TE 11_Record of Field Weld.pdf

PDF 50 KB Posted

Attached to
Railroad Repair and Maintenance Federal contract opportunity
Solicitation number
W9124823B0002
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command

View the file

Other files for this federal contract opportunity

Other files attached to Railroad Repair and Maintenance, newest first.
File Type Posted
RR Questions and Answers.docx DOCX document
Atch 6_WD KY20230040 (24FEB23).pdf PDF
TE 10_Railer Inspection Forms.pdf PDF
Atch 7_Railroad Mapbook.pdf PDF
Atch 3_WD KY20230066 (24FEB23).pdf PDF
Atch 8_TI 850-02_TypeI_Crossing.pdf PDF
W9124823B0002.pdf PDF
Atch 5_WD TN20230147 (6JAN23).pdf PDF
TE 9_Hazmat Inventory_ RR.pdf PDF
Atch 12_22B0002 Bid Schedule.pdf.xlsx XLSX spreadsheet
Atch 4_WD KY20230078 (24FEB23).pdf PDF
Atch 2_WD TN20230135 (6JAN23).pdf PDF
Atch 1_WD TN20230132 (6JAN23).pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RECORD OF FIELD WELD

RECORD OF ITEMS REPAIRED OR REBUILT BY THE

ELECTRIC ARC WELDING METHOD AND GRINDING

INSTALLATION ________________ TURNOUT NUMBER _____

(Circle)

DATE __________ TIME ________ AM/PM AIR TEMP ____ EC WEATHER ____________

ITEM REBUILT DESCRIPTION WEIGHT LENGTH LH RH REINFORCED

Switch Point [_____] [_____] [_____] [_____] [_____] Frog [_____] [_____] [_____] [_____] [_____] Railroad Crossing [_____] [_____] [_____] [_____] [_____] Guard Rails [_____] [_____] [_____] [_____] [_____] Switch Point Protector [_____] [_____] [_____] [_____] [_____] Rail (Ends) [_____] [_____] [_____] [_____] [_____] Rail-Engine Burns [_____] [_____] [_____] [_____] [_____]

RECORD OF FIELD WELD

INSTALLATION ___________________________________ WELD NUMBER ________________

FINAL INSTALLED LOCATION _______________________ TRACK ______________________

STATION _______________________ RAIL L. R. (Circle)

AM DATE _____________ TIME

______________ PM (Circle) AIR TEMPERATURE ____________ EF. WEATHER

___________________________________ RAIL TEMPERATURE ____________ EF. WELD KIT

MANUFACTURER ________________________________________________________ RAIL GAP

(NEAREST 1.6 MM (1/16 in.) _____ RAIL CUT REQUIRED? YES NO (Circle) BACK RAIL MANUFACTURER _______________________ USED RAIL? YES NO (Circle)

YEAR/MONTH ROLLED __________________ HEAT NUMBER ________________________

AHEAD RAIL

MANUFACTURER _______________________ USED RAIL? YES NO (Circle)

YEAR/MONTH ROLLED __________________ HEAT NUMBER ________________________

REMARKS ______________________________________________________________________

ULTRASONIC TEST DATE AND RESULTS _____________________________________________

KIT MFG. REPRESENTATIVE PRESENT _________ WELDING FOREMAN___________________

(Initial) CONTRACTING OFFICER'S REPRESENTATIVE

PRESENT __________________ RECORDER ___________________________

(Initial) (Signed)

__________________ RECORDER ___________________________

(Initial) (Signed)

FOR GOVERNMENT USE ONLY ULTRASONIC TEST DATE AND RESULTS

File details come from the government source that posted it. Updated .