Bid Tabulation Report Summary

This is a Bid Tabulation Report for federal construction project VA ERFO FS GWJEF808 2020-2(1), titled "Repairs to Punch and Judy, Little Stony, Blackhorse, Dry Run and Hussy Mountain Sites," located in Bedford, Scott, Wythe, and Tazewell Counties, Virginia, within the George Washington and Jefferson National Forests. The solicitation (693C73-26-B-000007) was opened on April 28, 2026, and administered by the Eastern Federal Lands Division. The contract was awarded to JWM Enterprises, LLC on July 7, 2026. Seven contractors submitted responsive bids across five optional schedules (A through E), with bid amounts ranging from $687,479.38 to $12,075,115.00 depending on the schedule and included options.

The project involves comprehensive site repairs and restoration services including mobilization, surveying, testing, erosion control, clearing and grubbing, tree removal, roadway work, structural construction (concrete and riprap), drainage systems, soil stabilization, turf establishment, and temporary traffic control. Individual bid items span specialized work such as gabions, reinforced soil slopes, box culvert installation, concrete pavement, signage, and utility relocation. Base Schedule A pricing for the awarded contractor totals $1,271,845.00, with combined base and optional schedules (B-E) reaching $5,067,150.00. The Engineer's Estimate for the base schedule was $1,570,000.00. Competitive bids were received from Central Southern Construction Corp., King General Contractors Inc., Kovilic Construction Company Inc., Structural Engineering Group Inc., Estes Bros. Construction Inc., and Abrams Group Construction LLC, with detailed line-item pricing provided for all bid items across all schedules.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION REPORT

Project No. : VA ERFO FS GWJEF808 2020-2(1) Project Name: Repairs to Punch and Judy, Little Stony, Blackhorse, Dry Run and Hussy Mountain Sites.

Contractor Responsive? Base Schedule A Central Southern Construction Corp. $3,577,600.00

King General Contractors, Inc. $2,520,267.77 Kovilic Construction Company Inc $1,835,100.00 Structural Engineering Group, Inc. $1,092,983.20 Estes Bros. Const., Inc. $1,514,832.20 Abrams Group Construction LLC $687,479.38 JWM Enterprises, LLC $1,271,845.00 Engineer's Estimate $1,570,000.00

Contractor Responsive? Total Base Schedule A and Option(s): BCDE Central Southern Construction Corp. $12,075,115.00

King General Contractors, Inc. $10,560,152.48 Kovilic Construction Company Inc $9,563,750.00 Structural Engineering Group, Inc. $9,399,638.73 Estes Bros. Const., Inc. $7,957,265.17 Abrams Group Construction LLC $5,151,432.21 JWM Enterprises, LLC $5,067,150.00 Engineer's Estimate $7,787,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : David Bogner

Contractor Responsive? Option: B Central Southern Construction Corp. $2,764,450.00

King General Contractors, Inc. $3,542,815.28 Kovilic Construction Company Inc $2,970,200.00 Structural Engineering Group, Inc. $2,572,145.60 Estes Bros. Const., Inc. $1,719,072.30 Abrams Group Construction LLC $1,260,612.72 JWM Enterprises, LLC $1,462,530.00 Engineer's Estimate $2,065,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Contractor Responsive? Option: C Central Southern Construction Corp. $1,736,415.00

King General Contractors, Inc. $1,627,014.95 Kovilic Construction Company Inc $1,574,200.00 Structural Engineering Group, Inc. $1,269,505.50 Estes Bros. Const., Inc. $945,934.40 Abrams Group Construction LLC $872,210.65 JWM Enterprises, LLC $700,410.00 Engineer's Estimate $1,012,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Contractor Responsive? Option: D Central Southern Construction Corp. $1,883,850.00

King General Contractors, Inc. $1,492,450.70 Kovilic Construction Company Inc $1,982,650.00 Structural Engineering Group, Inc. $2,503,410.30 Estes Bros. Const., Inc. $1,162,799.79 Abrams Group Construction LLC $1,001,879.76 JWM Enterprises, LLC $777,880.00 Engineer's Estimate $1,795,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Contractor Responsive? Option: E Central Southern Construction Corp. $2,112,800.00

King General Contractors, Inc. $1,377,603.78 Kovilic Construction Company Inc $1,201,600.00 Structural Engineering Group, Inc. $1,961,594.13 Estes Bros. Const., Inc. $2,614,626.48 Abrams Group Construction LLC $1,329,249.70 JWM Enterprises, LLC $854,485.00 Engineer's Estimate $1,345,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Project No. : VA ERFO FS

GWJEF808 2020-2(1)

Project Name: Repairs to Punch and Judy, Little Stony, Blackhorse, Dry Run and Hussy Mountain Sites.

Division: Eastern Federal Lands

Schedule: A Schedule Type: Base Lead Designer: Thang Nguyen Solicitation No. : 693C73-26-B-000007 Opened at: Ashburn, VA Opened by: David Bogner State: VA County: Bedford, Scott, Wythe, Tazewell Federal Land: George Washington and Jefferson National Forests

Bid Open Date and Time: 04/28/2026

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204

$3,577,600.00

King General Contractors, Inc., 250 Bob Morrison Blvd, Bristol, VA, 24201

$2,520,267.77

Kovilic Construction Company Inc, 3721 N Carnation Street, Franklin Park, IL, 60131

$1,835,100.00

Estes Bros. Const., Inc., 126 Sugar Run Road, Jonesville, VA, 24263

$1,514,832.20

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : David Bogner

David Bogner

Contract Specialist

JWM Enterprises, LLC 7/7/2026

4/28/2026

JWM Enterprises, LLC, 2312 Lee Highway, Marion, VA, 24354

$1,271,845.00

Structural Engineering Group, Inc., 38997 E. Colonial Highway, Hamilton, VA, 20158

$1,092,983.20

Abrams Group Construction

LLC,

3645 HWY 90,

Pace, FL, 32571

$687,479.38

Engineer's Estimate $1,570,000.00

Project No. : VA ERFO FS GWJEF808 2020-2(1) Project Name: Repairs to Punch and Judy, Little Stony, Blackhorse, Dry Run and Hussy Mountain Sites.

Schedule: A Schedule Type: Base

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION Central Southern Construction Corp. $725,000.00

Estes Bros. Const., Inc. $625,800.00

King General Contractors, Inc. $121,410.00

Kovilic Construction Company Inc $100,000.00

Abrams Group Construction LLC $81,722.10

Structural Engineering Group, Inc.

$38,557.20

JWM Enterprises, LLC $6,600.00 Engineer's Estimate ALL LPSM LPSM $125,640.00

A0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Central Southern Construction Corp. $360,000.00

Kovilic Construction Company Inc $50,000.00

King General Contractors, Inc. $44,730.00

Structural Engineering Group, Inc.

$38,557.20

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Abrams Group Construction LLC $27,192.26

Estes Bros. Const., Inc. $10,000.00

JWM Enterprises, LLC $5,500.00 Engineer's Estimate ALL LPSM LPSM $37,100.00

A0060 15401-0000 CONTRACTOR

TESTING

Central Southern Construction Corp. $360,000.00

Estes Bros. Const., Inc. $96,000.00

King General Contractors, Inc. $63,900.00

Kovilic Construction Company Inc $50,000.00

Structural Engineering Group, Inc.

$38,557.20

Abrams Group Construction LLC $18,128.18

JWM Enterprises, LLC $5,500.00 Engineer's Estimate ALL LPSM LPSM $34,350.00

A0080 15705-0100 SOIL EROSION

CONTROL, SILT

FENCE

Kovilic Construction Company Inc 500.000 $20.00 $10,000.00

King General Contractors, Inc. 500.000 $17.25 $8,625.00

Structural Engineering Group, Inc.

500.000 $16.70 $8,350.00

Central Southern Construction Corp. 500.000 $15.00 $7,500.00

Abrams Group Construction LLC 500.000 $12.84 $6,420.00

Estes Bros. Const., Inc. 500.000 $8.67 $4,335.00

JWM Enterprises, LLC 500.000 $8.00 $4,000.00 Engineer's Estimate 500.000 LNFT $28.00 $14,000.00

A0100 15706-0200 SOIL EROSION

CONTROL, CHECK

DAM

Kovilic Construction Company Inc 15.000 $1,000.00 $15,000.00

Central Southern Construction Corp. 15.000 $750.00 $11,250.00

Abrams Group Construction LLC 15.000 $679.81 $10,197.15

King General Contractors, Inc. 15.000 $670.95 $10,064.25

Structural Engineering Group, Inc.

15.000 $424.10 $6,361.50

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0100 15706-0200 SOIL EROSION

CONTROL, CHECK

DAM

Estes Bros. Const., Inc. 15.000 $373.76 $5,606.40

JWM Enterprises, LLC 15.000 $335.00 $5,025.00 Engineer's Estimate 15.000 EACH $592.00 $8,880.00

A0120 15706-1600 SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION

EXIT

Structural Engineering Group, Inc.

2.000 $13,109.40 $26,218.80

Abrams Group Construction LLC 2.000 $7,553.40 $15,106.80

Central Southern Construction Corp. 2.000 $6,500.00 $13,000.00

Kovilic Construction Company Inc 2.000 $5,000.00 $10,000.00

JWM Enterprises, LLC 2.000 $4,400.00 $8,800.00 Estes Bros. Const., Inc. 2.000 $3,892.50 $7,785.00

King General Contractors, Inc. 2.000 $3,834.00 $7,668.00

Engineer's Estimate 2.000 EACH $18,650.00 $37,300.00

A0140 20103-0000 CLEARING AND

GRUBBING

King General Contractors, Inc. 400.000 $70.29 $28,116.00

JWM Enterprises, LLC 400.000 $43.75 $17,500.00 Central Southern Construction Corp. 400.000 $30.00 $12,000.00

Estes Bros. Const., Inc. 400.000 $30.00 $12,000.00

Abrams Group Construction LLC 400.000 $22.67 $9,068.00

Kovilic Construction Company Inc 400.000 $10.00 $4,000.00

Structural Engineering Group, Inc.

400.000 $9.00 $3,600.00

Engineer's Estimate 400.000 SQYD $17.00 $6,800.00

A0160 20120-1000 REMOVAL,

INDIVIDUAL TREE

Estes Bros. Const., Inc. 5.000 $3,700.00 $18,500.00

Structural Engineering Group, Inc.

5.000 $3,213.10 $16,065.50

Abrams Group Construction LLC 5.000 $2,358.03 $11,790.15

Central Southern Construction Corp. 5.000 $2,000.00 $10,000.00

Kovilic Construction Company Inc 5.000 $1,000.00 $5,000.00

King General Contractors, Inc. 5.000 $894.60 $4,473.00

JWM Enterprises, LLC 5.000 $500.00 $2,500.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0160 20120-1000 REMOVAL,

INDIVIDUAL TREE Engineer's Estimate 5.000 EACH $2,650.00 $13,250.00

A0180 20401-0000 ROADWAY

EXCAVATION

Kovilic Construction Company Inc 450.000 $200.00 $90,000.00

King General Contractors, Inc. 450.000 $127.80 $57,510.00

Abrams Group Construction LLC 450.000 $83.09 $37,390.50

Central Southern Construction Corp. 450.000 $80.00 $36,000.00

Structural Engineering Group, Inc.

450.000 $70.70 $31,815.00

Estes Bros. Const., Inc. 450.000 $70.00 $31,500.00

JWM Enterprises, LLC 450.000 $40.00 $18,000.00 Engineer's Estimate 450.000 CUYD $75.00 $33,750.00

A0200 20436-2000 BACKFILL,

GRANULAR (VDOT

#3 COARSE

AGGREGATE)

Estes Bros. Const., Inc. 150.000 $227.58 $34,137.00

Kovilic Construction Company Inc 150.000 $200.00 $30,000.00

Central Southern Construction Corp. 150.000 $150.00 $22,500.00

Structural Engineering Group, Inc.

150.000 $136.20 $20,430.00

Abrams Group Construction LLC 150.000 $128.40 $19,260.00

King General Contractors, Inc. 150.000 $111.19 $16,678.50

JWM Enterprises, LLC 150.000 $80.00 $12,000.00 Engineer's Estimate 150.000 TON $55.00 $8,250.00

A0220 20701-0700 SEPARATION-

STABILIZATION

GEOTEXTILE, CLASS

2, TYPE B

King General Contractors, Inc. 750.000 $30.03 $22,522.50

Central Southern Construction Corp. 750.000 $15.00 $11,250.00

Abrams Group Construction LLC 750.000 $13.59 $10,192.50

Kovilic Construction Company Inc 750.000 $10.00 $7,500.00

Structural Engineering Group, Inc.

750.000 $5.40 $4,050.00

JWM Enterprises, LLC 750.000 $5.00 $3,750.00 Estes Bros. Const., Inc. 750.000 $4.05 $3,037.50

Engineer's Estimate 750.000 SQYD $8.00 $6,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0240 20810-0000 SHORING AND

BRACING

Central Southern Construction Corp. $150,000.00

Kovilic Construction Company Inc $100,000.00

Structural Engineering Group, Inc.

$71,973.40

Abrams Group Construction LLC $26,821.44

Estes Bros. Const., Inc. $25,000.00

JWM Enterprises, LLC $25,000.00 King General Contractors, Inc. $6,390.00

Engineer's Estimate ALL LPSM LPSM $68,000.00

A0260 25102-0200 PLACED RIPRAP,

METHOD A, CLASS

2 (VDOT CLASS I)

Central Southern Construction Corp. 6.000 $1,000.00 $6,000.00

Kovilic Construction Company Inc 6.000 $1,000.00 $6,000.00

King General Contractors, Inc. 6.000 $600.66 $3,603.96

Estes Bros. Const., Inc. 6.000 $340.61 $2,043.66

Abrams Group Construction LLC 6.000 $226.61 $1,359.66

Structural Engineering Group, Inc.

6.000 $154.20 $925.20

JWM Enterprises, LLC 6.000 $125.00 $750.00 Engineer's Estimate 6.000 TON $205.00 $1,230.00

A0280 25102-0600 PLACED RIPRAP,

METHOD A, CLASS

6 (VDOT CLASS III)

Central Southern Construction Corp. 4.000 $1,200.00 $4,800.00

Kovilic Construction Company Inc 4.000 $1,000.00 $4,000.00

King General Contractors, Inc. 4.000 $792.36 $3,169.44

Estes Bros. Const., Inc. 4.000 $341.66 $1,366.64

Abrams Group Construction LLC 4.000 $264.36 $1,057.44

Structural Engineering Group, Inc.

4.000 $224.90 $899.60

JWM Enterprises, LLC 4.000 $125.00 $500.00 Engineer's Estimate 4.000 TON $170.00 $680.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0300 25302-1000 GABIONS,

GALVANIZED OR

ALUMINIZED

COATED

Kovilic Construction Company Inc 400.000 $1,000.00 $400,000.00

Structural Engineering Group, Inc.

400.000 $816.10 $326,440.00

King General Contractors, Inc. 400.000 $814.73 $325,892.00

Central Southern Construction Corp. 400.000 $750.00 $300,000.00

JWM Enterprises, LLC 400.000 $400.00 $160,000.00 Estes Bros. Const., Inc. 400.000 $275.65 $110,260.00

Abrams Group Construction LLC 400.000 $143.52 $57,408.00

Engineer's Estimate 400.000 CUYD $440.00 $176,000.00

A0320 26101-0000 REINFORCED SOIL

SLOPE

Central Southern Construction Corp. 4,300.000 $250.00 $1,075,000.00

King General Contractors, Inc. 4,300.000 $172.53 $741,879.00

JWM Enterprises, LLC 4,300.000 $155.00 $666,500.00 Kovilic Construction Company Inc 4,300.000 $100.00 $430,000.00

Estes Bros. Const., Inc. 4,300.000 $75.60 $325,080.00

Structural Engineering Group, Inc.

4,300.000 $21.80 $93,740.00

Abrams Group Construction LLC 4,300.000 $16.62 $71,466.00

Engineer's Estimate 4,300.000 SQFT $114.00 $490,200.00 A0340 30101-0000 AGGREGATE BASE Kovilic Construction

Company Inc 110.000 $150.00 $16,500.00

King General Contractors, Inc. 110.000 $140.55 $15,460.50

Abrams Group Construction LLC 110.000 $135.96 $14,955.60

Structural Engineering Group, Inc.

110.000 $102.80 $11,308.00

Central Southern Construction Corp. 110.000 $100.00 $11,000.00

JWM Enterprises, LLC 110.000 $80.00 $8,800.00 Estes Bros. Const., Inc. 110.000 $67.90 $7,469.00

Engineer's Estimate 110.000 TON $110.00 $12,100.00

A0360 30110-0000 AGGREGATE

SURFACE COURSE

King General Contractors, Inc. 270.000 $153.36 $41,407.20

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0360 30110-0000 AGGREGATE

SURFACE COURSE

Kovilic Construction Company Inc 270.000 $150.00 $40,500.00

Central Southern Construction Corp. 270.000 $120.00 $32,400.00

Structural Engineering Group, Inc.

270.000 $102.80 $27,756.00

Abrams Group Construction LLC 270.000 $98.19 $26,511.30

JWM Enterprises, LLC 270.000 $80.00 $21,600.00 Estes Bros. Const., Inc. 270.000 $69.37 $18,729.90

Engineer's Estimate 270.000 TON $212.00 $57,240.00

A0380 60201-0600 18-INCH PIPE

CULVERT

Central Southern Construction Corp. 18.000 $500.00 $9,000.00

Structural Engineering Group, Inc.

18.000 $289.20 $5,205.60

Kovilic Construction Company Inc 18.000 $200.00 $3,600.00

Abrams Group Construction LLC 18.000 $181.28 $3,263.04

JWM Enterprises, LLC 18.000 $165.00 $2,970.00 Estes Bros. Const., Inc. 18.000 $161.10 $2,899.80

King General Contractors, Inc. 18.000 $137.39 $2,473.02

Engineer's Estimate 18.000 LNFT $150.00 $2,700.00

A0400 60501-0000 STANDARD

UNDERDRAIN

SYSTEM

Kovilic Construction Company Inc 380.000 $150.00 $57,000.00

Abrams Group Construction LLC 380.000 $128.40 $48,792.00

Structural Engineering Group, Inc.

380.000 $96.40 $36,632.00

Central Southern Construction Corp. 380.000 $80.00 $30,400.00

JWM Enterprises, LLC 380.000 $50.00 $19,000.00 King General Contractors, Inc. 380.000 $38.34 $14,569.20

Estes Bros. Const., Inc. 380.000 $11.41 $4,335.80

Engineer's Estimate 380.000 LNFT $99.00 $37,620.00

A0420 61401-0000 LEAN CONCRETE

BACKFILL

(LEVELING PAD

FOR WALL)

Kovilic Construction Company Inc 40.000 $1,500.00 $60,000.00

King General Contractors, Inc. 40.000 $1,341.90 $53,676.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0420 61401-0000 LEAN CONCRETE

BACKFILL

(LEVELING PAD

FOR WALL)

Estes Bros. Const., Inc. 40.000 $783.00 $31,320.00

JWM Enterprises, LLC 40.000 $650.00 $26,000.00 Abrams Group Construction LLC 40.000 $528.74 $21,149.60

Structural Engineering Group, Inc.

40.000 $514.10 $20,564.00

Central Southern Construction Corp. 40.000 $450.00 $18,000.00

Engineer's Estimate 40.000 CUYD $2,400.00 $96,000.00

A0440 62401-0300 FURNISHING AND

PLACING TOPSOIL,

4-INCH DEPTH

King General Contractors, Inc. 500.000 $40.90 $20,450.00

Central Southern Construction Corp. 500.000 $40.00 $20,000.00

Kovilic Construction Company Inc 500.000 $20.00 $10,000.00

Estes Bros. Const., Inc. 500.000 $11.05 $5,525.00

Abrams Group Construction LLC 500.000 $10.40 $5,200.00

JWM Enterprises, LLC 500.000 $10.00 $5,000.00 Structural Engineering Group, Inc.

500.000 $3.90 $1,950.00

Engineer's Estimate 500.000 SQYD $21.00 $10,500.00

A0460 62502-0000 TURF

ESTABLISHMENT

King General Contractors, Inc. 500.000 $34.51 $17,255.00

Central Southern Construction Corp. 500.000 $20.00 $10,000.00

Kovilic Construction Company Inc 500.000 $20.00 $10,000.00

Estes Bros. Const., Inc. 500.000 $15.25 $7,625.00

Abrams Group Construction LLC 500.000 $13.25 $6,625.00

JWM Enterprises, LLC 500.000 $10.00 $5,000.00 Structural Engineering Group, Inc.

500.000 $3.90 $1,950.00

Engineer's Estimate 500.000 SQYD $12.00 $6,000.00

A0480 62901-0600 ROLLED EROSION

CONTROL

PRODUCT, TYPE 2.B

Structural Engineering Group, Inc.

200.000 $122.10 $24,420.00

Central Southern Construction Corp. 200.000 $20.00 $4,000.00

Kovilic Construction Company Inc 200.000 $20.00 $4,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0480 62901-0600 ROLLED EROSION

CONTROL

PRODUCT, TYPE 2.B

King General Contractors, Inc. 200.000 $18.85 $3,770.00

Abrams Group Construction LLC 200.000 $10.57 $2,114.00

Estes Bros. Const., Inc. 200.000 $8.69 $1,738.00

JWM Enterprises, LLC 200.000 $5.50 $1,100.00 Engineer's Estimate 200.000 SQYD $8.00 $1,600.00

A0500 62901-1000 ROLLED EROSION

CONTROL

PRODUCT, TYPE 3.B

Structural Engineering Group, Inc.

150.000 $122.10 $18,315.00

King General Contractors, Inc. 150.000 $22.68 $3,402.00

Central Southern Construction Corp. 150.000 $20.00 $3,000.00

Kovilic Construction Company Inc 150.000 $20.00 $3,000.00

Abrams Group Construction LLC 150.000 $13.59 $2,038.50

Estes Bros. Const., Inc. 150.000 $10.69 $1,603.50

JWM Enterprises, LLC 150.000 $6.00 $900.00 Engineer's Estimate 150.000 SQYD $13.00 $1,950.00

A0520 62901-1100 ROLLED EROSION

CONTROL

PRODUCT, TYPE 4

Structural Engineering Group, Inc.

500.000 $147.80 $73,900.00

King General Contractors, Inc. 500.000 $22.68 $11,340.00

Central Southern Construction Corp. 500.000 $20.00 $10,000.00

Kovilic Construction Company Inc 500.000 $20.00 $10,000.00

Abrams Group Construction LLC 500.000 $17.41 $8,705.00

Estes Bros. Const., Inc. 500.000 $8.69 $4,345.00

JWM Enterprises, LLC 500.000 $7.00 $3,500.00 Engineer's Estimate 500.000 SQYD $12.00 $6,000.00

A0540 62901-1200 ROLLED EROSION

CONTROL

PRODUCT, TYPE 5.A

Structural Engineering Group, Inc.

100.000 $160.70 $16,070.00

King General Contractors, Inc. 100.000 $25.56 $2,556.00

Abrams Group Construction LLC 100.000 $24.18 $2,418.00

Estes Bros. Const., Inc. 100.000 $21.70 $2,170.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0540 62901-1200 ROLLED EROSION

CONTROL

PRODUCT, TYPE 5.A

Central Southern Construction Corp. 100.000 $20.00 $2,000.00

Kovilic Construction Company Inc 100.000 $20.00 $2,000.00

JWM Enterprises, LLC 100.000 $8.50 $850.00 Engineer's Estimate 100.000 SQYD $12.00 $1,200.00

A0560 63308-3000 OBJECT MARKER,

TYPE 3

Structural Engineering Group, Inc.

2.000 $2,506.20 $5,012.40

King General Contractors, Inc. 2.000 $2,346.30 $4,692.60

Kovilic Construction Company Inc 2.000 $1,000.00 $2,000.00

Central Southern Construction Corp. 2.000 $750.00 $1,500.00

Abrams Group Construction LLC 2.000 $679.81 $1,359.62

JWM Enterprises, LLC 2.000 $600.00 $1,200.00 Estes Bros. Const., Inc. 2.000 $460.00 $920.00

Engineer's Estimate 2.000 EACH $430.00 $860.00

A0580 63501-0000 TEMPORARY

TRAFFIC CONTROL

Central Southern Construction Corp. $150,000.00

Abrams Group Construction LLC $36,254.55

Structural Engineering Group, Inc.

$32,131.00

Kovilic Construction Company Inc $30,000.00

King General Contractors, Inc. $13,674.60

JWM Enterprises, LLC $6,500.00 Estes Bros. Const., Inc. $1,500.00

Engineer's Estimate ALL LPSM LPSM $16,800.00 A0600 63701-0000 FIELD OFFICE Central Southern

Construction Corp. 1.000 $72,000.00 $72,000.00

Estes Bros. Const., Inc. 1.000 $54,000.00 $54,000.00

Kovilic Construction Company Inc 1.000 $50,000.00 $50,000.00

JWM Enterprises, LLC 1.000 $40,000.00 $40,000.00 King General Contractors, Inc. 1.000 $25,560.00 $25,560.00

Structural Engineering Group, Inc.

1.000 $19,278.60 $19,278.60

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0600 63701-0000 FIELD OFFICE Abrams Group Construction LLC 1.000 $18,117.99 $18,117.99

Engineer's Estimate 1.000 EACH $38,000.00 $38,000.00

A0620 65101-1000 DRAPED ROCKFALL

PROTECTION, WIRE

MESH

King General Contractors, Inc. 500.000 $1,646.70 $823,350.00

Kovilic Construction Company Inc 500.000 $450.00 $225,000.00

JWM Enterprises, LLC 500.000 $375.00 $187,500.00 Central Southern Construction Corp. 500.000 $200.00 $100,000.00

Abrams Group Construction LLC 500.000 $170.79 $85,395.00

Structural Engineering Group, Inc.

500.000 $143.90 $71,950.00

Estes Bros. Const., Inc. 500.000 $116.40 $58,200.00

Engineer's Estimate 500.000 SQYD $440.00 $220,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

GWJEF808 2020-2(1)

Project Name: Repairs to Punch and Judy, Little Stony, Blackhorse, Dry Run and Hussy Mountain Sites.

Division: Eastern Federal Lands

Schedule: B Schedule Type: Option Lead Designer: Thang Nguyen Solicitation No. : 693C73-26-B-000007 Opened at: Ashburn, VA Opened by: David Bogner State: VA County: Bedford, Scott, Wythe, Tazewell Federal Land: George Washington and Jefferson National Forests

Bid Open Date and Time: 04/28/2026

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive King General Contractors, Inc., 250 Bob Morrison Blvd, Bristol, VA, 24201

$3,542,815.28

Kovilic Construction Company Inc, 3721 N Carnation Street, Franklin Park, IL, 60131

$2,970,200.00

Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204

$2,764,450.00

Structural Engineering Group, Inc., 38997 E. Colonial Highway, Hamilton, VA, 20158

$2,572,145.60

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : David Bogner

David Bogner

Contract Specialist

JWM Enterprises, LLC

7/7/2026

Estes Bros. Const., Inc., 126 Sugar Run Road, Jonesville, VA, 24263

$1,719,072.30

JWM Enterprises, LLC, 2312 Lee Highway, Marion, VA, 24354

$1,462,530.00

Abrams Group Construction

LLC,

3645 HWY 90,

Pace, FL, 32571

$1,260,612.72

Engineer's Estimate $2,065,000.00

Project No. : VA ERFO FS GWJEF808 2020-2(1) Project Name: Repairs to Punch and Judy, Little Stony, Blackhorse, Dry Run and Hussy Mountain Sites.

Schedule: B Schedule Type: Option

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

B0020 15101-0000 MOBILIZATION Estes Bros. Const., Inc. $496,840.00

Central Southern Construction Corp. $360,000.00

Kovilic Construction Company Inc $200,000.00

King General Contractors, Inc. $182,115.00

Structural Engineering Group, Inc.

$154,228.80

Abrams Group Construction LLC $148,014.68

JWM Enterprises, LLC $7,500.00 Engineer's Estimate ALL LPSM LPSM $161,630.00

B0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Central Southern Construction Corp. $180,000.00

Kovilic Construction Company Inc $50,000.00

King General Contractors, Inc. $44,730.00

Structural Engineering Group, Inc.

$38,557.20

Abrams Group Construction LLC $27,549.10

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Estes Bros. Const., Inc. $20,000.00

JWM Enterprises, LLC $6,500.00 Engineer's Estimate ALL LPSM LPSM $48,860.00

B0060 15401-0000 CONTRACTOR

TESTING

Central Southern Construction Corp. $180,000.00

Estes Bros. Const., Inc. $90,000.00

King General Contractors, Inc. $63,900.00

Kovilic Construction Company Inc $50,000.00

Structural Engineering Group, Inc.

$38,557.20

Abrams Group Construction LLC $22,395.66

JWM Enterprises, LLC $6,500.00 Engineer's Estimate ALL LPSM LPSM $45,250.00

B0080 15702-6000 SOIL EROSION

CONTROL,

TEMPORARY

STREAM

DIVERSION

Kovilic Construction Company Inc $100,000.00

JWM Enterprises, LLC $80,000.00 Central Southern Construction Corp. $60,000.00

Abrams Group Construction LLC $51,534.33

Structural Engineering Group, Inc.

$41,127.70

Estes Bros. Const., Inc. $30,525.00

King General Contractors, Inc. $10,224.00

Engineer's Estimate ALL LPSM LPSM $55,400.00

B0100 15705-0100 SOIL EROSION

CONTROL, SILT

FENCE

King General Contractors, Inc. 1,100.000 $103.52 $113,872.00

Kovilic Construction Company Inc 1,100.000 $20.00 $22,000.00

Structural Engineering Group, Inc.

1,100.000 $16.70 $18,370.00

Central Southern Construction Corp. 1,100.000 $15.00 $16,500.00

Abrams Group Construction LLC 1,100.000 $12.98 $14,278.00

Estes Bros. Const., Inc. 1,100.000 $8.67 $9,537.00

JWM Enterprises, LLC 1,100.000 $8.00 $8,800.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0100 15705-0100 SOIL EROSION

CONTROL, SILT

FENCE

Engineer's Estimate 1,100.000 LNFT $23.00 $25,300.00

B0120 15706-0200 SOIL EROSION

CONTROL, CHECK

DAM

Kovilic Construction Company Inc 30.000 $1,000.00 $30,000.00

Central Southern Construction Corp. 30.000 $750.00 $22,500.00

King General Contractors, Inc. 30.000 $670.95 $20,128.50

Structural Engineering Group, Inc.

30.000 $449.80 $13,494.00

Abrams Group Construction LLC 30.000 $381.45 $11,443.50

Estes Bros. Const., Inc. 30.000 $373.76 $11,212.80

JWM Enterprises, LLC 30.000 $350.00 $10,500.00 Engineer's Estimate 30.000 EACH $592.00 $17,760.00

B0140 15706-1600 SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION

EXIT

Structural Engineering Group, Inc.

2.000 $13,109.40 $26,218.80

Central Southern Construction Corp. 2.000 $6,500.00 $13,000.00

Abrams Group Construction LLC 2.000 $5,153.44 $10,306.88

JWM Enterprises, LLC 2.000 $5,000.00 $10,000.00 Kovilic Construction Company Inc 2.000 $5,000.00 $10,000.00

Estes Bros. Const., Inc. 2.000 $3,892.50 $7,785.00

King General Contractors, Inc. 2.000 $3,834.00 $7,668.00

Engineer's Estimate 2.000 EACH $18,650.00 $37,300.00

B0160 20103-0000 CLEARING AND

GRUBBING

King General Contractors, Inc. 2,600.000 $70.29 $182,754.00

JWM Enterprises, LLC 2,600.000 $50.00 $130,000.00 Abrams Group Construction LLC 2,600.000 $22.67 $58,942.00

Central Southern Construction Corp. 2,600.000 $20.00 $52,000.00

Estes Bros. Const., Inc. 2,600.000 $11.00 $28,600.00

Kovilic Construction Company Inc 2,600.000 $10.00 $26,000.00

Structural Engineering Group, Inc.

2,600.000 $9.00 $23,400.00

Engineer's Estimate 2,600.000 SQYD $17.00 $44,200.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0180 20120-1000 REMOVAL,

INDIVIDUAL TREE

Structural Engineering Group, Inc.

15.000 $3,315.90 $49,738.50

Abrams Group Construction LLC 15.000 $2,080.61 $31,209.15

Central Southern Construction Corp. 15.000 $2,000.00 $30,000.00

Estes Bros. Const., Inc. 15.000 $1,200.00 $18,000.00

Kovilic Construction Company Inc 15.000 $1,000.00 $15,000.00

King General Contractors, Inc. 15.000 $894.60 $13,419.00

JWM Enterprises, LLC 15.000 $500.00 $7,500.00 Engineer's Estimate 15.000 EACH $2,650.00 $39,750.00

B0200 20401-0000 ROADWAY

EXCAVATION

Kovilic Construction Company Inc 2,200.000 $150.00 $330,000.00

King General Contractors, Inc. 2,200.000 $127.80 $281,160.00

Central Southern Construction Corp. 2,200.000 $80.00 $176,000.00

Structural Engineering Group, Inc.

2,200.000 $70.70 $155,540.00

Estes Bros. Const., Inc. 2,200.000 $68.00 $149,600.00

JWM Enterprises, LLC 2,200.000 $50.00 $110,000.00 Abrams Group Construction LLC 2,200.000 $45.43 $99,946.00

Engineer's Estimate 2,200.000 CUYD $75.00 $165,000.00

B0220 20436-2000 BACKFILL,

GRANULAR (VDOT

#3 COARSE

AGGREGATE)

Kovilic Construction Company Inc 2,000.000 $150.00 $300,000.00

Structural Engineering Group, Inc.

2,000.000 $136.20 $272,400.00

Estes Bros. Const., Inc. 2,000.000 $125.78 $251,560.00

Central Southern Construction Corp. 2,000.000 $115.00 $230,000.00

King General Contractors, Inc. 2,000.000 $107.99 $215,980.00

Abrams Group Construction LLC 2,000.000 $79.41 $158,820.00

JWM Enterprises, LLC 2,000.000 $75.00 $150,000.00 Engineer's Estimate 2,000.000 TON $55.00 $110,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0240 20701-0700 SEPARATION-

STABILIZATION

GEOTEXTILE, CLASS

2, TYPE B

King General Contractors, Inc. 2,300.000 $30.03 $69,069.00

Central Southern Construction Corp. 2,300.000 $12.50 $28,750.00

Abrams Group Construction LLC 2,300.000 $10.57 $24,311.00

Kovilic Construction Company Inc 2,300.000 $10.00 $23,000.00

JWM Enterprises, LLC 2,300.000 $5.50 $12,650.00 Structural Engineering Group, Inc.

2,300.000 $5.40 $12,420.00

Estes Bros. Const., Inc. 2,300.000 $4.26 $9,798.00

Engineer's Estimate 2,300.000 SQYD $8.00 $18,400.00

B0260 20810-0000 SHORING AND

BRACING

Kovilic Construction Company Inc $200,000.00

Central Southern Construction Corp. $150,000.00

Structural Engineering Group, Inc.

$78,206.90

Estes Bros. Const., Inc. $25,000.00

JWM Enterprises, LLC $25,000.00 Abrams Group Construction LLC $13,081.02

King General Contractors, Inc. $6,390.00

Engineer's Estimate ALL LPSM LPSM $68,000.00

B0280 25102-0200 PLACED RIPRAP,

METHOD A, CLASS

2 (VDOT CLASS I)

Central Southern Construction Corp. 8.000 $1,000.00 $8,000.00

Kovilic Construction Company Inc 8.000 $1,000.00 $8,000.00

King General Contractors, Inc. 8.000 $568.71 $4,549.68

Estes Bros. Const., Inc. 8.000 $460.35 $3,682.80

Structural Engineering Group, Inc.

8.000 $159.40 $1,275.20

Abrams Group Construction LLC 8.000 $154.60 $1,236.80

JWM Enterprises, LLC 8.000 $125.00 $1,000.00 Engineer's Estimate 8.000 TON $205.00 $1,640.00

B0300 25102-0600 PLACED RIPRAP,

METHOD A, CLASS

6 (VDOT CLASS III)

Central Southern Construction Corp. 10.000 $1,500.00 $15,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0300 25102-0600 PLACED RIPRAP,

METHOD A, CLASS

6 (VDOT CLASS III)

Kovilic Construction Company Inc 10.000 $1,000.00 $10,000.00

King General Contractors, Inc. 10.000 $690.12 $6,901.20

Estes Bros. Const., Inc. 10.000 $461.40 $4,614.00

Abrams Group Construction LLC 10.000 $264.36 $2,643.60

Structural Engineering Group, Inc.

10.000 $224.90 $2,249.00

JWM Enterprises, LLC 10.000 $125.00 $1,250.00 Engineer's Estimate 10.000 TON $170.00 $1,700.00

B0320 25302-1000 GABIONS,

GALVANIZED OR

ALUMINIZED

COATED

Kovilic Construction Company Inc 750.000 $1,000.00 $750,000.00

Structural Engineering Group, Inc.

750.000 $816.10 $612,075.00

King General Contractors, Inc. 750.000 $814.73 $611,047.50

Central Southern Construction Corp. 750.000 $750.00 $562,500.00

JWM Enterprises, LLC 750.000 $450.00 $337,500.00 Estes Bros. Const., Inc. 750.000 $319.29 $239,467.50

Abrams Group Construction LLC 750.000 $108.22 $81,165.00

Engineer's Estimate 750.000 CUYD $440.00 $330,000.00 B0340 30101-0000 AGGREGATE BASE Central Southern

Construction Corp. 300.000 $200.00 $60,000.00

Kovilic Construction Company Inc 300.000 $150.00 $45,000.00

King General Contractors, Inc. 300.000 $140.58 $42,174.00

Abrams Group Construction LLC 300.000 $135.96 $40,788.00

Structural Engineering Group, Inc.

300.000 $102.80 $30,840.00

Estes Bros. Const., Inc. 300.000 $89.81 $26,943.00

JWM Enterprises, LLC 300.000 $75.00 $22,500.00 Engineer's Estimate 300.000 TON $110.00 $33,000.00

B0360 30110-0000 AGGREGATE

SURFACE COURSE

Central Southern Construction Corp. 700.000 $220.00 $154,000.00

King General Contractors, Inc. 700.000 $153.36 $107,352.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0360 30110-0000 AGGREGATE

SURFACE COURSE

Kovilic Construction Company Inc 700.000 $150.00 $105,000.00

Structural Engineering Group, Inc.

700.000 $102.80 $71,960.00

Abrams Group Construction LLC 700.000 $98.19 $68,733.00

Estes Bros. Const., Inc. 700.000 $90.86 $63,602.00

JWM Enterprises, LLC 700.000 $75.00 $52,500.00 Engineer's Estimate 700.000 TON $212.00 $148,400.00

B0380 60501-0000 STANDARD

UNDERDRAIN

SYSTEM

Kovilic Construction Company Inc 550.000 $100.00 $55,000.00

Structural Engineering Group, Inc.

550.000 $96.40 $53,020.00

Abrams Group Construction LLC 550.000 $84.51 $46,480.50

Central Southern Construction Corp. 550.000 $55.00 $30,250.00

JWM Enterprises, LLC 550.000 $50.00 $27,500.00 King General Contractors, Inc. 550.000 $38.34 $21,087.00

Estes Bros. Const., Inc. 550.000 $11.88 $6,534.00

Engineer's Estimate 550.000 LNFT $99.00 $54,450.00

B0400 61401-0000 LEAN CONCRETE

BACKFILL

(LEVELING PAD

FOR WALL)

Kovilic Construction Company Inc 70.000 $1,500.00 $105,000.00

King General Contractors, Inc. 70.000 $1,341.90 $93,933.00

Estes Bros. Const., Inc. 70.000 $783.00 $54,810.00

JWM Enterprises, LLC 70.000 $675.00 $47,250.00 Abrams Group Construction LLC 70.000 $528.74 $37,011.80

Structural Engineering Group, Inc.

70.000 $514.10 $35,987.00

Central Southern Construction Corp. 70.000 $275.00 $19,250.00

Engineer's Estimate 70.000 CUYD $2,410.00 $168,700.00

B0420 62401-0300 FURNISHING AND

PLACING TOPSOIL,

4-INCH DEPTH

Structural Engineering Group, Inc.

2,600.000 $55.30 $143,780.00

King General Contractors, Inc. 2,600.000 $40.90 $106,340.00

Central Southern Construction Corp. 2,600.000 $20.00 $52,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0420 62401-0300 FURNISHING AND

PLACING TOPSOIL,

4-INCH DEPTH

Kovilic Construction Company Inc 2,600.000 $20.00 $52,000.00

Abrams Group Construction LLC 2,600.000 $10.40 $27,040.00

JWM Enterprises, LLC 2,600.000 $10.00 $26,000.00 Estes Bros. Const., Inc. 2,600.000 $8.05 $20,930.00

Engineer's Estimate 2,600.000 SQYD $21.00 $54,600.00

B0440 62502-0000 TURF

ESTABLISHMENT

King General Contractors, Inc. 2,600.000 $25.56 $66,456.00

Central Southern Construction Corp. 2,600.000 $20.00 $52,000.00

Abrams Group Construction LLC 2,600.000 $13.25 $34,450.00

Estes Bros. Const., Inc. 2,600.000 $10.75 $27,950.00

JWM Enterprises, LLC 2,600.000 $10.00 $26,000.00 Kovilic Construction Company Inc 2,600.000 $10.00 $26,000.00

Structural Engineering Group, Inc.

2,600.000 $3.90 $10,140.00

Engineer's Estimate 2,600.000 SQYD $12.00 $31,200.00

B0460 62901-0600 ROLLED EROSION

CONTROL

PRODUCT, TYPE 2.B

Structural Engineering Group, Inc.

480.000 $135.00 $64,800.00

King General Contractors, Inc. 480.000 $20.13 $9,662.40

Central Southern Construction Corp. 480.000 $20.00 $9,600.00

Kovilic Construction Company Inc 480.000 $20.00 $9,600.00

Abrams Group Construction LLC 480.000 $10.57 $5,073.60

Estes Bros. Const., Inc. 480.000 $8.69 $4,171.20

JWM Enterprises, LLC 480.000 $5.50 $2,640.00 Engineer's Estimate 480.000 SQYD $8.00 $3,840.00

B0480 62901-1100 ROLLED EROSION

CONTROL

PRODUCT, TYPE 4

Structural Engineering Group, Inc.

2,600.000 $147.80 $384,280.00

King General Contractors, Inc. 2,600.000 $21.41 $55,666.00

Central Southern Construction Corp. 2,600.000 $20.00 $52,000.00

Kovilic Construction Company Inc 2,600.000 $20.00 $52,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0480 62901-1100 ROLLED EROSION

CONTROL

PRODUCT, TYPE 4

Abrams Group Construction LLC 2,600.000 $17.41 $45,266.00

Estes Bros. Const., Inc. 2,600.000 $8.69 $22,594.00

JWM Enterprises, LLC 2,600.000 $6.00 $15,600.00 Engineer's Estimate 2,600.000 SQYD $12.00 $31,200.00

B0500 62901-1200 ROLLED EROSION

CONTROL

PRODUCT, TYPE 5.A

Structural Engineering Group, Inc.

480.000 $160.70 $77,136.00

Abrams Group Construction LLC 480.000 $24.18 $11,606.40

King General Contractors, Inc. 480.000 $23.96 $11,500.80

Estes Bros. Const., Inc. 480.000 $21.70 $10,416.00

Central Southern Construction Corp. 480.000 $20.00 $9,600.00

Kovilic Construction Company Inc 480.000 $20.00 $9,600.00

JWM Enterprises, LLC 480.000 $8.00 $3,840.00 Engineer's Estimate 480.000 SQYD $12.00 $5,760.00

B0520 63308-3000 OBJECT MARKER,

TYPE 3

Structural Engineering Group, Inc.

2.000 $3,174.50 $6,349.00

King General Contractors, Inc. 2.000 $2,364.30 $4,728.60

JWM Enterprises, LLC 2.000 $2,000.00 $4,000.00 Kovilic Construction Company Inc 2.000 $1,000.00 $2,000.00

Central Southern Construction Corp. 2.000 $750.00 $1,500.00

Abrams Group Construction LLC 2.000 $463.81 $927.62

Estes Bros. Const., Inc. 2.000 $460.00 $920.00

Engineer's Estimate 2.000 EACH $430.00 $860.00

B0540 63501-0000 TEMPORARY

TRAFFIC CONTROL

Central Southern Construction Corp. $70,000.00

Kovilic Construction Company Inc $50,000.00

Structural Engineering Group, Inc.

$32,131.00

Abrams Group Construction LLC $28,835.72

King General Contractors, Inc. $11,757.60

JWM Enterprises, LLC $10,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

B0540 63501-0000 TEMPORARY

TRAFFIC CONTROL

Estes Bros. Const., Inc. $1,500.00

Engineer's Estimate ALL LPSM LPSM $16,800.00 B0560 63701-0000 FIELD OFFICE JWM Enterprises, LLC 1.000 $40,000.00 $40,000.00

Central Southern Construction Corp. 1.000 $30,000.00 $30,000.00

King General Contractors, Inc. 1.000 $25,560.00 $25,560.00

Structural Engineering Group, Inc.

1.000 $23,134.30 $23,134.30

Kovilic Construction Company Inc 1.000 $20,000.00 $20,000.00

Abrams Group Construction LLC 1.000 $18,552.36 $18,552.36

Estes Bros. Const., Inc. 1.000 $1,000.00 $1,000.00

Engineer's Estimate 1.000 EACH $38,000.00 $38,000.00

B0580 65101-1000 DRAPED ROCKFALL

PROTECTION, WIRE

MESH

King General Contractors, Inc. 700.000 $1,646.70 $1,152,690.00

Kovilic Construction Company Inc 700.000 $450.00 $315,000.00

JWM Enterprises, LLC 700.000 $400.00 $280,000.00 Central Southern Construction Corp. 700.000 $200.00 $140,000.00

Abrams Group Construction LLC 700.000 $198.53 $138,971.00

Structural Engineering Group, Inc.

700.000 $143.90 $100,730.00

Estes Bros. Const., Inc. 700.000 $116.40 $81,480.00

Engineer's Estimate 700.000 SQYD $440.00 $308,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

GWJEF808 2020-2(1)

Project Name: Repairs to Punch and Judy, Little Stony, Blackhorse, Dry Run and Hussy Mountain Sites.

Division: Eastern Federal Lands

Schedule: C Schedule Type: Option Lead Designer: Thang Nguyen Solicitation No. : 693C73-26-B-000007 Opened at: Ashburn, VA Opened by: David Bogner State: VA County: Bedford, Scott, Wythe, Tazewell Federal Land: George Washington and Jefferson National Forests

Bid Open Date and Time: 04/28/2026

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204

$1,736,415.00

King General Contractors, Inc., 250 Bob Morrison Blvd, Bristol, VA, 24201

$1,627,014.95

Kovilic Construction Company Inc, 3721 N Carnation Street, Franklin Park, IL, 60131

$1,574,200.00

Structural Engineering Group, Inc., 38997 E. Colonial Highway, Hamilton, VA, 20158

$1,269,505.50

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : David Bogner

David Bogner

Contract Specialist

JWM Enterprises, LLC

126 Sugar Run Road, Jonesville, VA, 24263

$945,934.40

Abrams Group Construction

LLC,

3645 HWY 90,

Pace, FL, 32571

$872,210.65

JWM Enterprises, LLC, 2312 Lee Highway, Marion, VA, 24354

$700,410.00

Engineer's Estimate $1,012,000.00

Project No. : VA ERFO FS GWJEF808 2020-2(1) Project Name: Repairs to Punch and Judy, Little Stony, Blackhorse, Dry Run and Hussy Mountain Sites.

Schedule: C Schedule Type: Option

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

C0020 15101-0000 MOBILIZATION Central Southern Construction Corp. $360,000.00

Estes Bros. Const., Inc. $280,000.00

Abrams Group Construction LLC $126,741.88

King General Contractors, Inc. $111,825.00

Kovilic Construction Company Inc $100,000.00

Structural Engineering Group, Inc.

$64,262.00

JWM Enterprises, LLC $7,500.00 Engineer's Estimate ALL LPSM LPSM $103,624.00

C0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Central Southern Construction Corp. $180,000.00

Kovilic Construction Company Inc $50,000.00

King General Contractors, Inc. $44,730.00

Structural Engineering Group, Inc.

$28,917.90

Abrams Group Construction LLC $23,314.58

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

C0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Estes Bros. Const., Inc. $20,000.00

JWM Enterprises, LLC $7,500.00 Engineer's Estimate ALL LPSM LPSM $23,320.00

C0060 15401-0000 CONTRACTOR

TESTING

Central Southern Construction Corp. $180,000.00

King General Contractors, Inc. $63,900.00

Estes Bros. Const., Inc. $61,000.00

Structural Engineering Group, Inc.

$28,917.90

Kovilic Construction Company Inc $20,000.00

Abrams Group Construction LLC $16,838.31

JWM Enterprises, LLC $7,500.00 Engineer's Estimate ALL LPSM LPSM $21,590.00

C0080 15702-6000 SOIL EROSION

CONTROL,

TEMPORARY

STREAM

DIVERSION

Kovilic Construction Company Inc $200,000.00

Abrams Group Construction LLC $96,019.63

Central Southern Construction Corp. $50,000.00

JWM Enterprises, LLC $50,000.00 Structural Engineering Group, Inc.

$41,127.70

Estes Bros. Const., Inc. $35,525.00

King General Contractors, Inc. $10,224.00

Engineer's Estimate ALL LPSM LPSM $55,400.00

C0100 15706-1600 SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION

EXIT

Structural Engineering Group, Inc.

3.000 $13,366.50 $40,099.50

Central Southern Construction Corp. 3.000 $6,500.00 $19,500.00

Abrams Group Construction LLC 3.000 $6,476.27 $19,428.81

JWM Enterprises, LLC 3.000 $5,000.00 $15,000.00 Kovilic Construction Company Inc 3.000 $5,000.00 $15,000.00

Estes Bros. Const., Inc. 3.000 $3,892.50 $11,677.50

King General Contractors, Inc. 3.000 $3,834.00 $11,502.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

C0100 15706-1600 SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION

EXIT

Engineer's Estimate 3.000 EACH $17,700.00 $53,100.00

C0120 15706-2300 SOIL EROSION

CONTROL, ON-SITE

CONCRETE

WASHOUT

STRUCTURE

Structural Engineering Group, Inc.

1.000 $16,708.10 $16,708.10

Central Southern Construction Corp. 1.000 $5,000.00 $5,000.00

Estes Bros. Const., Inc. 1.000 $4,575.00 $4,575.00

Abrams Group Construction LLC 1.000 $3,885.76 $3,885.76

King General Contractors, Inc. 1.000 $3,067.20 $3,067.20

JWM Enterprises, LLC 1.000 $2,000.00 $2,000.00 Kovilic Construction Company Inc 1.000 $1,000.00 $1,000.00

Engineer's Estimate 1.000 EACH $4,870.00 $4,870.00

C0140 20103-0000 CLEARING AND

GRUBBING

King General Contractors, Inc. 700.000 $70.29 $49,203.00

JWM Enterprises, LLC 700.000 $50.00 $35,000.00 Kovilic Construction Company Inc 700.000 $50.00 $35,000.00

Central Southern Construction Corp. 700.000 $30.00 $21,000.00

Abrams Group Construction LLC 700.000 $18.13 $12,691.00

Estes Bros. Const., Inc. 700.000 $15.00 $10,500.00

Structural Engineering Group, Inc.

700.000 $9.00 $6,300.00

Engineer's Estimate 700.000 SQYD $17.00 $11,900.00

C0160 20120-1000 REMOVAL,

INDIVIDUAL TREE

Structural Engineering Group, Inc.

30.000 $3,315.90 $99,477.00

Central Southern Construction Corp. 30.000 $2,000.00 $60,000.00

Abrams Group Construction LLC 30.000 $1,664.49 $49,934.70

Kovilic Construction Company Inc 30.000 $1,000.00 $30,000.00

King General Contractors, Inc. 30.000 $894.60 $26,838.00

Estes Bros. Const., Inc. 30.000 $800.00 $24,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

C0160 20120-1000 REMOVAL,

INDIVIDUAL TREE

JWM Enterprises, LLC 30.000 $400.00 $12,000.00 Engineer's Estimate 30.000 EACH $2,220.00 $66,600.00

C0180 20302-2100 REMOVAL OF PIPE

CULVERT

King General Contractors, Inc. 23.000 $255.60 $5,878.80

Abrams Group Construction LLC 23.000 $233.13 $5,361.99

Central Southern Construction Corp. 23.000 $180.00 $4,140.00

Structural Engineering Group, Inc.

23.000 $178.80 $4,112.40

JWM Enterprises, LLC 23.000 $150.00 $3,450.00 Kovilic Construction Company Inc 23.000 $100.00 $2,300.00

Estes Bros. Const., Inc. 23.000 $40.00 $920.00

Engineer's Estimate 23.000 LNFT $192.00 $4,416.00

C0200 20401-0000 ROADWAY

EXCAVATION

Kovilic Construction Company Inc 150.000 $200.00 $30,000.00

King General Contractors, Inc. 150.000 $159.75 $23,962.50

Central Southern Construction Corp. 150.000 $80.00 $12,000.00

Estes Bros. Const., Inc. 150.000 $75.00 $11,250.00

Abrams Group Construction LLC 150.000 $58.29 $8,743.50

JWM Enterprises, LLC 150.000 $50.00 $7,500.00 Structural Engineering Group, Inc.

150.000 $32.10 $4,815.00

Engineer's Estimate 150.000 CUYD $91.00 $13,650.00

C0220 25102-0400 PLACED RIPRAP,

METHOD A, CLASS

4 (VDOT CLASS II)

King General Contractors, Inc. 110.000 $798.75 $87,862.50

Kovilic Construction Company Inc 110.000 $300.00 $33,000.00

Estes Bros. Const., Inc. 110.000 $279.36 $30,729.60

Central Southern Construction Corp. 110.000 $200.00 $22,000.00

Structural Engineering Group, Inc.

110.000 $192.80 $21,208.00

Abrams Group Construction LLC 110.000 $148.96 $16,385.60

JWM Enterprises, LLC 110.000 $125.00 $13,750.00 Engineer's Estimate 110.000 TON $290.00 $31,900.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

C0240 25102-0600 PLACED RIPRAP,

METHOD A, CLASS

6 (VDOT CLASS III)

King General Contractors, Inc. 1,600.000 $543.15 $869,040.00

Kovilic Construction Company Inc 1,600.000 $350.00 $560,000.00

Structural Engineering Group, Inc.

1,600.000 $224.90 $359,840.00

Central Southern Construction Corp. 1,600.000 $220.00 $352,000.00

Estes Bros. Const., Inc. 1,600.000 $143.30 $229,280.00

JWM Enterprises, LLC 1,600.000 $125.00 $200,000.00 Abrams Group Construction LLC 1,600.000 $123.05 $196,880.00

Engineer's Estimate 1,600.000 TON $220.00 $352,000.00

C0260 25306-1000 REVETMENT MAT,

ARTICULATED

CONCRETE BLOCK

Structural Engineering Group, Inc.

50.000 $1,702.90 $85,145.00

JWM Enterprises, LLC 50.000 $1,250.00 $62,500.00 Abrams Group Construction LLC 50.000 $1,147.80 $57,390.00

Kovilic Construction Company Inc 50.000 $1,000.00 $50,000.00

Central Southern Construction Corp. 50.000 $650.00 $32,500.00

Estes Bros. Const., Inc. 50.000 $648.24 $32,412.00

King General Contractors, Inc. 50.000 $575.10 $28,755.00

Engineer's Estimate 50.000 SQYD $335.00 $16,750.00

C0280 30110-0000 AGGREGATE

SURFACE COURSE

Central Southern Construction Corp. 320.000 $220.00 $70,400.00

King General Contractors, Inc. 320.000 $172.53 $55,209.60

Kovilic Construction Company Inc 320.000 $150.00 $48,000.00

Structural Engineering Group, Inc.

320.000 $102.80 $32,896.00

JWM Enterprises, LLC 320.000 $85.00 $27,200.00 Abrams Group Construction LLC 320.000 $77.72 $24,870.40

Estes Bros. Const., Inc. 320.000 $61.32 $19,622.40

Engineer's Estimate 320.000 TON $90.00 $28,800.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

C0300 55201-0200 STRUCTURAL

CONCRETE, CLASS

A (AE) (BOX

CULVERT

FOOTINGS)

Kovilic Construction Company Inc 15.000 $5,000.00 $75,000.00

Structural Engineering Group, Inc.

15.000 $4,626.90 $69,403.50

Central Southern Construction Corp. 15.000 $2,850.00 $42,750.00

King General Contractors, Inc. 15.000 $2,236.50 $33,547.50

JWM Enterprises, LLC 15.000 $2,000.00 $30,000.00 Abrams Group Construction LLC 15.000 $1,554.30 $23,314.50

Estes Bros. Const., Inc. 15.000 $1,470.70 $22,060.50

Engineer's Estimate 15.000 CUYD $3,300.00 $49,500.00

C0320 55201-0200 STRUCTURAL

CONCRETE, CLASS

A (AE)

(WINGWALLS FOR

BOX CULVERT)

Kovilic Construction Company Inc 25.000 $5,000.00 $125,000.00

Structural Engineering Group, Inc.

25.000 $4,626.90 $115,672.50

Central Southern Construction Corp. 25.000 $3,200.00 $80,000.00

JWM Enterprises, LLC 25.000 $2,000.00 $50,000.00 Estes Bros. Const., Inc. 25.000 $1,715.70 $42,892.50

Abrams Group Construction LLC 25.000 $1,683.82 $42,095.50

King General Contractors, Inc. 25.000 $1,501.65 $37,541.25

Engineer's Estimate 25.000 CUYD $3,300.00 $82,500.00

C0340 60220-0300 4 FEET SPAN, 3

FEET RISE PRECAST

REINFORCED

CONCRETE BOX

CULVERT

Central Southern Construction Corp. 18.000 $7,500.00 $135,000.00

JWM Enterprises, LLC 18.000 $5,750.00 $103,500.00 Kovilic Construction Company Inc 18.000 $5,000.00 $90,000.00

Abrams Group Construction LLC 18.000 $4,324.41 $77,839.38

King General Contractors, Inc. 18.000 $3,738.15 $67,286.70

Estes Bros. Const., Inc. 18.000 $2,929.70 $52,734.60

Structural Engineering Group, Inc.

18.000 $1,317.70 $23,718.60

Engineer's Estimate 18.000 LNFT $1,700.00 $30,600.00 C0360 60901-0000 CURB, CONCRETE Estes Bros. Const., Inc. 10.000 $1,475.70 $14,757.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

C0360 60901-0000 CURB, CONCRETE Central Southern Construction Corp. 10.000 $500.00 $5,000.00

Abrams Group Construction LLC 10.000 $259.05 $2,590.50

JWM Enterprises, LLC 10.000 $250.00 $2,500.00 Kovilic Construction Company Inc 10.000 $250.00 $2,500.00

Structural Engineering Group, Inc.

10.000 $224.90 $2,249.00

King General Contractors, Inc. 10.000 $148.97 $1,489.70

Engineer's Estimate 10.000 LNFT $155.00 $1,550.00

C0380 61401-0000 LEAN CONCRETE

BACKFILL

Estes Bros. Const., Inc. 4.000 $3,283.50 $13,134.00

JWM Enterprises, LLC 4.000 $2,000.00 $8,000.00 Kovilic Construction Company Inc 4.000 $2,000.00 $8,000.00

King General Contractors, Inc. 4.000 $1,597.50 $6,390.00

Central Southern Construction Corp. 4.000 $1,000.00 $4,000.00

Structural Engineering Group, Inc.

4.000 $514.10 $2,056.40

Abrams Group Construction LLC 4.000 $453.34 $1,813.36

Engineer's Estimate 4.000 CUYD $2,400.00 $9,600.00

C0400 62401-0300 FURNISHING AND

PLACING TOPSOIL,

4-INCH DEPTH

Structural Engineering Group, Inc.

650.000 $55.30 $35,945.00

JWM Enterprises, LLC 650.000 $38.00 $24,700.00 King General Contractors, Inc. 650.000 $37.70 $24,505.00

Central Southern Construction Corp. 650.000 $20.00 $13,000.00

Kovilic Construction Company Inc 650.000 $20.00 $13,000.00

Estes Bros. Const., Inc. 650.000 $11.05 $7,182.50

Abrams Group Construction LLC 650.000 $10.40 $6,760.00

Engineer's Estimate 650.000 SQYD $21.00 $13,650.00

C0420 62502-0000 TURF

ESTABLISHMENT

King General Contractors, Inc. 650.000 $31.31 $20,351.50

Central Southern Construction Corp. 650.000 $20.00 $13,000.00

Report Generated on 04/30/2026 2:31 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

C0420 62502-0000 TURF

ESTABLISHMENT

Kovilic Construction Company Inc 650.000 $20.00 $13,000.00

Estes Bros. Const., Inc. 650.000 $15.25 $9,912.50

Abrams Group Construction LLC 650.000 $13.25 $8,612.50

JWM Enterprises, LLC 650.000 $10.00 $6,500.00 Structural Engineering Group, Inc.

650.000 $3.90 $2,535.00

Engineer's Estimate 650.000 SQYD $12.00 $7,800.00

C0440 62901-0600 ROLLED EROSION

CONTROL

PRODUCT, TYPE 2.B

Structural Engineering Group, Inc.

320.000 $135.00 $43,200.00

Kovilic Construction Company Inc 320.000 $20.00 $6,400.00

King General Contractors, Inc. 320.000 $18.85 $6,032.00

Central Southern Construction Corp. 320.000 $12.50 $4,000.00

Abrams Group Construction LLC 320.000 $10.57 $3,382.40

Estes Bros. Const., Inc. 320.000 $8.69 $2,780.80

JWM Enterprises, LLC 320.000 $5.50 $1,760.00 Engineer's Estimate 320.000 SQYD $8.00 $2,560.00

C0460 62901-1100 ROLLED EROSION

CONTROL

PRODUCT, TYPE 4

Structural Engineering Group, Inc.

650.000 $147.80 $96,070.00

King General Contractors, Inc. 650.000 $22.68 $14,742.00

Kovilic Construction Company Inc 650.000 $20.00 $13,000.00

Abrams Group Construction LLC 650.000 $17.41 $11,316.50

Central Southern Construction Corp. 650.000 $12.50 $8,125.00

Estes Bros. Const., Inc.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .