TE 9_Hazmat Inventory_ RR.pdf

PDF 1 MB Posted

Attached to
Railroad Repair and Maintenance Federal contract opportunity
Solicitation number
W9124823B0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

View the file

Other files for this federal contract opportunity

Other files attached to Railroad Repair and Maintenance, newest first.
File Type Posted
RR Questions and Answers.docx DOCX document
Atch 6_WD KY20230040 (24FEB23).pdf PDF
TE 10_Railer Inspection Forms.pdf PDF
Atch 7_Railroad Mapbook.pdf PDF
Atch 3_WD KY20230066 (24FEB23).pdf PDF
Atch 8_TI 850-02_TypeI_Crossing.pdf PDF
W9124823B0002.pdf PDF
Atch 12_22B0002 Bid Schedule.pdf.xlsx XLSX spreadsheet
Atch 4_WD KY20230078 (24FEB23).pdf PDF
Atch 2_WD TN20230135 (6JAN23).pdf PDF
Atch 1_WD TN20230132 (6JAN23).pdf PDF
TE 11_Record of Field Weld.pdf PDF
Atch 5_WD TN20230147 (6JAN23).pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FTCKY Hazmat Inventory Form

The contractor must complete and submit the FTCKY HAZMAT INVENTORY FORM, to include type and quantity of hazardous materials (HM) to be brought to the post and corresponding material safety data sheets (MSDS), prior to beginning action.

All HM requirements are found in the Fort Campbell Installation Technical Design Guide: See pp. 44-45, 63. As required by the Emergency Planning and Community Right-to-Know Act (EPCRA), the contractor will develop a site specific Environmental Protection Plan, in which "the Contractor will account for the quantity of HM brought to the post, the quantity used or expended during the job, and the leftover quantity which (1) may have additional useful life as HM and shall be removed by the Contractor, or (2) may be hazardous waste" (HW), which shall be removed per Fort Campbell requirements and disposed of offsite according to applicable regulations at the contractor's expense. The contractor shall submit an annual report on the use of HM and generation of HW on post to the Contracting Officer. Per 49 CFR 171-177, all HM transported to Fort Campbell must be properly containerized and labeled.

Project Hazardous Materials Log (print)

Contractor: Contract #: Date:

Work Order/Project No.

Activity:

Bldg. #: POC: COR: COR Phone #:

Date Product Name Product Manufacturer FSN/NSN/Product No.

Estimated # of Containers to be

Used Actual # of

Containers Used Container Size

(volume) MSDS Attached?

HMINVTRY.0 Revised:

March 2015 c.a.collins14 Typewritten Text

FE221362J

FTCKY Hazmat Inventory Form

File details come from the government source that posted it. Updated .