Statement of Work Unleaded Underground Storage Tank Repair.pdf

PDF 250 KB Posted

Attached to
Unleaded Underground Storage Tank Repair
Solicitation number
12405B24Q0224
Issued by

About this file

This document is a Statement of Work (SOW) for the repair of an unleaded underground storage tank at the Southeastern Fruit and Tree Nut Research Laboratory in Byron, Georgia. The SOW details the required equipment, labor, and materials to complete the Unleaded Overspill Bucket & Overfill Device Installation and the Unleaded Probe Riser Installation. Key requirements include providing a work schedule, protecting government assets, maintaining a clean work area, and meeting OSHA safety standards and NFPA requirements. The related federal contract opportunity is a Request for Quotation (RFQ) issued as a Total Small Business Set-Aside under NAICS code 237120 with a $45 million size standard. The solicitation number is 12405B24Q0224, and proposals are due by July 10, 2024. A site visit is scheduled for June 19, 2024, and questions are due by July 3, 2024. The award will be made on a best value basis considering technical acceptance, past performance, and price.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Underground Storage Tank (UST) Repair Southeastern Fruit and Tree Nut Research

Laboratory 21 Dunbar Rd., Byron, GA 31008

Byron, GA

General Information

1.0 Background

A recent inspection of the unleaded UST found that the Spill Bucket, Overfill Device and the Probe Riser needed to be replaced.

2.0 Scope of Work

Contractor to provide the necessary equipment, labor and materials to complete the following:

Unleaded Overspill Bucket & Overfill Device Installation

Breakout and remove approximately (2) 2' X 2' areas of concrete from around existing Unleaded overspill bucket

Furnish and install (1) new overfill prevention valve Furnish and install (1) new slip-on single wall overspill bucket and set to appropriate height Furnish and install (1) new top seal brass adapter and cap Backfill excavation with existing stockpiled material Dowel all existing concrete with #5 rebar every 2' and repour concrete with 8" of 4000 psi fiber concrete Furnish and install (1) "Regular" tank marker Perform a hydro test on the new overspill buckets Perform a functionality test on the new overfill prevention valve

Unleaded Probe Riser Installation

Breakout and remove approximately (1) 4' x 4' area of concrete over and around the existing Unleaded probe riser down to tank top Furnish and install (1) new 4" probe riser

Furnish and install (1) new gas float kit on customers existing probe Furnish and install (1) new 4" probe cap and adapter Backfill excavation with existing stockpiled material Dowel all existing concrete with #5 rebar every 2' and repour concrete with 8" of 4000 psi fiber concrete Cleanup and dispose of construction debris and paint overspill bucket lids

3.0 Contractor Requirements

A schedule of work including timeline of installation is to be provided before start of project.

Provide means for containing debris from demo/preparation activities.

Contractor shall protect all government assets, landscaping, or any federally owned structures from damage related to the demo/installation.

Contractor shall maintain a clean work area and ensure proper drainage pathways of the existing grounds/roadways.

Preparations for removal or transportation of the debris is the responsibility of the contractor.

Contractor will remove and dispose of all other materials.

Remove and replace any damaged material that will affect proper function and structural stability of the UST.

4.0 Government Furnished

None

5.0 Deliverables / Schedule

All work can be done during normal working hours, the Facilities Operation Specialist William Rengstorf will make arrangements with personnel if power needs to be cutoff.

Facilities Operations Specialist will do the final inspection before job is signed off as completed.

6.0 Travel

7.0 FIRE PROTECTION and LIFE SAFETY: The Contractor is expected to maintain, at all times, good and accepted practices and comply with OSHA safety standards.

All work shall be in accordance with the latest NFPA and NEC requirements to ensure maximum protection against loss of life and property by fire.

Design and installation must meet all UL325 and applicable NFPA Standards.