StatementofWork(SOW)-Novatel_.pdf
PDF 182 KB Posted
- Solicitation number
- 80NSSC245973Q
About this file
This statement of work outlines requirements for a research radar instrument project for NASA Goddard Space Flight Center. The scope includes purchasing one Novatel Dual-Antenna CPT7 Enclosure with GNSS+INS from Novatel for $182,000. The product is a dual antenna enclosure containing an OEM7720 with Honeywell HG4930 MEMS IMU that provides GPS, GLONASS, QZSS, SBAS, and RTK positioning capabilities with a 400Hz IMU data rate. The period of performance is two to four weeks from award. The related federal contract opportunity is solicitation number 80NSSC245973Q for the Novatel Dual-Antenna CPT7 Enclosure with GNSS+INS through the National Aeronautics and Space Administration Shared Services Center. The statement of work specifies the product requirements, delivery location at NASA Goddard Space Flight Center, and period of performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 80NSSC245973Q.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1. Objective/Requirements The NASA Goddard Space Flight Center (GSFC) requires the purchase of Novatel Dual-Antenna CPT7 Enclosure with GNSS+INS to use for a research radar instrument.
2. Characteristics, Scope, and Specs
Quantity OEM Part # Product Description
SPANCPT7‐WDD‐
RYN‐TBN‐P2
Novatel Dual‐Antenna CPT7 Enclosure with GNSS+INS
SLANVG087, CPT7 dual antenna enclosure containing OEM7720 with Honeywell HG4930 MEMS IMU. GPS+GAL+QZSS, L1/L2/E1/E5b, SBAS L1, Dual Antenna Activation, RTK+PPP+Single Point+DGPS PNT, ALIGN Relative Positioning, 20 Hz Data Output Rate, Base Station Corrections + Measurements, SPAN enabled with Relative INS + Profiles (includes Heave), 400Hz Raw IMU data rate/200Hz INS Solution Real‐Time, Includes GLIDE & RAIM. Note: Setup/Configuration Support by SLA included.
3. Place of Performance Gerald Heymsfield; Building 033; Room A405 NASA Goddard Space Flight Center (GSFC) 8800 Greenbelt Road Greenbelt, MD 20771
4. Period of Performance Period of Performance Dates: 2 to 4 Weeks ARO
File details come from the government source that posted it. Updated .