46 ACRES
ZONING:
PROJECT DESCRIPTION: CIVIL WORK RELATED TO
THE INSTALLATION OF A NEW LIFT STATION TO SERVICE TO
THE COMPLEX.
FEMA COMPLEX, THOMASVILLE, GA
ISSUE DATE: 07/18/2022
24-HOUR EMERGENCY CONTACT
TBD
100% DESIGN DEVELOPMENT PLANS
LEI PROJECT NO. 0379-0080
STREET ADDRESS: 402 S. PINETREE BLVD,
LAND LOT 41 & 42, 13TH DISTRICT,
CITY OF THOMASVILLE,
THOMAS COUNTY, GEORGIA
TAX PARCEL I.D. # 057 009
ARCHITECT
HOUSER WALKER ARCHITECTURE, LLC
1819 PEACHTREE ROAD NE #102
ATLANTA, GEORGIA 30309
OWNER/DEVELOPER
UNITED STATES OF AMERICA
402 S. PINETREE BLVD
THOMASVILLE, GEORGIA 31792
SITE
www.longeng.com
FAX 770.951.2496
TEL 770.951.24952550 HERITAGE CT.
SUITE 250
ATLANTA, GA 30339
COLORIZED PLANS DISCLAIMER: THIS SET OF
PLANS HAS BEEN FORMATTED TO BE PRINTED IN FULL
COLOR. GRAY-SCALE PHOTO COPIES MAY NOT APPEAR AS
INTENDED. CONTACT LONG ENGINEERING FOR ACCESS TO
AN OFFICIAL GRAY-SCALE VERSION OF THE PLANS.
SHEET LIST TABLE
LE
I #
-0
Fi le
L oc at io n:
p le i p ro je ct s\
-0
G
SA
T ho m as vi lle
L if t St at io n\
D ra w in gs \4
Ci vi l D ra w in gs
\0
9-
_C
N .d w g
Pl ot
D at e:
/1 8/
:2
PM
ch ri st ia n fa ns i
REVISIONS
DA
TE
RE
V
DE
SC
RI
PT
IO
N
RE
Q U
ES
TE
D
BY
SHEET
NUMBER SHEET TITLE
C000 COVER
CA001 ABBREVIATIONS AND LEGEND
CN001 GENERAL NOTES
CE001 EROSION CONTROL NOTES
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CD103 DEMOLITION PLAN
CD104 DEMOLITION PLAN
CU102 UTILITY PLAN
CU103 UTILITY PLAN
CU104 UTILITY PLAN
CU105 UTILITY PLAN
CP111 SANITARY SEWER PROFILES
CP112 SANITARY SEWER PROFILES
CE101 E&SC-I & II INITIAL & INTERMEDIATE PHASE
CE102 E&SC-I & II INITIAL & INTERMEDIATE PHASE
CE103 E&SC-I & II INITIAL & INTERMEDIATE PHASE
CE104 E&SC-I & II INITIAL & INTERMEDIATE PHASE
CE121 E&SC-III FINAL PHASE
CE122 E&SC-III FINAL PHASE
CE123 E&SC-III FINAL PHASE
CE124 E&SC-III FINAL PHASE
CE501 DETAILS-ES&PC
CE502 DETAILS-ES&PC
CU501 DETAILS-UTILITY
1 OF 2 TOPOGRAPHIC & UTILITY SURVEY
2 OF 2 TOPOGRAPHIC & UTILITY SURVEY
N
/0
6/
DD
D
ES
IG
N S
U
BM
IT
TA
L
/1 0/
DD
D
ES
IG
N
S U
BM
IT
TA
L
/1
8/
0%
D D
DE
SI
G N
S U
BM
IT
TA
L
07/18/2022
GENERAL CONTRACTOR SHALL COORDINATE WITH THE CITY OF THOMASVILLE AND GSA
TO PAY SANITARY SEWR TAPPING FEES AND TERMINATION POINT OF PROPOSED UTILITIES
SERVISING THE SITE.
TC
E
T
TV
TC
E
T
TV
E
T
TV
12''W
1''NW
E E
T T
TV
12''W
1''NW
E-T-TV E-T-TV
STMSTM
2''G 2''G
TC
UNK
(QL-X)
(DIP)
(PVC)
(QL-X)
(DIP)
(QL-X)
(QL-X)
X X X
TP TP
LOD
X X X
(QL-X)
(PVC)(QL-X)
(RCP)(QL-X)
8''F8''F(DIP)(QL-X)
AB
BR
EV
IA
TI
O
N S, S
YM
BO
LS
L
IN
ET
YP
ES
CA001
A/C AIR CONDITIONING
ABAN ABANDON
ACC ACCESSIBLE
ACP ASBESTOS CONCRETE PIPE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
ALNMT ALIGNMENT
ALT ALTERNATE
AMP AMPERE
AMT AMOUNT
APPROX APPROXIMATE
APT APARTMENT
ARCH ARCHITECT
ASPH ASPHALT
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AUTO AUTOMATIC
AVE AVENUE
AVG AVERAGE
B/B BACK TO BACK
BAF BAFFLE
BC BOTTOM OF CURB
BCV BUTTERFLY CHECK VALVE
BDRY BOUNDARY
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BMP BEST MANAGEMENT PRACTICE
BRG BEARING
BRK BRICK
BSL BUILDING SETBACK LINE
BSMT BASEMENT
BTWN BETWEEN
BV BALL VALVE
BW BOTH WAYS
C&G CURB AND GUTTER
C/C CENTER TO CENTER
CAB CABINET
CB CATCH BASIN
CD CONSTRUCTION DOCUMENTS
CERT CERTIFY
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
CH CHANNEL
CHKV CHECK VALVE
CHW CHILLED WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CURB INLET
CIP CAST-IN-PLACE
CIP CAST IRON PIPE
CIRC CIRCULAR
CJ CONTROL JOINT
CL CENTER LINE
C/L CHAIN LINK
CLASS CLASSIFICATION
CLL COLUMN LINE
CLR CLEAR
CM CONSTRUCTION MANAGEMENT
CMP CORRUGATED METAL PIPE
CND CONDUIT
CNDS CONDENSATE
CNR CORNER
CNTR CENTER
CO CERTIFICATE OF OCCUPANCY
CO CLEANOUT
CO COMPANY
COEFF COEFFICIENT
COL COLUMN
COMB COMBINATION, COMBINED
COMM COMMUNICATION
CONC CONCRETE
COND CONDITION
CONSTR CONSTRUCTION
CONTR CONTRACTOR
COORD COORDINATE
COV CUT OFF VALVE
CP CONTROL POINT
CRN CROWN
CS COMBINED SEWER
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CTPF CRIMP TOP PIPE FOUND
CTP CRIMP TOP PIPE
CTR CONTOUR
CTR COOLING TOWER RETURN
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CULV CULVERT
CY CUBIC YARD
CYL CYLINDER
D DEPTH
D/B DESIGN-BUILD
DA DRAINAGE AREA
DAT DATUM
DBC DIRECT BURIED CABLE
DBL DOUBLE
DDCA DOUBLE DETECTOR CHECK ASSEMBLY
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DENS DENSITY
DEPT DEPARTMENT
DESCR DESCRIPTION
DET DETAIL
DETN DETENTION
DEV DEVELOPMENT
DF DRINKING FOUNTAIN
DFLCT DEFLECTION
DI DROP INLET
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIP DUCTILE IRON PIPE
DIR DIRECTION
DISCH DISCHARGE
DIST DISTANCE
DIST DISTRICT
DIV DIVISION
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DS DOWNSPOUT
DSGN DESIGN
DWG DRAWING
E EAST
E ELECTRIC
EA EACH
ECC ECCENTRIC
ED EDGE OF DRIVE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATION
ENCL ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
EOS EDGE OF SLAB
EP EDGE OF PAVEMENT (PAVING)
EPA ENVIRONMENTAL PROTECTION AGENCY
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ESMT EASEMENT
EST ESTIMATE
ETC ET CETERA
EW EACH WAY
EX GR EXISTING GRADE
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
F FIRE LINE
F/F FACE TO FACE
FACIL FACILITY
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FED FEDERAL
FES FLARED END SECTION
FFE FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FHWA FEDERAL HIGHWAY ADMINSTRATION
FIG FIGURE
FG FINISHED GRADE
FL FLOWLINE
FLG FLANGE
FLR FLOOR
FOC FIBER OPTIC CABLE
FOC FACE OF CURB
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FLAGPOLE
FPS FEET PER SECOND
FREQ FREQUENCY
FRWY FREEWAY
FT FOOT, FEET
FTG FOOTING
FUT FUTURE
FW FIRE LINE
G NATURAL GAS
GA GAGE
GAB GRADED AGGREGATE BASE
GAL GALLON
GALV GALVANIZED
GB GRADE BREAK
GC GENERAL CONTRACTOR
GDR GUARD RAIL
GEN GENERAL
GLV GLOBE VALVE
GM GAS METER
GMP GUARANTEED MAXIMUM PRICE
GDOT GEORGIA DEPARTMENT OF TRANSPORTATION
GOVT GOVERNMENT
GP GUY POLE
GPD GALLONS PER DAY
GPM GALLONS PER MINUTE
GR GROUND
GRAN GRANITE
GRN C GRANITE CURB
GRT GRATE
GT GREASE TRAP
GTV GATE VALVE
GUT GUTTER
GV GAS VALVE
GWE GROUND WATER ELEVATION
HAZ MAT HAZARDOUS MATERIALS
H HORIZONTAL
HB HOSE BIBB
HC HANDICAP
HD HEAVY DUTY
HDPE HIGH DENSITY POLYETHYLENE
HDR C HEADER CURB
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HNDRL HANDRAIL
HORIZ HORIZONTAL
HOSP HOSPITAL
HPT HIGH POINT
HP HORSEPOWER
HQ HEADQUARTERS
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HW HEADWALL
HWY HIGHWAY
I INTERSTATE (HIGHWAY)
IBC INTERNATIONAL BUILDING CODE
ICV IRRIGATION CONTROL VALVE
ID IDENTIFICATION
ID "INSIDE DIAMETER/INSIDE DIMENSION"
IN INCH
INC INCORPORATED
INFO INFORMATION
INSTR INSTRUMENT
INV INVERT ELEVATION
IP IRON PIPE
IPF IRON PIN FOUND
IPS IRON PIN SET
IRR IRRIGATION, UNKNOWN SIZE/TYPE
IW IRRIGATION WATER
J-BOX JUNCTION BOX
JT JOINT
LA LANDSCAPE ARCHITECT
LAB LABORATORY
LAT LATITUDE
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LLL LAND LOT LINE
LNDSCP LANDSCAPE
LNG LONGITUDE
LOC LOCATION
LOD LIMITS OF DISTURBANCE
LP LIGHT POLE
LPT LOW POINT
LS LUMP SUM
LT LIGHT
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMO MEMORANDUM
MEP MECHANICAL ELECTRICAL PLUMPING ENGINEER
MFR REC MANUFACTURER'S RECOMMENDATION
MGD MILLION GALLONS PER DAY
MGT MANAGEMENT
MH MANHOLE
MID MIDDLE
MIN MINIMUM
MIN MINUTE
MISC MISCELLANEOUS
MOB MEDICAL OFFICE BUILDING
MOD MODIFY
MON MONUMENT
MPH MILES PER HOUR
MSL MEAN SEA LEVEL
MTL METAL
MULT MULTIPLE
MUNIC MUNICIPAL
MW MONITORING WELL
N NORTH
NA NOT APPLICABLE
NE NORTHEAST
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NT WT NET WEIGHT
NTE NOT TO EXCEED
NTP NOTICE TO PROCEED
NTS NOT TO SCALE
NW NORTHWEST
O OXYGEN
OC ON CENTER
OCS OUTLET CONTROL STRUCTURE
OD OUTSIDE DIAMETER
OFC OFFICE
OFD OVERFLOW DRAIN
OH OVERHANG
OPNG OPENING
OPT OPTIONAL
ORIG ORIGINAL
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OTPF OPEN TOP PIPE FOUND
OTP OPEN TOP PIPE
OZ OUNCE
P POLE
PAR PARALLEL
PB PULL BOX
PC POINT OF CURVATURE
PC PORTLAND CEMENT
PCCP PORTLAND CEMENT CONCRETE PAVEMENT
PCF POUNDS PER CUBIC FOOT
PE POLYETHYLENE
PEN PENETRATE
PERF PERFORATED
PERIM PERIMETER
PERM PERMANENT
PERP PERPENDICULAR
PH PHASE
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PKWY PARKWAY
PKNS PK NAIL SET
PL PROPERTY LINE
PL PLACE
PLBG PLUMBING
POB POINT OF BEGINNING
POS POSITIVE
POTW POTABLE WATER
PPM PARTS PER MILLLION
PREFAB PREFABRICATE
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PRKG PARKING
PROJ PROJECT
PROP PROPOSED
PRP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PV PHOTOVOLTAIC
PVC POLYVINYL CHLORIDE (PLASTIC)
Q RATE OF FLOW
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QUAD QUADRANT
QUAL QUALITY
R RADIUS
RBC REBAR CAP
RBF REBAR FOUND
RBS REBAR SET
RCB REINFORCED CONCRETE BOX
RCP REINFORCED CONCRETE PIPE
RD ROAD
RD ROOF DRAIN
RDC REDUCER
REBAR REINFORCING STEEL BARS
RECT RECTANGLE
REF REFERENCE
REG REGULATION
REINF REINFORCE
REQD REQUIRED
REV REVISION
RFI REQUEST FOR INFORMATION
RLG RAILING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
RR RAILROAD
RWL RAIN WATER LEADER
S SOUTH
S/W SIDEWALK
SALV SALVAGE
SAN SANITARY
SB STREAM BANK
SC STREAM CENTER
SD SCHEMATIC DESIGN
SD STORM DRAIN
SDR STANDARD DIMENSION RATIO
SE STREAM EDGE
SE SOUTHEAST
SECT SECTION
SED SEDIMENT
SEP TNK SEPTIC TANK
SF SQUARE FOOT (FEET)
SHLDR SHOULDER
SHT SHEET
SLV SLEEVE
SMH STEAM MANHOLE
SMP SUMP PUMP
SPEC SPECIFICATION
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER
ST STREET
ST PR STATIC PRESSURE
STA STATION
STD STANDARD
STL STEEL
STM STEAM
STOR STORAGE
STRUC STRUCTURAL
SURV SURVEY
SVC SERVICE
SW SOUTHWEST
SWM STORM WATER MANAGEMENT
SYS SYSTEM
T TELEPHONE
TAN TANGENT
TBM TEMPORARY BENCHMARK
TC TOP OF CURB
TCP TRAFFIC CONTROL PLAN
TCP TERRA COTTA PIPE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEL TELEPHONE
TEMP TEMPORARY
THRUOUT THROUGHOUT
THRU THROUGH
TOD TOP OF DOME
TOF TOP OF FOOTING
TOG TOP OF GRATE
TOPO TOPOGRAPHY
TP TELEPHONE POLE
TR TREE
TW TOP OF WALL
TYP TYPICAL
UD UNDER DRAIN
UG UNDERGROUND
UNK UNKNOWN
UNO UNLESS NOTED OTHERWISE
UP UTILITY POLE
UTIL UTILITY
V VERTICAL
V VOLT
VAR VARIES
VB VALVE BOX
VC VERTICAL CURVE
VCP VITRIFIED CLAY PIPE
VEL VELOCITY
VERT VERTICAL
VIF VERIFY IN FIELD
VOL VOLUME
W WATT
W WATER
W WEST
W WIDE
W/ WITH
W/O WITHOUT
WM WATER METER
WT WEIGHT
WV WATER VALVE
WWR WELDED WIRE REINFORCEMENT
X SECT CROSS SECTION
XFMR TRANSFORMER
YH YARD HYDRANT
YI YARD INLET
YR YEAR
* NOTE: FEATURES SHOWN ON THE EXISTING CONDITIONS SHEET WILL APPEAR NON-SCREENED
GENERAL ABBREVIATIONS
HAND HOLE
TRANSFORMER
LIGHT POLE
SPLICE BOX
CABINET
SUBCRIBER LOOP CARRIER (aka "SLICK")
WELL
STAND PIPE
BACKFLOW PREVENTER
POST INDICATOR VALVE
AIR RELEASE VALVE
GAS VENT
ELECTRIC MANHOLE
ELECTRIC METER
ELECTRIC BOX
CABLE TV MANHOLE
WATER VALVE
WATER METER
WATER MANHOLE
WATER VAULT
UTILITY POLE/GUY POLE
TELECOMMUNICATIONS MANHOLE
TELECOMMUNICATIONS PEDESTAL
CABLE TV PEDESTAL
WATER VALVE MARKER
GUY ANCHOR
FIRE HYDRANT ASSEMBLY (INCLUDES ASSOCIATED VALVE)
EXISTING
SANITARY SEWER CLEANOUT
GREASE TRAP
AIR RELEASE VALVE
SANITARY SEWER MANHOLE
GAS PRESSURE REGULATOR
GAS MANHOLE
GAS VALVE
GAS METER
SANITARY SEWER FORCE MAIN VALVE
QUALITY LEVEL (QL) DELINEATION
STORM DRAINAGE STRUCTURE ID
TEST HOLE (QL-A ONLY)
CONFLICT LOCATION
(UTILITY IMPACT ANALYSIS (UIA) ONLY)
TRAFFIC CONTROL PEDESTRIAN SIGNAL/ BUTTON POST
TRAFFIC CONTROL MANHOLE/ ELECTRIC COMMUNICATIONS BOX
END OF UTILITY
TRAFFIC CONTROL HAND HOLE/ PULL BOX
TRAFFIC CONTROL CABINET
1004.9 x
14"O
1004.90 x
14"O
TREE WITH COMMON NAME ABBREVIATION, APPROX.
CALIPER, AND DRIP LINE (BASED ON TREE CALIPER)
SPOT ELEVATION
POWER POLE W/LIGHT
TRAFFIC SIGNAL POLE
MAST ARM w/TRAFFIC SIGNAL
STREET LIGHT
POWER POLE
FIRE DEPARTMENT CONNECTION
STORM DRAIN DOUBLEWING CATCHBASIN
STORM DRAIN SINGLEWING CATCHBASIN
STORM DRAIN INLET
STEAM MANHOLE
CURB AND GUTTER
UTILITY SYMBOLS
PROPOSED
SOIL BORING
MISCELLANEOUS SYMBOLS
DESCRIPTION
STORM DRAIN CURB INLET AND GRATE
SANITARY SEWER STRUCTURE ID
ELECTRIC VAULT
FENCE
CONTOUR LINE W/ELEVATION - MAJOR
SILT FENCE
TREE PROTECTION FENCE
MISCELLANEOUS LINETYPES
LIMITS OF DISTURBANCE
NRCS SOIL BOUNDARIES
EXISTING PROPOSEDDESCRIPTION
BALD BALD CYPRESS
B BIRCH
BG BLACKGUM
CH CHERRY
CM CREPE MYRTLE
COT COTTONWOOD
CRY CRYPTOMERIA
DOG DOGWOOD
ELM ELM
HACK HACKBERRY
HAW HAWTHORN
HW HARDWOOD
HICK HICKORY
LEY LEYLAND CYPRESS
M MAPLE
MAG MAGNOLIA
O OAK
P PINE
RB RIVER BIRCH
RDBD RED BUD
SG SWEETGUM
SOUR SOURWOOD
SYC SYCAMORE
TP TULIP POPLAR
WIL WILLOW
WO WATER OAK
TREE ABBREVIATIONS
ELECTRIC (QL-X)
TELECOMMUNICATIONS
CABLE TV
STEAM FOR LABELED PIPE SIZES (QL-X)
GAS FOR LABELED PIPE SIZES (QL-X)
TRAFFIC CONTROL (QL-X)
PROPOSEDEXISTING
TRAFFIC CONTROL
UTILITY LINETYPES
OVERHEAD:
UNDERGROUND:
SUBSURFACE UTILITY LOCATION QUALITY LEVELS AND DEFINITIONS
ELECTRIC - OVERHEAD
TELECOMMUNICATIONS
CABLE TELEVISION
NOTE : MULTIPLE OVERHEAD UTILITIES WILL BE SHOWN WITH THE APPROPRIATE ABBREVIATIONS:
SANITARY SEWER WITH FLOW DIRECTION FOR
LABELED PIPE SIZES AND MATERIAL (QL-X)
DESCRIPTION
ASPHALT PAVING
STANDARD DUTY
CONCRETE PAVING
STANDARD DUTY
ASPHALT PAVING
HEAVY DUTY
CONCRETE PAVING
HEAVY DUTY
CONCRETE
SIDEWALK
UNDISTURBED
EARTH
COMPACTED
EARTH
ASPHALT PAVING
EXISTING
CONCRETE PAVING
EXISTING
QL-D DEPICTED ACCORDING TO UTILITY RECORD INFORMATION AND IN-FIELD VISUAL INSPECTION. NO ELECTRONIC DESIGNATING INFORMATION WAS
OBTAINED.
QL-C EXISTING UTILITY STRUCTURES HAVE BEEN FIELD LOCATED AND SURVEYED TO ASSIST IN DEPICTING THE UTILITIES SHOWN ON RECORDS. NO
ELECTRONIC DESIGNATING INFORMATION WAS OBTAINED.
QL-B INFORMATION WAS OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODS TO DETERMINE THE EXISTENCE AND APPROPRIATE HORIZONTAL POSITION OF THE SUBSURFACE UTILITIES. QL-B DATA SHOULD BE REPRODUCIBLE BY SURFACE GEOPHYSICS AT ANY POINT OF THEIR DEPICTION. THIS INFORMATION IS SURVEYED TO APPLICABLE TOLERANCES DEFINED BY THE PROJECT AND REDUCED ONTO PLAN DOCUMENTS.
QL-A OBTAIN PRECISE HORIZONTAL AND VERTICAL POSITION OF THE UTILITY LINE BY EXCAVATING A TEST HOLE. THE TEST HOLE SHALL BE DONE USING VACUUM EXCAVATION OR COMPARABLE NONDESTRUCTIVE EQUIPMENT IN A MANNER AS TO CAUSE NO DAMAGE TO THE UTILITY LINE. AFTER EXCAVATING A TEST HOLE, A FIELD SURVEY SHALL BE PERFORMED TO DETERMINE THE EXACT LOCATION AND POSITION OF THE UTILITY LINE.
WATER FOR LABELED PIPE
SIZES AND MATERIAL (QL-X)
NON-POTABLE WATER FOR LABELED PIPE
SIZES AND MATERIAL (QL-X)
SANITARY SEWER FORCE MAIN WITH FLOW
DIRECTION AND MATERIAL (QL-X)
UNKNOWN UTILITY FOUND
IN SUE INVESTIGATION (QL-X)
GRAVEL
BUILDING
STORM DRAIN MANHOLE
STORM DRAIN WITH FLOW DIRECTION FOR
LABELED PIPE SIZES AND MATERIAL
COMBINED SEWER FOR LABELED
PIPE SIZES AND MATERIAL (QL-X)
TRAFFIC SIGN
TYPE OF UTILITY
PROPOSEDDESCRIPTIONEXISTING
BUILDING SETBACK LINE
PROPERTY LINE
CENTERLINE
PROPOSEDEXISTING
CONTOUR LINE W/ELEVATION - MINOR
COLUMN LINE CALLOUT
VEGETATION
S
E
W
ADA ACCESSIBLE
ROUTE
STORM DRAIN CLEANOUT
FIRE LINE FOR LABELED PIPE
SIZES AND MATERIAL (QL-X)
FLOW LINE OF SWALE
S
TC
S
SD
GPR
G
G
G
GT
W
W
PIV
W
W
TV
SLC
BFP
ARV
ARV
X
T
T
W
E
E
E
H
E
S
S
E
W
S
TC
SD
GPR
G
G
G
GT
W
W
PIV
W
W
TV
SLC
BFP
ARV
ARV
X
T
T
W
E
E
E
H
E
UTILITY STUB
A.7
C123
EX1
EX12
A.7
TH_
BENCHMARK
FDC
FHFH
FDC
(BSL)
TC
DESCRIPTION
DEMOLITION HATCHES
BUILDING TO BE REMOVED
INCLUDING FOUNDATIONS,
STEPS, UTILITIES, AND ALL
RELATED FEATURES
PAVEMENTS, CURBS, AND SIDEWALKS
LAND LOT LINE
LINEAR IMPROVEMENTS TO BE
REMOVED - UTILITIES, UTILITY
STRUCTURES,RETAINING WALLS,
FENCES, ETC.
TREE TO BE REMOVED INCLUDING
ROOT SYSTEMS GREATER THAT 1"
DIAMETER TO A DEPTH OF 12" BELOW
GROUND SURFACE
RETAINING WALL
6" P X
/ / / / / / / /UNK
B-11B-11
SSSS
PERVIOUS PAVER
BLOCKS
PAVEMENT/
GROUND HATCHES
PARKING SPACE COUNT
COMPACT PARKING SPACE
PARKING SPACE W/ INFRASTRUCTURE FOR FUTURE ELECTRIC VEHICLE CHARGING
WALKWAY HANDRAIL
ACCESSIBLE PARKING SPACE
STORM AREA/ LANDSCAPE DRAIN
STORM HEADWALL
C
EV
(RCP)18"SD
TREE LINE
(RCP)18"SD
960960
LO
N
G
-0
TH
O
M A
SV
IL
LE
LL
S.
P
IN
ET
RE
E
BL
VD
TH
OM
AS
VI
LL
E
FE
MA
C
OM
PL
EX
L
IF
T
ST
AT
IO
N
TH
O
M A
S
CO
U N
TY
G
EO
RG
IA
REVISIONS
DA
TE
DE
SC
RI
PT
IO
N
H
ER
IT
AG
E
CO
U
RT
ST
E
AT
LA
N
TA
G A
TE
L
0.
1.
95, FA
X
0.
1.
w w w
.l on ge ng
.c om
RE
V
RE
Q U
ES
TE
D
BY
SHEET
04-05-2022
CF
CF
GSWCC LEVEL II CERT. # 01209, EXPIRES 02-01-24
DATE
DESIGN QC:
DESIGNED BY:
CADD QC:
DRAWN BY:
IS
SU
ED
F
O R
CO
N
ST
RU
CT
IO
N N
O T
TA
TA
/0
6/
DD
D
ES
IG
N S
U
BM
IT
TA
L
/1 0/
DD
D
ES
IG
N
S U
BM
IT
TA
L
/1
8/
FI
N
AL
D
D
DE
SI
G
N S
U
BM
IT
TA
L
07/18/2022
N O
TE
S
R
EF
ER
EN
CE
S
CN001
GENERAL NOTES
SURVEY:
TOPOGRAPHIC AND UTILITY SURVEY PORTION OF PARCEL #057 007. PREPARED BY LONG
ENGINEERING INC, DATED 2/11/22
DEMOLITION NOTES
1. PRIOR TO CLEARING, THE CONTRACTOR SHALL OBTAIN WRITTEN VERIFICATION FROM ALL UTILITY COMPANIES THAT ALL UTILITIES HAVE BEEN REMOVED. IF UTILITIES HAVE NOT BEEN REMOVED BUT HAVE BEEN ABANDONED, THE VERIFICATION LETTER SHALL STATE THAT THEIR FACILITIES LEFT ON-SITE HAVE BEEN ISOLATED FROM THEIR SOURCE AND MAY BE REMOVED BY THE CONTRACTOR. IF UTILITIES ARE TO REMAIN AND HAVE BEEN LEFT ACTIVE, THE CONTRACTOR SHALL CAREFULLY PROTECT THEM AND IS RESPONSIBLE FOR
RESTORING THEM TO THEIR PREVIOUS CONDITION OR BETTER IF DAMAGED.
2. DISCONNECT AND SEAL OFF ABANDONED UTILITIES AND UTILITIES TO BE REMOVED PRIOR TO START OF DEMOLITION. UTILITIES SHALL BE DISCONNECTED BELOW EXISTING GRADE OR OUTSIDE OF CONTRACT LIMITS BY THE APPLICABLE PUBLIC UTILITY. ALL COSTS FOR
THIS WORK SHALL BE BORNE BY THE CONTRACTOR.
3. ALL MATERIALS GENERATED BY DEMOLITION, INCLUDING BUT NOT LIMITED TO: VEGETATION, PAVEMENTS, SLABS, RETAINING WALLS, FENCES, ORGANICS AND UNSUITABLE BEARING SOILS SHALL BE STRIPPED FROM THE SURFACE WITHIN THE CONSTRUCTION LIMITS AND DISPOSED OF LEGALLY OFFSITE. ALL WASTE FROM DEMOLITION OPERATIONS SHALL BE HAULED OFFSITE TO DISPOSAL AREA APPROVED
BY THE STATE OF GEORGIA FOR THE HANDLING OF DEMOLITION MATERIAL AND DEBRIS.
4. CONTRACTOR SHALL HAVE THE LIMITS OF CLEARING AND ALL BUFFERS STAKED WITH FLAGGING STRUNG AT CLEARING LIMITS TO
ENSURE THE PROPER LOCATION OF TREE SAVE FENCE AND PROPOSED IMPROVEMENTS.
5. ALL VEGETATION, ROOT SYSTEMS, TOPSOIL, REFUSE AND OTHER DELETERIOUS, NON-SOIL MATERIAL SHALL BE STRIPPED FROM THE PROPOSED CONSTRUCTION AREAS, REMOVED AND DISPOSED OF ACCORDING TO THE PROJECT SPECIFICATIONS. CLEAN TOPSOIL MAY BE
STOCKPILED AND REUSED LATER IN LANDSCAPED AREAS.
6. ALL STRUCTURES TO BE DEMOLISHED SHALL BE COMPLETELY REMOVED ABOVE AND BELOW GRADE. ABANDONED SERVICE LINES TO THE
STRUCTURES SHALL ALSO BE REMOVED.
7. ALL NECESSARY PERMITS AND INSPECTIONS FOR DEMOLITION SHALL BE OBTAINED BY THE CONTRACTOR PRIOR TO BEGINNING WORK.
8. CONTRACTOR SHALL PROTECT ALL ADJACENT LANDS FROM DAMAGE DURING DEMOLITION WORK. ANY OFF-SITE AREAS DISTURBED
SHALL BE RETURNED TO A CONDITION EQUAL TO OR BETTER THAN THE EXISTING CONDITION.
9. THE CONTRACTOR SHALL COORDINATE ALL CONSTRUCTION SCHEDULES AND ACTIVITIES WITH THE APPROPRIATE UTILITY COMPANY
AND THE OWNER/PROPERTY MANAGER OF ALL OPERATIONAL BUILDINGS ONSITE TO MINIMIZE DISRUPTIONS TO OVERALL PROPERTY
FUNCTIONS.
10. THE CONTRACTOR SHALL MAINTAIN EXISTING UTILITY SERVICE TO ALL IMPACTED PROPERTIES/BUILDINGS UNTIL THE RELOCATED
UTILITIES ARE INSPECTED AND APPROVED.
11. ALL STRUCTURES NOT LABELED FOR DEMOLITION SHALL BE PROTECTED FROM DAMAGE DURING ALL PHASES OF CONSTRUCTION. ANY STRUCTURES THAT ARE TO REMAIN THAT ARE DAMAGED SHALL BE REPAIRED BY THE CONTRACTOR TO A CONDITION EQUAL TO OR
BETTER THAN THE EXISTING CONDITION AT NO ADDITIONAL COST.
12. AT A MINIMUM, INITIAL EROSION & SEDIMENT CONTROL BMP'S SHALL BE INSTALLED AND DRAINAGE INLET PROTECTION SHALL BE IN
PLACE PRIOR TO DEMOLITION OPERATIONS.
13. CONTRACTOR SHALL INSTALL NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER TRAFFIC CONTROL METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE PUBLIC. TRAFFIC CONTROL DEVICES AND MEASURES SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION DURATION AND CONFORM TO LOCAL AND STATE DEPARTMENT OF TRANSPORTATION STANDARDS & SPECIFICATIONS. INTERRUPTION TO TRAFFIC FLOW IS TO BE MINIMIZED DURING PEAK TRAFFIC HOURS.
14. CONTRACTOR IS RESPONSIBLE FOR ALL DEMOLITION NECESSARY TO CONSTRUCT THE IMPROVEMENTS CONTEMPLATED IN THE
CONTRACT DOCUMENTS WHETHER OR NOT SHOWN ON THIS PLAN.
15. CONTRACTOR IS TO PROVIDE TEMPORARY SHORING, BRACING, AND/OR SUPPORT SYSTEMS AS REQUIRED TO PROVIDE STABILITY AND
PREVENT COLLAPSE OR FAILURE OF EXISTING IMPROVEMENTS TO REMAIN.
16. CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING ALL EXISTING UTILITIES ON SITE, DETERMINING THEIR LOCATION AND ELEVATION AND
PROTECTING THOSE TO REMAIN.
17. CONTRACTOR TO PROVIDE SUFFICIENT TEMPORARY FENCING TO PREVENT THE PUBLIC FROM ENTERING THE AREA IN WHICH DEMOLITION IS PLANNED OR IN PROGRESS. ALL GATES SHALL BE SECURED AND LOCKED DURING NON-WAKING HOURS.
18. STORM AND/OR SANITARY SEWER PIPES TO BE ABANDONED ARE TO BE REMOVED, GROUT FILLED OR CRUSHED IN PLACE. GROUT FILLING
IS ONLY ALLOWED WHEN SPECIFICALLY INDICATED ON THE DEMOLITION PLAN.
19. REMOVAL OF UTILITIES WITHIN THE PUBLIC RIGHT OF WAY OR THAT MAY IMPACT ADJACENT PROPERTIES ARE TO BE COORDINATED
WITH THE APPLICABLE UTILITY COMPANY.
20. TREES SHOWN TO BE REMOVED INCLUDE ONLY THOSE SHOWN ON THE EXISTING CONDITIONS PLAN. OTHER TREES MAY EXIST THAT
REQUIRE REMOVAL TO ENABLE THE IMPROVEMENTS TO BE CONSTRUCTED.
1. PROJECT THOMASVILLE FEMA COMPLEX LIFT STATION
ADDRESS: 402S. PINETREE BLVD, THOMASVILLE, THOMASVILLE COUNTY, 31792
OWNER: FEMA COMPLEX
402 S. PINETREE BLVD
THOMASVILLE, GA 31792
ENGINEER: LONG ENGINEERING, INC.
2550 HERITAGE COURT, SUITE 250
ATLANTA, GEORGIA 30339
770-951-2495
2. ZONING: N/A
3. BUILDING SETBACKS: N/A FT. FRONT YARD (STREET NAME)
N/A FT. SIDE YARD (STREET NAME)
N/A FT. SIDE YARD
N/A FT. REAR YARD
4. THE PROPERTY IS LOCATED WITHIN LAND LOT 42, 13 TH DISTRICT, CITY OF
THOMASVILLE , THOMASVILLE COUNTY, GEORGIA.
5. THE PROPOSED PROJECT TOTAL SITE AREA IS 37.66 ACRES. THE APPROXIMATE
DISTURBED AREA IS 0.33 ACRES.
6. UPON DISCOVERING ANY DISCREPANCIES BETWEEN THE ARCHITECTURAL AND THE
ENGINEERING PLANS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE
ARCHITECT AND ENGINEER.
7. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS SHOWN HEREON
WITH THE ARCHITECTURAL DRAWINGS AND EXISTING BUILDINGS PRIOR TO ANY
CONSTRUCTION AND SHALL PROMPTLY NOTIFY THE ARCHITECT AND ENGINEER OF
ANY DISCREPANCIES.
8. PROPOSED ELEVATIONS ALONG CURB LINES ARE TO THE BOTTOM OF CURB UNLESS
OTHERWISE NOTED BY A TC (TOP OF CURB).
9. ALL CONSTRUCTION MUST CONFORM TO THE LOCAL JURISDICTIONAL STANDARDS,
SPECIFICATIONS AND DETAILS. THE CONTRACTOR SHALL OBTAIN THESE
DOCUMENTS, BECOME FAMILIAR WITH THEM AND HAVE THEM ON THE JOB SITE AT
ALL TIMES.
10. PROPOSED BUILDING DIMENSIONS, IF PROVIDED, ARE PROVIDED FOR GENERAL
INFORMATION ONLY BASED ON PLANS REFERENCED (SEE THIS SHEET).
CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS SHOWN ON THE
PLANS FOR ALL STRUCTURES AS WELL AS ALL UTILITY LOCATIONS WITH CURRENT
ARCHITECTURAL, STRUCTURAL, AND PLUMBING PLANS AND ENSURING THERE ARE
NO CONFLICTS.
11. CONTRACTOR'S VEHICLES SHALL ONLY USE THE LOCAL ROADWAYS IN ACCORDANCE
WITH JURISDICTIONAL REQUIREMENTS.
12. NOTIFY LOCAL JURISDICTIONAL INSPECTOR 24 HOURS PRIOR TO BEGINNING OF
CONSTRUCTION.
13. ALL CONSTRUCTION VEHICLES SHALL PARK IN AREAS DESIGNATED BY THE OWNER.
14. OFF-STREET PARKING SHALL BE PROVIDED AND MAINTAINED THROUGHOUT
CONSTRUCTION.
15. NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER TRAFFIC
CONTROL DEVICES AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF
THE PUBLIC SHALL BE PROVIDED IN ACCORDANCE WITH THE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES, CURRENT EDITION AND MAINTAINED WHEN WORKING
IN CLOSE PROXIMITY TO PUBLIC ROADS. INTERRUPTION TO TRAFFIC FLOW IS TO BE
MINIMIZED DURING PEAK TRAFFIC HOURS.
16. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN ENTERING
MANHOLES, PIPES OR OTHER STRUCTURES SHOWN ON THE PLANS. AT A MINIMUM,
THESE PIPES AND STRUCTURES SHALL BE PROPERLY VENTILATED AND ENTRY
SHALL CONFORM TO OSHA REQUIREMENTS.
17. CONTRACTOR SHALL CLEARLY MARK AND MAINTAIN PROPERTY CORNER
MONUMENTATION AND BENCHMARKS WHENEVER POSSIBLE AND WILL BE
RESPONSIBLE FOR THE COST OF REPLACING THEM IF DISTURBED OR DESTROYED.
18. THE CONTRACTOR SHALL LEAVE THE SITE IN A CLEAN AND NEAT CONDITION. ALL
DEBRIS, VEGETATION WHICH HAS BEEN REMOVED, LUMBER, CONCRETE, ETC.,
SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF.
19. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION, ELEVATION
AND PRESENCE OF UTILITIES SHOWN ON THE PLANS IS NOT TO BE RELIED ON TO BE
ACCURATE, OR COMPLETE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
CONTACTING ALL UTILITY COMPANIES HAVING UTILITIES WITHIN OR ADJACENT TO
THE WORK AREA. THE CONTRACTOR SHALL HAVE THE UTILITIES FIELD LOCATED
AND COORDINATED WITH UTILITY COMPANIES 72 HOURS PRIOR TO CONSTRUCTION
TO HAVE THEM RELOCATED AND/OR ADAPTED FOR THE TIE-INS. IN ADDITION,
CONTRACTOR IS REQUIRED TO CONTACT THE UTILITIES PROTECTION CENTER OF
GEORGIA AT 1-800-282-7411 OR (770-623-4344 IN METRO ATLANTA) PRIOR TO ANY
EXCAVATION.
CONSTRUCTION NOTES
PROJECT NAME: THOMASVILLE FEMA COMPLEX LIFT STATION
LOCATION: 402 S. PINETREE BLVD
CITY/COUNTY/STATE: CITY OF THOMASVILLE, THOMASVILLE COUNTY, GEORGIA
SITE AREA: 37.66 AC
DESCRIPTION: THIS PROJECT CONSISTS OF THE DESIGN OF A NEW LIFT STATION FOR WASTE WATER
APPLICATION INSTALLATION OF A GAS LINE TO SERVICE THE FEMA CAMPUS.
SERVICES: LIFT STATION DESIGN
REFERENCES
A.D.A. NOTES
1. ALL HANDICAP ACCESSIBLE ROUTES SHALL NOT EXCEED A MAXIMUM LONGITUDINAL-SLOPE OF 5% AND A MAXIMUM CROSS-SLOPE OF 2%.
2. ALL HANDICAP PARKING SPACES AND ACCESS AISLES SHALL NOT EXCEED A SLOPE OF 2% IN ANY DIRECTION.
3. THE CONTRACTOR SHALL VERIFY ALL ELEVATIONS SHOWN ON THESE PLANS AND FIELD-STAKED ELEVATIONS WITHIN ALL A.D.A. AREAS PRIOR TO INSTALLATION OF APPLICABLE PAVING. SHOULD ANY AREAS WITHIN THE ACCESSIBLE ROUTE EXCEED MAXIMUM GRADE, THE
CONTRACTOR SHALL CONTACT THE CIVIL ENGINEER FOR FURTHER DIRECTION.
1. DIRT FOR FILL SHALL BE CLEAN, COHESIVE CLAY OR SANDY CLAY FREE OF DEBRIS, ORGANICS, DELETERIOUS MATERIAL AND ROCKS
GREATER THAN 3" DIA.
2. MAX CUT OR FILL SLOPES SHALL BE AS SHOWN ON THE PLANS BUT IN NO CASE SHALL EXCEED 2:1 (H:V) UNLESS APPROVED BY THE
PROJECT GEOTECHNICAL ENGINEER FOR TEMPORARY SLOPES.
3. EQUIPMENT AND MATERIALS SHALL BE STORED IN AREAS DESIGNATED BY THE OWNER. CONSTRUCTION AND STORAGE AREAS SHALL BE
KEPT NEAT AND CLEAN. TREE SAVE AREAS SHALL NOT BE USED FOR STORAGE OR PARKING.
4. ALL REINFORCED CONCRETE PIPE (RCP) SHALL BE CLASS III UNLESS OTHERWISE NOTED. CORRUGATED METAL PIPE SHALL BE 16 GA. MIN.
AND ASPHALT OR ALUMINUM COATED.
5. ALL CATCH BASINS SHALL BE FLUSH WITH THE NEW CURB.
6. ALL MANHOLE TOPS SHALL BE SET FLUSH WITH FINISHED GRADE IN LANDSCAPED AND PAVED AREAS.
7. CONTRACTOR TO VERIFY THE ELEVATIONS OF ALL TIE-IN POINTS FOR INSTALLATION OF UTILITIES, CURB & GUTTER, SIDEWALK AND
PAVING.
8. ALL BACKFILL MATERIAL SHALL BE COMPACTED TO NOT LESS THAN 95% OF THE OPTIMUM COMPACTION OR AS REQUIRED IN EARTHWORK
SPECIFICATION FOR ANY SOIL CLASSIFICATION AS DETERMINED BY THE STANDARD PROCTOR TEST AASHTO T-180 METHOD "A". BACKFILL MATERIAL SHALL BE CLEAN AND FREE OF ROOTS, ROCK OR DELETERIOUS MATTER. CONTRACTOR SHALL CORRECT ANY DAMAGE TO CURBING OR PAVING CAUSED BY TRENCH SETTLEMENT WHICH OCCURS WITHIN 12 MONTHS OF PROJECT ACCEPTANCE.
9. MANHOLES & DROP INLETS ARE DIMENSIONED TO THE CENTER OF THE RISER. CATCH BASINS ARE DIMENSIONED TO THE CENTER OF THE CATCH BASIN AT THE FACE OF CURB. LAYOUT DIMENSIONS ARE TO FACE OF CURB. FACE OF WALL, CENTERLINE OF PIPE, UNLESS
OTHERWISE NOTED.
10. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES BETWEEN PLAN AND FIELD CONDITIONS PROMPTLY UPON DISCOVERY. ANY CONFLICT OR DISCREPANCIES DISCOVERED WITHIN THE CONSTRUCTION PLANS SHALL BE REPORTED IMMEDIATELY TO THE OWNER'S REP AND ENGINEER OF RECORD FOR CLARIFICATION. FAILURE TO DO SO SHALL RESULT IN CONTRACTOR'S LIABILITY FOR
ISSUES ARISING FROM SUCH CONFLICTS OR DISCREPANCIES.
11. ALL EXISTING ELECTRICAL BOXES, WATER METER BOXES, AND VALVE BOXES, WHICH ARE TO REMAIN SHALL BE SET FLUSH WITH THE TOP
OF THE PROPOSED GRADE.
12. AREAS INTENDED TO SUPPORT PAVEMENT OR NEW FILL SHALL BE PROOFROLLED WITH A 20 TO 30 TON LOADED TRUCK OR OTHER PNEUMATIC-TIRED VEHICLE OF SIMILAR SIZE AND WEIGHT IN THE PRESENCE OF THE GEOTECHNICAL ENGINEER TO LOCATE WEAK, SOFT OR EXCESSIVELY WET MATERIALS. AREAS WHICH PUMP WHILE PROOFROLLED SHALL BE UNDERCUT AND BACK-FILLED IN ACCORDANCE
WITH THE PROJECT EARTHWORK SPECIFICATIONS.
13. CRUSHED STONE AGGREGATE IN ROADWAY/PARKING AREA PAVEMENT BASE SHALL CONFORM WITH CURRENT STATE OF GEORGIA, DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION. ALL ASPHALT MATERIAL AND PAVING OPERATIONS SHALL MEET APPLICABLE SPECIFICATIONS OF THE ASPHALT INSTITUTE AND GEORGIA DEPARTMENT OF
TRANSPORTATION.
14. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL REMOVE ALL SEDIMENT FROM THE DETENTION PONDS AND RESTORE THE PONDS TO THEIR PROPOSED FINISHED GRADE. ALL STORM DRAIN PIPES ARE ALSO TO BE COMPLETELY CLEANED OF ALL SILT AND
DEBRIS AT THE COMPLETION OF CONSTRUCTION.
15. SIGNING AND STRIPING TO BE PROVIDED BY THE CONTRACTOR ACCORDING TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT EDITION WITH ALL REVISIONS INCLUDED.
16. A-E IS RESPONSIBLE FOR PROVIDING AN AS-BUILT DRAWING OF THE DETENTION FACILITY(S) SIGNED AND SEALED BY A REGISTERED LAND SURVEYOR LICENSED IN THE STATE OF GEORGIA DETAILING THE VOLUME AND OUTLET CONTROL STRUCTURE CHARACTERISTICS AND FOR A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF GEORGIA FOR DETERMINATION OF THE COMPLIANCE OF THE FACILITY WITH THE APPROVED HYDROLOGY STUDY AND CONSTRUCTION DOCUMENTS. SHOULD THE AS- BUILT CONDITION BE IN NON-COMPLIANCE WITH THESE DOCUMENTS THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS REQUIRED FOR MODIFICATIONS AND RE-ANALYSIS BY THE
ENGINEER.
17. CONTRACTOR SHOULD COORDINATE WITH GAS PROVIDER ON STANDARDS AND REQUIREMENTS FOR GAS LINE CONSTRUCTION
LO
N
G
-0
TH
O
M A
SV
IL
LE
LL
S.
P
IN
ET
RE
E
BL
VD
TH
OM
AS
VI
LL
E
FE
MA
C
OM
PL
EX
L
IF
T
ST
AT
IO
N
TH
O
M A
S
CO
U N
TY
G
EO
RG
IA
REVISIONS
DA
TE
DE
SC
RI
PT
IO
N
H
ER
IT
AG
E
CO
U
RT
ST
E
AT
LA
N
TA
G A
TE
L
0.
1.
95, FA
X
0.
1.
w w w
.l on ge ng
.c om
RE
V
RE
Q U
ES
TE
D
BY
SHEET
04-05-2022
CF
CF
GSWCC LEVEL II CERT. # 01209, EXPIRES 02-01-24
DATE
DESIGN QC:
DESIGNED BY:
CADD QC:
DRAWN BY:
IS
SU
ED
F
O R
CO
N
ST
RU
CT
IO
N N
O T
TA
TA
/0
6/
DD
D
ES
IG
N S
U
BM
IT
TA
L
/1 0/
DD
D
ES
IG
N
S U
BM
IT
TA
L
/1
8/
FI
N
AL
D
D
DE
SI
G
N S
U
BM
IT
TA
L
SITE
ER
O
SI
O
N
S
ED
IM
EN
T
CO
N
TR
O L
N O
TE
S
(S
IT
E
AC
RE
CE001
SEDIMENT CONTROL-TREE PROTECTION
CLEARING & GRUBBING
MULCHING - TEMPORARY GRASSING
MAINT. OF EROSION CONTROL DEVICES
FINAL LANDSCAPING, CLEANING OF STORM DRAINS
DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12
MONTH
7-DAY VISIT CERTIFICATION
INITIAL PHASE E&SC INSTALLATION
ANTICIPATED START DATE: TBD ANTICIPATED COMPLETION DATE: TBD
APPROXIMATE ACTIVITY SCHEDULE
GRADING
24 HOUR CONTRACT
NAME: TBD
FIRM: TBD
PHONE: TBD
DISPOSITION OF SEDIMENT DEVICES
EROSION CONTROL NOTES (LAND DISTURBANCE <1.0 ACRES)
1. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE EPD 25' UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES
AND PERMITS.
2. ALONG ALL STATE WATERS AND OTHER SENSITIVE AREAS, TWO ROWS OF TYPE S SEDIMENT BARRIER SHALL BE USED OUTSIDE OF THE STATE WATERS UNDISTURBED BUFFER AND BE PLACED A MINIMUM OF 36 INCHES APART.
3. AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT ON BMP'S WITH A HYDRAULIC COMPONENT MUST BE PROVIDED BY THE DESIGN PROFESSIONAL PRIOR TO THEIR CONSTRUCTION.
4. CONTRACTOR TO MAINTAIN CONSTRUCTION EXITS TO PREVENT TRACKING OF MUD INTO THE PUBLIC RIGHT OF
WAY. ANY TRACKED MUD IS TO BE REMOVED FROM THE ROAD WAY IMMEDIATELY.
5. ALL GRADED SLOPES 3:1 OR GREATER MUST BE HYDROSEEDED AND COVERED WITH GDOT APPROVED WHEAT OR WOOD FIBER MATTING. IF NOT HYDROSEEDED, GDOT APPROVED MATTING THAT HAS BEEN IMPREGNATED WITH SEED AND FERTILIZER MUST BE USED. ALL SLOPES MUST BE PROPERLY PROTECTED UNTIL A PERMANENT
VEGETATIVE STAND IS ESTABLISHED.
6. ALL BMP'S TO REMAIN IN PLACE UNTIL PERMANENT VEGETATION IS WELL ESTABLISHED.
CLEARING PHASE NOTES
1. PRIOR TO LAND DISTURBING ACTIVITY, THE CONTRACTOR SHALL SCHEDULE A PRECONSTRUCTION MEETING WITH THE
AREA SITE DEVELOPMENT INSPECTOR.
2. THE CONTRACTOR SHALL OBSERVE THE PROJECT SEQUENCE SHOWN ON THE PLANS. THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND STRIPPED OF IT'S NATURAL COVER IS EXPOSED ONLY IN
SMALL QUANTITIES.
3. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE AT ALL TIMES.
4. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, LIMITS OF LAND DISTURBANCE SHALL BE CLEARLY AND
ACCURATELY DEMARCATED WITH STAKES, RIBBONS OR OTHER APPROPRIATE MEANS, AND SHALL BE DEMARCATED FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE THE LIMITS INDICATED
ON THE APPROVED PLANS.
5. PRIOR TO ANY OTHER CONSTRUCTION, A STABILIZED CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED AT EACH POINT
OF ENTRY TO OR EXIT FROM THE SITE OR ONTO ANY PUBLIC ROADWAY.
6. THE FOLLOWING INITIAL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED PRIOR TO ANY OTHER CONSTRUCTION
ACTIVITY:
a. THE CONSTRUCTION EXIT SHALL BE PLACED AS SHOWN ON THE PLANS.
b. IMMEDIATELY AFTER THE ESTABLISHMENT OF THE CONSTRUCTION EXIT, ALL PERIMETER EROSION CONTROL AND STORMWATER MANAGEMENT DEVICES SHALL BE INSTALLED AS SHOWN ON THE EROSION CONTROL PLAN.
c. TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO THE START OF ANY LAND DISTURBING ACTIVITY.
7. THE CONTRACTOR CAN PROCEED WITH CLEARING AND GRUBBING ACTIVITIES. AS CLEARING PERMITS, THE CONTRACTOR SHALL CONSTRUCT SEDIMENT PONDS AND OTHER SEDIMENT STORAGE BMP'S AS SHOWN ON PLANS.
8. THE CONTRACTOR CAN UTILIZE CLEARED TREES AS BARRIER BRUSH SEDIMENT CONTROL WHERE INITIAL GRADING
ACTIVITIES WILL NOT OCCUR.
9. NO BURN OR BURY PITS SHALL BE PERMITTED ON THE CONSTRUCTION SITE WITHOUT WRITTEN PERMISSION BY THE
OWNER.
10. ALL SILT FENCES MUST MEET THE REQUIREMENTS OF SECTION 171-TEMPORARY SILT FENCE FOR THE DEPARTMENT OF
TRANSPORTATION, STATE OF GEORGIA, STANDARD SPECIFICATIONS, LATEST EDITION.
11. SEDIMENT AND EROSION CONTROL MEASURES MUST BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE THIRD THE CAPACITY OF THE DEVICE.
ADDITIONAL DEVICES MUST BE INSTALLED IF NEW CHANNELS HAVE DEVELOPED.
12. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO THE PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1”- 3” OF STONE, AS CONDITIONS DEMAND. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM A VEHICLE ONTO PUBLIC ROADWAY OR INTO
STORM DRAINS MUST BE REMOVED IMMEDIATELY.
13. CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE PROPER
FUNCTIONING.
14. FAILURE TO INSTALL, OPERATE OR MAINTAIN ALL EROSION CONTROL MEASURES MAY RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE SITE UNTIL SUCH MEASURES ARE CORRECTED BACK TO THE APPROVED PLANS.
GRADING PHASE NOTES
1. DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE TO ENSURE THAT LAND STRIPPED OF ITS NATURAL GROUND COVER IS EXPOSED ONLY IN SMALL QUANTITIES, AND THEREFORE LIMITED
DURATIONS, BEFORE PERMANENT EROSION PROTECTION IS ESTABLISHED.
2. EARTHWORK OPERATIONS IN THE VICINITY OF STREAM BUFFERS SHALL BE CAREFULLY CONTROLLED TO AVOID DUMPING
OR SLOUGHING INTO THE BUFFER AREAS.
3. EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING CONSTRUCTION AND TO ALTER THE LOCATION OF EROSION CONTROL DEVICES ACCORDINGLY. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE DESIGN
PROFESSIONAL IMMEDIATELY.
4. STORM DRAIN OUTLET PROTECTION SHALL BE PLACED AT ALL OUTLET HEADWALLS AS SOON AS THE HEADWALL IS
CONSTRUCTED.
5. ALL DRAINAGE SWALES AND GRADED AREAS SHALL BE APPLIED WITH VEGETATIVE COVER AS SOON AS FINAL GRADE IS ACHIEVED. MULCH OR TEMPORARY GRASSING SHALL BE APPLIED TO ALL EXPOSED AREAS WITHIN 7 DAYS OF LAND DISTURBANCE. ALL DISTURBED AREAS LEFT MULCHED FOR MORE THAN 30 DAY SHALL BE STABILIZED WITH TEMPORARY
GRASSING.
6. THE CONTRACTOR SHALL MAINTAIN THE SEDIMENT POND UNTIL PERMANENT GROUNDCOVER IS ESTABLISHED. SEDIMENT SHALL BE CLEANED OUT OF THE POND WHEN IT REACHES ONE THIRD OF THE DEPTH OF THE BASIN.
7. SEDIMENT AND EROSION CONTROL MEASURES MUST BE CHECKED AFTER EACH RAIN EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT ACCUMULATION HAS REACHED ONE THIRD THE CAPACITY OF THE DEVICE.
ADDITIONAL DEVICES MUST BE INSTALLED IF NEW CHANNELS HAVE DEVELOPED.
8. CONTRACTOR SHALL INSPECT EROSION CONTROL MEASURES AT THE END OF EACH WORKING DAY TO ENSURE MEASURES
ARE FUNCTIONING PROPERLY.
9. THE CONSTRUCTION EXIT SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACK OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 1” - 3” OF STONE, AS CONDITIONS DEMAND.
ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM A VEHICLE ONTO PUBLIC ROADWAY OR INTO STORM
DRAIN MUST BE REMOVED IMMEDIATELY.
10. FAILURE TO INSTALL, OPERATE OR MAINTAIN ALL EROSION CONTROL MEASURES, MAY RESULT IN ALL CONSTRUCTION BEING STOPPED ON THE JOB UNTIL SUCH MEASURE ARE CORRECTED BACK TO THE APPROVED EROSION CONTROL PLANS.
FINAL PHASE NOTES
1. THE CONTRACTOR SHALL MAINTAIN THE SEDIMENT POND UNTIL PERMANENT GROUNDCOVER IS ESTABLISHED.
ALL SEDIMENT SHALL BE CLEANED OUT OF THE POND TO ACHIEVE FINAL DESIGN GRADES.
2. ALL ROADWAY AND PARKING SHOULDERS SHOULD BE GRASSED AS SOON AS FINAL GRADE IS ACHIEVED.
3. ALL DISTURBED AREAS ARE TO RECEIVE FINAL STABILIZATION WITH 100% OF THE SOIL SURFACE NOT COVERED
WITH STRUCTURES OR PAVEMENTS UNIFORMLY COVERED IN PERMANENT VEGETATION WITH A DENSITY OF 70%
OR GREATER OR LANDSCAPED IN ACCORDANCE WITH THE APPROVED LANDSCAPE PLAN.
4. UPON COMPLETION OF THE PROJECT AND RECEIPT OF THE CERTIFICATE OF COMPLETION, THE CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND DISPOSE OF THEM UNLESS NOTED
OTHERWISE ON PLANS.
5. ALL SEDIMENT IN STORM PIPES, PONDS, VAULTS, DRAINAGE STRUCTURES, ETC. IS TO BE COMPLETELY REMOVED
AND DISPOSED OF PROPERLY.
SITE SPECIFIC NOTES
1. SEE SHEETS CE501 THRU CE505 FOR EROSION CONTROL DETAILS.
2. THERE ARE NO WATERS OF THE STATE ON OR WITHIN 200 FEET OF PROJECT AREA.
3. SOIL SERIES FOR ENTIRE DISTURBED AREA = TfB, TfA, Gr, TuB, Se, CaC2, TsC2
4. TOTAL SITE AREA = 37.66 AC DISTURBED AREA = 0.33 AC
5. OWNER/DEVELOPER: GSA
6. CONTRACTOR: TBD
St of the sediment to drop out.
orarly stored allowing the bulk The surface water runoff is temp-or a dam across a waterway.
A basin created by excavation
DESCRIPTION
St
Sd2
Sd3
PRACTICECODE DETAIL
Co
DETAIL
Co
Ch
Cd
CODE PRACTICE
removing mud from tires exit to provide a place for located at the construction A crushed stone pad existing stream, or ditch.
stabilizing an open channel, Improving, constructing or thereby protecting public
A small temporary barrier
DESCRIPTION
area of concentrated flow.
a swale, drainage ditch or or dam constructed across
Sr
Dn2 structure.
Dn2
Gr down a slope. Temporary.
(label)
Gr
Ga
Dn1
(label)
Permanent structures installed to protect natural or artificial channels or waterways where otherwise the
A flexible conduit of heavy-duty fabric or other ma-conduct surface runoff terial designed to safely surface runoff down a slope.
designed to safely conduct material designed to conduit, pipe or similar A paved chute, sectional temporary or permanent streets.(label)
Di An earth channel or dike runoff. This may be a across a slope to divert located above, below or a noise or 'vision pollution' barrier.
some sediment. It is also at times reduce water velocity and remove bordering streams. It serves to from surrounding property and separating the land-disturbing siteBf
Ds1
Bf
DISTURBED AREA
STABILIZATION
(w/MULCHING
BUFFER
ZONE
Ds3
Ds2
SEEDING)
DISTURBED AREA
(w/PERMANENT
STABILIZATION
SEEDING)
DISTURBED AREA
STABILIZATION
(w/TEMPORARY
ONLY)
Ds3
Ds2
Ds1 drainageways.
type
Rt
Re
(indicate type)
(label)
(label)
Rd
Lv
Sd1
Rt
Re as a temporary sediment outlet structure to serve stormwater detention pond front of a permanent A device or structure placed in of straw or hay, gravel or a site. It may be sandbags, bales from leaving the construction sediment fence.
A barrier to prevent sediment across small streams or stone filter dam installed A permanent or temporary
A wall installed to stabilize cut will require special design.
obtainable. Each situation permissible slopes are not and fill slopes where maximum less erosive sheet flow. This should be constructed only on undisturbed soils.
An undisturbed natural "green belt"
(label) slope would be sufficient for the running water to form gullies.
centrated flow of waters into A structure to convert con-filter.
is being constructed.
Dc
A temporary channel con-while a permanent stucture around a construction site structed to convey flow transportation routes.
and other on-site vehicle
Cr A travelway constructed as division roads, parking areas including access roads, sub-part of a construction plan and inexpensive.
Fr are hand-placed into Rock filter baskets which position forming soil stabilizing structures.
Fr
Tc
Su similar structures.CHANNEL terraces, berms, dikes, orCONVEYANCEWt outlets for diversions, Paved or vegetative waterWATERWAY OR
STORMWATER
VEGETATED
Sr
(label)
Cr
Dc
Ds4
Ss
Du
Ss
Du
Ds4
Sb
Tac Tac
Sb
Cs Cs
STREAMBANK
STABILIZATION
(WITH PERMANENT
VEGETATION)
COASTAL
DUNE
STABILIZATION
DISTURBED AREA
STABILIZATION
(WITH SODDING)
DUST CONTROL
ON DISTURBED
AREAS
SLOPE
STABILIZATION
TACKIFIERS
AND
BINDERS
A paved or short section of riprap channel at the outlet of a storm drain system preventing erosion from the concentrated runoff.
An impounding area created by excavating around a storm drain inlet. The excavated area will be filled and stabilized on completion of construction activities.
Establishing permanent vegetative cover such as trees, shrubs, vines, sod, grasses or legumes on disturbed areas.
Establishing a temporary vegetative cover with fast growing seedings on disturbed areas.
Establishing temporary protection for disturbed areas where seedings may not have a suitable growing season to produce an erosion retarding cover.
Planting vegetation on dunes that are denuded, artificially constructed, or re-nourished.
Substance used to anchor straw or hay mulch by causing the organic material to bind together.
The use of readily available native plant materials to maintain and enhance streambanks, or to prevent, or restore and repair small streambank erosion problems.
A protective covering used to prevent erosion and establish temporary or permanent vegetation on steep slopes, shore lines, or channels.
Controlling surface and air movement of dust on construction site, roadways and similar sites.
A permanent vegetative cover using sods on highly erodible or critically eroded lands.
A floating or staked barrier in-stalled within the water (it may also be referred to as a floating boom, silt barrier, or silt curtain).
A rough soil surface with horizontal depressions on a contour or slopes left in a roughened condition after grading.
A temporary bridge or culvert-type structure protecting a stream or watercourse from damage by crossing construction equipment.
GABION
Su
A temporary stone barrier constructed at storm drain inlets and pond outlets.
temporary sediment basin is the lack temporary sediment trap from a principle feature distinguishing a sediment can settle out. The drains a disturbed area so that A small temporary pond that
Sd4 of a pipe or riser.
Dn1
CHANNEL
STABILIZATION
MAP
SYMBOL
MAP
SYMBOL
Sk
FLOATING
SURFACE
SKIMMER
A buoyant device that releases/ drains water from the surface of sediment ponds, traps, or basins at a controlled rate of flow.
Sk
(label)
Fl-Co Fl-Co
FLOCCULANTS
AND
COAGULANTS
Substance formulated to assist in the solids/liquid separation of suspended particles in solution.
Spb STEP
BERM
A linear control device constructed as a diversion perpendicular to the direction of the runoff to enhance dissipation and infiltration of run-off, while creating multiple sedi-mentation chambers with the em-ployment of intremediate dikes.(label)
Spb
SEDIMENT
TRAP,
TEMPORARY
SEDIMENT TRAP,
TEMPORARY
SEDIMENT
BASIN,
TEMPORARY
SEDIMENT
BARRIER
RETROFITTING
RETAINING
WALL
ROCK
FILTER
DAM
LEVEL
SPREADER
GRADE
STABILIZATION
STRUCTURE
FILTER
RING
PERMANENT
DOWNDRAIN
STRUCTURE
TEMPORARY
DOWNDRAIN
STRUCTURE
DIVERSION
STREAM
DIVERSION
CHANNEL
CONSTRUCTION
ROAD
STABILIZATION
CONSTRUCTION
EXIT
CHECKDAM
TURBIDITY
CURTAIN
SURFACE
ROUGHING
STORMDRAIN
INLET/OUTLET
PROTECTION
TEMPORARY
STREAM
CROSSING
Tp The practice of stripping off the more fertile soil, storing it, then spreading it over the disturbed area after completion of construction activities.
Tp
TOPSOILING
Tc
Tr To protect desirable trees from injury during construction activity.
TREE
PROTECTION
(show stripping & storage areas)
(denote tree centers)
GEORGIA UNIFORM CODING SYSTEM FOR SOIL EROSION
AND SEDIMENT CONTROL PRACTICES
STRUCTURAL PRACTICES
STRUCTURAL PRACTICESVEGETATIVE PRACTICES
SEDIMENT CONTROL-TREE PROTECTION
CLEARING & GRUBBING
7-DAY VISIT CERTIFICATION
INITIAL PHASE E&SC INSTALLATION
LO
N
G
-0
TH
O
M A
SV
IL
LE
LL
S.
P
IN
ET
RE
E
BL
VD
TH
OM
AS
VI
LL
E
FE
MA
C
OM
PL
EX
L
IF
T
ST
AT
IO
N
TH
O
M A
S
CO
U N
TY
G
EO
RG
IA
REVISIONS
DA
TE
DE
SC
RI
PT
IO
N
H
ER
IT
AG
E
CO
U
RT
ST
E
AT
LA
N
TA
G A
TE
L
0.
1.
95, FA
X
0.
1.
w w w
.l on ge ng
.c om
RE
V
RE
Q U
ES
TE
D
BY
SHEET
04-05-2022
CF
CF
GSWCC LEVEL II CERT. # 01209, EXPIRES 02-01-24
DATE
DESIGN QC:
DESIGNED BY:
CADD QC:
DRAWN BY:
IS
SU
ED
F
O R
CO
N
ST
RU
CT
IO
N N
O T
TA
TA
/0
6/
DD
D
ES
IG
N S
U
BM
IT
TA
L
/1 0/
DD
D
ES
IG
N
S U
BM
IT
TA
L
/1
8/
FI
N
AL
D
D
DE
SI
G
N S
U
BM
IT
TA
SD
G
G
G
G
G
G
G
FC
FC
W
G
W
T
W
W
W
E
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X
X X X X X X X X X
X
X X
X
X X X X X
FC FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
F
F
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
4.
5.
6.
2.
2.
6.
W
W
W
W
E
E
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
STORM PIPES TO BE
PROTECTED DURING
TRENCH EXCAVATION
LIMIT OF
DISTURBANCE
PORTION OF CHAIN LINK FENCE
WITHIN TRENCH EXCAVATION TO
BE REMOVED AND TO PUT TO ITS
ORIGINAL LOCATION ONCE THE
GROUND IS STABILIZED.
SOLE SITE ACCESS ROADWAY TO
REMAIN AVAILABLE TO TRAFFIC
DURING CONSTRUCTION
D
EM
O
LI
TI
O
N P
LA
N
CD101
N
SCALE: 1"=20'
20 40
10 30
UTILITY DISCLAIMER
THE CONTRACTOR IS RESPONSIBLE FOR THE VERIFICATION OF ALL
UTILITIES PRIOR TO BEGINNING CONSTRUCTION TO AVOID CONFLICTS
WITH PROPOSED CONSTRUCTION. UTILITIES SHOWN ON THESE PLANS
ARE BASED ON VARIOUS SOURCES AND MAY NOT BE RELIED UPON AS
BEING ACCURATE OR COMPLETE. THE CONTRACTOR IS RESPONSIBLE
FOR CALLING THE UTILITIES PROTECTION CENTER, INC. AT 811
(1-800-282-7411) AT LEAST 48 HOURS PRIOR TO EXCAVATING
ACTIVITIES TO HAVE ALL UTILITIES MARKED WITHIN AND ADJACENT
TO THE WORK AREA. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO RELOCATE ALL UTILITIES THAT ARE IN CONFLICT
WITH PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
THE PURPOSE OF THIS PLAN IS FOR DEMOLITION
ONLY. SEE SHEET CA001 FOR DEMOLITION LEGEND
& SEE SHEET CN001 FOR DEMOLITION NOTES.
LO
N
G
-0
TH
O
M A
SV
IL
LE
LL
S.
P
IN
ET
RE
E
BL
VD
TH
OM
AS
VI
LL
E
FE
MA
C
OM
PL
EX
L
IF
T
ST
AT
IO
N
TH
O
M A
S
CO
U N
TY
G
EO
RG
IA
REVISIONS
DA
TE
DE
SC
RI
PT
IO
N
H
ER
IT
AG
E
CO
U
RT
ST
E
AT
LA
N
TA
G A
TE
L
0.
1.
95, FA
X
0.
1.
w w w
.l on ge ng
.c om
RE
V
RE
Q U
ES
TE
D
BY
SHEET
04-05-2022
CF
CF
GSWCC LEVEL II CERT. # 01209, EXPIRES 02-01-24
DATE
DESIGN QC:
DESIGNED BY:
CADD QC:
DRAWN BY:
IS
SU
ED
F
O R
CO
N
ST
RU
CT
IO
N N
O T
TA
TA
/0
6/
DD
D
ES
IG
N S
U
BM
IT
TA
L
/1 0/
DD
D
ES
IG
N
S U
BM
IT
TA
L
/1
8/
FI
N
AL
D
D
DE
SI
G
N S
U
BM
IT
TA
W
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X
X X X X X X X X
X X X X X X X X X X
X X X X X X X X X X X X
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E
E E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
EX
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXX
XXXXXX
FC
FC
LOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD LOD
LOD
LOD
STORM PIPES TO BE
PROTECTED DURING
TRENCH EXCAVATION
PORTION OF CHAIN LINK FENCE
WITHIN TRENCH EXCAVATION TO
BE REMOVED AND TO PUT TO ITS
ORIGINAL LOCATION ONCE THE
GROUND IS STABILIZED.
SITE ACCESS ROADWAY TO
REMAIN AVAILABLE TO TRAFFIC
DURING CONSTRUCTION
D
EM
O
LI
TI
O
N P
LA
N
CD102
N
SCALE: 1"=20'
20 40
10 30
UTILITY DISCLAIMER
THE CONTRACTOR IS RESPONSIBLE FOR THE VERIFICATION OF ALL
UTILITIES PRIOR TO BEGINNING CONSTRUCTION TO AVOID CONFLICTS
WITH PROPOSED CONSTRUCTION. UTILITIES SHOWN ON THESE PLANS
ARE BASED ON VARIOUS SOURCES AND MAY NOT BE RELIED UPON AS
BEING ACCURATE OR COMPLETE. THE CONTRACTOR IS RESPONSIBLE
FOR CALLING THE UTILITIES PROTECTION CENTER, INC. AT 811
(1-800-282-7411) AT LEAST 48 HOURS PRIOR TO EXCAVATING
ACTIVITIES TO HAVE ALL UTILITIES MARKED WITHIN AND ADJACENT
TO THE WORK AREA. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO RELOCATE ALL UTILITIES THAT ARE IN CONFLICT
WITH PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
THE PURPOSE OF THIS PLAN IS FOR DEMOLITION
ONLY. SEE SHEET CA001 FOR DEMOLITION LEGEND
& SEE SHEET CN001 FOR DEMOLITION NOTES.
LO
N
G
-0
TH
O
M A
SV
IL
LE
LL
S.
P
IN
ET
RE
E
BL
VD
TH
OM
AS
VI
LL
E
FE
MA
C
OM
PL
EX
L
IF
T
ST
AT
IO
N
TH
O
M A
S
CO
U N
TY
G
EO
RG
IA
REVISIONS
DA
TE
DE
SC
RI
PT
IO
N
H
ER
IT
AG
E
CO
U
RT
ST
E
AT
LA
N
TA
G A
TE
L
0.
1.
95, FA
X
0.
1.
w w w
.l on ge ng
.c om
RE
V
RE
Q U
ES
TE
D
BY
SHEET
04-05-2022
CF
CF
GSWCC LEVEL II CERT. # 01209, EXPIRES 02-01-24
DATE
DESIGN QC:
DESIGNED BY:
CADD QC:
DRAWN BY:
IS
SU
ED
F
O R
CO
N
ST
RU
CT
IO
N N
O T
TA
TA
/0
6/
DD
D
ES
IG
N S
U
BM
IT
TA
L
/1 0/
DD
D
ES
IG
N
S U
BM
IT
TA
L
/1
8/
FI
N
AL
D
D
DE
SI
G
N S
U
BM
IT
TA
L
SS
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLOD
LO
D
LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
H
E
H
E
H
E E
S
E
E
E
E
E
H
E
E
E
W W
X X X X X X X X X X
X X X X X X X X X
X X X X X X X X
X X
X X
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X
X X
X
X
X X X X X X X X X X X X X X X X X
X X
X
X X X X X X X X X
X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X
X X X X X X X X X X
X X X
X X
X X
X X
X X
XX
X
X X
X
X X
X X
X X
E
E
E
E
E E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E E
E
E
E
E E
E
E
E
E
E
E
E
E E
E E
E E
E E E E E E
E
E E
E E
E
E E
E
E E
E E
E
E
E
E
E E
E
E
E E E E
E E
E E
E E
E E
E E
E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E E
E
E E
E
E
EE
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
FC
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E
E E E
E E E
E E E
E E E
E E E
E E E E E E E E E E E E E E E E E E E
E
E
E
E
E E
E E
E E
E E
E
FC
E
E
E
E
E
E
E
E
SS
SS
SS
SS
W
W
X X X
X X
X X
X
W W
W W
W
W
E E
E E
E E
E E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
FC
FC
FC
FC FC
FC
W
W
SS
SS
S…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .