This is an Invitation to Bid notice issued by Erickson-Hall Construction Co. on behalf of the San Diego Unified School District for the Sunset View Elementary School Whole Site Modernization project. The project encompasses the construction of two new buildings—Building 400 (administration) and Building 500 (classroom)—along with certification of four existing relocatable classroom buildings and comprehensive site improvements. Site improvements include parking lot reconfiguration, playground and landscaping upgrades, storm water retention systems, accessible improvements, installation of a photovoltaic system with battery energy storage, and aluminum ramps for existing relocatable buildings 600-603. The project carries an estimated value of $27,379,673 with a construction schedule of 33 months. A non-mandatory site walk is scheduled for October 1, 2026, at 2:00 PM at Sunset View Elementary School located at 4365 Hill Street, San Diego, CA 92107. Requests for Information are due October 8, 2025, District Prequalification Applications are due October 8, 2026, and bids are due October 22, 2026, all at 2:00 PM. Bidding documents, including DSA-approved plans and specifications, are available through BuildingConnected at no charge upon contacting the project manager, Nick Verdis, at (760) 796-7700 or nverdis@ericksonhall.com.
Qualified subcontractors must hold valid California State Contractors License classifications (A, B, or relevant C classifications) and comply with all prevailing wage requirements established by the Department of Industrial Relations, with the applicable rate being 2026-2 for preconstruction services. Subcontractors bidding amounts exceeding $100,000 must provide performance and payment bonds issued by corporate security. The District requires MEP (Mechanical/Electrical/Plumbing) prequalification for applicable contractors, with non-prequalified MEP subcontractors ineligible for award. Bids will be evaluated on a lowest responsive, responsible bid basis per individual bid package, though bidders may submit proposals for multiple bid packages to demonstrate economy of scale savings. The District has designated specific proprietary materials and products in categories including door hardware, play structures, access control systems, fire-alarm systems, synthetic grass surfacing, and irrigation systems. Additional requirements include compliance with SB 854, Project Stabilization Agreement, Skilled and Trained Workforce provisions, and Disabled Veteran Business and Emerging Business Enterprises goals. No subcontractor may withdraw their proposal for 90 days following bid opening, and the District reserves the right to reject any or all proposals.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2/5/2026
INVITATION TO BID
NOTICE: Notice is hereby given that Erickson-Hall Construction Co., on behalf of the San Diego Unified School District (“District”), is requesting bids from qualified subcontractors (licensed contractors holding a valid A (General Engineering), B (General Building), or appropriate C (Specialty) classification license relevant to the Lease-Leaseback (“LLB”)* Project described below:
PROJECT INFORMATION:
SUNSET VIEW ELEMENTARY SCHOOL WHOLE SITE MODERNIZATION – (GMP NO. 1)
LB25-0935-39-A1-G1
Estimate: $27,379,673 Construction Schedule: 33 months
Scope of Work: The sunset view elementary school new construction & modernization project consists of (2) new buildings, Building 400 (administration building) and Building 500 (classroom building) as well as all work required for the certification of (4) existing relocatable classroom buildings, and improvements to the site. The site improvements include but are not limited to, new layout for parking lot, selected upgrades to existing lower level playground, selected upgrades to landscaping and irrigation systems, storm water retention and accessible upgrades as required; other improvements include installation of new photovoltaic system and battery energy storage system (BESS); installation of new pc approved aluminum TMP ramps for existing relocatable classroom Buildings 600, 601, 602 & 603.
BID SCHEDULE: All subcontractors must adhere to the Bid Schedule below. If the General Contractor modifies this Bid Schedule, they will issue an addendum.
EVENT DEADLINE
Non-Mandatory Site Walk October 1, 2026, at 2:00 PM
RFIs Due October 8, 2025, at 2:00 PM District Prequalification Applications Due October 8, 2026, at 2:00 PM
Bids Due October 22, 2026, at 2:00 PM
Erickson-Hall Construction Co. CONTACT INFORMATION:
Project Contact Name & Title: Nick Verdis, Senior Estimator Project Contact Email: (760) 796-7700 and nverdis@ericksonhall.com
NON-MANDATORY JOB WALK: Attendees shall meet in front of the main office of Sunset View ES, 4365 Hill Street, San Deigo, CA 92107. Failure to attend or extreme tardiness and to sign in may render a bid ineligible.
FOR THE SAFETY OF OUR STUDENTS, ATTENDEES OF STIE WALK MUST ABIDE BY THE FOLLOWING:
• Photographs: when taking pictures of the site, please make sure students are not in the frame.
• Restrooms: please use a “staff only” restroom – student restrooms are not open to adults.
• Conduct: when walking through the campus, stay together as a group and keep your voices down. Class is in session.
• Leaving the walk before it has concluded: if you need to leave the site walk before it has ended, locate the general contractor staff and they will escort you to the nearest exit.
BIDDING DOCUMENTS: The DSA approved plans and specifications, appendices, and forms will be posted and maintained through BuildingConnected free of charge. For access to the documents, please contact Erickson-Hall Construction Co. and include: Company name, address, phone number, CA License # & classification(s), main point of contact, and bid package number(s) interested in bidding.
BID SUBMISSION: Each bid shall be in accordance with all terms, conditions, plans, specifications, and any other documents that comprise the bid documents. Subcontractors interested in submitting a Bid must submit via BuildingConnected.
BID REQUIREMENTS: Reference the Bidding Documents for information on requirements, such as prequalification; SB 854 / California Department of Industrial Relations (DIR); Project Stabilization Agreement (PSA); Skilled & Trained Workforce; Disabled Veteran Business (DVB) requirements and Emerging Business Enterprises (EBE) goals; bonds and insurance.
PROPRIETARY SPECIFICATIONS: Under Public Contract Code §3400(c)(2), the District or its designee, has made a finding that the following particular materials, products, things. or services are designated by specific brand or trade name in order to match other products in use on the Project:
08 71 00 Door Hardware 11 68 16 Play Structures 28 13 00 Access Control mailto:nverdis@ericksonhall.com
28 46 21.11 Addressable Fire-Alarm Systems
32 18 13 Synthetic Grass Surfacing
32 84 00 Planting Irrigation
RFIs: Submit RFI’s via email nverdis@ericksonhall.com to Erickson-Hall Construction Co.
DO NOT CONTACT THE DISTRICT DIRECTLY
PREVAILING WAGES: Prevailing wage requirements apply to all public works projects and must be followed per Exhibit G, Article 17 of the General Conditions of the Master Facilities Lease. The applicable prevailing wage determination during preconstruction is the one in effect on the date the RFP is first published in a newspaper of general circulation. Here, the applicable prevailing wage determination for preconstruction services referenced in the published RFP advertisement is 2026-2. The prevailing wage determination established for the Project shall remain applicable for the full duration of the Project, including all Work performed pursuant to authorized Change Orders under the Agreement, and shall remain in effect until all contract Work has been substantially completed. The applicable prevailing wage determination for an agreement or amendment that adds preconstruction services with public works as defined by Labor Code 1720(a)(1) such as site investigation or an agreement or amendment that adds a Guaranteed Maximum Price (GMP) for construction services, is based on the date the Prime Contractor first published an advertisement for that District defined GMP phase to subcontractors. The first bid advertisement date for each District defined GMP phase shall establish the applicable prevailing wage determination, regardless of how many times the Prime Contractor published an advertisement. That first bid advertisement to subcontractors shall state the applicable prevailing wage determination for construction services for the duration of that District defined GMP phase, including all Change Order Work. Based on its separate publication of the first bid advertisement date, each District defined GMP phase for construction services may have a different prevailing wage determination. The prevailing wage determination established for each District defined GMP phase shall remain applicable for the full duration of the District defined GMP phase, including all Work performed pursuant to authorized Change Orders under the Agreement, and shall remain in effect until all contract Work has been substantially completed. The following is a link to the Department of Industrial Relations (DIR) website to obtain rate information, and any applicable predetermined increases www.dir.ca.gov/oprl/dprewagedetermination.htm.
DISTRICT PREQUALIFICATION: Prequalifications are due per the Bid Schedule. Effective March 1, 2024, any solicitation opening after March 1, 2024, will no longer require Non-MEP prequalification. MEP (Mechanical/Electrical/Plumbing): Subcontractors performing work under one or more of the following license classifications:
A or B, and/or performing work of C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 should submit their prequalification application on PlanetBids. Go to tinyurl.com/SDUSD-PlanetBids, login as a vendor, then click the menu on the left, and select prequalification to get started. MEP prequalifications must be renewed annually on the approval anniversary. Bids will not be accepted from non-prequalified MEP subcontractors. Visit sandiegounified.org/contractor-prequalification or email prequal@sandi.net for more information.
PAYMENT AND PERFORMANCE BONDS: All subcontractors submitting bids in excess of $100,000 must be prepared to supply Erickson-Hall Construction with a performance and payment bond issued by a corporate security. Erickson-Hall Construction, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees.
BID PACKAGES: This project is being bid as “Bid Packages” per contract number. If a bidder is interested in bidding multiple bid packages, the bidder must submit individual bids for each bid package per GMP. Bidders may demonstrate economy of scale savings on their proposal forms by bidding multiple bid packages for a single GMP. However, bidders may NOT combine multiple bid packages for multiple GMPs, into a single GMP submission. All bids will be reviewed and evaluated for completeness of scope coverage. Subcontracts shall be awarded, if awarded at all, by the general contractor on the basis of lowest bid. The District defines lowest bid as the lowest responsive, responsible bid for a single bid package or the summation of the lowest value of multiple bid packages, if multiple bid packages were proposed by a subcontractor.
If DVBE mandatory participation is needed, the next lowest subcontractor who can meet the minimum 3% DVBE requirement may be selected.
CSLB: It is required that bidders possess the appropriate classification(s) of California State Contractors License(s) (“CSLB”) for their applicable work. The license must be valid and in good standing, at the time of bid opening and contract award. The District reserves the right to reject any and all proposals and to waive any irregularities or informalities in any proposals or in the bidding process. No Subcontractor may withdraw their proposal for a period of 90 days after the District receives proposals.
*Authorized under Education Code section §17406, LLB is a common delivery method used by approximately 89 school districts in California, including 15 school districts within San Diego County. Effective January 1, 2017, LLB is to be used mailto:nverdis@ericksonhall.com https://protect.checkpoint.com/v2/r01/___http:/www.dir.ca.gov/oprl/dprewagedetermination.htm___.YzJ1OnNhbmRpZWdvdW5pZmllZDE6YzpvZmZpY2UzNjVfZW1haWxzX2F0dGFjaG1lbnQ6ZTk1ZmMzM2ExYThlYjk1ZGE4ZjE3NGRmYzllMzMzYmE6NzozMWVkOjQ1ZTIwNzE5NDgyNzAyYTkzMWJiMzJjNmRmM2VkZjQwMDQ3YTIzNTc4NjhlYWYxYTc1Mzk0NzMyZWFkNDMzMjI6cDpUOkY http://sandiegounified.org/contractor-prequalification http://sandiegounified.org/contractor-prequalification mailto:prequal@sandi.net via a competitive selection process for best value award (in contrast to the regular design-bid-build which requires award to the lowest bidder).
SAN DIEGO UNIFIED SCHOOL DISTRICT
George A. Harris III Director, Fiscal Controls and Information Systems Facilities Planning and Construction
Advertisement Dates:
September 24, 2026
September 29, 2026
LB25-0935-39-A1-G1