This Statement of Work (SOW) details the requirement for aftercooler core replacement on the NOAA Ship FERDINAND R. HASSLER's main propulsion diesel engines (MPDEs) and ship's service diesel generators (SSDGs). The work involves removing existing aftercooler cores and installing government-furnished material (GFM) cores on both port and starboard engines, which are Caterpillar C32 and C9 models with specific serial numbers. The contractor must provide new OEM seals, gaskets, and sealant, inspect and clean turbo housings, air lines, and connection points, and perform an operational test of all four engines.

The work is scheduled to be performed at NOAA's Marine Operations Command – Atlantic (MOC-A) in Norfolk, VA during two potential periods: June 24-29, 2025, or August 21-26, 2025. The port engineer and point of contact is Justin Kusterer. Upon completion, the contractor must submit a service summary report including individual engine hours, total fuel burn, inspection observations, and maintenance recommendations. The contract is a 100% small business set-aside under NAICS code 336611 with a size standard of 1,300 employees, and quotes are due by May 14, 2025, at 5:00 PM Eastern Time.

View the file

Other files

File Type Posted
Sol_1333MK25Q0087.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA Hassler

( NOAA-S 250 )

Propulsion Machinery CONTRACT NO. N00000-00-X-0000

ITEM NO. 20001 CATEGORY "A" 2025-04-25

Aftercooler Core Replacement Kusterer, Justin

20001 - 1

1.1 Intent:

1.1.1 This item describes the requirement to change out

aftercoolers on the port and starboard main engines (MPDE) and ship’s service diesel generators (SSDG) aboard NOAA Ship

FERDINAND R. HASSLER.

1.2 References:

1.2.1 None

1.3 Government Furnished Material:

1.3.1 2 sets of aftercoolers for MPDEs (C32)

1.3.2 2 sets of aftercoolers for SSDGs (C9)

1.4 Requirements:

1.4.1 Remove existing and install GFM aftercooler cores on both the PORT and STARBOARD main diesel engines, and both the port and starboard SSDGs.

1.4.2 Provide new OEM seal and gasket sets to accommodate

aftercooler changes on each engine.

1.4.3 Provide sealant for aftercooler cores. See 1.6.4.

1.4.4 Inspect and clean turbo housings and air lines.

1.4.5 Inspect intake plenum.

1.4.6 Inspect remaining connection points and parts removed to facilitate aftercooler core change.

1.4.7 Checkpoint: Submit a condition found report to the port engineer and contracting officer to recommend additional replacement parts and maintenance, as required.

1.4.8 Reinstall all components, utilizing new OEM seals and

gaskets.

1.4.9 Package used aftercooler cores in the GFE containers.

1.4.10 Upon completion of all work, perform an operational test of all four engines. Observe engines for proper operation and control, to the satisfaction of the Chief Marine Engineer or Port Engineer.

1.4.11 Provide a service summary report. Include individual

engine hours and total fuel burn, inspection observations and any recommendations for additional maintenance or repairs.

NOAA Hassler

( NOAA-S 250 )

Propulsion Machinery CONTRACT NO. N00000-00-X-0000

ITEM NO. 20001 CATEGORY "A" 2025-04-25

Aftercooler Core Replacement Kusterer, Justin

20001 - 2

1.5 Quality Assurance:

1.5.1 Run each engine until normal operating temperatures and conditions are met. Verify no leaks and proper operational parameters are met.

1.6 Notes:

1.6.1 MPDEs are CAT C-32 Engines, SSDGs are CAT C9 Engines.

Engine S/Ns as follows:

PME RND00123

SME RND00124

PDG C9J00506

SDG C9J00507

1.6.2 The work is expected to be performed at NOAA’s Marine

Operations Command – Atlantic (MOC-A), Norfolk, VA facility between 6/24/2025 and 6/29/2025 or 8/21/2025 and 8/26/2025.

1.6.3 The point of contact for this work is the Port Engineer Justin Kusterer. He can be reached at 240-704-2815 or justin.kusterer@noaa.gov

1.6.4 It has been noted that after having been cleaned and

hydro tested, sealant may be removed from the aftercooler cores outer perimeter. The Contractor shall provide the required sealant in the event that GFE cores are lacking. Example:

1.1 Intent:
1.1.1 This item describes the requirement to change out aftercoolers on the port and starboard main engines (MPDE) and ship’s service diesel generators (SSDG) aboard NOAA Ship FERDINAND R. HASSLER.
1.2 References:
1.2.1 None
1.3 Government Furnished Material:
1.3.1 2 sets of aftercoolers for MPDEs (C32)
1.3.2 2 sets of aftercoolers for SSDGs (C9)
1.4 Requirements:
1.4.1 Remove existing and install GFM aftercooler cores on both the PORT and STARBOARD main diesel engines, and both the port and starboard SSDGs.
1.4.2 Provide new OEM seal and gasket sets to accommodate aftercooler changes on each engine.
1.4.3 Provide sealant for aftercooler cores. See 1.6.4.
1.4.4 Inspect and clean turbo housings and air lines.
1.4.5 Inspect intake plenum.
1.4.6 Inspect remaining connection points and parts removed to facilitate aftercooler core change.
1.4.7 Checkpoint: Submit a condition found report to the port engineer and contracting officer to recommend additional replacement parts and maintenance, as required.
1.4.8 Reinstall all components, utilizing new OEM seals and gaskets.
1.4.9 Package used aftercooler cores in the GFE containers.
1.4.10 Upon completion of all work, perform an operational test of all four engines. Observe engines for proper operation and control, to the satisfaction of the Chief Marine Engineer or Port Engineer.
1.4.11 Provide a service summary report. Include individual engine hours and total fuel burn, inspection observations and any recommendations for additional maintenance or repairs.
1.5 Quality Assurance:
1.5.1 Run each engine until normal operating temperatures and conditions are met. Verify no leaks and proper operational parameters are met.
1.6 Notes:
1.6.1 MPDEs are CAT C-32 Engines, SSDGs are CAT C9 Engines. Engine S/Ns as follows:
PME RND00123
SME RND00124
PDG C9J00506
SDG C9J00507
1.6.2 The work is expected to be performed at NOAA’s Marine Operations Command – Atlantic (MOC-A), Norfolk, VA facility between 6/24/2025 and 6/29/2025 or 8/21/2025 and 8/26/2025.
1.6.3 The point of contact for this work is the Port Engineer Justin Kusterer. He can be reached at 240-704-2815 or justin.kusterer@noaa.gov
1.6.4 It has been noted that after having been cleaned and hydro tested, sealant may be removed from the aftercooler cores outer perimeter. The Contractor shall provide the required sealant in the event that GFE cores are lacking. Example: