Statement_of_work_for_limestone_supply_at_Atchafalaya__NWR_12_21_2023.docx
DOCX document 1 MB Posted
- Solicitation number
- 140FS324Q0057
About this file
This statement of work outlines requirements for a limestone supply and tailgate spreading contract at the Atchafalaya National Wildlife Refuge in Louisiana. The contractor will supply approximately 1000 tons of #610 Kentucky blue/gray limestone and tailgate spread it to a depth of approximately four inches to improve the Green Tree Levee. Delivery of a minimum of 250 tons of limestone per day is required from 7:30 AM to 4:00 PM, Monday through Friday, to be coordinated with the refuge representative. The contractor is responsible for all equipment and must provide scale tickets with weight, material and date for each load. The related federal contract opportunity is solicitation number 140FS324Q0057 for the purchase and delivery of 1000 tons of #610 limestone to Southeast Louisiana refuges.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS324Q0057_Amd_0001.pdf | ||
| Sol_140FS324Q0057.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supply and tailgate spread #610 Limestone at the Atchafalaya National Wildlife Refuges
PR#
Specifications/Scope of Work
Contractor to supply approximately 1000 tons #610 Kentucky blue/gray limestone and tailgate spread limestone approximately four (4) inches in depth to improve the Green Tree Levee on Atchafalaya National Wildlife Refuge (NWR) in Iberville Parish, Louisiana.
(Phone number 985 882-2000).
Site Representative- Matt Sieja matt_sieja@fws.gov 985-517-9333and Neil Lalonde neil_lalonde@fws.gov 985-285-3335 COR – Robert Loudermilk Robert_loudermilk@fws.gov 985-882-2013
Delivery locations, quantity, and directions are listed below:
1. Greentree Levee:
Amount: 1000 tons of #610 Kentucky blue/gray limestone – tailgate delivered to match existing footprint and contour.
Location entrance: 30.447814° --91.661388°
Directions: from US 190- travel south on Hwy 975 approximately 3 miles and turn left of Big Alabama Road and travel approximately 4 miles to the beginning of the Green Tree Levee. From I-10 exit at the Whiskey Bay Exit, travel north on Hwy 975 approximately 14.75 miles, turn right on Big Alabama Road and travel approximately 4 miles to the beginning of the Green Tree Levee.
Contractor will coordinate with refuge representative to deliver a minimum of 250 tons of limestone daily from 7:30 AM to 4:00 PM, Monday through Friday. Delivery will not be accepted weekends, Federal Holiday or during wet conditions that could damage existing roads and parking areas. Contractor is responsible for all equipment used to deliver and tailgate spread to match existing footprint and contour. Scale tickets with a minimum of weight, material and date will be provided to refuge representative for each load.
End of Scope image1.png