Technical Questionnaire.pdf
PDF 140 KB Posted
- Attached to
- Boardwalk Replacement at Little Calumet Trail Federal contract opportunity
- Solicitation number
- 140P6421R0015
About this file
This document includes a technical questionnaire and details of a related federal contract opportunity for boardwalk replacement work at Indiana Dunes National Park. The technical questionnaire seeks detailed responses from offerors on their plans to complete the project safely and on schedule while adhering to specifications, and their experience with similar projects. The related federal contract opportunity is a solicitation notice for a firm-fixed price contract between $250,000 to $500,000 to remove and dispose of an existing boardwalk and install a new galvanized structural steel framed boardwalk at Little Calumet Trail in Indiana Dunes National Park. Evaluation criteria include technical capability, past performance, and price. The work is set aside 100% for small businesses under NAICS code 237990. The contracting office is the National Park Service Midwest Region and responses are due by May 2021, with work to begin that same month.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_0002.pdf | ||
| Sol_140P6421R0015_Amd_0002.pdf | ||
| Handrail Specifications_0002.pdf | ||
| Questions and Answers_0001.pdf | ||
| Sol_140P6421R0015_Amd_0001.pdf | ||
| Revised Drawings_0001.pdf | ||
| Revised Bid Schedule - Boardwalk Replacement_0001.xlsx | XLSX spreadsheet | |
| Revised Bid Schedule - Boardwalk Replacement_0001.pdf | ||
| Revised Specifications - Boardwalk Replacement_0001.pdf | ||
| Misc Documents_0001.pdf | ||
| Specifications - Boardwalk Replacement.pdf | ||
| Bid Schedule - Boardwalk Replacement.pdf | ||
| Bid Schedule - Boardwalk Replacement.xlsx | XLSX spreadsheet | |
| Pictures 2.pdf | ||
| Wage Determination.pdf | ||
| Technical Questionnaire.docx | DOCX document | |
| Past Performance Questionnaire.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| Notice to Contractors.pdf | ||
| Drawings.pdf | ||
| Sol_140P6421R0015.pdf | ||
| Pictures 1.pdf | ||
| COVID-19 Mask Policy.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONNAIRE
Boardwalk Replacement
Indiana Dunes National Park
OFFEROR:
SOLICITATION #:
DATE:
PLEASE NOTE: IN ADDITION TO PRICING PROVIDED ON THE BID SCHEDULE, YOUR
RESPONSES ON THIS QUESTIONNAIRE (AND YOUR RESPONSES ON THE PAST PERFORMANCE
QUESTIONNAIRE) ARE CRITICAL TO THE SELECTION OFFICIAL WHEN EVALUATING A
PROPOSAL FOR AWARD. INADEQUATE OR VAGUE RESPONSES MAY RESULT IN A LOWER
RATING. YOU MAY USE ADDITIONAL PAGES FOR YOUR RESPONSES, IF NEEDED.
Question #1
Please describe in detail how you plan to complete this project while adhering to the statement of work and period of performance and keeping costs in line with the bid schedule pricing provided in your proposal (Explain in detail your company’s experience installing boardwalk IAW specifications.)
Question #2
Please provide a Project Management Plan and describe how you will institute quality workmanship for a project of this nature and magnitude (Please explain in detail your company’s experience with warehouse management. Provide examples of procedures on how to handle and classify stored materials. Even explain how you intend to protect the materials that shall be used for this project. Indicate staging and delivery).
Question #3
Please describe in detail your company’s assets and/or technical equipment/facilities that may be utilized for a project of this nature and magnitude (Explain type of equipment that you plan to utilize for demolition/installation/material handling, including weights of equipment – while protecting the environment and installing new boardwalk).
Question #4
Please explain and list the materials/products your company will be installing per the Statement of Work/Specifications details. (IF QUOTING AN “OR EQUAL” PRODUCT, MUST SUBMIT WITH QUOTE
ALL SUPPORTING DOCUMENTS/SPECIFICATIONS FOR THOSE ITEMS).
Question #5
Please describe how you will address safety on the project, in an area open to the public, while maintaining safety to both the public, park staff and contractor’s forces.
Question #6
Please explain in detail your company’s experience with demolition and restoration of a boardwalk.
File details come from the government source that posted it. Updated .