Technical Questionnaire.docx
DOCX document 22 KB Posted
- Attached to
- Boardwalk Replacement at Little Calumet Trail Federal contract opportunity
- Solicitation number
- 140P6421R0015
About this file
This document contains a technical questionnaire and details of a federal contract opportunity for boardwalk replacement at Indiana Dunes National Park. The technical questionnaire includes six questions for offerors related to project completion, quality workmanship, required assets and equipment, materials to be installed, safety plans, and experience with demolition and boardwalk restoration.
The federal contract opportunity is a solicitation notice seeking proposals for a boardwalk replacement project at Little Calumet Trail in Indiana Dunes National Park. The work includes removing existing materials and installing a new galvanized steel boardwalk. The project magnitude is between $250,000 and $500,000 to be awarded as a firm-fixed price contract in May 2021. Evaluation criteria are technical approach, past performance, and price. The NAICS code is 237990 for specialty trade contractors with a $39.5 million size standard. The project is 100% set aside for small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers_0002.pdf | ||
| Sol_140P6421R0015_Amd_0002.pdf | ||
| Handrail Specifications_0002.pdf | ||
| Questions and Answers_0001.pdf | ||
| Sol_140P6421R0015_Amd_0001.pdf | ||
| Revised Specifications - Boardwalk Replacement_0001.pdf | ||
| Misc Documents_0001.pdf | ||
| Revised Drawings_0001.pdf | ||
| Revised Bid Schedule - Boardwalk Replacement_0001.xlsx | XLSX spreadsheet | |
| Revised Bid Schedule - Boardwalk Replacement_0001.pdf | ||
| Specifications - Boardwalk Replacement.pdf | ||
| Bid Schedule - Boardwalk Replacement.pdf | ||
| Bid Schedule - Boardwalk Replacement.xlsx | XLSX spreadsheet | |
| Pictures 1.pdf | ||
| Technical Questionnaire.pdf | ||
| COVID-19 Mask Policy.pdf | ||
| Pictures 2.pdf | ||
| Wage Determination.pdf | ||
| Past Performance Questionnaire.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| Notice to Contractors.pdf | ||
| Drawings.pdf | ||
| Sol_140P6421R0015.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL QUESTIONNAIRE
Boardwalk Replacement
Indiana Dunes National Park
OFFEROR:
SOLICITATION #:
DATE:
PLEASE NOTE: IN ADDITION TO PRICING PROVIDED ON THE BID SCHEDULE, YOUR RESPONSES ON THIS QUESTIONNAIRE (AND YOUR RESPONSES ON THE PAST PERFORMANCE QUESTIONNAIRE) ARE CRITICAL TO THE SELECTION OFFICIAL WHEN EVALUATING A PROPOSAL FOR AWARD. INADEQUATE OR VAGUE RESPONSES MAY RESULT IN A LOWER RATING. YOU MAY USE ADDITIONAL PAGES FOR YOUR RESPONSES, IF NEEDED.
Question #1
Please describe in detail how you plan to complete this project while adhering to the statement of work and period of performance and keeping costs in line with the bid schedule pricing provided in your proposal (Explain in detail your company’s experience installing boardwalk IAW specifications.)
Question #2
Please provide a Project Management Plan and describe how you will institute quality workmanship for a project of this nature and magnitude (Please explain in detail your company’s experience with warehouse management. Provide examples of procedures on how to handle and classify stored materials. Even explain how you intend to protect the materials that shall be used for this project. Indicate staging and delivery).
Question #3
Please describe in detail your company’s assets and/or technical equipment/facilities that may be utilized for a project of this nature and magnitude (Explain type of equipment that you plan to utilize for demolition/installation/material handling, including weights of equipment – while protecting the environment and installing new boardwalk).
Question #4
Please explain and list the materials/products your company will be installing per the Statement of Work/Specifications details. (IF QUOTING AN “OR EQUAL” PRODUCT, MUST SUBMIT WITH QUOTE ALL SUPPORTING DOCUMENTS/SPECIFICATIONS FOR THOSE ITEMS).
Question #5
Please describe how you will address safety on the project, in an area open to the public, while maintaining safety to both the public, park staff and contractor’s forces.
Question #6
Please explain in detail your company’s experience with demolition and restoration of a boardwalk.
File details come from the government source that posted it. Updated .