This document is a Design Professional Services Task Order issued by the Arizona Department of Administration's General Services Division, specifically for the Flagstaff-DVS-Courtyard Renovation project. The task order is between the State of Arizona and J2 Engineering and Environmental Design LLC, executed on February 7, 2022, under the existing contract CTR058875 for ADOA On-Call Civil Engineering Services.

The scope of services involves drainage mitigation for the Arizona State Veterans' Home in Flagstaff, with a total project cost of $23,850.00. The services include site investigation, conceptual options development, construction document preparation at 90% and final stages, and post-design construction administration. J2 Engineering will conduct a topographic survey, develop design plans, provide cost estimates, and create drainage memorandums. The breakdown includes $14,170.00 for J2 Design services, $6,680.00 for survey services by CRS (Consultant Registered Surveying), and a $3,000.00 design allowance. The project aims to address flooding issues in the center courtyard area of the veterans' home complex.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN PROFESSIONAL

SERVICES TASK ORDER

Description:

PCS-26-010 - Flagstaff-DVS-Courtyard

Renovation

Arizona Department of Administration

General Services Division 1400 W. Washington St., Ste. B200

Phoenix, AZ 85007

1 | Page

CTR078896

TASK ORDER

PCS-26-010 - Flagstaff-DVS-Courtyard Renovation

This Task Order is in accordance with contract CTR058875 ADOA On-Call Civil Engineers is made and entered into on February 7, 2022 by and between the State of Arizona, DEPARTMENT OF ADMINISTRATION acting by and through the General Services Division (“State”), and J 2 ENGINEERING AND ENVIRONMENTAL DESIGN LLC. (“Engineer"), both individually referenced as “Party” and collectively referenced as the “Parties.” The Parties agree as follows:

1. Statement of Work. Engineer agrees to provide the services contained in the attached Exhibit

“B” (“Statement of Work” or “Services”).

2. Compensation and Payment Schedule.

2.1. State shall pay the Engineer the amount specified in the Rate Schedule attached as Exhibit “C.” Payment shall not exceed the total amount set forth in Exhibit “C” unless otherwise authorized by the State.

3. Agreement Representatives.

DEPARTMENT OF ADMINISTRATION

DUSTIN DEASSON,

CONSTRUCTION PROCUREMENT MANAGER

1400 W WASHINGTON ST., SUITE B200

PHOENIX, AZ 85007

480-772-3446 dustin.deason@azdoa.gov

J 2 ENGINEERING AND ENVIRONMENTAL DESIGN LLC

JASON TOUCHIN

PRINCIPAL CIVIL ENGINEER

4649 E COTTON GIN LOOP STE B2

PHOENIX, AZ, 85040

(602) 438-2221 Jtouchin@j2design.us

Docusign Envelope ID: 1260DF2B-9294-4409-908B-2DDEBEA2FEC4 mailto:dustin.deason@azdoa.gov mailto:Jtouchin@j2design.us

2 | Page

INCORPORATED BY REFERENCE

The following shall be incorporated by reference and shall become part of the Agreement Solicitation: BPM004132 ADOA On-Call Civil Engineering Services Special Terms and Conditions of Solicitation BPM004132 Uniform Terms and Conditions of BPM004132

EXHIBITS

This Task Order includes the following Exhibits attached hereto:

Exhibit B: Statement of Work and Mutually Agreeable Scope Exclusions (Provided by Engineer) Exhibit C: Engineer and Sub-consultant Rate Schedule, Reimbursable Expenses (Provided by Engineer)

IN WITNESS WHEREOF, the Parties have executed this Agreement as of the date and year first set forth above.

ENGINEER: J 2 ENGINEERING AND ENVIRONMENTAL DESIGN LLC

Signature:

Printed Name:

Title:

Date:

STATE OF ARIZONA, DEPARTMENT OF ADMINISTRATION

Signature:

Printed Name:

Title:

Date:

Jason Touchin

Vice President - Principal Civil Engineer

30-Sep-25 | 6:52 AM MST

Dustin Deason

GSD Procurement Group Manager

30-Sep-25 | 8:28 AM MST

J2 Engineering and Environmental Design, LLC | 4649 E. Cotton Gin Loop, Suite B2 Phoenix, AZ 85040 | 602.438.2221 | www.j2design.us

M:\Proposals\ADOA\2025\AZ State Veterans Home Flagstaff 1

September 3, 2025

Re: Scope of Services for the AZ State Veterans’ Home Drainage Mitigation

Dear Brandon, J2 Engineering and Environmental Design, LLC (J2) is pleased to provide professional design services for the

Arizona Department of Administration (ADOA) AZ State Veterans’ Home drainage mitigation project. This scope of services and fees are based upon our understanding of the project from our discussions with ADOA staff and our site visit on August 21, 2025. J2 will serve as a prime consultant for the project providing civil engineering design services.

Project Understanding: The existing veterans’ home complex floods in the center courtyard area. J2 will evaluate the area based on topographic survey and mitigate the drainage flooding. The approach is to evaluate the flooding issue and J2 will propose initial conceptual options. Once the options are vetted, J2 will develop the design to final construction documents. Our estimated Lump Sum fees are as follows (see attached fee sheet for breakdown):

Design & Post Design Services:

J2 Design: $14,170.00

CRS (Survey): $ 6,680.00

Design Allowance: $ 3,000.00

Project Total: $23,850.00

Thank you for the opportunity to provide professional services on this exciting project and serve the ADOA.

Please contact me if you have any questions.

Sincerely, Jason Touchin, PE

Principal Civil Engineer jtouchin@j2design.us

(o) 602.438.2221

J2 Engineering and Environmental Design, LLC | 4649 E. Cotton Gin Loop, Suite B2 Phoenix, AZ 85040 | 602.438.2221 | www.j2design.us

M:\Proposals\ADOA\2025\AZ State Veterans Home Flagstaff 2

ADOA

AZ State Veterans’ Home Drainage Mitigation Scope of Design Services

Task 100: Site Investigation & Conceptual Options

J2 will attend a site visit with the ADOA. J2 will request as-builts and previous geotechnical and drainage reports from ADOA associated with the site to review. J2 will coordinate the topographic survey. J2 will evaluate the area and develop conceptual options to mitigate the flooding. These options will be in a PDF format.

Meetings:

• Site Visit - One (1) meeting. This meeting is anticipated to be six (6) hours in duration, including travel time. J2 will have one (1) representative at this meeting.

• Option Review Meeting – One (1) virtual meeting. This meeting is anticipated to be one (1) hour in duration. J2 will have two (2) representatives at this meeting.

Deliverables:

• Topographic Survey

• Conceptual Options

Task 200 & 300 – Construction Documents (90% and Final)

J2 will develop plans and details and provide staged submittals at the 90% and Final levels of completion. J2 will submit one (1) full-size set of plans at each stage for review.

The Design plans developed by J2 are anticipated to include the following:

1. Overall Project Cover Sheet

2. General Notes and Quantity Summary Sheet

3. Civil Grading and Drainage Sheet

4. Civil Details

5. Geometric Control and Control Tables Sheet

Construction document sheets will utilize a J2 standard border and at full-size will be 24”x36”. Plan view sheets will be at 1” = 10’ scale. It is assumed that the site will be covered by one (1) plan sheet. The construction document set, including cover sheets, plan sheets, and detail sheets, are anticipated to contain five (5) sheets produced by J2.

Special Provisions will be based on MAG format and provided on the plan sheets for the improvements.

J2 will develop a final cost estimate for the improvements

J2 Engineering and Environmental Design, LLC | 4649 E. Cotton Gin Loop, Suite B2 Phoenix, AZ 85040 | 602.438.2221 | www.j2design.us

M:\Proposals\ADOA\2025\AZ State Veterans Home Flagstaff 3

J2 will develop a draft and final drainage memorandum for the improvements, including calculations.

Deliverables:

• Design Plans (90%, Final), one (1) Full-size PDF set

• Cost Estimate (Final), one (1) PDF set

• Drainage Memorandum (Draft and Final), one (1) PDF set

• Comment Resolution Meeting – One (1) virtual meeting. This meeting is anticipated to be one (1) hour in duration. J2 will have two (2) representatives at this meeting.

Design Allowances

The following allowances may only be utilized if authorized in advance by the ADOA. These allowances will not be authorized until a full modified scope is known and may need to be increased if the required scope exceeds the established allowance amount. The following allowances have been established for this project:

Design: An allowance has been established to procure additional design services should the ADOA choose to add scope or design efforts beyond this original level of involvement. This may also include existing landscape and irrigation restoration.

Scope of Services: Post Design Services

Task 400 – Construction Administration

J2 will attend a pre-construction meeting (assuming a virtual option is available). J2 will have two (2) staff members attend the pre-construction meeting. The pre-construction meeting is anticipated to be one (1) hour in duration.

J2 will review shop drawings; review, respond, and coordinate requests for information (RFI). We are anticipating at a minimum the submittals to include:

• Concrete mix designs

• Pipe materials

• All drainage related items

• Site Visit - One (1) visit. This visit is anticipated to be six (6) hours in duration, including travel time. J2 will have one (1) representative at this site visit for either project review/observation or walk through.

J2 Engineering and Environmental Design, LLC | 4649 E. Cotton Gin Loop, Suite B2 Phoenix, AZ 85040 | 602.438.2221 | www.j2design.us

M:\Proposals\ADOA\2025\AZ State Veterans Home Flagstaff 4

General Project Understanding:

ADOA shall designate a Project Manager, to act as the Client’s representative with respect to the services to be performed or furnished by the Design Team under this agreement. The Project Manager will act on behalf of

ADOA, to have complete authority to transmit instructions, receive information, interpret, and define the Client’s policies and decisions with respect to the Design Team’s services for the project.

ADOA shall furnish to the Design Team, any existing pertinent data prepared by or services of others, including electronic base maps, drawings of physical conditions in or relating to existing surface or subsurface utilities or structures within the planning area and any other relevant information pertaining to the project.

ADOA warrants and represents that members of the Design Team have the right to enter upon the real property involved herein and extend the right to J2. The Design Team agrees to exercise due care in the performance of all services pursuant hereto.

The Design Team has provided no environmental or cultural investigations on this site/project, has no knowledge of any adverse environmental or cultural conditions on the site/project, and is not responsible for and has no liability for any such environmental or cultural condition should one be found. It is the responsibility of the ADOA to investigate and make these environmental or cultural determinations based on the best knowledge and information available at the time of this project. Clearance to begin work shall be given prior to directing or ordering the preparation of any engineering documents.

General Understanding Post Design (Construction Phase Services):

Limited post design services shall be performed by J2 Engineering and Environmental Design, LLC.

No construction observations will be provided by J2 under the limits described above with the intent of rendering a professional opinion regarding the quality of the completed construction strictly limited to the civil, landscape and irrigation aspects of the project. This task should not be construed to warrant the work of any contractor.

Any administrative and observation services provided by the Consultant Project Team are solely for the purpose of rendering a professional opinion regarding apparent conformance to contract requirements. Consultant does not warrant the work of any contractor. In accordance with generally accepted construction practice, the contractor shall be solely responsible for all job site conditions and safety of persons or property.

J2 shall not have control over, or charge of, and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work of each of the Contractors, since these are solely the Contractor’s responsibility under the Contract for

Construction. J2 shall not be responsible for a Contractor’s failure to carry out the Work in accordance with the respective Contract Documents. J2 shall not have control over, or charge of, acts or omissions of the

J2 Engineering and Environmental Design, LLC | 4649 E. Cotton Gin Loop, Suite B2 Phoenix, AZ 85040 | 602.438.2221 | www.j2design.us

M:\Proposals\ADOA\2025\AZ State Veterans Home Flagstaff 5

Contractors, Subcontractors, their agents or employees, or any other persons performing portions of the Work not directly employed by J2.

Design Assumptions and Exclusions:

1. Legal descriptions, boundary surveys, ALTA, title reports, and any effort to establish any easements are not included in this scope of services. Survey is limited to topographic.

2. J2 is not providing any re-platting or rezoning efforts.

3. J2 is not providing any 404 permits or applications nor are we providing any environmental, cultural, or biological investigations or clearances.

4. Fees of any type are not included.

5. This scope of services does not include any off-site drainage (hydrologic or hydraulic) analysis or reports.

6. All deliverables will be provided in PDF format to ADOA for distribution and any reproduction.

7. Geotechnical investigations and reports are not included.

8. Utility design or coordination is not included.

9. Submittals to any agencies outside of ADOA, for review, are not included.

We would expect to start our services promptly after receipt of your acceptance and complete our design services in a timely manner. This document represents the entire understanding of the Design Scope of Work as set out herein and may only be modified in writing signed by both parties.

Classification Man Hours Current Rates Total (rounded to nearest whole dollar)

Principal 0 $208.66 $0.00

Senior Project Manager 0 $180.70 $0.00

Project Manager 3 $128.88 $387.00

Project Engineer 97 $127.17 $12,335.00

Engineering Technician 12 $120.63 $1,448.00

Draftsperson 0 $83.39 $0.00

Clerical 0 $72.01 $0.00

Total Hours 112 Total Dollars $14,170.00

Total (Labor, Overhead, Profit): $14,170.00

Printing, Reproduction, Reprographics, Supplies Etc.

$0.00

$6,680.00

$6,680.00

$3,000.00

$3,000.00

$23,850.00

Date

* Included in Overhead *

DERIVATION OF COST PROPOSAL: DESIGN & POST DESIGN SERVICES

AZ Veterans' Home Drainage Mitigation

ADOA

J2 Engineering and Environmental Design, LLC

Total Allowances:

Jason Touchin, PE

9/3/2025

J2 Engineering and Environmental Design LLC

Total Cost (J2, Subconsultants, Allowances):

Principal Civil Engineer

Subconsultants

Direct Expenses

CRS (Survey)

Total Outside Services:

Allowances

Design Allowance

T a sk

N u m b e r

T a sk

P ri n c ip a l

S e n io r

P ro je c t

M a n a g e r

P ro je c t

M a n a g e r

P ro je c t

En g in e e r

En g in e e ri n g

T e c h n ic ia n

D ra ft sp e rs o n

C le ri c a l

T o ta l

.6

.7

.8

7.

.6

3.

.0

.0

R e vi e w e xi st in g s it e d a ta

Si te

V is it

1)

Ev a lu a te a n d

D e ve lo p C o n c e p tu a l O p ti o n s

O p ti o n R e vi e w

M e e ti n g

1)

.0

In it ia l G ra d in g

D ra in a g e D e si g n

In it ia l C o st

E st im a te

In it ia l D ra in a g e C a lc u la ti o n s

M e m o

.0

C o m m e n t R e so lu ti o n

M e e ti n g

1)

Fi n a l G ra d in g

D ra in a g e D e si g n

Fi n a l C o st

E st im a te

Fi n a l D ra in a g e C a lc u la ti o n s

M e m o

.0

Pr e

C o n st ru c ti o n M e e ti n g

1)

R

FI

R e sp o n se s, S u b m it ta l R e vi e w s

Si te

V is it

.0

.0

7.

,3

.0

1,4

.0

.0

.0

,17

.0

P o st D e si g n

S e rv ic e s

(C o n st ru c ti o n A d m in

R a te s

H o u rs

Fe e

S it e In v e st ig a ti o n

C o n c e p tu a l O p ti o n s

C o n st ru c ti o n D o c u m e n ts

Fi n a l)

C o n st ru c ti o n D o c u m e n ts

Certificate Of Completion Envelope Id: 1260DF2B-9294-4409-908B-2DDEBEA2FEC4 Status: Completed

Subject: TASK ORDER - PCS-26-010 Flagstaff-DVS-Courtyard Renovation.pdf

Source Envelope:

Document Pages: 13 Signatures: 2 Envelope Originator:

Certificate Pages: 5 Initials: 0 Dustin Deason

AutoNav: Enabled

EnvelopeId Stamping: Enabled

Time Zone: (UTC-07:00) Arizona

1840 W Jackson St.

Phoenix, AZ 85007 dustin.deason@azdoa.gov

IP Address: 54.146.192.81

Record Tracking Status: Original

9/29/2025 3:08:18 PM

Holder: Dustin Deason dustin.deason@azdoa.gov

Location: DocuSign

Security Appliance Status: Connected Pool: StateLocal

Storage Appliance Status: Connected Pool: Arizona Department of Administration -

General Services Division

Location: Docusign

Signer Events Signature Timestamp Jason Touchin jtouchin@j2design.us

Vice President - Principal Civil Engineer

J2 Design

Security Level: Email, Account Authentication (None)

Signature Adoption: Pre-selected Style

Using IP Address: 72.214.211.114

Sent: 9/29/2025 3:09:38 PM

Viewed: 9/30/2025 6:48:51 AM

Signed: 9/30/2025 6:52:28 AM

Electronic Record and Signature Disclosure:

Accepted: 5/24/2022 10:31:56 AM ID: 81a96e4d-50ef-41c9-8fe3-0ae1218d92b2

Dustin Deason dustin.deason@azdoa.gov

GSD Procurement Group Manager

ADOA

Security Level: Email, Account Authentication (None)

Signature Adoption: Pre-selected Style

Using IP Address: 104.129.198.99

Sent: 9/30/2025 6:52:29 AM

Viewed: 9/30/2025 8:28:35 AM

Signed: 9/30/2025 8:28:42 AM

Electronic Record and Signature Disclosure:

Not Offered via Docusign

In Person Signer Events Signature Timestamp

Editor Delivery Events Status Timestamp

Agent Delivery Events Status Timestamp

Intermediary Delivery Events Status Timestamp

Certified Delivery Events Status Timestamp

Carbon Copy Events Status Timestamp

Witness Events Signature Timestamp

Notary Events Signature Timestamp

Envelope Summary Events Status Timestamps

Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 9/29/2025 3:09:38 PM

Certified Delivered Security Checked 9/30/2025 8:28:35 AM

Signing Complete Security Checked 9/30/2025 8:28:42 AM

Completed Security Checked 9/30/2025 8:28:42 AM

Payment Events Status Timestamps

Electronic Record and Signature Disclosure

ELECTRONIC RECORD AND SIGNATURE DISCLOSURE

From time to time, State of Arizona Department of Administration - General Services Division

(we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

Getting paper copies

At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time

(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a

$0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.

Withdrawing your consent

If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.

Consequences of changing your mind

If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.

All notices and disclosures will be sent to you electronically

Electronic Record and Signature Disclosure created on: 8/8/2020 3:29:12 PM Parties agreed to: Jason Touchin

Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given

us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us.

How to contact State of Arizona Department of Administration - General Services

Division:

You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:

To contact us by email send messages to: marjorie.mckenna@azdoa.gov

To advise State of Arizona Department of Administration - General Services Division of your new email address

To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at marjorie.mckenna@azdoa.gov and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address.

If you created a DocuSign account, you may update it with your new email address through your account preferences.

To request paper copies from State of Arizona Department of Administration - General

Services Division

To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to marjorie.mckenna@azdoa.gov and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any.

To withdraw your consent with State of Arizona Department of Administration - General

Services Division

To inform us that you no longer wish to receive future notices and disclosures in electronic format you may:

i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may;

ii. send us an email to marjorie.mckenna@azdoa.gov and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..

Required hardware and software

The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide-signing-system-requirements.

Acknowledging your access and consent to receive and sign documents electronically

To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system.

By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:

You can access and read this Electronic Record and Signature Disclosure; and

You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and

Until or unless you notify State of Arizona Department of Administration - General

Services Division as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by State of Arizona

Department of Administration - General Services Division during the course of your relationship with State of Arizona Department of Administration - General Services

Division.

https://support.docusign.com/guides/signer-guide-signing-system-requirements https://support.docusign.com/guides/signer-guide-signing-system-requirements

TASK ORDER On-Call Civil Eng
J2 Proposal
2025-09-30T08:32:11-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .