STATEMENT OF NEED FOR SUPPLY OR SERVICE < $150K

Repair Laundry room Sump/Void Cover

1. SCOPE:

1.1 Objective: Replace the Sump/Void cover and insert.

2. REFERENCE DOCUMENTS:

2.1 Drawing:

3. GOVERNMENT FURNISHED MATERIALS:

3.1 None

4. GENERAL REQUIREMENTS:

4.1 The contractor shall perform all work in accordance with the requirements of the documents cited in paragraph 2 above and ABS rules.

4.1.1 In compartment 2-23-3-Q, the cover for the sump/void for the washing machine started to leak. The float for the pump needed to be cleaned. As the ship’s engineers attempted to remove the cover, the bolts kept breaking due to corrosion. The insert is corroded beyond repair and needs to be replaced.

4.1.2 Provide Contractor services to crop out old insert and replace with new. Deck in this area has terrazzo which does not need to be put back. The deck is 5/16” thick.

4.1.3 Provide contractor services to weld a new coaming for the suction pump, template from existing.

4.1.4 Provide Contractor services to clean and gas free the void, approx. 400 gal.

4.1.5 Provide Marine Chemist for gas free certification if required.

4.1.6 Inform Port Engineer 24 hours in advance, of when ABS is required for check points. ABS services will be paid for by NOAA.

4.2 Once new coaming and steel insert is installed, Dye Penetrant test the new welds, or whatever inspection that ABS requires.

5. QUALITY ASSURANCE:

5.1 Submit a written report of the results of the testing required by 4.2. The report shall contain the date, time results and names of witnesses.

6. NOTES:

6.1 Period of performance: June 1 – June 15, 2020.

6.2 Place of performance: Ford Island, Honolulu HI.

6.3 Base access to the Naval Base is required.

Figure 1: VOID cover and Coaming is below the pump.

Figure 2: Location – 2-23-3-Q

Figure 3: Steel thickness image1.jpeg image2.emf image3.emf