Tabulation of Bids - FW BIMU 107(1).pdf

PDF 1019 KB Posted

Attached to
Big Muddy National Wildlife Refuge
Solicitation number
693C73-21-C-000016
Issued by

About this file

This document contains a tabulation of bids report for a federal transportation contract. The report details bids received for Project No. FW-BIMU 107(1) to improve State Highway 98, Brady Lane, and Loesing Road in Missouri. The project includes three schedules - Schedule A for Highway 98 work, Schedule B for Brady Lane, and Schedule C for Loesing Road. Higgins Asphalt Paving Co. Inc. submitted the lowest responsive bid of $1,296,849.10 and was awarded contract 693C73-21-C-000016 by the Department of Transportation Federal Highway Administration on June 2, 2021 to complete all three schedules. The report provides bid amounts from eight contractors for various tasks involved in road improvements, including mobilization, surveying, testing, erosion control, clearing, sign and fence removal, excavation, base work and paving.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 04/26/21

1 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corporation

Construction Solutions Group, LLC

Eclipse Co., LLC

Genesis Design and Development, LLC

Higgins Asphalt Paving Co., Inc.

LaForge and Budd Construction Company

MEDVOLT CONSTRUCTION SERVICES, LLC

Base Schedule A

$839,500.00

$1,865,310.00

$3,296,538.00

$1,010,594.00

$1,154,520.00

$704,242.10

$1,175,920.00

$1,430,607.50

Option: B

$786,500.00

$1,054,720.00

$867,874.88

$994,353.12

$1,119,315.00

$495,687.00

$863,650.00

$1,166,890.00

Option: C

$130,000.00

$153,250.00

$162,132.50

$168,246.36

$147,500.00

$96,920.00

$120,250.00

$558,500.00

Contractor Responsive?

Engineer's Estimate

Central Southern Construction Corporation

Construction Solutions Group, LLC

Eclipse Co., LLC

Genesis Design and Development, LLC

Higgins Asphalt Paving Co., Inc.

LaForge and Budd Construction Company

2 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

MEDVOLT CONSTRUCTION SERVICES, LLC

Total Base Schedule A and Option(s): B

$1,626,000.00

$2,920,030.00

$4,164,412.88

$2,004,947.12

$2,273,835.00

$1,199,929.10

$2,039,570.00

3 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

$2,597,497.50

Total Base Schedule A and Option(s): BC

$1,756,000.00

$3,073,280.00

$4,326,545.38

$2,173,193.48

$2,421,335.00

$1,296,849.10

$2,159,820.00

4 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

$3,155,997.50

Total Base Schedule A and Option(s): C

$969,500.00

$2,018,560.00

$3,458,670.50

$1,178,840.36

$1,302,020.00

$801,162.10

$1,296,170.00

5 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

$1,989,107.50

6 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Solcitation No: 693C73-21-B-000010

Division: Eastern Federal Lands

State: MO County: Cooper

Federal Land: Big Muddy National Fish and Wildlife Refuge Opened at: Ashburn, VA

Opened by: Johnnie Ordonez

Date: 04/22/21

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Higgins Asphalt Paving Co., Inc. Apparent Low Bidder $704,242.10 35086 Higgins Rd Tipton Missouri 65081

Eclipse Co., LLC $1,010,594.00 11554 East Washington Street Chagrin Fall, OH 44023

Genesis Design and Development, LLC $1,154,520.00 7033 Kalgan Rd NE Rio Rancho, NM 87144

LaForge and Budd Construction Company $1,175,920.00 2020 North 21st Street Parsons, KS 67357

MEDVOLT CONSTRUCTION SERVICES, LLC $1,430,607.50

1600 GENESSEE ST. STE 722

KANSAS CITY, MO 64102

Central Southern Construction Corporation $1,865,310.00 2410 Harper Street Jacksonville, FL 32204

Construction Solutions Group, LLC $3,296,538.00 5512 Elk Valley Estates Dr St. Louis, MO 63128

Engineer's Estimate $839,500.00

Johnnie Ordonez Contract Specialist 4/26/2021

Higgins Asphalt Paving Co., Inc. 6/2/2021

7 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Higgins Asphalt Paving Co., Inc. Lump Sum $29,275.00 Eclipse Co., LLC Lump Sum $156,060.50 Genesis Design and Development, LLC Lump Sum $120,000.00 LaForge and Budd Construction Company Lump Sum $250,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $95,000.00 Central Southern Construction Corporation Lump Sum $700,000.00 Construction Solutions Group, LLC Lump Sum $132,500.00 Engineer's Estimate ALL LPSM Lump Sum $64,885.50

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Higgins Asphalt Paving Co., Inc. Lump Sum $15,650.00 Eclipse Co., LLC Lump Sum $52,000.00 Genesis Design and Development, LLC Lump Sum $25,000.00 LaForge and Budd Construction Company Lump Sum $40,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $19,500.00 Central Southern Construction Corporation Lump Sum $100,000.00 Construction Solutions Group, LLC Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

A0060 15401-0000 CONTRACTOR TESTING

Higgins Asphalt Paving Co., Inc. Lump Sum $23,000.00 Eclipse Co., LLC Lump Sum $153,303.00 Genesis Design and Development, LLC Lump Sum $25,000.00 LaForge and Budd Construction Company Lump Sum $50,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $16,500.00 Central Southern Construction Corporation Lump Sum $100,000.00 Construction Solutions Group, LLC Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $18,500.00

A0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Higgins Asphalt Paving Co., Inc. $11.40 $3,420.00 Eclipse Co., LLC $5.00 $1,500.00 Genesis Design and Development, LLC $5.00 $1,500.00 LaForge and Budd Construction Company $8.00 $2,400.00

MEDVOLT CONSTRUCTION SERVICES, LLC $5.00 $1,500.00

Central Southern Construction Corporation $10.00 $3,000.00 Construction Solutions Group, LLC $11.25 $3,375.00 Engineer's Estimate 300 LNFT $5.00 $1,500.00

8 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 15706-0200 SOIL EROSION CONTROL, CHECK DAM (DITCH CHECK)

Higgins Asphalt Paving Co., Inc. $445.00 $17,800.00 Eclipse Co., LLC $124.00 $4,960.00 Genesis Design and Development, LLC $1,200.00 $48,000.00 LaForge and Budd Construction Company $500.00 $20,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $1,750.00 $70,000.00

Central Southern Construction Corporation $350.00 $14,000.00 Construction Solutions Group, LLC $312.50 $12,500.00 Engineer's Estimate 40 EACH $550.00 $22,000.00

A0120 15706-0400 SOIL EROSION CONTROL, SEDIMENT TRAP

Higgins Asphalt Paving Co., Inc. $929.00 $1,858.00 Eclipse Co., LLC $1,126.00 $2,252.00 Genesis Design and Development, LLC $750.00 $1,500.00 LaForge and Budd Construction Company $1,500.00 $3,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $4,500.00 $9,000.00

Central Southern Construction Corporation $1,000.00 $2,000.00 Construction Solutions Group, LLC $1,250.00 $2,500.00 Engineer's Estimate 2 EACH $4,500.00 $9,000.00

A0140 15720-0000 STORM WATER POLLUTION PREVENTION PLAN

Higgins Asphalt Paving Co., Inc. Lump Sum $7,200.00 Eclipse Co., LLC Lump Sum $16,035.95 Genesis Design and Development, LLC Lump Sum $10,000.00 LaForge and Budd Construction Company Lump Sum $10,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $18,500.00 Central Southern Construction Corporation Lump Sum $15,000.00 Construction Solutions Group, LLC Lump Sum $12,500.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

A0160 20101-0000 CLEARING AND GRUBBING

Higgins Asphalt Paving Co., Inc. $3,717.00 $6,690.60 Eclipse Co., LLC $15,158.50 $27,285.30 Genesis Design and Development, LLC $15,000.00 $27,000.00 LaForge and Budd Construction Company $15,000.00 $27,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $14,000.00 $25,200.00

Central Southern Construction Corporation $7,500.00 $13,500.00 Construction Solutions Group, LLC $10,416.25 $18,749.25 Engineer's Estimate 1.8 ACRE $7,000.00 $12,600.00

9 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0180 20301-2400 REMOVAL OF SIGN

Higgins Asphalt Paving Co., Inc. $465.00 $930.00 Eclipse Co., LLC $189.00 $378.00 Genesis Design and Development, LLC $250.00 $500.00 LaForge and Budd Construction Company $500.00 $1,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $800.00 $1,600.00

Central Southern Construction Corporation $100.00 $200.00 Construction Solutions Group, LLC $312.50 $625.00 Engineer's Estimate 2 EACH $240.00 $480.00

A0200 20302-0800 REMOVAL OF FENCE, BARBED WIRE

Higgins Asphalt Paving Co., Inc. $3.40 $8,160.00 Eclipse Co., LLC $4.75 $11,400.00 Genesis Design and Development, LLC $10.00 $24,000.00 LaForge and Budd Construction Company $4.00 $9,600.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3.00 $7,200.00

Central Southern Construction Corporation $5.00 $12,000.00 Construction Solutions Group, LLC $2.50 $6,000.00 Engineer's Estimate 2,400 LNFT $0.80 $1,920.00

A0220 20302-2100 REMOVAL OF PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $37.70 $3,016.00 Eclipse Co., LLC $25.00 $2,000.00 Genesis Design and Development, LLC $55.00 $4,400.00 LaForge and Budd Construction Company $60.00 $4,800.00

MEDVOLT CONSTRUCTION SERVICES, LLC $50.00 $4,000.00

Central Southern Construction Corporation $100.00 $8,000.00 Construction Solutions Group, LLC $15.00 $1,200.00 Engineer's Estimate 80 LNFT $50.00 $4,000.00

A0240 20401-0000 ROADWAY EXCAVATION

Higgins Asphalt Paving Co., Inc. $37.85 $200,605.00 Eclipse Co., LLC $30.00 $159,000.00 Genesis Design and Development, LLC $45.00 $238,500.00 LaForge and Budd Construction Company $50.00 $265,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $11.00 $58,300.00

Central Southern Construction Corporation $40.00 $212,000.00 Construction Solutions Group, LLC $23.75 $125,875.00 Engineer's Estimate 5,300 CUYD $32.00 $169,600.00

10 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 25102-2200 PLACED RIPRAP, METHOD B, CLASS 2

Higgins Asphalt Paving Co., Inc. $97.00 $1,940.00 Eclipse Co., LLC $80.50 $1,610.00 Genesis Design and Development, LLC $250.00 $5,000.00 LaForge and Budd Construction Company $250.00 $5,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $310.00 $6,200.00

Central Southern Construction Corporation $300.00 $6,000.00 Construction Solutions Group, LLC $138.75 $2,775.00 Engineer's Estimate 20 TON $200.00 $4,000.00

A0280 30101-4000 AGGREGATE BASE GRADING C OR D

Higgins Asphalt Paving Co., Inc. $37.00 $34,965.00 Eclipse Co., LLC $34.00 $32,130.00 Genesis Design and Development, LLC $75.00 $70,875.00 LaForge and Budd Construction Company $65.00 $61,425.00

MEDVOLT CONSTRUCTION SERVICES, LLC $43.00 $40,635.00

Central Southern Construction Corporation $95.00 $89,775.00 Construction Solutions Group, LLC $50.00 $47,250.00 Engineer's Estimate 945 TON $55.00 $51,975.00

A0300 40101-0200 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3

MILLION ESAL (PG 64-22, ROUGHNESS TYPE IV)

Higgins Asphalt Paving Co., Inc. $112.00 $47,600.00 Eclipse Co., LLC $130.00 $55,250.00 Genesis Design and Development, LLC $180.00 $76,500.00 LaForge and Budd Construction Company $135.00 $57,375.00

MEDVOLT CONSTRUCTION SERVICES, LLC $185.00 $78,625.00

Central Southern Construction Corporation $150.00 $63,750.00 Construction Solutions Group, LLC $150.00 $63,750.00 Engineer's Estimate 425 TON $130.00 $55,250.00

A0320 40101-1400 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3

MILLION ESAL

Higgins Asphalt Paving Co., Inc. $100.00 $97,500.00 Eclipse Co., LLC $125.00 $121,875.00 Genesis Design and Development, LLC $175.00 $170,625.00 LaForge and Budd Construction Company $135.00 $131,625.00

MEDVOLT CONSTRUCTION SERVICES, LLC $180.00 $175,500.00

Central Southern Construction Corporation $150.00 $146,250.00 Construction Solutions Group, LLC $132.50 $129,187.50 Engineer's Estimate 975 TON $115.00 $112,125.00

11 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 41201-0000 TACK COAT

Higgins Asphalt Paving Co., Inc. $10.00 $50.00 Eclipse Co., LLC $450.00 $2,250.00 Genesis Design and Development, LLC $1,200.00 $6,000.00 LaForge and Budd Construction Company $500.00 $2,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3,900.00 $19,500.00

Central Southern Construction Corporation $1,000.00 $5,000.00 Construction Solutions Group, LLC $1,593.75 $7,968.75 Engineer's Estimate 5 TON $500.00 $2,500.00

A0360 60103-0160 CONCRETE, HEADWALL FOR 30-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $3,390.00 $3,390.00 Eclipse Co., LLC $3,168.00 $3,168.00 Genesis Design and Development, LLC $10,000.00 $10,000.00 LaForge and Budd Construction Company $10,000.00 $10,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $19,500.00 $19,500.00

Central Southern Construction Corporation $3,000.00 $3,000.00 Construction Solutions Group, LLC $12,500.00 $12,500.00 Engineer's Estimate 1 EACH $3,000.00 $3,000.00

A0380 60201-0600 18-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $61.00 $5,490.00 Eclipse Co., LLC $95.00 $8,550.00 Genesis Design and Development, LLC $180.00 $16,200.00 LaForge and Budd Construction Company $110.00 $9,900.00

MEDVOLT CONSTRUCTION SERVICES, LLC $225.00 $20,250.00

Central Southern Construction Corporation $150.00 $13,500.00 Construction Solutions Group, LLC $250.00 $22,500.00 Engineer's Estimate 90 LNFT $120.00 $10,800.00

A0400 60201-0900 30-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $133.00 $7,980.00 Eclipse Co., LLC $145.00 $8,700.00 Genesis Design and Development, LLC $275.00 $16,500.00 LaForge and Budd Construction Company $175.00 $10,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $260.00 $15,600.00

Central Southern Construction Corporation $175.00 $10,500.00 Construction Solutions Group, LLC $375.00 $22,500.00 Engineer's Estimate 60 LNFT $150.00 $9,000.00

12 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $965.00 $4,825.00 Eclipse Co., LLC $891.00 $4,455.00 Genesis Design and Development, LLC $3,500.00 $17,500.00 LaForge and Budd Construction Company $750.00 $3,750.00

MEDVOLT CONSTRUCTION SERVICES, LLC $2,500.00 $12,500.00

Central Southern Construction Corporation $1,500.00 $7,500.00 Construction Solutions Group, LLC $937.50 $4,687.50 Engineer's Estimate 5 EACH $750.00 $3,750.00

A0440 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $856.00 $1,712.00 Eclipse Co., LLC $1,250.00 $2,500.00 Genesis Design and Development, LLC $4,500.00 $9,000.00 LaForge and Budd Construction Company $2,500.00 $5,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3,600.00 $7,200.00

Central Southern Construction Corporation $2,000.00 $4,000.00 Construction Solutions Group, LLC $2,500.00 $5,000.00 Engineer's Estimate 2 EACH $2,200.00 $4,400.00

A0460 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

Higgins Asphalt Paving Co., Inc. $5.70 $34,513.50 Eclipse Co., LLC $5.50 $33,302.50 Genesis Design and Development, LLC $6.00 $36,330.00 LaForge and Budd Construction Company $4.00 $24,220.00

MEDVOLT CONSTRUCTION SERVICES, LLC $68.00 $411,740.00

Central Southern Construction Corporation $10.00 $60,550.00 Construction Solutions Group, LLC $375.00 $2,270,625.00 Engineer's Estimate 6,055 SQYD $14.00 $84,770.00

A0480 62502-0000 TURF ESTABLISHMENT

Higgins Asphalt Paving Co., Inc. $2.30 $13,926.50 Eclipse Co., LLC $0.65 $3,935.75 Genesis Design and Development, LLC $3.00 $18,165.00 LaForge and Budd Construction Company $5.00 $30,275.00

MEDVOLT CONSTRUCTION SERVICES, LLC $4.00 $24,220.00

Central Southern Construction Corporation $7.00 $42,385.00 Construction Solutions Group, LLC $10.00 $60,550.00 Engineer's Estimate 6,055 SQYD $3.50 $21,192.50

13 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 62901-0600 ROLLED EROSION CONTROL PRODUCT, TYPE 2.B

Higgins Asphalt Paving Co., Inc. $1.75 $3,062.50 Eclipse Co., LLC $3.25 $5,687.50 Genesis Design and Development, LLC $25.00 $43,750.00 LaForge and Budd Construction Company $6.00 $10,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $4.50 $7,875.00

Central Southern Construction Corporation $15.00 $26,250.00 Construction Solutions Group, LLC $15.00 $26,250.00 Engineer's Estimate 1,750 SQYD $8.00 $14,000.00

A0520 63302-0000 SIGN SYSTEM

Higgins Asphalt Paving Co., Inc. $36.00 $3,240.00 Eclipse Co., LLC $147.50 $13,275.00 Genesis Design and Development, LLC $25.00 $2,250.00 LaForge and Budd Construction Company $25.00 $2,250.00

MEDVOLT CONSTRUCTION SERVICES, LLC $800.00 $72,000.00

Central Southern Construction Corporation $100.00 $9,000.00 Construction Solutions Group, LLC $187.50 $16,875.00 Engineer's Estimate 90 SQFT $90.00 $8,100.00

A0540 63316-1000 REMOVE AND RESET SIGN

Higgins Asphalt Paving Co., Inc. $180.00 $180.00 Eclipse Co., LLC $146.50 $146.50 Genesis Design and Development, LLC $500.00 $500.00 LaForge and Budd Construction Company $1,500.00 $1,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $1,200.00 $1,200.00

Central Southern Construction Corporation $200.00 $200.00 Construction Solutions Group, LLC $625.00 $625.00 Engineer's Estimate 1 EACH $550.00 $550.00

A0560 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Higgins Asphalt Paving Co., Inc. $1.00 $3,100.00 Eclipse Co., LLC $2.00 $6,200.00 Genesis Design and Development, LLC $4.50 $13,950.00 LaForge and Budd Construction Company $1.00 $3,100.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3.00 $9,300.00

Central Southern Construction Corporation $5.00 $15,500.00 Construction Solutions Group, LLC $2.50 $7,750.00 Engineer's Estimate 3,100 LNFT $3.00 $9,300.00

14 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0580 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN

Higgins Asphalt Paving Co., Inc. $1.00 $1,600.00 Eclipse Co., LLC $2.00 $3,200.00 Genesis Design and Development, LLC $4.00 $6,400.00 LaForge and Budd Construction Company $1.00 $1,600.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3.00 $4,800.00

Central Southern Construction Corporation $3.00 $4,800.00 Construction Solutions Group, LLC $3.75 $6,000.00 Engineer's Estimate 1,600 LNFT $2.00 $3,200.00

A0600 63405-0500 PAVEMENT MARKINGS, TYPE B, TURN ARROW

Higgins Asphalt Paving Co., Inc. $72.00 $144.00 Eclipse Co., LLC $500.00 $1,000.00 Genesis Design and Development, LLC $250.00 $500.00 LaForge and Budd Construction Company $1,000.00 $2,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $550.00 $1,100.00

Central Southern Construction Corporation $300.00 $600.00 Construction Solutions Group, LLC $750.00 $1,500.00 Engineer's Estimate 2 EACH $300.00 $600.00

A0620 63405-0650 PAVEMENT MARKINGS, TYPE B, "ONLY" WORD MESSAGE

Higgins Asphalt Paving Co., Inc. $72.00 $144.00 Eclipse Co., LLC $700.00 $1,400.00 Genesis Design and Development, LLC $325.00 $650.00 LaForge and Budd Construction Company $1,000.00 $2,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $550.00 $1,100.00

Central Southern Construction Corporation $300.00 $600.00 Construction Solutions Group, LLC $1,250.00 $2,500.00 Engineer's Estimate 2 EACH $350.00 $700.00

A0640 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM (TRIM-LINE CHANNELIZER)

Higgins Asphalt Paving Co., Inc. $34.00 $1,190.00 Eclipse Co., LLC $50.50 $1,767.50 Genesis Design and Development, LLC $55.00 $1,925.00 LaForge and Budd Construction Company $100.00 $3,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $100.00 $3,500.00

Central Southern Construction Corporation $200.00 $7,000.00 Construction Solutions Group, LLC $62.50 $2,187.50 Engineer's Estimate 35 EACH $90.00 $3,150.00

15 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0660 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Higgins Asphalt Paving Co., Inc. $17.00 $1,190.00 Eclipse Co., LLC $23.00 $1,610.00 Genesis Design and Development, LLC $100.00 $7,000.00 LaForge and Budd Construction Company $30.00 $2,100.00

MEDVOLT CONSTRUCTION SERVICES, LLC $195.00 $13,650.00

Central Southern Construction Corporation $35.00 $2,450.00 Construction Solutions Group, LLC $187.50 $13,125.00 Engineer's Estimate 70 SQFT $40.00 $2,800.00

A0680 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Higgins Asphalt Paving Co., Inc. $61.00 $14,640.00 Eclipse Co., LLC $66.00 $15,840.00 Genesis Design and Development, LLC $150.00 $36,000.00 LaForge and Budd Construction Company $50.00 $12,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $105.00 $25,200.00

Central Southern Construction Corporation $50.00 $12,000.00 Construction Solutions Group, LLC $125.00 $30,000.00 Engineer's Estimate 240 HOUR $57.30 $13,752.00

A0700 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM (ADVANCED FLASHER)

Higgins Asphalt Paving Co., Inc. Lump Sum $24,000.00 Eclipse Co., LLC Lump Sum $36,622.00 Genesis Design and Development, LLC Lump Sum $15,000.00 LaForge and Budd Construction Company Lump Sum $20,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $38,750.00 Central Southern Construction Corporation Lump Sum $40,000.00 Construction Solutions Group, LLC Lump Sum $39,000.00 Engineer's Estimate ALL LPSM Lump Sum $17,500.00

A0720 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP

Higgins Asphalt Paving Co., Inc. $8,400.00 $8,400.00 Eclipse Co., LLC $3,756.00 $3,756.00 Genesis Design and Development, LLC $12,500.00 $12,500.00 LaForge and Budd Construction Company $7,500.00 $7,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $22,000.00 $22,000.00

Central Southern Construction Corporation $5,000.00 $5,000.00 Construction Solutions Group, LLC $5,000.00 $5,000.00 Engineer's Estimate 1 EACH $4,500.00 $4,500.00

16 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0740 63610-1600 CONDUIT, 2-INCH, PVC (WITH #14 TRACER WIRE)

Higgins Asphalt Paving Co., Inc. $36.00 $30,600.00 Eclipse Co., LLC $13.00 $11,050.00 Genesis Design and Development, LLC $10.00 $8,500.00 LaForge and Budd Construction Company $25.00 $21,250.00

MEDVOLT CONSTRUCTION SERVICES, LLC $18.00 $15,300.00

Central Southern Construction Corporation $25.00 $21,250.00 Construction Solutions Group, LLC $13.75 $11,687.50 Engineer's Estimate 850 LNFT $21.00 $17,850.00

A0760 63611-0200 WIRE, ELECTRICAL CONDUCTORS, 12 AWG

Higgins Asphalt Paving Co., Inc. $4.00 $3,000.00 Eclipse Co., LLC $3.50 $2,625.00 Genesis Design and Development, LLC $15.00 $11,250.00 LaForge and Budd Construction Company $7.00 $5,250.00

MEDVOLT CONSTRUCTION SERVICES, LLC $6.75 $5,062.50

Central Southern Construction Corporation $15.00 $11,250.00 Construction Solutions Group, LLC $3.56 $2,670.00 Engineer's Estimate 750 LNFT $1.00 $750.00

A0780 63621-1000 UTILITY BOX, PULLBOX (PREFORMED, CLASS 2)

Higgins Asphalt Paving Co., Inc. $3,840.00 $19,200.00 Eclipse Co., LLC $1,878.00 $9,390.00 Genesis Design and Development, LLC $150.00 $750.00 LaForge and Budd Construction Company $2,400.00 $12,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $2,600.00 $13,000.00

Central Southern Construction Corporation $1,500.00 $7,500.00 Construction Solutions Group, LLC $2,000.00 $10,000.00 Engineer's Estimate 5 EACH $2,100.00 $10,500.00

A0800 63701-0000 FIELD OFFICE

Higgins Asphalt Paving Co., Inc. $11,500.00 $11,500.00 Eclipse Co., LLC $30,000.00 $30,000.00 Genesis Design and Development, LLC $10,500.00 $10,500.00 LaForge and Budd Construction Company $20,000.00 $20,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $37,500.00 $37,500.00

Central Southern Construction Corporation $50,000.00 $50,000.00 Construction Solutions Group, LLC $50,000.00 $50,000.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00

17 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0820 64501-0000 LOCATE UTILITIES

Higgins Asphalt Paving Co., Inc. Lump Sum $7,555.00 Eclipse Co., LLC Lump Sum $3,123.50 Genesis Design and Development, LLC Lump Sum $5,000.00 LaForge and Budd Construction Company Lump Sum $15,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $1,500.00 Central Southern Construction Corporation Lump Sum $20,000.00 Construction Solutions Group, LLC Lump Sum $6,250.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

Total Schedule - All Items

Higgins Asphalt Paving Co., Inc. $704,242.10 Eclipse Co., LLC $1,010,594.00 Genesis Design and Development, LLC $1,154,520.00 LaForge and Budd Construction Company $1,175,920.00

MEDVOLT CONSTRUCTION SERVICES, LLC $1,430,607.50

Central Southern Construction Corporation $1,865,310.00 Construction Solutions Group, LLC $3,296,538.00 Engineer's Estimate $839,500.00

18 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Solcitation No: 693C73-21-B-000010

Division: Eastern Federal Lands

State: MO County: Cooper

Federal Land: Big Muddy National Fish and Wildlife Refuge Opened at: Ashburn, VA

Opened by: Johnnie Ordonez

Date: 04/22/21

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Higgins Asphalt Paving Co., Inc. Apparent Low Bidder $495,687.00 35086 Higgins Rd Tipton Missouri 65081

LaForge and Budd Construction Company $863,650.00 2020 North 21st Street Parsons, KS 67357

Construction Solutions Group, LLC $867,874.88 5512 Elk Valley Estates Dr St. Louis, MO 63128

Eclipse Co., LLC $994,353.12 11554 East Washington Street Chagrin Fall, OH 44023

Central Southern Construction Corporation $1,054,720.00 2410 Harper Street Jacksonville, FL 32204

Genesis Design and Development, LLC $1,119,315.00 7033 Kalgan Rd NE Rio Rancho, NM 87144

MEDVOLT CONSTRUCTION SERVICES, LLC $1,166,890.00

1600 GENESSEE ST. STE 722

KANSAS CITY, MO 64102

Engineer's Estimate $786,500.00

Johnnie Ordonez Contract Specialist 4/26/2021

19 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0020 15101-0000 MOBILIZATION

Higgins Asphalt Paving Co., Inc. Lump Sum $5,400.00 LaForge and Budd Construction Company Lump Sum $170,000.00 Construction Solutions Group, LLC Lump Sum $126,875.00 Eclipse Co., LLC Lump Sum $125,000.00 Central Southern Construction Corporation Lump Sum $100,000.00 Genesis Design and Development, LLC Lump Sum $112,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $59,500.00 Engineer's Estimate ALL LPSM Lump Sum $58,811.00

B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Higgins Asphalt Paving Co., Inc. Lump Sum $13,200.00 LaForge and Budd Construction Company Lump Sum $35,000.00 Construction Solutions Group, LLC Lump Sum $9,375.00 Eclipse Co., LLC Lump Sum $48,500.00 Central Southern Construction Corporation Lump Sum $50,000.00 Genesis Design and Development, LLC Lump Sum $15,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $16,000.00 Engineer's Estimate ALL LPSM Lump Sum $19,000.00

B0060 15401-0000 CONTRACTOR TESTING

Higgins Asphalt Paving Co., Inc. Lump Sum $16,800.00 LaForge and Budd Construction Company Lump Sum $35,000.00 Construction Solutions Group, LLC Lump Sum $12,500.00 Eclipse Co., LLC Lump Sum $353,000.00 Central Southern Construction Corporation Lump Sum $50,000.00 Genesis Design and Development, LLC Lump Sum $15,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $9,500.00 Engineer's Estimate ALL LPSM Lump Sum $17,500.00

B0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Higgins Asphalt Paving Co., Inc. $9.00 $6,300.00 LaForge and Budd Construction Company $5.00 $3,500.00 Construction Solutions Group, LLC $11.25 $7,875.00 Eclipse Co., LLC $5.00 $3,500.00 Central Southern Construction Corporation $10.00 $7,000.00 Genesis Design and Development, LLC $5.00 $3,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $5.00 $3,500.00

Engineer's Estimate 700 LNFT $5.00 $3,500.00

20 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0100 15706-0200 SOIL EROSION CONTROL, CHECK DAM (DITCH CHECK)

Higgins Asphalt Paving Co., Inc. $515.00 $7,725.00 LaForge and Budd Construction Company $500.00 $7,500.00 Construction Solutions Group, LLC $625.00 $9,375.00 Eclipse Co., LLC $115.00 $1,725.00 Central Southern Construction Corporation $350.00 $5,250.00 Genesis Design and Development, LLC $1,200.00 $18,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $1,750.00 $26,250.00

Engineer's Estimate 15 EACH $550.00 $8,250.00

B0120 15706-0400 SOIL EROSION CONTROL, SEDIMENT TRAP

Higgins Asphalt Paving Co., Inc. $1,220.00 $3,660.00 LaForge and Budd Construction Company $1,500.00 $4,500.00 Construction Solutions Group, LLC $1,250.00 $3,750.00 Eclipse Co., LLC $1,126.00 $3,378.00 Central Southern Construction Corporation $1,000.00 $3,000.00 Genesis Design and Development, LLC $750.00 $2,250.00

MEDVOLT CONSTRUCTION SERVICES, LLC $4,500.00 $13,500.00

Engineer's Estimate 3 EACH $4,500.00 $13,500.00

B0140 20101-0000 CLEARING AND GRUBBING

Higgins Asphalt Paving Co., Inc. $4,030.00 $6,045.00 LaForge and Budd Construction Company $4,500.00 $6,750.00 Construction Solutions Group, LLC $10,416.25 $15,624.38 Eclipse Co., LLC $16,123.00 $24,184.50 Central Southern Construction Corporation $7,500.00 $11,250.00 Genesis Design and Development, LLC $15,000.00 $22,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $14,000.00 $21,000.00

Engineer's Estimate 1.5 ACRE $7,000.00 $10,500.00

B0160 20301-1200 REMOVAL OF HEADWALL

Higgins Asphalt Paving Co., Inc. $766.00 $4,596.00 LaForge and Budd Construction Company $1,500.00 $9,000.00 Construction Solutions Group, LLC $1,875.00 $11,250.00 Eclipse Co., LLC $409.50 $2,457.00 Central Southern Construction Corporation $2,500.00 $15,000.00 Genesis Design and Development, LLC $1,500.00 $9,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $1,800.00 $10,800.00

Engineer's Estimate 6 EACH $800.00 $4,800.00

21 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0180 20302-0800 REMOVAL OF FENCE, BARBED WIRE

Higgins Asphalt Paving Co., Inc. $3.50 $4,200.00 LaForge and Budd Construction Company $4.00 $4,800.00 Construction Solutions Group, LLC $3.75 $4,500.00 Eclipse Co., LLC $5.00 $6,000.00 Central Southern Construction Corporation $5.00 $6,000.00 Genesis Design and Development, LLC $10.00 $12,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3.00 $3,600.00

Engineer's Estimate 1,200 LNFT $0.80 $960.00

B0200 20302-2100 REMOVAL OF PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $26.00 $3,250.00 LaForge and Budd Construction Company $40.00 $5,000.00 Construction Solutions Group, LLC $25.00 $3,125.00 Eclipse Co., LLC $27.50 $3,437.50 Central Southern Construction Corporation $100.00 $12,500.00 Genesis Design and Development, LLC $55.00 $6,875.00

MEDVOLT CONSTRUCTION SERVICES, LLC $100.00 $12,500.00

Engineer's Estimate 125 LNFT $50.00 $6,250.00

B0220 20401-0000 ROADWAY EXCAVATION

Higgins Asphalt Paving Co., Inc. $43.00 $62,350.00 LaForge and Budd Construction Company $50.00 $72,500.00 Construction Solutions Group, LLC $23.75 $34,437.50 Eclipse Co., LLC $27.50 $39,875.00 Central Southern Construction Corporation $40.00 $58,000.00 Genesis Design and Development, LLC $45.00 $65,250.00

MEDVOLT CONSTRUCTION SERVICES, LLC $11.00 $15,950.00

Engineer's Estimate 1,450 CUYD $32.00 $46,400.00

B0240 20435-1000 BACKFILL, SELECT GRANULAR

Higgins Asphalt Paving Co., Inc. $126.00 $3,276.00 LaForge and Budd Construction Company $200.00 $5,200.00 Construction Solutions Group, LLC $103.75 $2,697.50 Eclipse Co., LLC $92.00 $2,392.00 Central Southern Construction Corporation $150.00 $3,900.00 Genesis Design and Development, LLC $150.00 $3,900.00

MEDVOLT CONSTRUCTION SERVICES, LLC $360.00 $9,360.00

Engineer's Estimate 26 CUYD $150.00 $3,900.00

22 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0260 25102-2300 PLACED RIPRAP, METHOD B, CLASS 3

Higgins Asphalt Paving Co., Inc. $92.00 $10,120.00 LaForge and Budd Construction Company $150.00 $16,500.00 Construction Solutions Group, LLC $63.75 $7,012.50 Eclipse Co., LLC $80.50 $8,855.00 Central Southern Construction Corporation $200.00 $22,000.00 Genesis Design and Development, LLC $250.00 $27,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $260.00 $28,600.00

Engineer's Estimate 110 TON $80.00 $8,800.00

B0280 30101-4000 AGGREGATE BASE GRADING C OR D

Higgins Asphalt Paving Co., Inc. $30.50 $65,270.00 LaForge and Budd Construction Company $55.00 $117,700.00 Construction Solutions Group, LLC $50.00 $107,000.00 Eclipse Co., LLC $35.00 $74,900.00 Central Southern Construction Corporation $95.00 $203,300.00 Genesis Design and Development, LLC $75.00 $160,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $43.00 $92,020.00

Engineer's Estimate 2,140 TON $55.00 $117,700.00

B0300 30303-3000 ROADWAY RECONDITIONING

Higgins Asphalt Paving Co., Inc. $6.25 $39,062.50 LaForge and Budd Construction Company $5.00 $31,250.00 Construction Solutions Group, LLC $3.75 $23,437.50 Eclipse Co., LLC $3.50 $21,875.00 Central Southern Construction Corporation $10.00 $62,500.00 Genesis Design and Development, LLC $10.00 $62,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $18.50 $115,625.00

Engineer's Estimate 6,250 SQYD $15.00 $93,750.00

B0320 40101-0200 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3

MILLION ESAL (PG 64-22, ROUGHNESS TYPE IV)

Higgins Asphalt Paving Co., Inc. $108.00 $118,800.00 LaForge and Budd Construction Company $135.00 $148,500.00 Construction Solutions Group, LLC $137.50 $151,250.00 Eclipse Co., LLC $119.00 $130,900.00 Central Southern Construction Corporation $150.00 $165,000.00 Genesis Design and Development, LLC $180.00 $198,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $185.00 $203,500.00

Engineer's Estimate 1,100 TON $130.00 $143,000.00

23 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0340 41102-0000 PRIME COAT

Higgins Asphalt Paving Co., Inc. $1.15 $7,130.00 LaForge and Budd Construction Company $2.00 $12,400.00 Construction Solutions Group, LLC $2.19 $13,578.00 Eclipse Co., LLC $1.80 $11,160.00 Central Southern Construction Corporation $3.00 $18,600.00 Genesis Design and Development, LLC $5.00 $31,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $4.00 $24,800.00

Engineer's Estimate 6,200 SQYD $3.00 $18,600.00

B0360 41201-0000 TACK COAT

Higgins Asphalt Paving Co., Inc. $10.00 $40.00 LaForge and Budd Construction Company $1,000.00 $4,000.00 Construction Solutions Group, LLC $1,612.50 $6,450.00 Eclipse Co., LLC $515.00 $2,060.00 Central Southern Construction Corporation $1,000.00 $4,000.00 Genesis Design and Development, LLC $1,200.00 $4,800.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3,900.00 $15,600.00

Engineer's Estimate 4 TON $390.00 $1,560.00

B0380 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $1,570.00 $6,280.00 LaForge and Budd Construction Company $3,500.00 $14,000.00 Construction Solutions Group, LLC $13,750.00 $55,000.00 Eclipse Co., LLC $1,985.50 $7,942.00 Central Southern Construction Corporation $2,500.00 $10,000.00 Genesis Design and Development, LLC $8,500.00 $34,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $16,000.00 $64,000.00

Engineer's Estimate 4 EACH $4,600.00 $18,400.00

B0400 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $1,610.00 $3,220.00 LaForge and Budd Construction Company $7,500.00 $15,000.00 Construction Solutions Group, LLC $15,000.00 $30,000.00 Eclipse Co., LLC $4,019.00 $8,038.00 Central Southern Construction Corporation $3,500.00 $7,000.00 Genesis Design and Development, LLC $10,000.00 $20,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $20,000.00 $40,000.00

Engineer's Estimate 2 EACH $7,600.00 $15,200.00

24 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0420 60201-0600 18-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $71.00 $4,970.00 LaForge and Budd Construction Company $125.00 $8,750.00 Construction Solutions Group, LLC $250.00 $17,500.00 Eclipse Co., LLC $95.00 $6,650.00 Central Southern Construction Corporation $150.00 $10,500.00 Genesis Design and Development, LLC $180.00 $12,600.00

MEDVOLT CONSTRUCTION SERVICES, LLC $225.00 $15,750.00

Engineer's Estimate 70 LNFT $120.00 $8,400.00

B0440 60201-0800 24-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $80.00 $11,200.00 LaForge and Budd Construction Company $150.00 $21,000.00 Construction Solutions Group, LLC $250.00 $35,000.00 Eclipse Co., LLC $104.00 $14,560.00 Central Southern Construction Corporation $175.00 $24,500.00 Genesis Design and Development, LLC $225.00 $31,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $250.00 $35,000.00

Engineer's Estimate 140 LNFT $150.00 $21,000.00

B0460 60201-1000 36-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $124.00 $4,960.00 LaForge and Budd Construction Company $225.00 $9,000.00 Construction Solutions Group, LLC $312.50 $12,500.00 Eclipse Co., LLC $170.00 $6,800.00 Central Southern Construction Corporation $250.00 $10,000.00 Genesis Design and Development, LLC $300.00 $12,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $275.00 $11,000.00

Engineer's Estimate 40 LNFT $130.00 $5,200.00

B0480 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $1,080.00 $4,320.00 LaForge and Budd Construction Company $1,500.00 $6,000.00 Construction Solutions Group, LLC $937.50 $3,750.00 Eclipse Co., LLC $891.00 $3,564.00 Central Southern Construction Corporation $1,500.00 $6,000.00 Genesis Design and Development, LLC $3,500.00 $14,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $2,500.00 $10,000.00

Engineer's Estimate 4 EACH $750.00 $3,000.00

25 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0500 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

Higgins Asphalt Paving Co., Inc. $1,500.00 $3,000.00 LaForge and Budd Construction Company $1,800.00 $3,600.00 Construction Solutions Group, LLC $1,250.00 $2,500.00 Eclipse Co., LLC $1,283.71 $2,567.42 Central Southern Construction Corporation $1,750.00 $3,500.00 Genesis Design and Development, LLC $3,750.00 $7,500.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3,350.00 $6,700.00

Engineer's Estimate 2 EACH $1,300.00 $2,600.00

B0520 62401-0300 FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

Higgins Asphalt Paving Co., Inc. $8.00 $17,680.00 LaForge and Budd Construction Company $5.00 $11,050.00 Construction Solutions Group, LLC $3.75 $8,287.50 Eclipse Co., LLC $5.25 $11,602.50 Central Southern Construction Corporation $10.00 $22,100.00 Genesis Design and Development, LLC $6.00 $13,260.00

MEDVOLT CONSTRUCTION SERVICES, LLC $68.00 $150,280.00

Engineer's Estimate 2,210 SQYD $14.00 $30,940.00

B0540 62502-0000 TURF ESTABLISHMENT

Higgins Asphalt Paving Co., Inc. $3.25 $7,182.50 LaForge and Budd Construction Company $5.00 $11,050.00 Construction Solutions Group, LLC $16.25 $35,912.50 Eclipse Co., LLC $0.62 $1,370.20 Central Southern Construction Corporation $7.00 $15,470.00 Genesis Design and Development, LLC $3.00 $6,630.00

MEDVOLT CONSTRUCTION SERVICES, LLC $4.50 $9,945.00

Engineer's Estimate 2,210 SQYD $3.50 $7,735.00

B0560 62901-0600 ROLLED EROSION CONTROL PRODUCT, TYPE 2.B

Higgins Asphalt Paving Co., Inc. $1.75 $7,350.00 LaForge and Budd Construction Company $5.00 $21,000.00 Construction Solutions Group, LLC $6.25 $26,250.00 Eclipse Co., LLC $3.25 $13,650.00 Central Southern Construction Corporation $15.00 $63,000.00 Genesis Design and Development, LLC $25.00 $105,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3.80 $15,960.00

Engineer's Estimate 4,200 SQYD $8.00 $33,600.00

26 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0580 63302-0000 SIGN SYSTEM

Higgins Asphalt Paving Co., Inc. $36.00 $1,800.00 LaForge and Budd Construction Company $50.00 $2,500.00 Construction Solutions Group, LLC $93.75 $4,687.50 Eclipse Co., LLC $136.00 $6,800.00 Central Southern Construction Corporation $100.00 $5,000.00 Genesis Design and Development, LLC $55.00 $2,750.00

MEDVOLT CONSTRUCTION SERVICES, LLC $800.00 $40,000.00

Engineer's Estimate 50 SQFT $90.00 $4,500.00

B0600 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Higgins Asphalt Paving Co., Inc. $1.55 $9,455.00 LaForge and Budd Construction Company $1.00 $6,100.00 Construction Solutions Group, LLC $1.25 $7,625.00 Eclipse Co., LLC $1.50 $9,150.00 Central Southern Construction Corporation $5.00 $30,500.00 Genesis Design and Development, LLC $4.50 $27,450.00

MEDVOLT CONSTRUCTION SERVICES, LLC $3.00 $18,300.00

Engineer's Estimate 6,100 LNFT $3.00 $18,300.00

B0620 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM (TRIM-LINE CHANNELIZER)

Higgins Asphalt Paving Co., Inc. $20.00 $1,200.00 LaForge and Budd Construction Company $100.00 $6,000.00 Construction Solutions Group, LLC $62.50 $3,750.00 Eclipse Co., LLC $51.00 $3,060.00 Central Southern Construction Corporation $200.00 $12,000.00 Genesis Design and Development, LLC $55.00 $3,300.00

MEDVOLT CONSTRUCTION SERVICES, LLC $100.00 $6,000.00

Engineer's Estimate 60 EACH $90.00 $5,400.00

B0640 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Higgins Asphalt Paving Co., Inc. $11.00 $1,210.00 LaForge and Budd Construction Company $50.00 $5,500.00 Construction Solutions Group, LLC $187.50 $20,625.00 Eclipse Co., LLC $22.00 $2,420.00 Central Southern Construction Corporation $35.00 $3,850.00 Genesis Design and Development, LLC $25.00 $2,750.00

MEDVOLT CONSTRUCTION SERVICES, LLC $195.00 $21,450.00

Engineer's Estimate 110 SQFT $40.00 $4,400.00

27 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: B

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0660 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Higgins Asphalt Paving Co., Inc. $61.00 $17,080.00 LaForge and Budd Construction Company $50.00 $14,000.00 Construction Solutions Group, LLC $125.00 $35,000.00 Eclipse Co., LLC $66.00 $18,480.00 Central Southern Construction Corporation $50.00 $14,000.00 Genesis Design and Development, LLC $150.00 $42,000.00

MEDVOLT CONSTRUCTION SERVICES, LLC $105.00 $29,400.00

Engineer's Estimate 280 HOUR $57.30 $16,044.00

B0680 63603-0100 SYSTEM INSTALLATION, ELECTRICAL COMPANY COMPENSATION

Higgins Asphalt Paving Co., Inc. Lump Sum $10,000.00 LaForge and Budd Construction Company Lump Sum $10,000.00 Construction Solutions Group, LLC Lump Sum $10,000.00 Eclipse Co., LLC Lump Sum $10,000.00 Central Southern Construction Corporation Lump Sum $10,000.00 Genesis Design and Development, LLC Lump Sum $10,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $10,000.00 Engineer's Estimate ALL CTSM Lump Sum $10,000.00

B0700 64501-0000 LOCATE UTILITIES

Higgins Asphalt Paving Co., Inc. Lump Sum $7,555.00 LaForge and Budd Construction Company Lump Sum $10,000.00 Construction Solutions Group, LLC Lump Sum $9,375.00 Eclipse Co., LLC Lump Sum $4,500.00 Central Southern Construction Corporation Lump Sum $10,000.00 Genesis Design and Development, LLC Lump Sum $5,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $1,500.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00

Total Schedule - All Items

Higgins Asphalt Paving Co., Inc. $495,687.00 LaForge and Budd Construction Company $863,650.00 Construction Solutions Group, LLC $867,874.88 Eclipse Co., LLC $994,353.12 Central Southern Construction Corporation $1,054,720.00 Genesis Design and Development, LLC $1,119,315.00

MEDVOLT CONSTRUCTION SERVICES, LLC $1,166,890.00

Engineer's Estimate $786,500.00

28 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: C

Schedule Type: Options

Solcitation No: 693C73-21-B-000010

Division: Eastern Federal Lands

State: MO County: Cooper

Federal Land: Big Muddy National Fish and Wildlife Refuge Opened at: Ashburn, VA

Opened by: Johnnie Ordonez

Date: 04/22/21

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Higgins Asphalt Paving Co., Inc. Apparent Low Bidder $96,920.00 35086 Higgins Rd Tipton Missouri 65081

LaForge and Budd Construction Company $120,250.00 2020 North 21st Street Parsons, KS 67357

Genesis Design and Development, LLC $147,500.00 7033 Kalgan Rd NE Rio Rancho, NM 87144

Central Southern Construction Corporation $153,250.00 2410 Harper Street Jacksonville, FL 32204

Construction Solutions Group, LLC $162,132.50 5512 Elk Valley Estates Dr St. Louis, MO 63128

Eclipse Co., LLC $168,246.36 11554 East Washington Street Chagrin Fall, OH 44023

MEDVOLT CONSTRUCTION SERVICES, LLC $558,500.00

1600 GENESSEE ST. STE 722

KANSAS CITY, MO 64102

Engineer's Estimate $130,000.00

Johnnie Ordonez

4/26/2021 Contract Specialist

29 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0020 15101-0000 MOBILIZATION

Higgins Asphalt Paving Co., Inc. Lump Sum $3,120.00 LaForge and Budd Construction Company Lump Sum $20,000.00 Genesis Design and Development, LLC Lump Sum $15,000.00 Central Southern Construction Corporation Lump Sum $25,000.00 Construction Solutions Group, LLC Lump Sum $62,500.00 Eclipse Co., LLC Lump Sum $27,416.36 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $25,000.00 Engineer's Estimate ALL LPSM Lump Sum $11,250.00

C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Higgins Asphalt Paving Co., Inc. Lump Sum $6,600.00 LaForge and Budd Construction Company Lump Sum $10,000.00 Genesis Design and Development, LLC Lump Sum $5,000.00 Central Southern Construction Corporation Lump Sum $10,000.00 Construction Solutions Group, LLC Lump Sum $6,250.00 Eclipse Co., LLC Lump Sum $20,000.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $7,500.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00

C0060 15401-0000 CONTRACTOR TESTING

Higgins Asphalt Paving Co., Inc. Lump Sum $8,400.00 LaForge and Budd Construction Company Lump Sum $10,000.00 Genesis Design and Development, LLC Lump Sum $5,000.00 Central Southern Construction Corporation Lump Sum $10,000.00 Construction Solutions Group, LLC Lump Sum $6,250.00 Eclipse Co., LLC Lump Sum $45,855.00 MEDVOLT CONSTRUCTION SERVICES, LLC Lump Sum $8,500.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00

C0080 30303-3000 ROADWAY RECONDITIONING

Higgins Asphalt Paving Co., Inc. $8.25 $23,100.00 LaForge and Budd Construction Company $5.00 $14,000.00 Genesis Design and Development, LLC $10.00 $28,000.00 Central Southern Construction Corporation $10.00 $28,000.00 Construction Solutions Group, LLC $3.75 $10,500.00 Eclipse Co., LLC $3.50 $9,800.00

MEDVOLT CONSTRUCTION SERVICES, LLC $150.00 $420,000.00

Engineer's Estimate 2,800 SQYD $15.00 $42,000.00

30 out of 30

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: C

Schedule Type: Options

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

C0100 40101-0200 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3

MILLION ESAL (PG 64-22, ROUGHNESS TYPE IV)

Higgins Asphalt Paving Co., Inc. $110.00 $52,250.00 LaForge and Budd Construction Company $130.00 $61,750.00 Genesis Design and Development, LLC $180.00 $85,500.00 Central Southern Construction Corporation $150.00 $71,250.00 Construction Solutions Group, LLC $147.50 $70,062.50 Eclipse Co., LLC $129.00 $61,275.00

MEDVOLT CONSTRUCTION SERVICES, LLC $180.00 $85,500.00

Engineer's Estimate 475 TON $130.00 $61,750.00

C0120 41102-0000 PRIME COAT

Higgins Asphalt Paving Co., Inc. $1.15 $3,450.00 LaForge and Budd Construction Company $1.50 $4,500.00 Genesis Design and Development, LLC $3.00 $9,000.00 Central Southern Construction Corporation $3.00 $9,000.00 Construction Solutions Group, LLC $2.19 $6,570.00 Eclipse Co., LLC $1.30 $3,900.00

MEDVOLT CONSTRUCTION SERVICES, LLC $4.00 $12,000.00

Engineer's Estimate 3,000 SQYD $3.00 $9,000.00

Total Schedule - All Items

Higgins Asphalt Paving Co., Inc. $96,920.00 LaForge and Budd Construction Company $120,250.00 Genesis Design and Development, LLC $147,500.00 Central Southern Construction Corporation $153,250.00 Construction Solutions Group, LLC $162,132.50 Eclipse Co., LLC $168,246.36

MEDVOLT CONSTRUCTION SERVICES, LLC $558,500.00

Engineer's Estimate $130,000.00

Bid Error Report

1 out of 6

Project No: FW-BIMU 107(1)

Project Name: State Highway 98, Brady Lane, and Loesing Road Improvements

Schedule: A

Schedule Type: Base

Bid Item Check Pass

Bidder Line Item Number Bidder's Extension Computed Extension

No Line Item Errors Found

2 out of 6

Project No: FW-BIMU 107(1)