TechSpec_20B0007_Solicitation.pdf

PDF 2 MB Posted

Attached to
Ice Harbor Headcover Oil Water Separator
Solicitation number
W912EF20B0007
Issued by

About this file

This is a solicitation for a construction project to install an oil water separator system at Ice Harbor Lock and Dam in Washington. The project includes designing, manufacturing, and installing three 100 gpm oil water separators along with associated piping and electrical work. Additional scope involves extending the existing drainage sump baffle system. The estimated contract value is between $1-5 million. Competition is set aside for small businesses. A pre-bid site visit will be offered approximately two weeks after posting. Bids are due by August 5, 2022. The contractor must implement extensive safety and quality control programs in accordance with EM 385-1-1 and develop activity hazard analyses and a fall protection plan. The contractor must use the government-furnished QCS software to record project information. Foreign nationals require four to five weeks of clearance to access the site.

View the file

Other files

File Type Posted
W912EF20B0007 Bid Worksheet Resulte 9232020.pdf PDF
Amended 20B0007-0001_specs.pdf PDF
Drawings_Amended 20B0007-0001.pdf PDF
W912EF20B0007-0001.pdf PDF
W912EF20B0007.pdf PDF
20B0007_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I ce Har bor Head Cover Oi l Wat er Separ at or W912EF20B0007

PROJECT TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

00 01 15. 00 28 LI ST OF DRAWI NGS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 00 00. 00 28 GENERAL REQUI REMENTS

01 11 01. 00 28 SUPPLEMENTARY REQUI REMENTS

01 14 00. 10 28 PROJECT SI TE RESTRI CTI ONS

01 14 00. 90 28 I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY

(OPSEC)

01 22 00. 00 28 MEASUREMENT AND PAYMENT

01 32 01. 00 28 PROJECT SCHEDULE

01 33 00 SUBMI TTAL PROCEDURES

01 35 10. 00 28 DIVING

01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 01. 00 28 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)

01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL

01 51 00. 00 28 TEMPORARY UTI LI TI ES

01 55 10. 00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS

01 57 20. 00 28 ENVI RONMENTAL PROTECTI ON

01 78 00. 00 28 CLOSEOUT SUBMI TTALS

01 78 23. 00 28 OPERATI ON AND MAI NTENANCE DATA

01 91 00. 00 28 SYSTEMS TESTI NG AND COMMI SSI ONI NG

DI VI SI ON 03 - CONCRETE

03 60 00. 01 28 MI SC CONCRETE AND CONCRETE DEMOLI TI ON

DI VI SI ON 05 - METALS

05 50 14. 00 28 METALWORK AND METAL FABRI CATI ON

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 48 00. 01 28 ANCHORS AND SEI SMI C RESTRAI NT FOR EQUI PMENT

DI VI SI ON 22 - PLUMBI NG

22 00 00. 00 28 PI PI NG, GENERAL PURPOSE

DI VI SI ON 26 - ELECTRI CAL

26 05 00. 00 28 GENERAL ELECTRI CAL WORK

26 05 19. 00 28 I NSULATED WI RE AND CABLE

26 20 00. 00 28 I NTERI OR DI STRI BUTI ON SYSTEM

26 51 00. 00 40 I NTERI OR LI GHTI NG

DI VI SI ON 46 - WATER AND WASTEWATER EQUI PMENT

46 25 14. 00 28 COALESCI NG OI L- WATER SEPARATORS

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

This page intentionally left blank

SECTI ON TABLE OF CONTENTS

DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 CONTRACT DRAWI NGS

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

1. 3 RESOURCE DRAWI NGS ( R)

- - End of Sect i on Tabl e of Cont ent s - -

DOCUMENT 00 01 15. 00 28

SECTI ON 00 01 15. 00 28

LI ST OF DRAWI NGS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on l i s t s t he dr awi ngs f or t he pr oj ect pur suant t o cont r act c l ause " DFARS 252. 236- 7001, Cont r act Dr awi ngs, Maps and Speci f i cat i ons. "

1. 2 CONTRACT DRAWI NGS

Cont r act dr awi ngs ar e as f ol l ows:

Sheet Number Description Fi l e Number Revision Number

Date

GENERAL

G-001 COVER SHEET AND LOCATI ON MAPS IHG-1-0-1/536

G-002 I NDEX SHEET IHG-1-0-1/537

G-101 POWERHOUSE EL 349. 5 KEY PLAN IHP-1-0-1/397

G-102 POWERHOUSE EL 335. 5 KEY PLAN IHP-1-0-1/398

STRUCTURAL

S-101 STRUCTURAL PLAN VI EW ERECTI ON BAY

DRAI NAGE PUMP ROOM

IHP-1-5-12/1

S-301 HOI ST BEAM ASSEMBLY SECTI ONS IHP-1-5-12/2

S-302 STRUCTURAL CONCRETE DRAI NAGE PUMP

ROOM

IHP-1-5-12/3

MECHANICAL

MD101 DRAI NAGE SUMP PI PI NG REMOVAL IHP-1-3-12/78

MP101 GENERATOR BAY PI PI NG PLAN IHP-1-3-12/79

MP102 I NSTALLATI ON OF PUMP AND TURBI NE

PI T PI PI NG ( UNI TS 1- 3) DETAI LS

IHP-1-3-12/80

MP103 I NSTALLATI ON OF OI L WATER

SEPARATOR PI PI NG PLAN

IHP-1-3-12/82

MP104 I NSTALLATI ON OF OI L WATER

SEPARATOR PI PI NG PLAN

IHP-1-3-12/83

MP201 I NSTALLATI ON OF OI L WATER

SEPARATOR PI PI NG SECTI ON

IHP-1-3-12/84

MP501 OI L WATER SEPARATOR PI PI NG DETAI LS IHP-1-3-12/85

MP502 OI L WATER SEPARATOR WASTE OI L &

OI L PUMP PI PI NG DETAI LS

IHP-1-3-12/86

MP503 I NTAKE AND DI SCHARGE PI PI NG DETAI LS IHP-1-3-12/87

MP504 TURBI NE PI T PI PI NG DETAI LS IHP-1-3-12/88

MP505 COALESCER AND HOI ST SYSTEM PLAN

AND SECTI ON - EL 335. 5

IHP-1-3-12/89

MP506 100 GPM OWS TANK PLAN AND

ELEVATIONS

IHP-1-3-12/90

MP601 PI PI NG AND I NSTRUMENTATI ON DI AGRAM IHP-1-3-12/91

MP602 OI L WATER SEPARATOR PI PI NG LAYOUT

I SOMETRI C DI AGRAM

IHP-1-3-12/92

MP603 OI L WATER SEPARATOR PI PI NG

I SOMETRI C DI AGRAM DETAI LS

IHP-1-3-12/93

MP604 MECHANI CAL EQUI PMENT SCHEDULES IHP-1-3-12/94

MY101 DRAI NAGE SUMP DI FFUSER SI DE UNI T

BAFFLES PLAN & SECTI ONS

IHP-1-3-12/95

MY501 DRAI NAGE SUMP DI FFUSER EXTENSI ON

W/ SLOT CONTROL DETAI LS

IHP-1-3-12/96

MY502 DRAI NAGE SUMP TYPI CAL DI FFUSER

EXTENSI ON DETAI LS

IHP-1-3-12/97

MY503 DRAI NAGE SUMP DI FFUSER END UNI T

DETAILS

IHP-1-3-12/98

ELECTRICAL

E-001 ELECTRI CAL LEGEND IHP-1-6-12/217

ED106 PUMP ROOM LI GHTI NG PLAN EL 335. 5 -

ERECTI ON BAY

IHP-1-6-12/218

ED601 HEAD COVER SUMP PUMP CONTROLS DEMO IHP-1-6-12/219

ED602 UNI TS 1- 3 TURBI NE PI T WI RI NG

DI AGRAM DEMO

IHP-1-6-12/220

ED603 UNI TS 4- 6 TURBI NE PI T WI RI NG

DI AGRAM DEMO

IHP-1-6-12/221

ED613 FSQ1 ONE LI NE DI AGRAM DEMO IHP-1-6-12/222

E-101 UNI TS 1- 3 TURBI NE PI T PUMP 3

I NSTALL PLAN VI EW

IHP-1-6-12/223

E-102 UNI TS 1- 3 TURBI NE PI T PUMP 3

I NSTALL PANEL ELEVATI ON VI EW

IHP-1-6-12/224

E-103 UNI TS 4- 6 TURBI NE PI T PUMP 3

I NSTALL PLAN VI EW

IHP-1-6-12/225

E-104 UNI TS 4- 6 TURBI NE PI T PUMP 3

I NSTALL PANEL ELEVATI ON VI EW

IHP-1-6-12/226

E-105 PUMP ROOM PLAN VI EW OWS I NSTALL IHP-1-6-12/227

E-106 PUMP ROOM LI GHTI NG PLAN EL. 335. 5

- ERECTI ON BAY

IHP-1-6-12/228

E-201 SU1 MCC UNI T 1 - PUMP 3 I NSTALL IHP-1-6-12/229

E-202 SU2 MCC UNI T 2 - PUMP 3 I NSTALL IHP-1-6-12/230

E-203 SU3 MCC UNI T 3 - PUMP 3 I NSTALL IHP-1-6-12/231

E-204 SU4 MCC UNI T 4 - PUMP 3 I NSTALL IHP-1-6-12/232

E-205 SU5 MCC UNI T 5 - PUMP 3 I NSTALL IHP-1-6-12/233

E-206 SU6 MCC UNI T 6 - PUMP 3 I NSTALL IHP-1-6-12/234

E-207 ELECTRI CAL - PUMP ROOM ELEVATI ON IHP-1-6-12/235

E-401 OWS CONTROL CABI NET OWSCC PANEL

LAYOUT

IHP-1-6-12/236

E-601 HEAD COVER SUMP PUMP CONTROLS

INSTALL

IHP-1-6-12/237

E-602 UNI TS 1- 3 TURBI NE PI T WI RI NG

DIAGRAM

IHP-1-6-12/238

E-603 UNI TS 4- 6 TURBI NE PI T WI RI NG

DIAGRAM

IHP-1-6-12/239

E-604 SU1, CQ11 & CQ12 ONE LI NE DI AGRAM

UNI T 1 - PUMP THREE I NSTALL

IHP-1-6-12/240

E-605 SU2 ONE LI NE DI AGRAM UNI T 2 - PUMP

THREE I NSTALL

IHP-1-6-12/241

E-606 SU3 ONE LI NE DI AGRAM UNI T 3 - PUMP

3 I NSTALL

IHP-1-6-12/242

E-607 SU4 ONE LI NE DI AGRAM UNI T 4 - PUMP

3 I NSTALL

IHP-1-6-12/243

E-608 SU5 AND CQ21 ONE LI NE DI AGRAM UNI T

5 - PUMP 3 I NSTALL

IHP-1-6-12/244

E-609 SU6 ONE LI NE DI AGRAM UNI T 6 - PUMP

3 I NSTALL

IHP-1-6-12/245

E-610 OWS I NSTALL OWS CONTROL PANEL IHP-1-6-12/246

E-611 OWS I NSTALL OWS CONTROL CABI NET IHP-1-6-12/247

E-612 OWS I NSTALL OWS CONTROL CABI NET

PT. 2

E-613 OWS CONTROL CABI NET TERMI NAL PLAN IHP-1-6-12/248

E-614 FSQ1 ONE LI NE DI AGRAM OI L WATER

SEPARATOR I NSTALL

IHP-1-6-12/249

E-615 CABLE AND CONDUI T SCHEDULE PART 1 IHP-1-6-12/250

E-616 CABLE AND CONDUI T SCHEDULE PART 2 IHP-1-6-12/251

1. 2. 1 Use Of Gover nment Pr epar ed Cont r act CAD El ect r oni c Fi l es

a. No Resour ce ( R) ( " For I nf or mat i on Onl y" ) dr awi ngs ar e avai l abl e on

CAD.

b. The Cont r act or assumes al l r i sks associ at ed i n usi ng el ect r oni c CAD drawings.

c. El ect r oni c copi es of CAD dr awi ngs ar e onl y avai l abl e i n Bent l ey DGN format.

d. The cont r act dr awi ngs shal l gover n i f t her e ar e any di scr epanci es bet ween t he el ect r oni c copy and t he cont r act dr awi ng. The Cont r act or shal l pr ompt l y not i f y t he Cont r act i ng Of f i cer of any di scr epanci es.

The Gover nment wi l l not be r esponsi bl e t o cor r ect t he el ect r oni c CAD drawing.

1. 3 RESOURCE DRAWI NGS ( R)

These R dr awi ngs ar e i ncl uded wi t h t he dr awi ngs f or i nf or mat i on onl y. The Gover nment does not war r ant t he accur acy of t he R dr awi ngs. The Gover nment r ecommends t hat t he Cont r act or ver i f y t he accur acy of R dr awi ngs.

Resour ce ( R) dr awi ngs ar e as f ol l ows:

Sheet Number

Description Fi l e Number Revision Number

Date

Resource

R-001 POWERHOUSE TRANSVERSE SECTI ON - MAI N

UNI T BAY

IHP-1-0-0/2

R-002 POWERHOUSE UNI TS 4- 6 ARRANGEMENT

TRANSVERSE SECTI ON

IHP-6-0-0/13

R-003 POWERHOUSE - CONCRETE OUTLI NE

GENERATOR BAYS PLAN - EL 349. 50

IHP-1.1-4-2/12

R-004 POWERHOUSE UNI TS 4- 6 - CONCRETE

OUTLI NE PLANS & SECTI ONS - EL 349. 5

SHEET I

IHP-1.2-4-2/10

R-005 POWERHOUSE - MECHANI CAL ERECTI ON AND

SERVI CE BAYS SUBSTRUCTURE - PLANS AND

SECTION

IHP-1-3-8/5

R-006 POWERHOUSE - MECHANI CAL ERECTI ON AND

SERVI CE BAY SUBSTRUCTURE - SECTI ONS

AND DETAI LS

IHP-1-3-8/6

R-007 DRAI NAGE SUMP OI L SKI MMER MECHANI CAL

EQUI PMENT DRAI NAGE SUMP EL 335. 5 PLAN

IHP-1-3-17/9

R-008 DRAI NAGE SUMP OI L SKI MMER DI FFUSER,

BAFFLES, AND PI PI NG DRAI NAGE SUMP EL

330. 0 PLAN

IHP-1-3-17/10

R-009 DRAI NAGE SUMP OI L SKI MMER DI FFUSER,

BAFFLES, AND PI PI NG DRAI NAGE SUMP

SECTIONS

IHP-1-3-17/11

R-010 DRAI NAGE SUMP OI L SKI MMER ARRANGEMENT

AND PI PI NG SCHEMATI C

IHP-1-3-17/12

R-011 DRAI NAGE SUMP OI L SKI MMER - OI L

SKI MMER COLLECTI ON TANK - MECHANI CAL

EQUI PMENT ARRANGEMENT AND PI PI NG

IHP-1-3-17/13

R-012 POWERHOUSE - CONCRETE TRANSVERSE

SECTI ON ERECTI ON BAY AND SERVI CE BAY

IHP-1-4-0/2

R-013 POWERHOUSE - CONCRETE OUTLI NE

ERECTI ON BAY SUMPS - PLANS AND

SECTIONS

IHP-1-4-3/7

R-014 POWERHOUSE - CONCRETE OUTLI NE SOUTH

FI SH ENTRANCE PLAN AT EL 335. 00

IHP-1-4-5/2

R-015 POWERHOUSE - CONCRETE OUTLI NE SOUTH

FI SH ENTRANCE PLAN AT EL 354. 00

IHP-1-4-5/3

R-016 POWERHOUSE - EXPOSED PI PI NG GENERATOR

COOLI NG WATER SECTI ONS AND DETAI LS

IHP-1.1-3-9/15A

R-017 POWERHOUSE - CONCRETE OUTLI NE

GENERATOR BAYS TRANSVERSE &

LONGI TUDI NAL SECTI ONS

IHP-1.1-4-2/1

R-018 POWERHOUSE - CONCRETE OUTLI NE

GENERATOR BAYS SECTI ONS - EL 349. 50

IHP-1.1-4-2/13

R-019 POWERHOUSE - CONCRETE OUTLI NE

ERECTI ON BAY PLAN - EL 335. 50 & 349. 50

IHP-1.1-4-3/1

R-020 POWERHOUSE - UNI TS 4- 6 EXPOSED PI PI NG

GENERATOR BAY PLAN

IHP-1.2-3-9/6

R-021 POWERHOUSE - UNI TS 4- 6 EXPOSED PI PI NG

GENERATOR BAY STRAI NER PI T

IHP-1.2-3-9/9

R-022 POWERHOUSE - UNI TS 4- 6 EXPOSED PI PI NG

GENERATOR BAY PI PE CHASE 1

IHP-1.2-3-9/10

R-023 POWERHOUSE - UNI TS 4- 6 EXPOSED PI PI NG

GENERATOR BAY PI PE CHASE 2

IHP-1.2-3-9/11

R-024 POWERHOUSE - PI PI NG DI AGRAM UNWATERI NG

AND DRAI NAGE SUMP PUMPS

IHP-9-3-9/1

R-025 POWERHOUSE DOVER- ROTARY OI LDRAULI C

ELEVATOR

E-17451

R-026 SUMP PUMP & FLOAT SWI TCH FOR HEAD

COVER DRAI N

3208-X-2

R-027 HEAD COVER I NTERMEDI ATE WELD & MACH

ELEVATION

3629-AAH-1

R-028 HEAD COVER - I NTERMEDI ATE WELD & MACH

ASSEMBLY PLAN

3629-AAY-1

R-029 I NTERMEDI ATE HEAD COVER PLAN 3629-ARV-1

R-030 I NTERMEDI ATE HEAD COVER ELEVATI ONS 3629-ARW-1

R-031 DI STRI BUTOR SECTI ON 280" DI A - 6XA - RH 4460-JM-1

R-032 DI STRI BUTOR PLAN 280" - 6XA - RH 4460-JP-1

R-033 DI STRI BUTOR SECTI ON 300" 6XA - RH

TURBINE

4460-OA-1

R-034 DI STRI BUTOR PLAN 300" 6XA RH TURBI NE 4460-OB-1

R-035 TURBI NE PI T SUMP PUMP PI PI NG 4834-AHF-1

R-036 POWERHOUSE - ELECTRI CAL ONE LI NE

DI AGRAMS SU1, CQ11 & CQ12

IHP-1.1-6-1E21/2

R-037 POWERHOUSE - ELECTRI CAL ONE LI NE

DI AGRAMS SU2 & SU3

IHP-1.1-6-1E21/3

R-038 POWERHOUSE UNI TS 4- 6 ELECTRI CAL

DI AGRAMS ONE LI NE - SQ2 & SU4

IHP-1.2-6-1F21/1

R-039 POWERHOUSE UNI TS 4- 6 ELECTRI CAL

DI AGRAMS ONE LI NE SU5, SU6 & CQ21

IHP-1.2-6-1G21/1

R-040 SU1 480 V 3PH, 60HZ, 11- 350 MOTOR

CONTROL CENTER DI GRAM & SCHEMATI C

SE-5-D-752-4

R-041 SU2 480 V 3PH, 60HZ, 11- 350 MOTOR

CONTROL CENTER DI GRAM & SCHEMATI C

SE-5-D-752-4A

R-042 SU3 480 V 3PH, 60HZ, 11- 350 MOTOR

CONTROL CENTER DI GRAM & SCHEMATI C

SE-5-D-752-4B

R-043 POWERHOUSE - ELECTRI CAL 480 VOLT MAI N

UNI T CONTROL CENTERS SU1, SU2. SU3 &

CQ12

IHP-1.1-6-1E2/2

R-044 SU4 LOAD CENTER SO 4046- 2MCC

R-045 SU5 LOAD CENTER SO 4046- 4MCC

R-046 LOAD CENTER SU6 SO 4046- 6MCC

R-047 POWERHOUSE UNI TS 4- 6 ELECTRI CAL

EQUI PMENT 480 VOLT CONTROL CENTERS

SU4, SU5 & SU6

IHP-1-6-1A8/2

R-048 POWERHOUSE - ELECTRI CAL CONTROL

DI AGRAMS MAI N UNI T EQUI PMENT

IHP-1.1-6-1E24/1

R-049 MAI N UNI TS 1- 3 TURBI NE PI T ELECTRI CAL

CONDUI T DETAI LS

IHP-1-6-12/6

R-050 POWERHOUSE - ELECTRI CAL EQUI PMENT

I NSTALLATI ON TURBI NE PI TS

IHP-1.1-6-1E11/6

R-051 POWERHOUSE - ELECTRI CAL EQUI PMENT

I NSTALLATI ON MAI N UNI T - TURBI NE PI T

CONNECTI ON DI AGRAM

IHP-1.1-6-1E51/1

R-052 DI GI TAL GOVERNOR I NSTALLATI ON MAI N

UNI TS 4- 6 TURBI NE PI T ELECTRI CAL

CONDUI T DETAI LS

IHP-1-6-9F11/3

R-053 DI GI TAL GOVERNOR I NSTALLATI ON MAI N

UNI TS 4- 6 ELECTRI CAL EQUI PMENT PLAN

TURBI NE PI T

IHP-1-6-9F11/1

R-054 UNI TS 4, 5 & 6 ELECTRI CAL COMPONENTS

CONNECTI ON DI AGRAM

4570-SL-1

R-055 POWERHOUSE - ELECTRI CAL EMBEDDED

CONDUI T & GROUNDI NG MAI N UNI T BAY NO.

1 UPSTREAM HALF - EL 349. 5

IHP-1.1-6-1E1/1

R-056 POWERHOUSE - ELECTRI CAL EMBEDDED

CONDUI T & GROUNDI NG MAI N UNI T BAY NO.

1 DOWNSTREAM HALF - EL 349. 5

IHP-1.1-6-1E1/2

R-057 POWERHOUSE - ELECTRI CAL EMBEDDED

CONDUI T & GROUNDI NG MAI N UNI T BAY NO.

2 UPSTREAM HALF - EL 349. 5

IHP-1.1-6-1E1/6

R-058 POWERHOUSE - ELECTRI CAL EMBEDDED

CONDUI T & GROUNDI NG MAI N UNI T BAY NO.

2 DOWNSTREAM HALF - EL. 349. 5

IHP-1.1-6-1E1/7

R-059 POWERHOUSE - ELECTRI CAL EMBEDDED

CONDUI T & GROUNDI NG MAI N UNI T BAY NO.

3 UPSTREAM HALF - EL 349. 5

IHP-1.1-6-1F1/1

R-060 POWERHOUSE - ELECTRI CAL EMBEDDED

CONDUI T & GROUNDI NG MAI N UNI T BAY NO.

3 DOWNSTREAM HALF - EL 349. 5

IHP-1.1-6-1F1/2

R-061 POWERHOUSE UNI TS 4- 6 EMBEDDED CONDUI T

& GROUNDI NG MAI N UNI T BAY NO. 4

UPSTREAM HALF - EL 349. 5

IHP-1.2-6-1F1/5

R-062 POWERHOUSE UNI TS 4- 6 EMBEDDED CONDUI T

& GROUNDI NG MAI N UNI T BAY NO. 4

DOWNSTREAM HALF - EL 349. 5

IHP-1.2-6-1F1/6

R-063 POWERHOUSE UNI TS 4- 6 EMBEDDED CONDUI T

& GROUNDI NG MAI N UNI T BAY NO. 5

UPSTREAM HALF - EL 349. 5

IHP-1.2-6-1G1/1

R-064 POWERHOUSE UNI TS 4- 6 EMBEDDED CONDUI T

& GROUNDI NG MAI N UNI T BAY NO. 5

DOWNSTREAM HALF - EL 349. 5

IHP-1.2-6-1G1/2

R-065 POWERHOUSE UNI TS 4- 6 EMBEDDED CONDUI T

& GROUNDI NG MAI N UNI T BAY NO. 6

UPSTREAM HALF - EL 349. 5

IHP-1.2-6-1G1/4

R-066 POWERHOUSE UNI TS 4- 6 EMBEDDED CONDUI T

& GROUNDI NG MAI N UNI T BAY NO. 6

DOWNSTREAM HALF - EL 349. 5

IHP-1.2-6-1G1/5

R-067 ELECTRI CAL - FSQ1 ONE LI NE DI AGRAM N/A

R-068 POWERHOUSE - ELECTRI CAL ONE LI NE

DI AGRAM FSP1 & FSQ1 SWI TCHGEAR

IHP-1.1-6-1C21/1

R-069 POWERHOUSE - LI GHTI NG ERECTI ON AND

SERVI CE BAYS EL. 433, 418. 5, 401,

388, & 335. 5

IHP-1.1-6-2D8/1

R-070 POWERHOUSE - REI NFORCEMENT SOUTH FI SH

ENTRANCE GALLERY AT EL 349. 5

IHP-1-4-5/27

R-071 POWERHOUSE - REI NFORCEMENT ERECTI ON

BAY POWERHOUSE - WEST WALL

IHP-1-4-3/23

R-072 POWERHOUSE - CONCRETE OUTLI NE

ERECTI ON BAY SECTI ONS AND DETAI LS

IHP-1-4-3/6

- - End of Document - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS

CONTRACTS

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 00 00. 00 28

GENERAL REQUI REMENTS

PART 1 GENERAL

1. 1 VETERANS EMPLOYMENT EMPHASI S FOR U. S. ARMY CORPS OF ENGI NEERS CONTRACTS

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n FAR Par t 22. 13, FAR Pr ovi s i on 52. 222- 38, FAR Cl ause 52. 222- 35, FAR Cl ause 52. 222- 37, DFARS

222. 13 and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:

Feder al Vet er an Empl oyment I nf or mat i on http://www.fedshirevets.gov/index.aspx

Depar t ment of Labor Vet er ans Empl oyment Assi st ance http://www.dol.gov/vets/

Depar t ment of Vet er ans Af f ai r s- VOW t o Hi r e Her oes Act http://benefits.va.gov/vow/

Ar my Wounded War r i or Pr ogr am -http://wtc.army.mil/modules/employers/index.html

U. S. Chamber of Commer ce Foundat i on- Hi r i ng Our Her oes http://www.hiringourheroes.org/

Gui de t o Hi r i ng Vet er ans - Ref er ence Mat er i al https://duckduckgo.com/l/?kh=-1&uddg=https%3A%2F%2Fwww.ebenefits.va.gov%2Febenefits-portal%2Fdownloads%2Fveterans-hiring-guide-2014.pdf

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

1. 4 REGULAR CLEANUP AND DEBRI S DI SPOSAL

1. 5 EQUI PMENT LI ST

1. 6 TESTI NG OF EQUI PMENT

1. 7 DI SPOSI TI ON OF REMOVED MATERI ALS AND EQUI PMENT

1. 8 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

1. 9 PRE- WORK AND POST WORK SURVEYS

1. 10 CARE OF DRAI NS

1. 11 PROTECTI ON OF POWERHOUSE FLOORS

1. 12 AI R PURI TY CONTROL I N THE POWERHOUSE

1. 13 FI RE CONTROL

1. 14 TRAI NI NG

1. 15 PROJECT SUPERI NTENDENT

1. 16 KEY PERSONNEL SUBSTI TUTI ON

1. 17 POST AWARD MEETI NGS

1. 17. 1 Pr e- Wor k Meet i ng

1. 17. 2 Pr e- Const r uct i on Meet i ng

1. 17. 2. 1 Mi nut es

1. 17. 2. 2 Demobi l i z i ng And Remobi l i z i ng

1. 18 WEEKLY PRODUCTI ON MEETI NGS

1. 18. 1 Mi nut es

1. 19 ADDI TI ONAL MEETI NGS

1. 20 PARTNERI NG

1. 20. 1 Gener al

1. 20. 2 Par t ner i ng Meet i ngs

1. 21 RED ZONE MEETI NG

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Weekl y Meet i ng Agenda

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 01. 00 28

SUPPLEMENTARY REQUI REMENTS

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS.

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

Compl y wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. Desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t i n accor dance wi t h SECTI ON

01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Equi pment Li st ; I C

Pr e- Wor k Sur vey Phot os And Repor t ; I C

Pr oj ect Super i nt endent ; I C

Ai r Pur i t y Cont r ol Pr ogr am; G, C

SD- 07 Cer t i f i cat es

Key Per sonnel Subst i t ut i on; G C

SD- 11 Cl oseout Submi t t al s

Post - Wor k Sur vey Phot os And Repor t ; I C

Tr ai ni ng Manual s; G C

1. 3 FI ELD VERI FI CATI ON OF SI TE CONDI TI ONS

Fi el d ver i f y al l el evat i ons, di mensi ons, and coor di nat es of exi st i ng f eat ur es i ndi cat ed on t he cont r act dr awi ngs t hat af f ect new const r uct i on.

Any devi at i ons shal l be updat ed as per SECTI ON 01 78 23. 00 28, OPERATI ON

AND MAI NTENANCE DATA, par agr aph MAI NTAI N WORKI NG AS- BUI LT CONTRACT DRAWI NGS

AND RESOURCE DRAWI NGS.

1. 4 REGULAR CLEANUP AND DEBRI S DI SPOSAL

Wi t h t he except i on of mat er i al s speci f i cal l y i ndi cat ed or speci f i ed t o be sal vaged f or r euse i n const r uct i on, or t ur ned over t o t he Gover nment , al l wast es and demol i shed mat er i al s shal l become t he pr oper t y of t he Cont r act or and shal l be r emoved f r om t he j ob s i t e dai l y i n accor dance wi t h Feder al , St at e, and l ocal r egul at i ons. The Cont r act or shal l f ur ni sh wast e cont ai ner s. Al l smal l wast e cont ai ner s pr ovi ded by t he cont r act or shal l be empt i ed dai l y, l ar ge bi n cont ai ner s shal l be empt i ed when f ul l or once a week.

1. 5 EQUI PMENT LI ST

Fur ni sh a compl et e l i s t of al l equi pment t o be used on t he Pr oj ect Thi r t y ( 30) days pr i or t o commencement of on- si t e wor k. Submi t a r evi sed l i s t i n t he event of change of equi pment . Li st s shal l i nc l ude r ent ed equi pment as wel l as l ease- pur chase or sal e- l easeback equi pment . The i ni t i al l i s t and t he r evi sed l i s t s shal l i ndi cat e dat es equi pment i s assi gned t o or r emoved f r om t he Pr oj ect and adequat e i dent i f i cat i on or descr i pt i on of each i t em of equi pment i ncl udi ng manuf act ur er ' s name ( abbr evi at ed) , model number , manuf act ur er ' s ser i al number , year of manuf act ur e, and Cont r act or ' s assi gned ser i al or r ecor d number .

1. 6 TESTI NG OF EQUI PMENT

Bef or e any machi ner y or mechani zed equi pment i s put t o use on t he j ob, i t shal l be i nspect ed and t est ed by a qual i f i ed per son and det er mi ned t o be i n saf e oper at i ng condi t i on. Cr anes or der r i cks shal l be t est ed by t he Cont r act or or a qual i f i ed t est i ng agency i n accor dance wi t h EM 385- 1- 1.

Equi pment shal l be l ar ge enough t o saf el y handl e pr oposed pi cks or t asks wi t hout exceedi ng t he cr ane r at i ng est abl i shed by t hese t est s.

1. 7 DI SPOSI TI ON OF REMOVED MATERI ALS AND EQUI PMENT

Unl ess ot her wi se speci f i ed i n ot her sect i ons of t he speci f i cat i ons, al l exi st i ng equi pment r emoved and not r ei nst al l ed shal l become t he pr oper t y of t he Cont r act or , r emoved f r om t he Pr oj ect s i t e, and di sposed of i n a l egal manner . Mat er i al s t hat cannot be r emoved dai l y may be t empor ar i l y st or ed on- si t e at an appr oved ar ea. Sal vaged mat er i al s shal l not be sol d on t he pr oj ect s i t e.

1. 8 PROTECTI ON AND RESTORATI ON OF EXI STI NG FACI LI TI ES

Ref er ence FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s ( Apr 1984) .

1. 9 PRE- WORK AND POST WORK SURVEYS

Conduct a pr e- wor k sur vey pr i or t o st ar t of on- si t e wor k and a post-work survey dur i ng pr oj ect c l oseout , wi t h t he Cont r act i ng Of f i cer ( KO) , of t he wor k ar eas. The r esul t s of t he sur veys shal l be document ed by di gi t al phot ogr aphs and descr i pt i ve nar r at i ve r epor t s. A col or copy of t he sur vey phot ogr aphs and nar r at i ve r epor t s shal l be submi t t ed t o t he KO wi t hi n f i ve ( 5) days af t er sur vey has been compl et ed.

1. 10 CARE OF DRAI NS

Do not use exi st i ng power house f l oor dr ai ns f or di sposal of any sol i d mat er i al or any l i qui ds ot her t han c l ear wat er .

1. 11 PROTECTI ON OF POWERHOUSE FLOORS

a. Car e shal l be t aken t o pr event damage t o al l f l oor s and cur bs wi t hi n t he Power house. Pr ot ect i on shal l i ncl ude a cont i nuous l ayer of oi l - i mper vi ous kr af t paper over t he exi st i ng f l oor sur f ace wi t h j oi nt s of t he kr af t paper j oi ned wi t h an appr opr i at e t ape. I n addi t i on, t ongue and gr oove 3/ 4- i nch- t hi ck Or i ent ed St r and Boar d ( OSB) pl ywood shal l be i nst al l ed over t he cr af t paper at al l wor k and st or age ar eas. Pl ywood j oi nt s shal l be f ast ened t o ensur e edges of pl ywood sheet s ar e, and r emai n, f l ush wi t h each ot her and do not pose a t r i ppi ng hazar d dur i ng execut i on of t hi s wor k. Mi ni mum nomi nal 2" x4" wood shal l be i nst al l ed al ong exi st i ng cur b f eat ur es wi t hi n t he cont r act or wor k ar eas and al ong per i met er s of t he wor k ar eas. Wood used f or cur b pr ot ect i on shal l be secur ed i n pl ace wi t hout anchor i ng i nt o t he exi st i ng f l oor s or cur bs.

b. Pi pe t r enches shal l r emai n accessi bl e even i f cover ed. Al l desi gnat i ons r el at i ng t o f i r e pr ot ect i on equi pment t hat get cover ed shal l be mar ked on t he t empor ar y f l oor cover i ng. Pr ovi de addi t i onal bl ocki ng and wood suppor t s when r equi r ed. Al so sui t abl y pr ot ect ot her sur f aces of wor k. Damage t o f l oor s or cur bs caused by t he Cont r act or ' s oper at i ons shal l be r epai r ed at no addi t i onal cost t o Gover nment .

Repai r s shal l mat ch t he sur r oundi ng ar ea i n mat er i al t ype, col or , t ext ur e, and sur f ace f i ni sh and ar e subj ect t o appr oval . Wor k i n t he power house shal l not st ar t unt i l f l oor and cur b pr ot ect i on i s i n pl ace.

1. 12 AI R PURI TY CONTROL I N THE POWERHOUSE

Take al l necessar y pr ecaut i ons t o maxi mi ze t he cont r ol , and pr event i on, of al l dust and f umes cr eat ed by oper at i ons under t hi s cont r act f r om escapi ng i nt o t he power house. To t he maxi mum ext ent possi bl e, al l dust and di r t shal l be r emoved by vacuum cl eani ng. At l east 30 wor ki ng days pr i or t o commencement of wor k i n t he power house, submi t f or appr oval , i n wr i t i ng, a proposed Ai r Pur i t y Cont r ol Pr ogr am. Ai r Pur i t y Cont r ol Pr ogr am shal l i ncl ude, but not necessar i l y be l i mi t ed t o, t he f ol l owi ng:

( 1) Adequat e i sol at i on and vent i l at i on of ai r ar c i ng, wel di ng, bur ni ng, and gr i ndi ng oper at i ons.

( 2) Pr ovi s i on of exhaust duct s t hat shal l di schar ge out s i de t he power house st r uct ur e wher e mechani cal vent i l at i on i s used.

( 3) Cont r ol l ed oper at i on of power dr i ven t ool s.

( 4) Fur ni shi ng and r emovi ng of oi l ed sawdust or ot her dust pr event at i ves i n ar eas t hat cannot be pr oper l y r ender ed f r ee f r om excessi ve dust i ng by vacuum cl eani ng or ot her met hods.

( 5) Vacuum cl eani ng of spaces wi t hi n t he wor k ar eas wher e dust accumulates.

( 6) Ai r - , el ect r i cal - , or bat t er y- dr i ven equi pment may be used i nsi de t he power house.

( 7) I nt er nal - combust i on engi ne power ed equi pment wi l l not be per mi t t ed t o oper at e i nsi de t he power house unl ess exhaust ed t o t he ext er i or except f or shor t per i ods of t i me ( not t o exceed 15 mi nut es i n a 2 hour wi ndow) t o unl oad mat er i al s and equi pment .

Dependi ng upon t he Cont r act or ' s pl ant , equi pment , and met hods of oper at i on, addi t i onal pr ovi s i ons f or sat i sf act or y ai r pur i t y cont r ol wi l l be r equi r ed and shal l be i nc l uded i n t he pr oposed Ai r Pur i t y Cont r ol Pr ogr am.

1. 13 FI RE CONTROL

Each pi ece of i nt er nal combust i on engi ne dr i ven equi pment used at t he wor k s i t e shal l be equi pped wi t h a f i r e ext i ngui sher i n accor dance wi t h r ecommendat i on Nat i onal Fi r e Pr ot ect i on Associ at i on ( NFPA) as appr opr i at e.

The mi ni mum appr oved r at i ng of ext i ngui sher s shal l not be l ess t han 5- B: C.

1. 14 TRAINING

Pr ovi de one ( 1) on- si t e t r ai ni ng sessi on, appr oxi mat el y f our ( 4) hour s each by an aut hor i zed Manuf act ur es Repr esent at i ve. Thi s t r ai ni ng wi l l cover t he pr ogr ammi ng, oper at i on and mai nt enance of t he compl et e Oi l Wat er Separ at or syst em as i nst al l ed. The cl ass wi l l consi st of oper at or s and mai nt enance per sonnel wi t h t he possi bi l i t y syst em manager s and engi neer s al so i n attendance.

Submit t r ai ni ng manual s and document at i on f or appr oval Thi r t y ( 30) days pr i or t o schedul ed c l asses and f ur ni sh suf f i c i ent t r ai ni ng mat er i al s at t he t r ai ni ng c l asses f or al l s t udent s pl us a mi ni mum of t hr ee ( 3) copi es f or pr oj ect f i l es. Wher e audi o/ v i sual mat er i al s ar e used i n t r ai ni ng c l asses, t hr ee ( 3) copi es of such mat er i al s shal l be f ur ni shed t o t he Pr oj ect f or use i n f ut ur e t r ai ni ng. I t shal l be t he Cont r act or ' s r esponsi bi l i t y t o coor di nat e t he t r ai ni ng sessi ons wi t h t he KO t o ensur e mi ni mum conf l i c t s wi t h ongoi ng Pr oj ect wor k.

1. 15 PROJECT SUPERI NTENDENT

The Pr oj ect Super i nt endent i s r equi r ed on t he wor ksi t e, at al l t i mes wor k i s bei ng per f or med, unt i l wor k on t hi s cont r act i s compl et ed and accept ed.

Assi gn a compet ent super i nt endent as per FAR Cl ause 52. 236- 6 " Super i nt endence by t he Cont r act or " . Submi t Super i nt endent name and cont act i nf or mat i on pr i or t o st ar t of on- si t e const r uct i on.

1. 16 KEY PERSONNEL SUBSTI TUTI ON

I f t he Cont r act or pl ans on r epl aci ng any Key per sonnel ( Pr oj ect Super i nt endent , CQC Syst em Manager , or CQC st af f Member s) t hey must have t he appr oval of t he KO. Per sonnel shal l possess t he qual i f i cat i ons t hat meet or exceed t hose st at ed i n t hi s cont r act f or t he posi t i on of t he i ndi v i dual t hey ar e r epl aci ng. Submi t qual i f i cat i ons of new per sonnel at l east Fi f t een ( 15) cal endar days i n advance of dat e of r epl acement .

1. 17 POST AWARD MEETI NGS

1. 17. 1 Pr e- Wor k Meet i ng

Wi t hi n Thi r t y ( 30) cal endar days af t er r ecei pt of Not i ce t o Pr oceed, at t end a Pr e- Wor k Meet i ng. Seni or Level member s of t he Cont r act or ' s st af f i nvol ved wi t h t hi s cont r act shal l par t i c i pat e i n t hi s meet i ng t o di scuss t he over al l cont r act r equi r ement s. The Gover nment wi l l l ead t hi s meet i ng and t ake t he meet i ng mi nut es.

1. 17. 2 Pr e- Const r uct i on Meet i ng

The Pr oj ect Super i nt endent shal l coor di nat e wi t h t he KO and est abl i sh t he dat e of t he Pr e- Const r uct i on Meet i ng. The meet i ng wi l l be hel d at t he Pr oj ect s i t e at l east one ( 1) week pr i or t o mobi l i z i ng t o t he j ob s i t e.

The Pr oj ect Super i nt endent shal l l ead t he Pr e- Const r uct i on Meet i ng di scussi ng t he Cont r act or ' s pl an on execut i ng t he wor k at t he pr oj ect s i t e, schedul e, r equi r ed c l ear ances and t i mef r ame f or t hem, and pl an f or i mpl ement i ng saf et y and qual i t y cont r ol . The Gover nment wi l l have key member s f r om t he Pr oj ect st af f t o di scuss envi r onment al and c l ear ance i ssues. Key member s of t he cont r act or st af f shal l at t end t hi s meet i ng i ncl udi ng t he Qual i t y Cont r ol ( QC) Syst em Manager , Si t e Saf et y and Heal t h Of f i cer ( SSHO) and any ot her member s det er mi ned by t he Gover nment t o be required.

1. 17. 2. 1 Minutes

The Pr oj ect Super i nt endent shal l be r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 48 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 17. 2. 2 Demobi l i z i ng And Remobi l i z i ng

Anyt i me t he Cont r act or demobi l i zes f r om t he s i t e and r emobi l i zes at a l at er dat e, anot her Pr e- Const r uct i on Meet i ng shal l be hel d and shal l f ol l ow t he r equi r ement s l i s t ed above.

1. 18 WEEKLY PRODUCTI ON MEETI NGS

Dur i ng al l f abr i cat i on and onsi t e const r uct i on wor k, hol d a weekl y pr oduct i on meet i ng t o br i ef t he Gover nment on t he st at us of t he pr oj ect .

a. Use t he at t ached " Weekl y Meet i ng Agenda" and di scuss al l el ement s of t hi s agenda.

b. Pr ovi de a t hr ee ( 3) week ' l ook ahead' .

1. Descr i be al l pl anned const r uct i on act i v i t i es, on- si t e and of f - s i t e over t he next t hr ee ( 3) weeks.

2. ENSURE t hese act i v i t i es al i gn t o t he over al l const r uct i on SCHEDULE submi t t ed under SECTI ON 01 32 01. 00 28 PROJECT SCHEDULE.

3. RECORD any changes t o t he Pr oj ect Schedul e AND I NCLUDE I N t he next schedul ed updat e.

c. Key member s of t he Cont r act or ' s st af f i ncl udi ng t he Qual i t y Cont r ol Syst em Manager and t he SI TE SAFETY AND HEALTH OFFI CER shal l at t end.

d. The Qual i t y Cont r ol Syst em Manager shal l di scuss al l QC aspect s out l i ned i n SECTI ON 01 45 04. 00 28 CONTRACTOR QUALI TY CONTROL.

e. The Gover nment r eser ves t he r i ght t o r equi r e any per son f r om t he Cont r act or ' s st af f such as t he Pr oj ect Manager , Engi neer , Schedul er or

Key Subcont r act or Per sonnel t o at t end t he meet i ng.

f . Submi t each meet i ng agenda t o t he KO 24 hour s pr i or t o t he meet i ng.

1. 18. 1 Minutes

The Pr oj ect Super i nt endent shal l be r esponsi bl e f or t aki ng t he meet i ng mi nut es and shal l send t hem el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Gover nment ' s Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer .

1. 19 ADDI TI ONAL MEETI NGS

Recor d t he mi nut es of al l meet i ngs, i ncl udi ng al l conf er ence cal l s, t hat occur bet ween t he Cont r act or and Gover nment . Send mi nut es el ect r oni cal l y wi t hi n 24 hour s of t he meet i ng t o t he Cont r act i ng Of f i cer f or concur r ence.

E- mai l subj ect l i ne shal l i ncl ude pr oj ect name and meet i ng t opi c.

1. 20 PARTNERING

1. 20. 1 General

The Gover nment i nt ends t o encour age t he f oundat i on of a cohesi ve par t ner shi p wi t h t he Cont r act or and i t s subcont r act or s by i nf or mal l y par t ner i ng t hi s cont r act . Thi s par t ner shi p wi l l be st r uct ur ed t o dr aw on t he st r engt hs of each or gani zat i on t o i dent i f y and achi eve r eci pr ocal goal s. The obj ect i ves ar e ef f ect i ve and ef f i c i ent cont r act per f or mance wi t h t he i nt ent t o achi eve a saf e compl et i on of t he wor k - wi t hi n budget , on schedul e, and i n accor dance wi t h pl ans and speci f i cat i ons. Thi s par t ner shi p woul d be bi l at er al i n makeup and par t i c i pat i on wi l l be t ot al l y vol unt ar y. I f Par t ner i ng i s pur sued, meet i ngs woul d be hel d as i dent i f i ed i n t he f ol l owi ng par agr aph.

1. 20. 2 Par t ner i ng Meet i ngs

Wi t hi n Thi r t y ( 30) cal endar days of r ecei pt of Not i ce t o Pr oceed, t he i ni t i al par t ner i ng meet i ng wi l l be schedul ed i f t he meet i ng i s r equest ed by t he Cont r act or . The Cont r act or ' s key per sonnel wi l l at t end a f ace- t o- f ace par t ner i ng meet i ng ( t ypi cal l y one ( 1) day i n dur at i on) t oget her wi t h key Gover nment per sonnel , t o di scuss pr oj ect goal s and communi cat i on.

Fol l ow- up meet i ngs wi l l be hel d per i odi cal l y , as r equi r ed, t hr oughout t he dur at i on of t he cont r act , as agr eed t o by t he Cont r act or and t he Gover nment .

1. 21 RED ZONE MEETI NG

Set up and l ead a Red Zone meet i ng t o occur a mi ni mum of f our t een ( 14) cal endar days pr i or t o compl et i on. Cont act t he KO t o Schedul e t hi s meet i ng. The Gover nment ’ s r epr esent at i ve wi l l i nc l ude t he KO, key per sonnel f r om t he Pr oj ect , Pr oj ect Engi neer , Qual i t y Assur ance Repr esent at i ve, and Resi dent Engi neer . The key peopl e f r om t he Cont r act or shal l be, at a mi ni mum, t he Pr oj ect Super i nt endent , Qual i t y Cont r ol Syst em Manager , Schedul er , key subcont r act or s per sonnel , and Pr oj ect Manager .

The pur pose of t hi s meet i ng i s t o devel op an over al l schedul e f or al l act i v i t i es r equi r ed by bot h t he Gover nment and Cont r act or and t o compl et e each uni t t hr ough commi ssi oni ng and f i nal accept ance. The Gover nment wi l l come pr epar ed wi t h al l t hei r act i v i t i es, key dat es, and dur at i ons f or al l wor k r equi r ed by t he Gover nment t o compl et e each uni t . The Cont r act or shal l pr ovi de t he same i nf or mat i on f or al l of t hei r act i v i t i es. The

Cont r act or ’ s schedul er shal l i nput al l of t hi s i nf or mat i on i nt o t he Cont r act or ’ s pr oj ect schedul e dur i ng t he meet i ng.

Thi s schedul e shal l be updat ed weekl y, or as needed, based on t he i nf or mat i on f r om t he weekl y pr oduct i on meet i ngs f or bot h t he Gover nment and Cont r act or act i v i t i es.

See 52. 211- 10 COMMENCEMENT, PROSECUTI ON, AND COMPLETI ON OF WORK f or wor k wi ndow i nf or mat i on.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

- - End of Sect i on - -

Weekly Meeting agenda template

Schedule - Work scheduled over the next week Three week look ahead Overall Schedule Review

Submittals Review- Submittal Register Submittals approved by QC Outstanding Submittals RFI’s Letters

Coordination - Clearances required over the next week, include the following:

A description of the work to be performed under the Clearance.

Determine the correct energy isolation points needed to perform the work safely.

Physical barriers, protective grounds, piping blanks, or bulkheads that shall be used, including locations.

Determine the procedure and method of testing for stored energy if applicable.

The date and time the Clearance shall be required.

The estimated length of time the system or equipment shall be out of service and the time to return the system or equipment to service in an emergency.

Coordination issues

Safety- Review of AHA’s for ongoing work Pending AHA’s

Required for new work Status of Gov’t approval

Safety issues

QC -

Preparatory meetings Held over last week- status of meeting minutes

Required over the next week Initial meetings over the next week Follow up over the next week Rework list Review Deficiency tracking log

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 PROJECT SECURI TY

1. 3. 1 Cont r act or Vehi c l e Access

1. 3. 2 I dent i f i cat i on of Empl oyees

1. 3. 2. 1 Har d Hat Requi r ement s

1. 3. 2. 2 I ce Har bor Badgi ng

1. 3. 3 Del i ver y of Equi pment

1. 4 USE OF POWERHOUSE BRI DGE CRANE

1. 4. 1 Cr ane Oper at or s

1. 4. 2 Use of t he Cr anes

1. 4. 3 Ri gger s

1. 5 FACI LI TY OCCUPANCY CLOSURE

1. 6 WORK SCHEDULES

1. 6. 1 Cont r act or ' s Wor k Schedul e

1. 6. 2 Gover nment ' s Wor k Schedul e

1. 7 USE OF WALLA WALLA DI STRI CT PARKS

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used)

ATTACHMENTS:

Secur i t y Badge For m

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 10 28

PROJECT SI TE RESTRI CTI ONS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 Saf et y and Heal t h Requi r ement s Manual

Cont r act or shal l be r esponsi bl e f or compl yi ng wi t h t he cur r ent edi t i on and al l changes post ed on t he web as of t he ef f ect i ve dat e of t hi s sol i c i t at i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. A desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 07 Cer t i f i cat es

Qualifications ; G, C

1. 3 PROJECT SECURI TY

The Pr oj ect s i t e i s a secur ed ar ea and access ont o t he Pr oj ect i s r est r i c t ed. The secur i t y measur es af f ect al l of t he Cont r act or ' s vehi c l es and per sonnel . Ther e wi l l be del ays when ent er i ng Pr oj ect s due t o l ocked gat es, vehi c l e i nspect i ons, and per sonnel checks. I nspect i ons and checks may i ncl ude i nspect i on of t ool boxes, br i ef cases, l unch boxes, and ot her containers.

1. 3. 1 Cont r act or Vehi c l e Access

Pr oj ect access r oads on bot h s i des of t he dams ar e secur ed wi t h l ocked gat es. Al l vehi c l es t hat pass t hr ough t he l ocked gat es wi l l be subj ect t o bei ng sear ched. No pr i vat el y owned vehi c l es ( POV' s) wi l l be al l owed t hr ough l ocked gat es. Onl y Cont r act or ' s wor k vehi c l es and equi pment t hat ar e essent i al t o t he conduct of t he wor k wi l l be al l owed i n t he wor k ar eas. Al l Cont r act or vehi c l es shal l di spl ay sui t abl e per manent or t empor ar y i dent i f i cat i on.

1. 3. 2 I dent i f i cat i on of Empl oyees

1. 3. 2. 1 Har d Hat Requi r ement s

Ever y Cont r act or empl oyee ( pr i me or subcont r act or ) shal l have a har d hat meet i ng t he r equi r ement s of EM 385- 1- 1. Har dhat s shal l di spl ay t he Pr i me

Cont r act or name, subcont r act or name, and t he empl oyee' s name. Cont r act or empl oyee har dhat s shal l not be whi t e wi t h r ed mar ki ngs. I t shal l be t he r esponsi bi l i t y of t he Pr oj ect Super i nt endent t o enf or ce t hi s r equi r ement .

1. 3. 2. 2 I ce Har bor Badgi ng

Gover nment Pr oj ect per sonnel wi l l pr ovi de t he Cont r act or ' s per sonnel wi t h i dent i f i cat i on badges as t hey ar r i ve on s i t e. Al l empl oyees t hat wi l l need access t o t he secur ed ar ea shal l have I D badges. Compl et e t he Secur i t y Badge For m ( at t ached t o t he end of t hi s SECTI ON) , submi t t he compl et ed f or m t o t he Cont r act i ng Of f i cer ( KO) 48 hour s pr i or t o t he empl oyee ar r i v i ng t o wor k on t he pr oj ect s i t e. Fur ni sh i ni t i al i dent i f i cat i on ( dr i ver ' s l i cense) f or each empl oyee, r equi r i ng I D badges, and upon i ssuance of of f i c i al badges, r equi r i ng each empl oyee t hat ent er s t he secur ed ar eas t o have t he Gover nment f ur ni shed I D badge on t hem and di spl ayed above t hei r wai st . Al l pr escr i bed i dent i f i cat i on shal l i mmedi at el y be del i ver ed t o t he Qual i t y Assur ance Repr esent at i ve f or cancel l at i on upon t he r el ease of t he empl oyee or pr oj ect compl et i on. I f r equi r ed by t he KO, empl oyees wi l l be phot ogr aphed by t he Gover nment . Empl oyees who f ai l t o submi t t o phot ogr aphi ng wi l l not be al l owed on t he Pr oj ect s i t e.

1. 3. 3 Del i ver y of Equi pment

The cont r act or i s r esponsi bl e f or del i ver y and r ecei pt of al l mat er i al s and equi pment . Gover nment per sonnel wi l l not be avai l abl e t o assi st t he Cont r act or i n t hese act i v i t i es. To t he maxi mum ext ent possi bl e, del i ver i es shal l ar r i ve on t he same si de of t he r i ver as t he Cont r act or ' s wor k ar ea.

Del i ver y vehi c l es wi l l be al l owed t o cr oss t he r i ver over t he dam onl y wi t h Gover nment appr oval . Del i ver y vehi c l es ar r i v i ng on t he opposi t e s i de of t he r i ver as t he wor k ar ea shal l be unl oaded out s i de t he l ocked gat e, equi pment shal l be l oaded ont o Cont r act or ' s vehi c l es, and Cont r act or ' s vehi c l es wi l l t hen be al l owed t o cr oss t he dam t o t he wor k ar ea.

1. 4 USE OF POWERHOUSE BRI DGE CRANE

The Gover nment ' s br i dge cr ane wi t hi n t he power house wi l l be avai l abl e f or t he wor k wi t hi n t he wor ki ng l oad and movement l i mi t s of t he cr ane. The br i dge cr ane wi l l be avai l abl e f or use by t he Cont r act or at such t i mes as not r equi r ed f or ot her mai nt enance and r epai r wor k per f or med by Gover nment per sonnel . The Gover nment wi l l f ur ni sh el ect r i c power , l ubr i cat i on, and nor mal mai nt enance i ncl udi ng adj ust ment s wi t hout cost t o t he Cont r act or .

Pr ovi de t he KO at l east 24 hour s not i ce i n advance each t i me use of t he cr anes i s desi r ed on weekdays and 48 hour s not i ce f or use on weekends and Feder al hol i days.

1. 4. 1 Cr ane Oper at or s

The Cont r act or shal l f ur ni sh qual i f i ed br i dge cr ane oper at or s f or t hei r oper at i ons. Each oper at or , i n addi t i on t o meet i ng t he r equi r ement s of SECTION 01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS, shal l have had at l east 3- year s exper i ence on a br i dge cr ane of equi val ent capaci t y and char act er i st i cs. Qualifications f or each oper at or i n t he f or m of an af f i davi t s i gned by t he oper at or and t he Cont r act or shal l be submi t t ed.

The af f i davi t shal l i ncl ude a compl et e r ecor d of al l r el at ed wor k wi t h par t i cul ar emphasi s on exper i ence di r ect l y r el at ed t o oper at i on of a br i dge cr ane handl i ng compar abl e l oads. Bef or e any oper at or i s appr oved he shal l spend at l east 1 hour i n t r ai ni ng on t he cr anes under t he di r ect super vi s i on of a Gover nment oper at or . The Cont r act or ' s cr ane oper at or s may be r et est ed at any t i me. The Cont r act or shal l ensur e t hat t he cr ane oper at or s have cur r ent ( wi t hi n t he pr evi ous 12 mont hs) physi cal or medi cal exami nat i ons wi t h emphasi s on hear i ng, eyesi ght , and car di ovascul ar condi t i ons. Dat es of physi cal exams shal l be submi t t ed t o t he KO al ong wi t h qual i f i cat i ons.

1. 4. 2 Use of t he Cr anes

The Cont r act or wi l l be l i abl e f or al l damage, due t o f aul t or negl i gence, i ncur r ed whi l e t he cr anes ar e oper at ed by t he Cont r act or ' s cr ane oper at or s.

1. 4. 3 Riggers

Onl y qual i f i ed r i gger s shal l be used i n pr epar i ng l oads f or l i f t i ng and i n at t achi ng such l oads t o t he cr anes. Al l per sonnel per f or mi ng r i ggi ng shal l meet r equi r ement s of SECTI ON 01 35 29. 10 28 GOVERNMENTAL SAFETY REQUI REMENTS. A Gover nment oper at or wi l l check t hem f or knowl edge of hand si gnal s. Hand hel d por t abl e r adi os may be used but onl y on non- Gover nment frequencies.

1. 5 FACI LI TY OCCUPANCY CLOSURE

St r eet s, wal ks, and ot her f aci l i t i es occupi ed and used by t he Gover nment shal l not be c l osed or obst r uct ed wi t hout wr i t t en per mi ssi on f r om t he KO.

1. 6 WORK SCHEDULES

1. 6. 1 Cont r act or ' s Wor k Schedul e

At t he Pr e- Wor k Meet i ng, f ur ni sh a schedul e of number of wor ki ng days per week, shi f t s per day, and hour s per shi f t f or cont r act wor k. Fur ni sh not i f i cat i on of any change of schedul e of r egul ar wor k hour s, over t i me wor k hour s, and shi f t s of wor k cr ews and per sonnel at t he s i t e. Thi s not i f i cat i on shal l be pr ovi ded a mi ni mum of 48 hour s pr i or t o any schedul e change t o al l ow sui t abl e schedul i ng of Gover nment per sonnel and i nspect i on. Except i on t o t hi s r equi r ement may be al l owed i n case of schedul e change due t o emer gency condi t i ons.

1. 6. 2 Gover nment ' s Wor k Schedul e

a. The mai nt enance cr ews at t he dam wor k f r om 6: 30 a. m. t o 5: 00 p. m. , Monday t hr ough Thur sday. Cr ews and st af f do not wor k on weekends and Feder al hol i days. I f a Feder al hol i day f al l s on a Fr i day, t he cr ews and st af f do not wor k on t he pr ecedi ng Thur sday. A power house oper at or i s at t he s i t e 24 hour s a day, 7 days a week, i ncl udi ng Feder al hol i days but i s not avai l abl e t o assi st t he Cont r act or .

b. I f t he Cont r act or r equi r es Gover nment suppor t or assi st ance out s i de of nor mal wor k hour s, t he Cont r act or must make a f or mal wr i t t en r equest t o t he KO at l east one week pr i or t o t he dat e t hat suppor t / assi st ance i s needed. The Gover nment wi l l r evi ew t hi s r equest , but t her e i s no guar ant ee t hat Gover nment suppor t or assi st ance can be pr ovi ded.

1. 7 USE OF WALLA WALLA DI STRI CT PARKS

Speci al consi der at i on f or t he use of t he Wal l a Wal l a Di st r i c t Campi ng Gr ounds wi l l not be gi ven t o t he Cont r act or i f campi ng at t hese s i t es.

The Cont r act or ' s cr ew may not use Gover nment par ki ng l ot s near I ce Har bor Lock and Dam f or RV par ki ng.

PART 2 PRODUCTS ( Not Used)

PART 3 EXECUTI ON ( Not Used) - - End of Sect i on - -

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SUBMI TTALS

1. 3 Bi ogr aphi cal I nf or mat i on Submi t t al

1. 4 AT LEVEL 1 TRAI NI NG

1. 5 ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES

1. 6 EMPLOYEE ESCORT

1. 7 PRE- SCREEN CANDI DATES USI NG E- VERI FY PROGRAM

PART 2 PRODUCTS ( NOT USED)

PART 3 EXECUTI ON ( NOT USED)

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 14 00. 90 28

I NTEGRATI NG ANTI TERRORI SM ( AT) AND OPERATI ONS SECURI TY ( OPSEC)

PART 1 GENERAL

The wor k cover ed by t hi s sect i on of t he speci f i cat i ons consi st s of wor k common t o mor e t han one sect i on of t hese TECHNI CAL SPECI FI CATI ONS. Thi s cont r act does not r equi r e access t o or handl i ng of c l assi f i ed mat er i al .

Thi s cont r act r equi r es access t o secur ed and r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment . Secur ed ar ea i s consi der ed any l ocat i on wher e on- si t e wor k i s per f or med by Cont r act or empl oyees. The r est r i c t ed ar eas, sensi t i ve i nf or mat i on, or equi pment consi st s of ever yt hi ng i nsi de t he secur i t y f ence at t he pr oj ect .

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

FEDERAL ACQUI SI TI ON REGULATI ONS ( FAR)

FAR 52. 204- 9 ( 2015) Per sonal I dent i t y Ver i f i cat i on of Cont r act or Per sonnel

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s havi ng an " I " desi gnat i on ar e f or i nf or mat i on onl y. The desi gnat i on f ol l owi ng t he " G" or " I " desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h SECTI ON 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Ant i Ter r or i sm ( AT) Level 1; I , C

Pr e- Scr een Candi dat es Usi ng E- Ver i f y Pr ogr am; I , C

Bi ogr aphi cal I nf or mat i on; G, C

1. 3 Bi ogr aphi cal I nf or mat i on Submi t t al

Submi t Bi ogr aphi cal I nf or mat i on t o t he KO vi a e- mai l as a passwor d pr ot ect ed pdf f i l e f or al l per sonnel r equi r i ng unescor t ed access or r equi r i ng access t o gover nment i nf or mat i on syst ems. See par agr aph " ACCESS AND GENERAL PROTECTI ON/ SECURI TY POLI CY AND PROCEDURES" f or addi t i onal i nf or mat i on and det ai l s on i t ems t o submi t .

1.…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .