This document contains a bid tabulation report for a federal contract solicitation to rehabilitate nine bridges in Great Smoky Mountains National Park. The solicitation included three schedules of work - Schedule A for base requirements, Schedule B for optional additional work, and Schedule C for further optional work. Four contractors submitted bids by the July 16th deadline.

The tabulation report shows Estes Bros. Const., Inc. was the apparent low bidder with a total bid of $2,769,501.85 for all schedules combined. Their bids of $1,041,517.51 for Schedule A, $507,305.18 for Schedule B, and $1,220,679.16 for Schedule C were within 0.53% of the engineer's estimates. The contract was awarded to Estes Bros. Const., Inc. on August 20, 2020 for their total bid amount. The work will be overseen by the Department of Transportation Federal Highway Administration and takes place in Blount and Sevier counties within Great Smoky Mountains National Park.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 07/16/20

1 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Contractor Responsive?

Engineer's Estimate

Bluegrass Contracting Corporation

Estes Bros. Const., Inc.

Kovilic Construction Company, Inc.

Structural Engineering Group, Inc.

Base Schedule A

$520,000.00

$832,925.00

$1,041,517.51

$688,990.00

$1,045,746.70

Option: B

$510,000.00

$814,552.50

$507,305.18

$837,275.00

$1,192,292.92

Option: C

$1,050,000.00

$1,378,252.50

$1,220,679.16

$1,590,175.00

$1,745,765.63

Contractor Responsive?

Engineer's Estimate

Bluegrass Contracting Corporation

Estes Bros. Const., Inc.

Kovilic Construction Company, Inc.

Structural Engineering Group, Inc.

Total Base Schedule A and Option(s): B

$1,030,000.00

$1,647,477.50

$1,548,822.69

$1,526,265.00

$2,238,039.62

Total Base Schedule A and Option(s): BC

$2,080,000.00

$3,025,730.00

$2,769,501.85

$3,116,440.00

$3,983,805.25

Total Base Schedule A and Option(s): C

$1,570,000.00

$2,211,177.50

$2,262,196.67

$2,279,165.00

$2,791,512.33

2 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-20-B-000021

Division: Eastern Federal Lands

State: TN County: Blount, Sevier

Federal Land: Great Smoky Mountains National Park Opened at: Sterling, Virginia

Opened by: C. Shawn Long

Date: 07/16/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Kovilic Construction Company, Inc. $688,990.00 3721 N. Carnation Street Franklin Park Illinois 60131

Bluegrass Contracting Corporation $832,925.00 1075 Red Mile Road Lexington Kentucky 40504

Estes Bros. Const., Inc. $1,041,517.51 126 Sugar Run Road Jonesville Virginia 24263

Structural Engineering Group, Inc. $1,045,746.70 21135 Whitfield Place, Suite 201 Sterling Virginia 20165

Engineer's Estimate $520,000.00

C. Shawn Long Contracting Officer

7/16/2020

Estes Bros. Const., Inc. 8/20/2020

3 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0050 15101-0000 MOBILIZATION

Kovilic Construction Company, Inc. Lump Sum $100,000.00 Bluegrass Contracting Corporation Lump Sum $125,000.00 Estes Bros. Const., Inc. Lump Sum $565,464.00 Structural Engineering Group, Inc. Lump Sum $81,653.94 Engineer's Estimate ALL LPSM Lump Sum $46,803.25

A0150 15201-0000 CONSTRUCTION SURVEY AND STAKING

Kovilic Construction Company, Inc. Lump Sum $57,500.00 Bluegrass Contracting Corporation Lump Sum $45,000.00 Estes Bros. Const., Inc. Lump Sum $10,000.00 Structural Engineering Group, Inc. Lump Sum $7,661.10 Engineer's Estimate ALL LPSM Lump Sum $12,000.00

A0250 15401-0000 CONTRACTOR TESTING

Kovilic Construction Company, Inc. Lump Sum $5,000.00 Bluegrass Contracting Corporation Lump Sum $60,000.00 Estes Bros. Const., Inc. Lump Sum $39,800.00 Structural Engineering Group, Inc. Lump Sum $36,424.27 Engineer's Estimate ALL LPSM Lump Sum $11,000.00

A0350 15702-4000 SOIL EROSION CONTROL, FILTER BAG

Kovilic Construction Company, Inc. Lump Sum $5,000.00 Bluegrass Contracting Corporation Lump Sum $25,000.00 Estes Bros. Const., Inc. Lump Sum $5,635.00 Structural Engineering Group, Inc. Lump Sum $22,983.30 Engineer's Estimate ALL LPSM Lump Sum $2,000.00

A0450 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Kovilic Construction Company, Inc. $25.00 $1,250.00 Bluegrass Contracting Corporation $45.00 $2,250.00 Estes Bros. Const., Inc. $9.36 $468.00 Structural Engineering Group, Inc. $85.12 $4,256.00 Engineer's Estimate 50 LNFT $15.00 $750.00

A0550 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

Kovilic Construction Company, Inc. $200.00 $30,000.00 Bluegrass Contracting Corporation $300.00 $45,000.00 Estes Bros. Const., Inc. $18.00 $2,700.00 Structural Engineering Group, Inc. $130.53 $19,579.50 Engineer's Estimate 150 LNFT $42.00 $6,300.00

4 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0650 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Kovilic Construction Company, Inc. $5,000.00 $5,000.00 Bluegrass Contracting Corporation $6,300.00 $6,300.00 Estes Bros. Const., Inc. $2,090.00 $2,090.00 Structural Engineering Group, Inc. $27,239.46 $27,239.46 Engineer's Estimate 1 EACH $4,000.00 $4,000.00

A0750 30102-2000 AGGREGATE BASE GRADING C OR D, 6-INCH DEPTH

Kovilic Construction Company, Inc. $27.00 $1,890.00 Bluegrass Contracting Corporation $60.00 $4,200.00 Estes Bros. Const., Inc. $44.42 $3,109.40 Structural Engineering Group, Inc. $68.10 $4,767.00 Engineer's Estimate 70 SQYD $35.00 $2,450.00

A0850 31302-0000 AGGREGATE-TOPSOIL COURSE

Kovilic Construction Company, Inc. $25.00 $875.00 Bluegrass Contracting Corporation $95.50 $3,342.50 Estes Bros. Const., Inc. $68.90 $2,411.50 Structural Engineering Group, Inc. $85.12 $2,979.20 Engineer's Estimate 35 SQYD $30.00 $1,050.00

A0950 40201-0300 ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS C , PG 64-22 (1/2-INCH NOMINAL MAXIMUM SIZE

AGGREGATE)

Kovilic Construction Company, Inc. $250.00 $18,750.00 Bluegrass Contracting Corporation $450.00 $33,750.00 Estes Bros. Const., Inc. $481.25 $36,093.75 Structural Engineering Group, Inc. $655.45 $49,158.75 Engineer's Estimate 75 TON $200.00 $15,000.00

A1050 41202-0000 TACK COAT

Kovilic Construction Company, Inc. $10.00 $700.00 Bluegrass Contracting Corporation $70.00 $4,900.00 Estes Bros. Const., Inc. $75.00 $5,250.00 Structural Engineering Group, Inc. $102.15 $7,150.50 Engineer's Estimate 70 GAL $18.00 $1,260.00

5 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1150 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

Kovilic Construction Company, Inc. $27.00 $10,125.00 Bluegrass Contracting Corporation $58.50 $21,937.50 Estes Bros. Const., Inc. $62.50 $23,437.50 Structural Engineering Group, Inc. $85.12 $31,920.00 Engineer's Estimate 375 SQYD $30.00 $11,250.00

A1250 55201-1200 STRUCTURAL CONCRETE, CLASS S (SEAL) (UNDERPINNING)

Kovilic Construction Company, Inc. $2,500.00 $12,500.00 Bluegrass Contracting Corporation $2,100.00 $10,500.00 Estes Bros. Const., Inc. $2,447.48 $12,237.40 Structural Engineering Group, Inc. $5,958.63 $29,793.15 Engineer's Estimate 5 CUYD $1,500.00 $7,500.00

A1350 55220-0000 REPAIR CONCRETE (TOP OF DECK - STRUCTURE #5460-042P)

Kovilic Construction Company, Inc. $1,350.00 $13,500.00 Bluegrass Contracting Corporation $1,400.00 $14,000.00 Estes Bros. Const., Inc. $332.29 $3,322.90 Structural Engineering Group, Inc. $1,191.73 $11,917.30 Engineer's Estimate 10 SQYD $1,300.00 $13,000.00

A1450 55220-0000 REPAIR CONCRETE (STRUCTURE #5460-042P)

Kovilic Construction Company, Inc. $1,350.00 $60,750.00 Bluegrass Contracting Corporation $1,200.00 $54,000.00 Estes Bros. Const., Inc. $928.88 $41,799.60 Structural Engineering Group, Inc. $1,872.71 $84,271.95 Engineer's Estimate 45 SQYD $2,200.00 $99,000.00

A1550 55235-0000 EXPANSION JOINTS (ASPHALTIC PLUG)

Kovilic Construction Company, Inc. $150.00 $8,250.00 Bluegrass Contracting Corporation $525.00 $28,875.00 Estes Bros. Const., Inc. $181.50 $9,982.50 Structural Engineering Group, Inc. $146.41 $8,052.55 Engineer's Estimate 55 LNFT $350.00 $19,250.00

A1650 55235-0000 EXPANSION JOINTS (PRE-COMPRESSED FOAM-SUPPORTED SILICONE SEAL)

Kovilic Construction Company, Inc. $100.00 $7,500.00 Bluegrass Contracting Corporation $230.00 $17,250.00 Estes Bros. Const., Inc. $110.00 $8,250.00 Structural Engineering Group, Inc. $146.41 $10,980.75 Engineer's Estimate 75 LNFT $550.00 $41,250.00

6 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1750 55501-0000 STRUCTURAL STEEL (STEEL ARMOR WITH CONCRETE ATTACHMENTS)

Kovilic Construction Company, Inc. Lump Sum $10,000.00 Bluegrass Contracting Corporation Lump Sum $5,500.00 Estes Bros. Const., Inc. Lump Sum $4,004.00 Structural Engineering Group, Inc. Lump Sum $9,704.06 Engineer's Estimate ALL LPSM Lump Sum $3,000.00

A1850 55601-0300 BRIDGE RAILING, ALUMINUM, TWO RAIL (REMOVE AND REPLACE - STRUCTURE #5460-041P)

Kovilic Construction Company, Inc. $400.00 $14,000.00 Bluegrass Contracting Corporation $410.00 $14,350.00 Estes Bros. Const., Inc. $233.90 $8,186.50 Structural Engineering Group, Inc. $851.23 $29,793.05 Engineer's Estimate 35 LNFT $550.00 $19,250.00

A1950 56901-0000 CONCRETE OVERLAY (POLYESTER POLYMER CONCRETE, 1-INCH DEPTH)

Kovilic Construction Company, Inc. $315.00 $83,475.00 Bluegrass Contracting Corporation $390.00 $103,350.00 Estes Bros. Const., Inc. $388.23 $102,880.95 Structural Engineering Group, Inc. $595.86 $157,902.90 Engineer's Estimate 265 SQYD $220.00 $58,300.00

A2050 61401-0000 LEAN CONCRETE BACKFILL (PIGMENTED)

Kovilic Construction Company, Inc. $10,000.00 $10,000.00 Bluegrass Contracting Corporation $5,500.00 $5,500.00 Estes Bros. Const., Inc. $5,457.51 $5,457.51 Structural Engineering Group, Inc. $5,958.63 $5,958.63 Engineer's Estimate 1 CUYD $5,000.00 $5,000.00

A2150 61704-1000 REPLACEMENT POST, STEEL (ALUMINUM POST)

Kovilic Construction Company, Inc. $5,000.00 $5,000.00 Bluegrass Contracting Corporation $2,300.00 $2,300.00 Estes Bros. Const., Inc. $2,917.00 $2,917.00 Structural Engineering Group, Inc. $1,191.73 $1,191.73 Engineer's Estimate 1 EACH $2,500.00 $2,500.00

A2250 62030-0000 REPOINT STONE MASONRY (STRUCTURE #5460-013P & 5460-042P & 5460-162P)

Kovilic Construction Company, Inc. $75.00 $82,500.00 Bluegrass Contracting Corporation $35.00 $38,500.00 Estes Bros. Const., Inc. $29.70 $32,670.00 Structural Engineering Group, Inc. $72.43 $79,673.00 Engineer's Estimate 1,100 LNFT $30.00 $33,000.00

7 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2350 62502-0000 TURF ESTABLISHMENT

Kovilic Construction Company, Inc. $25.00 $875.00 Bluegrass Contracting Corporation $25.00 $875.00 Estes Bros. Const., Inc. $58.00 $2,030.00 Structural Engineering Group, Inc. $194.56 $6,809.60 Engineer's Estimate 35 SQYD $15.00 $525.00

A2450 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

Kovilic Construction Company, Inc. $5.00 $2,200.00 Bluegrass Contracting Corporation $70.00 $30,800.00 Estes Bros. Const., Inc. $13.75 $6,050.00 Structural Engineering Group, Inc. $98.67 $43,414.80 Engineer's Estimate 440 LNFT $10.00 $4,400.00

A2550 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Kovilic Construction Company, Inc. $100.00 $5,500.00 Bluegrass Contracting Corporation $140.00 $7,700.00 Estes Bros. Const., Inc. $30.00 $1,650.00 Structural Engineering Group, Inc. $85.12 $4,681.60 Engineer's Estimate 55 EACH $60.00 $3,300.00

A2650 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Kovilic Construction Company, Inc. $15,000.00 $60,000.00 Bluegrass Contracting Corporation $2,400.00 $9,600.00 Estes Bros. Const., Inc. $6,000.00 $24,000.00 Structural Engineering Group, Inc. $22,285.28 $89,141.12 Engineer's Estimate 4 EACH $7,000.00 $28,000.00

A2750 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM

Kovilic Construction Company, Inc. $5,000.00 $5,000.00 Bluegrass Contracting Corporation $36,600.00 $36,600.00 Estes Bros. Const., Inc. $10,000.00 $10,000.00 Structural Engineering Group, Inc. $80,339.39 $80,339.39 Engineer's Estimate 1 EACH $20,000.00 $20,000.00

A2850 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Kovilic Construction Company, Inc. $5.00 $175.00 Bluegrass Contracting Corporation $60.00 $2,100.00 Estes Bros. Const., Inc. $20.00 $700.00 Structural Engineering Group, Inc. $243.21 $8,512.35 Engineer's Estimate 35 LNFT $1.00 $35.00

8 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A2950 63503-0800 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKING REMOVAL

Kovilic Construction Company, Inc. $5.00 $175.00 Bluegrass Contracting Corporation $60.00 $2,100.00 Estes Bros. Const., Inc. $20.00 $700.00 Structural Engineering Group, Inc. $243.21 $8,512.35 Engineer's Estimate 35 LNFT $1.85 $64.75

A3050 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Kovilic Construction Company, Inc. $50.00 $15,500.00 Bluegrass Contracting Corporation $17.50 $5,425.00 Estes Bros. Const., Inc. $30.00 $9,300.00 Structural Engineering Group, Inc. $54.48 $16,888.80 Engineer's Estimate 310 SQFT $35.00 $10,850.00

A3150 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Kovilic Construction Company, Inc. $75.00 $36,000.00 Bluegrass Contracting Corporation $54.00 $25,920.00 Estes Bros. Const., Inc. $29.00 $13,920.00 Structural Engineering Group, Inc. $76.87 $36,897.60 Engineer's Estimate 480 HOUR $26.90 $12,912.00

A3250 63701-0000 FIELD OFFICE

Kovilic Construction Company, Inc. $20,000.00 $20,000.00 Bluegrass Contracting Corporation $41,000.00 $41,000.00 Estes Bros. Const., Inc. $45,000.00 $45,000.00 Structural Engineering Group, Inc. $25,537.00 $25,537.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00

Total Schedule - All Items

Kovilic Construction Company, Inc. $688,990.00 Bluegrass Contracting Corporation $832,925.00 Estes Bros. Const., Inc. $1,041,517.51 Structural Engineering Group, Inc. $1,045,746.70 Engineer's Estimate $520,000.00

9 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Solcitation No: 693C73-20-B-000021

Division: Eastern Federal Lands

State: TN County: Blount, Sevier

Federal Land: Great Smoky Mountains National Park Opened at: Sterling, Virginia

Opened by: C. Shawn Long

Date: 07/16/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Estes Bros. Const., Inc. $507,305.18 126 Sugar Run Road Jonesville Virginia 24263

Bluegrass Contracting Corporation $814,552.50 1075 Red Mile Road Lexington Kentucky 40504

Kovilic Construction Company, Inc. $837,275.00 3721 N. Carnation Street Franklin Park Illinois 60131

Structural Engineering Group, Inc. $1,192,292.92 21135 Whitfield Place, Suite 201 Sterling Virginia 20165

Engineer's Estimate $510,000.00

C. Shawn Long

Contracting Officer

10 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0050 15101-0000 MOBILIZATION

Estes Bros. Const., Inc. Lump Sum $124,500.00 Bluegrass Contracting Corporation Lump Sum $125,000.00 Kovilic Construction Company, Inc. Lump Sum $100,000.00 Structural Engineering Group, Inc. Lump Sum $85,097.60 Engineer's Estimate ALL LPSM Lump Sum $45,873.00

B0150 15201-0000 CONSTRUCTION SURVEY AND STAKING

Estes Bros. Const., Inc. Lump Sum $5,000.00 Bluegrass Contracting Corporation Lump Sum $25,000.00 Kovilic Construction Company, Inc. Lump Sum $5,000.00 Structural Engineering Group, Inc. Lump Sum $7,984.20 Engineer's Estimate ALL LPSM Lump Sum $12,000.00

B0250 15401-0000 CONTRACTOR TESTING

Estes Bros. Const., Inc. Lump Sum $10,000.00 Bluegrass Contracting Corporation Lump Sum $30,000.00 Kovilic Construction Company, Inc. Lump Sum $5,000.00 Structural Engineering Group, Inc. Lump Sum $37,960.42 Engineer's Estimate ALL LPSM Lump Sum $11,000.00

B0350 15702-4000 SOIL EROSION CONTROL, FILTER BAG

Estes Bros. Const., Inc. Lump Sum $7,635.00 Bluegrass Contracting Corporation Lump Sum $11,500.00 Kovilic Construction Company, Inc. Lump Sum $10,000.00 Structural Engineering Group, Inc. Lump Sum $23,952.59 Engineer's Estimate ALL LPSM Lump Sum $3,600.00

B0450 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Estes Bros. Const., Inc. $9.36 $2,059.20 Bluegrass Contracting Corporation $45.00 $9,900.00 Kovilic Construction Company, Inc. $10.00 $2,200.00 Structural Engineering Group, Inc. $88.71 $19,516.20 Engineer's Estimate 220 LNFT $8.00 $1,760.00

B0550 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

Estes Bros. Const., Inc. $30.00 $14,100.00 Bluegrass Contracting Corporation $300.00 $141,000.00 Kovilic Construction Company, Inc. $350.00 $164,500.00 Structural Engineering Group, Inc. $130.60 $61,382.00 Engineer's Estimate 470 LNFT $105.00 $49,350.00

11 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0650 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Estes Bros. Const., Inc. $1,045.00 $2,090.00 Bluegrass Contracting Corporation $6,300.00 $12,600.00 Kovilic Construction Company, Inc. $7,500.00 $15,000.00 Structural Engineering Group, Inc. $28,388.25 $56,776.50 Engineer's Estimate 2 EACH $4,000.00 $8,000.00

B0750 20304-9000 REMOVAL OF STREAM DEBRIS

Estes Bros. Const., Inc. Lump Sum $9,750.00 Bluegrass Contracting Corporation Lump Sum $7,500.00 Kovilic Construction Company, Inc. Lump Sum $37,000.00 Structural Engineering Group, Inc. Lump Sum $22,178.32 Engineer's Estimate ALL LPSM Lump Sum $700.00

B0850 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3

Estes Bros. Const., Inc. $110.97 $11,651.85 Bluegrass Contracting Corporation $175.00 $18,375.00 Kovilic Construction Company, Inc. $500.00 $52,500.00 Structural Engineering Group, Inc. $620.99 $65,203.95 Engineer's Estimate 105 TON $160.00 $16,800.00

B0950 30102-2000 AGGREGATE BASE GRADING C OR D, 6-INCH DEPTH

Estes Bros. Const., Inc. $42.83 $2,783.95 Bluegrass Contracting Corporation $60.00 $3,900.00 Kovilic Construction Company, Inc. $25.00 $1,625.00 Structural Engineering Group, Inc. $70.97 $4,613.05 Engineer's Estimate 65 SQYD $35.00 $2,275.00

B1050 31302-0000 AGGREGATE-TOPSOIL COURSE

Estes Bros. Const., Inc. $68.90 $3,789.50 Bluegrass Contracting Corporation $95.00 $5,225.00 Kovilic Construction Company, Inc. $25.00 $1,375.00 Structural Engineering Group, Inc. $88.71 $4,879.05 Engineer's Estimate 55 SQYD $30.00 $1,650.00

B1150 40201-0300 ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS C , PG 64-22 (1/2-INCH NOMINAL MAXIMUM SIZE

AGGREGATE)

Estes Bros. Const., Inc. $481.25 $52,937.50 Bluegrass Contracting Corporation $450.00 $49,500.00 Kovilic Construction Company, Inc. $250.00 $27,500.00 Structural Engineering Group, Inc. $683.09 $75,139.90 Engineer's Estimate 110 TON $200.00 $22,000.00

12 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1250 41202-0000 TACK COAT

Estes Bros. Const., Inc. $75.00 $7,125.00 Bluegrass Contracting Corporation $70.00 $6,650.00 Kovilic Construction Company, Inc. $10.00 $950.00 Structural Engineering Group, Inc. $106.46 $10,113.70 Engineer's Estimate 95 GAL $18.00 $1,710.00

B1350 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

Estes Bros. Const., Inc. $62.50 $32,812.50 Bluegrass Contracting Corporation $58.50 $30,712.50 Kovilic Construction Company, Inc. $54.00 $28,350.00 Structural Engineering Group, Inc. $88.71 $46,572.75 Engineer's Estimate 525 SQYD $30.00 $15,750.00

B1450 55201-1200 STRUCTURAL CONCRETE, CLASS S (SEAL) (UNDERPINNING)

Estes Bros. Const., Inc. $14,863.48 $14,863.48 Bluegrass Contracting Corporation $2,100.00 $2,100.00 Kovilic Construction Company, Inc. $20,000.00 $20,000.00 Structural Engineering Group, Inc. $16,145.82 $16,145.82 Engineer's Estimate 1 CUYD $1,500.00 $1,500.00

B1550 55220-0000 REPAIR CONCRETE (BACKWALL - STRUCTURE #5460-048P)

Estes Bros. Const., Inc. $797.50 $3,987.50 Bluegrass Contracting Corporation $1,400.00 $7,000.00 Kovilic Construction Company, Inc. $2,250.00 $11,250.00 Structural Engineering Group, Inc. $11,710.16 $58,550.80 Engineer's Estimate 5 SQYD $2,200.00 $11,000.00

B1650 55220-0000 REPAIR CONCRETE (TOP OF DECK - STRUCTURE #5460-048P)

Estes Bros. Const., Inc. $332.20 $24,915.00 Bluegrass Contracting Corporation $735.00 $55,125.00 Kovilic Construction Company, Inc. $150.00 $11,250.00 Structural Engineering Group, Inc. $1,218.34 $91,375.50 Engineer's Estimate 75 SQYD $1,300.00 $97,500.00

B1750 55223-0000 REPAIR CONCRETE (EXPOSED STEEL REBAR REPAIR-EPOXY PAINT)

Estes Bros. Const., Inc. $27.50 $137.50 Bluegrass Contracting Corporation $170.00 $850.00 Kovilic Construction Company, Inc. $100.00 $500.00 Structural Engineering Group, Inc. $798.42 $3,992.10 Engineer's Estimate 5 LNFT $300.00 $1,500.00

13 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1850 55235-0000 EXPANSION JOINTS (PRE-COMPRESSED FOAM-SUPPORTED SILICONE SEAL)

Estes Bros. Const., Inc. $110.00 $7,150.00 Bluegrass Contracting Corporation $185.00 $12,025.00 Kovilic Construction Company, Inc. $200.00 $13,000.00 Structural Engineering Group, Inc. $152.59 $9,918.35 Engineer's Estimate 65 LNFT $550.00 $35,750.00

B1950 55506-0000 MISCELLANEOUS STEEL (DECK DRAINAGE SCUPPER)

Estes Bros. Const., Inc. $1,645.00 $6,580.00 Bluegrass Contracting Corporation $2,400.00 $9,600.00 Kovilic Construction Company, Inc. $2,000.00 $8,000.00 Structural Engineering Group, Inc. $1,685.55 $6,742.20 Engineer's Estimate 4 EACH $1,000.00 $4,000.00

B2050 55901-0000 MEMBRANE WATERPROOFING (STRUCTURE #5460-048P)

Estes Bros. Const., Inc. $107.75 $31,786.25 Bluegrass Contracting Corporation $146.00 $43,070.00 Kovilic Construction Company, Inc. $135.00 $39,825.00 Structural Engineering Group, Inc. $221.78 $65,425.10 Engineer's Estimate 295 SQYD $100.00 $29,500.00

B2150 56001-0000 REMOVAL OF CONCRETE BY HYDRODEMOLITION (ASPHALT WEARING SURFACE

Estes Bros. Const., Inc. $50.53 $14,906.35 Bluegrass Contracting Corporation $160.00 $47,200.00 Kovilic Construction Company, Inc. $100.00 $29,500.00 Structural Engineering Group, Inc. $345.98 $102,064.10 Engineer's Estimate 295 SQYD $61.00 $17,995.00

B2250 56101-0000 STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR

Estes Bros. Const., Inc. $206.50 $10,325.00 Bluegrass Contracting Corporation $165.00 $8,250.00 Kovilic Construction Company, Inc. $100.00 $5,000.00 Structural Engineering Group, Inc. $159.68 $7,984.00 Engineer's Estimate 50 LNFT $200.00 $10,000.00

B2350 56302-2000 PAINTING, STEEL STRUCTURE (MOISTURE INSENSITIVE EPOXY COATING)

Estes Bros. Const., Inc. $116.87 $9,349.60 Bluegrass Contracting Corporation $100.00 $8,000.00 Kovilic Construction Company, Inc. $250.00 $20,000.00 Structural Engineering Group, Inc. $288.32 $23,065.60 Engineer's Estimate 80 SQFT $75.00 $6,000.00

14 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B2450 62026-1000 REMOVE AND RESET STONE MASONRY

Estes Bros. Const., Inc. $2,420.00 $2,420.00 Bluegrass Contracting Corporation $2,600.00 $2,600.00 Kovilic Construction Company, Inc. $10,000.00 $10,000.00 Structural Engineering Group, Inc. $21,291.19 $21,291.19 Engineer's Estimate 1 SQYD $2,000.00 $2,000.00

B2550 62030-0000 REPOINT STONE MASONRY (STRUCTURE #5460-047P)

Estes Bros. Const., Inc. $29.70 $35,640.00 Bluegrass Contracting Corporation $35.00 $42,000.00 Kovilic Construction Company, Inc. $100.00 $120,000.00 Structural Engineering Group, Inc. $75.50 $90,600.00 Engineer's Estimate 1,200 LNFT $30.00 $36,000.00

B2650 62502-0000 TURF ESTABLISHMENT

Estes Bros. Const., Inc. $58.00 $3,190.00 Bluegrass Contracting Corporation $25.00 $1,375.00 Kovilic Construction Company, Inc. $10.00 $550.00 Structural Engineering Group, Inc. $157.91 $8,685.05 Engineer's Estimate 55 SQYD $15.00 $825.00

B2750 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID

Estes Bros. Const., Inc. $13.75 $8,250.00 Bluegrass Contracting Corporation $35.00 $21,000.00 Kovilic Construction Company, Inc. $4.00 $2,400.00 Structural Engineering Group, Inc. $51.75 $31,050.00 Engineer's Estimate 600 LNFT $10.00 $6,000.00

B2850 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Estes Bros. Const., Inc. $30.00 $750.00 Bluegrass Contracting Corporation $140.00 $3,500.00 Kovilic Construction Company, Inc. $100.00 $2,500.00 Structural Engineering Group, Inc. $88.71 $2,217.75 Engineer's Estimate 25 EACH $60.00 $1,500.00

B2950 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Estes Bros. Const., Inc. $12,000.00 $24,000.00 Bluegrass Contracting Corporation $2,400.00 $4,800.00 Kovilic Construction Company, Inc. $15,000.00 $30,000.00 Structural Engineering Group, Inc. $27,465.64 $54,931.28 Engineer's Estimate 2 EACH $7,000.00 $14,000.00

15 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B3050 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Estes Bros. Const., Inc. $30.00 $3,900.00 Bluegrass Contracting Corporation $17.50 $2,275.00 Kovilic Construction Company, Inc. $50.00 $6,500.00 Structural Engineering Group, Inc. $56.78 $7,381.40 Engineer's Estimate 130 SQFT $35.00 $4,550.00

B3150 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Estes Bros. Const., Inc. $29.00 $13,920.00 Bluegrass Contracting Corporation $54.00 $25,920.00 Kovilic Construction Company, Inc. $75.00 $36,000.00 Structural Engineering Group, Inc. $80.11 $38,452.80 Engineer's Estimate 480 HOUR $26.90 $12,912.00

B3250 63701-0000 FIELD OFFICE

Estes Bros. Const., Inc. $5,000.00 $5,000.00 Bluegrass Contracting Corporation $41,000.00 $41,000.00 Kovilic Construction Company, Inc. $20,000.00 $20,000.00 Structural Engineering Group, Inc. $31,049.65 $31,049.65 Engineer's Estimate 1 EACH $25,000.00 $25,000.00

Total Schedule - All Items

Estes Bros. Const., Inc. $507,305.18 Bluegrass Contracting Corporation $814,552.50 Kovilic Construction Company, Inc. $837,275.00 Structural Engineering Group, Inc. $1,192,292.92 Engineer's Estimate $510,000.00

16 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Solcitation No: 693C73-20-B-000021

Division: Eastern Federal Lands

State: TN County: Blount, Sevier

Federal Land: Great Smoky Mountains National Park Opened at: Sterling, Virginia

Opened by: C. Shawn Long

Date: 07/16/20

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Estes Bros. Const., Inc. $1,220,679.16 126 Sugar Run Road Jonesville Virginia 24263

Bluegrass Contracting Corporation $1,378,252.50 1075 Red Mile Road Lexington Kentucky 40504

Kovilic Construction Company, Inc. $1,590,175.00 3721 N. Carnation Street Franklin Park Illinois 60131

Structural Engineering Group, Inc. $1,745,765.63 21135 Whitfield Place, Suite 201 Sterling Virginia 20165

Engineer's Estimate $1,050,000.00

C. Shawn Long Contracting Officer

17 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0050 15101-0000 MOBILIZATION

Estes Bros. Const., Inc. Lump Sum $213,500.00 Bluegrass Contracting Corporation Lump Sum $175,000.00 Kovilic Construction Company, Inc. Lump Sum $150,000.00 Structural Engineering Group, Inc. Lump Sum $72,210.15 Engineer's Estimate ALL LPSM Lump Sum $72,595.00

C0150 15201-0000 CONSTRUCTION SURVEY AND STAKING

Estes Bros. Const., Inc. Lump Sum $15,000.00 Bluegrass Contracting Corporation Lump Sum $45,000.00 Kovilic Construction Company, Inc. Lump Sum $20,000.00 Structural Engineering Group, Inc. Lump Sum $6,775.04 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

C0250 15401-0000 CONTRACTOR TESTING

Estes Bros. Const., Inc. Lump Sum $20,000.00 Bluegrass Contracting Corporation Lump Sum $50,000.00 Kovilic Construction Company, Inc. Lump Sum $20,000.00 Structural Engineering Group, Inc. Lump Sum $32,211.57 Engineer's Estimate ALL LPSM Lump Sum $23,000.00

C0350 15702-4000 SOIL EROSION CONTROL, FILTER BAG

Estes Bros. Const., Inc. Lump Sum $4,635.00 Bluegrass Contracting Corporation Lump Sum $15,000.00 Kovilic Construction Company, Inc. Lump Sum $10,000.00 Structural Engineering Group, Inc. Lump Sum $20,325.13 Engineer's Estimate ALL LPSM Lump Sum $4,500.00

C0450 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Estes Bros. Const., Inc. $9.36 $2,152.80 Bluegrass Contracting Corporation $43.00 $9,890.00 Kovilic Construction Company, Inc. $25.00 $5,750.00 Structural Engineering Group, Inc. $63.50 $14,605.00 Engineer's Estimate 230 LNFT $8.00 $1,840.00

C0550 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

Estes Bros. Const., Inc. $30.00 $10,800.00 Bluegrass Contracting Corporation $300.00 $108,000.00 Kovilic Construction Company, Inc. $250.00 $90,000.00 Structural Engineering Group, Inc. $110.83 $39,898.80 Engineer's Estimate 360 LNFT $105.00 $37,800.00

18 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0650 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Estes Bros. Const., Inc. $1,250.00 $1,250.00 Bluegrass Contracting Corporation $6,300.00 $6,300.00 Kovilic Construction Company, Inc. $7,500.00 $7,500.00 Structural Engineering Group, Inc. $24,089.05 $24,089.05 Engineer's Estimate 1 EACH $4,000.00 $4,000.00

C0750 20301-0400 REMOVAL OF BRIDGE (SUPERSTRUCTURE - 5460-060P)

Estes Bros. Const., Inc. $66,000.00 $66,000.00 Bluegrass Contracting Corporation $66,600.00 $66,600.00 Kovilic Construction Company, Inc. $90,000.00 $90,000.00 Structural Engineering Group, Inc. $149,050.98 $149,050.98 Engineer's Estimate 1 EACH $25,000.00 $25,000.00

C0850 20301-0400 REMOVAL OF BRIDGE (SUPERSTRUCTURE - 5460-078P)

Estes Bros. Const., Inc. $14,750.00 $14,750.00 Bluegrass Contracting Corporation $24,200.00 $24,200.00 Kovilic Construction Company, Inc. $60,000.00 $60,000.00 Structural Engineering Group, Inc. $149,050.98 $149,050.98 Engineer's Estimate 1 EACH $12,000.00 $12,000.00

C0950 20803-0000 STRUCTURAL BACKFILL

Estes Bros. Const., Inc. $231.71 $10,426.95 Bluegrass Contracting Corporation $180.00 $8,100.00 Kovilic Construction Company, Inc. $100.00 $4,500.00 Structural Engineering Group, Inc. $451.67 $20,325.15 Engineer's Estimate 45 CUYD $175.00 $7,875.00

C1050 25102-0300 PLACED RIPRAP, METHOD A, CLASS 3

Estes Bros. Const., Inc. $632.97 $5,063.76 Bluegrass Contracting Corporation $175.00 $1,400.00 Kovilic Construction Company, Inc. $500.00 $4,000.00 Structural Engineering Group, Inc. $526.95 $4,215.60 Engineer's Estimate 8 TON $160.00 $1,280.00

C1150 30101-4000 AGGREGATE BASE GRADING C OR D

Estes Bros. Const., Inc. $107.76 $12,931.20 Bluegrass Contracting Corporation $80.00 $9,600.00 Kovilic Construction Company, Inc. $100.00 $12,000.00 Structural Engineering Group, Inc. $127.97 $15,356.40 Engineer's Estimate 120 TON $75.00 $9,000.00

19 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1250 30102-2000 AGGREGATE BASE GRADING C OR D, 6-INCH DEPTH

Estes Bros. Const., Inc. $43.60 $2,616.00 Bluegrass Contracting Corporation $60.00 $3,600.00 Kovilic Construction Company, Inc. $25.00 $1,500.00 Structural Engineering Group, Inc. $60.22 $3,613.20 Engineer's Estimate 60 SQYD $35.00 $2,100.00

C1350 30303-2000 AGGREGATE SURFACE RECONDITIONING (EXISTING)

Estes Bros. Const., Inc. $16.28 $6,512.00 Bluegrass Contracting Corporation $17.50 $7,000.00 Kovilic Construction Company, Inc. $15.00 $6,000.00 Structural Engineering Group, Inc. $30.11 $12,044.00 Engineer's Estimate 400 SQYD $25.00 $10,000.00

C1450 31302-0000 AGGREGATE-TOPSOIL COURSE

Estes Bros. Const., Inc. $62.47 $7,496.40 Bluegrass Contracting Corporation $95.00 $11,400.00 Kovilic Construction Company, Inc. $25.00 $3,000.00 Structural Engineering Group, Inc. $75.28 $9,033.60 Engineer's Estimate 120 SQYD $30.00 $3,600.00

C1550 40201-0300 ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS C , PG 64-22 (1/2-INCH NOMINAL MAXIMUM SIZE

AGGREGATE)

Estes Bros. Const., Inc. $481.25 $28,875.00 Bluegrass Contracting Corporation $450.00 $27,000.00 Kovilic Construction Company, Inc. $250.00 $15,000.00 Structural Engineering Group, Inc. $579.64 $34,778.40 Engineer's Estimate 60 TON $200.00 $12,000.00

C1650 41202-0000 TACK COAT

Estes Bros. Const., Inc. $75.00 $6,750.00 Bluegrass Contracting Corporation $70.00 $6,300.00 Kovilic Construction Company, Inc. $10.00 $900.00 Structural Engineering Group, Inc. $90.33 $8,129.70 Engineer's Estimate 90 GAL $18.00 $1,620.00

20 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C1750 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH

Estes Bros. Const., Inc. $62.50 $29,687.50 Bluegrass Contracting Corporation $60.00 $28,500.00 Kovilic Construction Company, Inc. $27.00 $12,825.00 Structural Engineering Group, Inc. $75.28 $35,758.00 Engineer's Estimate 475 SQYD $30.00 $14,250.00

C1850 41301-0700 ASPHALT PAVEMENT MILLING, 2 1/2-INCH DEPTH (STRUCTURE #5460-050P)

Estes Bros. Const., Inc. $75.00 $9,750.00 Bluegrass Contracting Corporation $70.00 $9,100.00 Kovilic Construction Company, Inc. $50.00 $6,500.00 Structural Engineering Group, Inc. $90.33 $11,742.90 Engineer's Estimate 130 SQYD $18.00 $2,340.00

C1950 55202-1000 STRUCTURAL CONCRETE, CLASS D (AE), FOR APPROACH SLABS, TYPE 1

Estes Bros. Const., Inc. $1,448.98 $34,775.52 Bluegrass Contracting Corporation $700.00 $16,800.00 Kovilic Construction Company, Inc. $450.00 $10,800.00 Structural Engineering Group, Inc. $1,138.21 $27,317.04 Engineer's Estimate 24 SQYD $480.00 $11,520.00

C2050 55220-0000 REPAIR CONCRETE (TOP OF DECK - STRUCTURE #5460-050P)

Estes Bros. Const., Inc. $332.29 $11,630.15 Bluegrass Contracting Corporation $825.00 $28,875.00 Kovilic Construction Company, Inc. $250.00 $8,750.00 Structural Engineering Group, Inc. $1,032.39 $36,133.65 Engineer's Estimate 35 SQYD $1,300.00 $45,500.00

C2150 55225-0000 CLEAN AND RESEAL JOINTS (POURABLE JOINT - STRUCTURE #5460-050P)

Estes Bros. Const., Inc. $88.62 $3,987.90 Bluegrass Contracting Corporation $40.50 $1,822.50 Kovilic Construction Company, Inc. $100.00 $4,500.00 Structural Engineering Group, Inc. $150.56 $6,775.20 Engineer's Estimate 45 LNFT $70.00 $3,150.00

C2250 55501-0000 STRUCTURAL STEEL (5460-078P: WATERLINE SUPPORT AND PIPE INSULATION)

Estes Bros. Const., Inc. Lump Sum $14,420.00 Bluegrass Contracting Corporation Lump Sum $6,800.00 Kovilic Construction Company, Inc. Lump Sum $20,000.00 Structural Engineering Group, Inc. Lump Sum $7,527.83 Engineer's Estimate ALL LPSM Lump Sum $10,000.00

21 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C2350 55502-0000 STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED (STRUCTURES #5460-60 & 5460-078P)

Estes Bros. Const., Inc. $3.96 $245,520.00 Bluegrass Contracting Corporation $3.45 $213,900.00 Kovilic Construction Company, Inc. $7.00 $434,000.00 Structural Engineering Group, Inc. $8.39 $520,180.00 Engineer's Estimate 62,000 LB $5.00 $310,000.00

C2450 55601-1300 BRIDGE RAILING, TIMBER (STRUCTURES #5460-60 & 5460-078P)

Estes Bros. Const., Inc. $231.20 $60,112.00 Bluegrass Contracting Corporation $225.00 $58,500.00 Kovilic Construction Company, Inc. $445.00 $115,700.00 Structural Engineering Group, Inc. $115.81 $30,110.60 Engineer's Estimate 260 LNFT $250.00 $65,000.00

C2550 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED (STRUCTURES #5460-60 & 5460-078P)

Estes Bros. Const., Inc. $9,208.20 $147,331.20 Bluegrass Contracting Corporation $11,000.00 $176,000.00 Kovilic Construction Company, Inc. $10,000.00 $160,000.00 Structural Engineering Group, Inc. $6,022.26 $96,356.16 Engineer's Estimate 16 MFBM $7,000.00 $112,000.00

C2650 55701-2000 STRUCTURAL TIMBER AND LUMBER, TREATED (STRUCTRUE #5460-060P: TIMBER RUNNER)

Estes Bros. Const., Inc. $22,212.98 $44,425.96 Bluegrass Contracting Corporation $8,800.00 $17,600.00 Kovilic Construction Company, Inc. $15,000.00 $30,000.00 Structural Engineering Group, Inc. $6,022.26 $12,044.52 Engineer's Estimate 2 MFBM $7,000.00 $14,000.00

C2750 56101-0000 STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR (BEAMS, CENTER SPAN - STRUCTURE #5460-050P)

Estes Bros. Const., Inc. $206.50 $14,455.00 Bluegrass Contracting Corporation $165.00 $11,550.00 Kovilic Construction Company, Inc. $100.00 $7,000.00 Structural Engineering Group, Inc. $150.56 $10,539.20 Engineer's Estimate 70 LNFT $200.00 $14,000.00

C2850 56401-1000 BEARING DEVICE, ELASTOMERIC (STRUCTURES #5460-060P & 5460-078P)

Estes Bros. Const., Inc. $1,011.35 $22,249.70 Bluegrass Contracting Corporation $1,700.00 $37,400.00 Kovilic Construction Company, Inc. $1,000.00 $22,000.00 Structural Engineering Group, Inc. $30.11 $662.42 Engineer's Estimate 22 EACH $1,500.00 $33,000.00

22 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C2950 56901-0000 CONCRETE OVERLAY (POLYESTER POLYMER CONCRETE, 2 1/2-INCH DEPTH)

Estes Bros. Const., Inc. $436.12 $56,695.60 Bluegrass Contracting Corporation $475.00 $61,750.00 Kovilic Construction Company, Inc. $300.00 $39,000.00 Structural Engineering Group, Inc. $526.95 $68,503.50 Engineer's Estimate 130 SQYD $350.00 $45,500.00

C3050 61401-0000 LEAN CONCRETE BACKFILL (STRUCTURES #5460-60 & 5460-078P)

Estes Bros. Const., Inc. $5,843.51 $11,687.02 Bluegrass Contracting Corporation $3,700.00 $7,400.00 Kovilic Construction Company, Inc. $1,000.00 $2,000.00 Structural Engineering Group, Inc. $5,269.48 $10,538.96 Engineer's Estimate 2 CUYD $5,000.00 $10,000.00

C3150 61901-0000 FENCE (TREE PROTECTION)

Estes Bros. Const., Inc. $5.00 $425.00 Bluegrass Contracting Corporation $26.50 $2,252.50 Kovilic Construction Company, Inc. $50.00 $4,250.00 Structural Engineering Group, Inc. $70.85 $6,022.25 Engineer's Estimate 85 LNFT $4.00 $340.00

C3250 61905-0000 TREE PLANKING

Estes Bros. Const., Inc. $20.00 $280.00 Bluegrass Contracting Corporation $285.00 $3,990.00 Kovilic Construction Company, Inc. $50.00 $700.00 Structural Engineering Group, Inc. $451.67 $6,323.38 Engineer's Estimate 14 LNFT $26.00 $364.00

C3350 62030-0000 REPOINT STONE MASONRY (STRUCTURE #5460-078P)

Estes Bros. Const., Inc. $29.70 $2,970.00 Bluegrass Contracting Corporation $35.00 $3,500.00 Kovilic Construction Company, Inc. $100.00 $10,000.00 Structural Engineering Group, Inc. $64.06 $6,406.00 Engineer's Estimate 100 LNFT $30.00 $3,000.00

C3450 62030-0000 REPOINT STONE MASONRY (STRUCTURE #5460-060P)

Estes Bros. Const., Inc. $29.70 $5,197.50 Bluegrass Contracting Corporation $35.00 $6,125.00 Kovilic Construction Company, Inc. $100.00 $17,500.00 Structural Engineering Group, Inc. $64.06 $11,210.50 Engineer's Estimate 175 LNFT $30.00 $5,250.00

23 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C3550 62030-0000 REPOINT STONE MASONRY (PARAPETS - STRUCTURE #5460-050P)

Estes Bros. Const., Inc. $29.70 $29,700.00 Bluegrass Contracting Corporation $35.00 $35,000.00 Kovilic Construction Company, Inc. $75.00 $75,000.00 Structural Engineering Group, Inc. $64.06 $64,060.00 Engineer's Estimate 1,000 LNFT $30.00 $30,000.00

C3650 62502-0000 TURF ESTABLISHMENT

Estes Bros. Const., Inc. $58.00 $6,960.00 Bluegrass Contracting Corporation $25.00 $3,000.00 Kovilic Construction Company, Inc. $25.00 $3,000.00 Structural Engineering Group, Inc. $134.00 $16,080.00 Engineer's Estimate 120 SQYD $15.00 $1,800.00

C3750 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Estes Bros. Const., Inc. $30.00 $600.00 Bluegrass Contracting Corporation $140.00 $2,800.00 Kovilic Construction Company, Inc. $100.00 $2,000.00 Structural Engineering Group, Inc. $75.28 $1,505.60 Engineer's Estimate 20 EACH $60.00 $1,200.00

C3850 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Estes Bros. Const., Inc. $6,000.00 $18,000.00 Bluegrass Contracting Corporation $2,400.00 $7,200.00 Kovilic Construction Company, Inc. $15,000.00 $45,000.00 Structural Engineering Group, Inc. $26,277.14 $78,831.42 Engineer's Estimate 3 EACH $7,000.00 $21,000.00

C3950 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Estes Bros. Const., Inc. $20.00 $1,500.00 Bluegrass Contracting Corporation $50.00 $3,750.00 Kovilic Construction Company, Inc. $100.00 $7,500.00 Structural Engineering Group, Inc. $126.47 $9,485.25 Engineer's Estimate 75 LNFT $48.00 $3,600.00

C4050 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Estes Bros. Const., Inc. $30.00 $6,150.00 Bluegrass Contracting Corporation $17.50 $3,587.50 Kovilic Construction Company, Inc. $50.00 $10,250.00 Structural Engineering Group, Inc. $48.18 $9,876.90 Engineer's Estimate 205 SQFT $35.00 $7,175.00

24 out of 24

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C4150 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Estes Bros. Const., Inc. $29.00 $8,410.00 Bluegrass Contracting Corporation $54.00 $15,660.00 Kovilic Construction Company, Inc. $75.00 $21,750.00 Structural Engineering Group, Inc. $67.98 $19,714.20 Engineer's Estimate 290 HOUR $26.90 $7,801.00

C4250 63701-0000 FIELD OFFICE

Estes Bros. Const., Inc. $5,000.00 $5,000.00 Bluegrass Contracting Corporation $41,000.00 $41,000.00 Kovilic Construction Company, Inc. $20,000.00 $20,000.00 Structural Engineering Group, Inc. $26,347.40 $26,347.40 Engineer's Estimate 1 EACH $25,000.00 $25,000.00

Total Schedule - All Items

Estes Bros. Const., Inc. $1,220,679.16 Bluegrass Contracting Corporation $1,378,252.50 Kovilic Construction Company, Inc. $1,590,175.00 Structural Engineering Group, Inc. $1,745,765.63 Engineer's Estimate $1,050,000.00

Bid Error Report

1 out of 6

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

2 out of 6

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: A

Schedule Type: Base

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Bluegrass Contracting Corporation $832,925.00 $832,925.00

Estes Bros. Const., Inc. $1,041,517.51 $1,041,517.51

Kovilic Construction Company, Inc. $733,990.00 $688,990.00 X

Structural Engineering Group, Inc. $1,045,747.72 $1,045,746.70 X

The apparent low bidder is 32.50% above the engineer's estimate.

3 out of 6

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Bid Item Check Pass

4 out of 6

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: B

Schedule Type: Options

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Bluegrass Contracting Corporation $814,552.50 $814,552.50

Estes Bros. Const., Inc. $507,305.18 $507,305.18

Kovilic Construction Company, Inc. $837,275.00 $837,275.00

Structural Engineering Group, Inc. $1,192,290.91 $1,192,292.92 X

The apparent low bidder is 0.53% below the engineer's estimate.

5 out of 6

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Bid Item Check Pass

6 out of 6

Project No: NP–GRSM 14(3),112(1),ETC.

Project Name: Rehabilitation of Nine Bridges on the Tennessee Side of the Park

Schedule: C

Schedule Type: Options

Bid Total Check Pass

Bidder Bidder's Bid Amount Computed Bid Amount Error

Bluegrass Contracting Corporation $1,378,252.50 $1,378,252.50

Estes Bros. Const., Inc. $1,220,679.16 $1,220,679.16

Kovilic Construction Company, Inc. $1,590,175.00 $1,590,175.00

Structural Engineering Group, Inc. $1,746,020.69 $1,745,765.63 X

The apparent low bidder is 16.26% above the engineer's estimate.