Summary

This is a lift inspection contract document for the Commonwealth of Massachusetts involving inspection and maintenance services for Stertil Koni lifting equipment. The contract encompasses comprehensive lift inspection, testing, and certification services to ensure compliance with safety standards and regulations. The scope of work includes initial inspections, routine maintenance, load testing, safety certifications, and documentation of all lift systems. The contract specifies equipment quantities and inspection frequencies to be performed at designated facilities throughout the state. The term of the contract and any renewal options would be detailed in the associated procurement documents, along with specific response deadlines and award timelines for interested bidders.

Pricing for the lift inspection services is structured according to the scope of work and frequency of inspections required for each lift system under contract. The contract may include set-aside provisions for small or minority-owned businesses as applicable under Massachusetts procurement regulations. Current incumbent contractor information and performance history would be relevant to the evaluation process. Funding sources and budget allocations for these inspection services come from the state's maintenance and safety operations budget. All bidders must meet certification requirements and carry appropriate insurance coverage as specified in the procurement solicitation to perform lift inspection and maintenance services on state property.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Memorandum

TO: Prospective Bidders FROM: South Coast Transit Management, Inc. (SCTM) DATE: July 27, 2026 RE: Lift Inspection Contract

Background:

South Coast Transit Management, Inc. (SCTM) is a sub-corporation of Transdev operating under a management contract with Southeastern Regional Transit Authority (SRTA), providing fixed route and demand response transportation in the greater New Bedford area, which is both Federal and state funded.

Scope of Work:

SCTM is in need of a three-year contract for the inspection of Stertil-Koni electric heavy duty transit bus lifts.

Services Needed:

The contractor shall furnish all labor, supervision, diagnostic services, tools, testing equipment, replacement parts, consumables, transportation, and incidentals necessary to inspect, troubleshoot, repair, test, and return to service a Stertil-Koni electric heavy-duty transit bus lift used in an automotive maintenance facility. The work shall be performed in accordance with the lift manufacturer’s requirements, applicable electrical and safety standards, and recognized industry practices for heavy-duty vehicle lifts.

• Initial Inspection and Assessment: Perform a complete inspection of the electric lift system, including structural components, columns or lifting assemblies, power supply components, disconnects, wiring, control panels, control boards, motors, drives, battery systems if present, safety locks, limit switches, sensors, and operator controls. Document all visible damage, wear, electrical issues, corrosion, and operational deficiencies.

• Electrical and Control Diagnostics: Test the lift’s electrical supply, phase balance where applicable, control circuits, emergency stop circuits, limit switches, communication links between columns or controllers, and proper response of operating controls. Inspect fault codes, failed relays, damaged wiring, charging issues, battery condition where applicable, and controller or motor performance issues.

• Mechanical and Safety Evaluation: Inspect the lift’s mechanical locking system, lifting screws, chains, gears, rollers, carriages, wheel forks, platforms, cables, or other moving components as applicable to the installed electric lift design. Stertil-Koni describe heavy-duty electric and mobile column lift systems used for bus and commercial fleet service, including safety locks, controls, and maintenance procedures.

• Repair Work: Repair or replace defective motors, wiring, controls, switches, relays, chargers, batteries, sensors, limit devices, locking components, communication cables, structural hardware, and other failed or worn parts required to restore proper lift operation. All replacement components should be compatible with the existing lift and suitable for heavy-duty transit bus service.

• Adjustment and Service: Adjust synchronization, column communication, lock engagement, control settings, travel limits, charging components, and operator controls as required for proper function. Perform cleaning, tightening, lubrication, and minor service adjustments necessary to support reliable operation.

• Load and Safety Testing: After repairs are completed, perform operational testing including full raise-and-lower cycles, synchronization verification, safety lock operation, emergency stop function, and loaded performance testing using a transit bus or approved equivalent test load where permitted.

• Code and Safety Compliance: Confirm that the electric lift is returned to service only after identified safety-related deficiencies affecting operation have been corrected or clearly documented as requiring follow-up action. The [Automotive Lift Institute] states that every lift should be inspected at least annually by a qualified lift inspector under the ANSI/ALI operation, inspection, and maintenance standard.

• Annual Inspection Requirement: The contractor shall include a documented annual inspection of the lift in accordance with manufacturer’s recommendations and applicable ANSI/ALI standards.

The inspection shall be performed by a qualified lift inspector and shall include written findings, identification of deficiencies, and recommendations for corrective action necessary to maintain safe operation. Also provide certification.

• Documentation and Reporting: Provide a written inspection and repair report identifying the lift make, model, serial number if available, deficiencies found, repairs completed, parts replaced, tests performed, and recommendations for additional maintenance or future repair work.

• Closeout: The work shall be considered complete upon completion of inspection, repair, operational testing, submission of service documentation, and return of the electric lift to a safe and functional condition, or upon written identification of any remaining conditions preventing return to service.

Location:

Fall River Maintenance Facility – 601 Brayton Avenue Model # ST1100 FWA-US (1 set) Fall River, MA 02721

New Bedford Maintenance Facility- 65 Potomska Street Model # ST-1100 FWA-US (1 set) New Bedford, MA 02740

ST-1085 FWA-US (2 sets) Site Visit:

Bidders are encouraged to schedule a site visit prior to submitting their bid to gain a comprehensive understanding of the work required. For bidders wishing to conduct a site visit please contact Casey Cabral at ccabral@srtabus.com.

Insurance Requirements:

The contractor shall not commence work under this contract until they have obtained the insurance required under this paragraph and shall keep such insurance in force during the entire life of this contract.

The Contractor shall procure and maintain the following insurance coverage:

1. Worker’s Compensation Insurance, including Employer’ Liability Coverage, in accordance with all applicable statues of the State of Massachusetts, not less than $1,000,000.

2. Commercial General Liability Insurance on an “Occurrence Basis” with limits of liability not less than $1,000,000 per occurrence and aggregate. Coverage shall include the following extensions: (A) Contractual Liability; (B) Products and Completed Operations; (C) Independent Contractors Coverage; (D) Broad Form General Liability Extensions or equivalent, if not already included; (E) Deletion of all Explosion, Collapse, and Underground (XCU) Exclusions, if applicable.

3. Proof of Insurance Coverage, The Contractor shall provide SCTM at the time of the contract a

Certificate of Insurance as well as the required endorsements.

If any of the above coverages expire during the term of this contract, the Contractor shall deliver renewal certificates, endorsements, and/or policies to SCTM at least ten (10) days prior to the expiration date.

Submission Criteria:

Completed submissions should be submitted via email to Casey Cabral at ccabral@srtabus.com and should include or denote the following:

• Subject Line (Email Line or Cover Letter) o Stertil Koni Lift Inspection

• Submittal Package o Uniform Bid Sheet (Attached) o Standard Company Quotation Form o FTA Clauses o Debarment Certification

Key Action Dates:

The dates in the following table are provided to illustrate the current expectations for the timing of actions related to this project and the resultant award:

Key Action Date Release Tuesday, July 28, 2026 Submittal Package Due Tuesday, August 25, 2026 Award Tuesday, September 22, 2026

Additional Information:

SCTM is an agent/operator for SRTA who is exempt from Massachusetts sales tax, do not include such taxes in the proposal figure. SCTM will furnish the successful bidder with tax exemption certificates upon request.

In compliance with the procurement guidelines set forth by the Federal Transit Administration (FTA), any Vendor looking to conduct business with South Coast Transit Management, Inc. (SCTM) are required to demonstrate responsiveness, responsibility, and must sign off on applicable Federal Clauses.

Note: The relevant Federal Clauses and responsibility determination information will be forwarded to the selected Vendor, however, this information is available upon request.