Subcontractor_Listing.pdf

PDF 224 KB Posted

Attached to
Playhouse Park EV Chargers Phase II Construction Project
Solicitation number
2026-IFB-LM-0403
Issued by
Los Angeles County, California

About this file

This is a Subcontractor Listing form for the Playhouse Park EV Chargers Phase II Construction Project, administered by Pasadena Water and Power (PWP) in Pasadena, California. The form is designed to document subcontractors and shoring design engineers involved in the project, which encompasses the expansion and upgrade of electric vehicle charging infrastructure at Playhouse Park, located at 701 Union Street, Pasadena, California 91101. The project involves the installation of twenty new Level 2 electric vehicle supply equipment (EVSE) stalls and replacement of four existing Level 2 chargers, resulting in a total of twenty-four EVSE stalls upon completion. Associated work includes electrical infrastructure, foundations, conduit, conductors, panelboard equipment, load management equipment, pavement and parking markings, and site restoration.

The form requires contractors to list all subcontractors performing work on the project, with spaces for seven subcontractor entries including names, addresses, and descriptions of work. Additionally, the form mandates the listing of any Civil or Structural Engineers responsible for shoring design, with space for six engineer entries. If shoring is not required for the project, contractors must indicate "NONE" in the shoring design section. The form serves as a transparency and accountability mechanism to ensure PWP has visibility into all entities contributing to the project's execution.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .