Tab 25 - Attachment 2 QASP.pdf
PDF 605 KB Posted
- Attached to
- DSCC Fire Alarm Testing (CSC-22505) Federal contract opportunity
- Solicitation number
- SP470222Q0022
- Issued by
- Defense Logistics Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tab 26 - SP470222Q00220003 Attach 2.pdf | ||
| Tab 26 - SP470222Q00220003 Attach 1.xlsx | XLSX spreadsheet | |
| Tab 26 - SF30_SP470222Q00220003.pdf | ||
| Tab 26 - SP470222Q00220002 Attach 1.pdf | ||
| Tab 26 - SF30_SP470222Q00220002.pdf | ||
| Tab 26 - SF30_SP470222Q00220001.pdf | ||
| Tab 25 - Attachment 1 DD 3150.pdf | ||
| Tab 25 - DD1449_SP470222Q0022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE PLAN
Testing of Fire Alarm / MNS / MWNS Systems for DSCC Columbus
1. Pre-Performance Phase:
1.1 The Contracting Officer Representative (COR) will review and approve the contractor’s quality control plan.
1.2 COR will coordinate review and approval of safety plan through the Environmental Safety and Occupational Health Office.
1.3 COR will instruct contractor in procedures for obtaining contractor ID badges and building keys.
1.4 Establish points of contact and chain of command.
1.5. Schedule a face to face meeting with the contractor, COR and contracting to review the PWS and DSCC policies.
1.6 Verify contractor qualifications for employees to conduct inspection and repair services.
2. Performance Phase:
2.1 The COR will periodically inspection the contractor’s work to ensure all work is being performed according to the PWS requirements. Major items to be inspected or assessed include:
2.1.1 Scheduling requirements.
2.1.2 Field verification of equipment testing/inspection and restoration of work area.
2.1.3 Timely submission and completeness of required reports.
2.1.4 Timely scheduling and correction of documented deficiencies.
2.2 The contractor will be notified in writing of all deficiencies to allow the COR and contractor to keep a written record of the contractor’s performance.
2.3 The COR will document and inform contracting if the contractor’s performance is not meeting the PWS requirements.
2.4 Review and accept the contractor’s WAWF invoice.
3. Post Phase:
3.1 Ensure all contractor badges and building keys are returned.