Statement of Work Summary: Wing Operation Center Common Operating Picture Displays

This Statement of Work dated June 24, 2026, outlines requirements for replacing projector and audio/video infrastructure at Malmstrom Air Force Base, Building 500, Room 127, Montana. The contractor must replace two ceiling-mounted projectors behind desk #19 and upgrade the Crestron Audio/Video over IP (AVoIP) system to the latest generation of Crestron NVX hardware. Key deliverables include unplugging and removing existing projectors, installing two new units with cabling attachment, conducting full system function checks, providing in-depth training to assigned personnel, and transferring removed equipment to the end-user. The project must be completed within 120 days of contract award, and all labor, materials, equipment, and supervision are contractor-provided responsibilities.

Technical requirements specify projectors with 4K or higher image quality rated for at least 16,500 lumens, ceiling-mounted using existing MICEO Adj Projector Mount (MODEL JR3XL) or equivalent vibration protection, designed for 24/7 operation without degradation, and capable of keystone correction for the angled 9.58-degree display wall. Input types must include VGA, SVGA, HDMI, DVI-D, USB-C, and IP, with four 4K inputs per projector for quad displays. The encoder/decoder upgrade requires replacing 20 Crestron DM-NVX-E30 encoders with DM-NVX-384 units supporting 4K video with HDMI and USB-C inputs, and replacing eight DM-NVX-350 units with new decoders enabling native multi-window processing for at least twelve simultaneous sources. The existing network switch must be replaced with a POE++ capable model such as Crestron CEN-SW-POE-48-ULTRA. Contractor obligations include providing a detailed schedule, owner's manuals and warranty documents in PDF format, coordinated technical integration with government representatives meeting Air Force and DoD standards, concealed cabling, site measurement verification, a minimum 5-year warranty with optional extended service contract provisions, and a maintenance process. Shipping and installation costs must be factored into quotes for the Malmstrom AFB location, with access requiring basic background check clearance.

View the file

Other files

File Type Posted
Notice of Intent to Sole Source - Hardware.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Wing Operation Center Common Operating Picture Displays Dated: 24 June 2026

PART I - NIPR

I. Overview:

The contractor will replace the current projectors (2) that are installed from the ceiling behind desk #19 as shown in diagram 1. Additionally, the contractor will perform a hardware upgrade of the Crestron Audio/Video over IP (AVoIP) system, replacing the current components with the latest generation of Crestron NVX hardware or equivalent and ensure compatibility with existing system to include projector endpoint.

Diagram 1 – Desk Layout

II. Objectives:

Unplug cabling from previous projectors and remove the projectors from the mounts.

Install two new projectors where mounts are located and attach cabling. Conduct a full system function check to ensure operability. Provide in-depth training to assigned personnel on system capabilities, troubleshooting, and overall familiarization. The procured projectors and A/V components shall be compatible with the existing operating components where applicable. Provide removed equipment to the end-user for proper accountability and disposal.

a. Projector Requirements. Image quality must be high definition or better (i.e., 4K).

The display system must be user-maintainable/plug-and-play to the greatest extent possible. Displays need to be designed to operate 24 hours a day and 7 days a week without experiencing degradation. The entire system should be designed to be modularly replaceable, with a high priority placed on system longevity. Projectors shall be ceiling mounted and attached to the existing anti-vibration mounts (MICEO Adj Projector Mount, MODEL JR3XL) or an equivalent vibration protection solution shall be provided and installed. Projectors must be rated for at least 16,500 lumens. The device must NOT contain wireless signal capability.

b. Environmental Requirements. Projectors need to be able to project onto the current display wall, which is angled at 9.58 degrees inward, without distorting the image. Proposed solutions must be able to perform keystone correction to account for the wall angle. Projectors must be bright enough for low ambient light with adjustable brightness. Projectors will cover a composite image of 30’x9.53’ and must be compatible with the NP18ZL-4K zoom lens. The distance from the projector to the video wall is approximately 27ft.

c. Input Types. Input types should include but not be limited to VGA, SVGA, HDMI, DVI-D, USB-C, and IP. Each projector must provide four 4K inputs into a single quad display.

III. Encoder/Decoder upgrade:

The current first-generation Crestron AVoIP system is approaching the end of its warranted life and shall be replaced to ensure continued trouble-free operation and to leverage new system capabilities.

a. Encoding. The current 20 Crestron DM-NVX-E30 video encoders at each of the 19 desks and the TV feed shall be replaced. The new encoder units (Crestron DM-NVX-

384) shall be installed at each location, utilizing existing network cabling where possible. The new encoders must support 4K video and provide options for both HDMI and USB-C inputs.

b. Decoding and Multi-Window Capability. The current eight Crestron DM-NVX-350 encoder/decoder units and associated card frame shall be replaced with new decoder units (such as Crestron DM-NVX-384) capable of native multi-window (multiview) processing. The upgraded hardware must allow for dynamic composition of multiple sources into various layouts on the main display, removing the need for external multiviewer hardware. The system shall allow at least twelve sources to be displayed simultaneously across the two projectors.

c. Network Switch. The existing network switch in the main rack will be replaced with a new model capable of delivering the higher power (POE++) required by the new encoder/decoder units (such as a Crestron CEN-SW-POE-48-ULTRA).

Diagram 2 – Decoding Video

IV. Deliverables:

a. The contractor shall provide a detailed schedule showing the critical path from award to installation of a fully operational system.

b. Include all owner's manuals, specifications, and warranty documents. PDF is preferable.

c. The contractor is to provide/furnish all labor, materials, equipment, and supervision necessary to complete the project within 120 days of contract award.

V. Installation:

a. Any technical integration must be coordinated with government representatives and meet all Air Force and DoD network, telecommunications, and security standards.

b. The contractor shall ensure all cabling is concealed.

c. The contractor shall verify all site measurements prior to implementation.

d. The contractor shall perform work in a controlled area and will be escorted at all times.

e. The contractor shall remove all debris from packaging and handle the proper disposal of their waste containers daily.

VI. Shipping:

a. The contractor shall factor into their quote the cost of shipping and installing the system in 77th St. N., Bldg. 500 Room 127, Malmstrom AFB, Montana 59405.

b. The facility does not have a dock that can be used to unload equipment or materials.

c. The installation agency must be able to gain access to the installation by passing a basic background check.

VII. Warranty of Components & Maintenance:

a. The contractor shall provide a detailed synopsis of the warranty.

b. The system will have a minimum of a 5-year warranty included in the quote. The contractor must also provide an option quote for an extended service contract to cover items like adjustments, software updates, and troubleshooting.

c. The contractor shall provide a process for maintenance once the system is operational.