This document is a Statement of Work (SOW) for the replacement of the roof on the Fee Kiosk at the Oregon Inlet Campground within the Cape Hatteras National Seashore. The major work components include demolishing the existing roofing materials and installing a new 0.40 Aluminum mechanically seamed double lock style structural standing seam metal roofing system. The new roof must meet specific requirements such as wind rating, material and weather tightness warranties, and color selection. The work is to be performed by a qualified roofing installer and includes associated carpentry, electrical, and plumbing work.
The related federal contract opportunity is a solicitation (Solicitation Number: 140P5324R0047) issued by the Department of the Interior National Park Service Southeast Region for the REPLACE ROOF ON OREGON INLET FEE KIOSK project. This is a firm-fixed price 100% small business set-aside procurement with the award based on the lowest price technically acceptable quote. The period of performance is estimated to be 60 days from the Notice to Proceed, approximately September 23, 2024 to November 22, 2024. An optional site visit is scheduled for September 10, 2024, and quotes are due by September 17, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5324R0047_Amd_0001.pdf | ||
| QUESTIONS_AND_ANSWERS_0001.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| Wage_Rate_Determination.pdf | ||
| Sol_140P5324R0047.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Roofs on Comfort Stations & Showers, Oregon Inlet Campground Page 1
CAPE HATTERAS NATIONAL SEASHORE
Outer Banks Group
Scope of Work
Replace Roof on Fee Kiosk at Oregon Inlet Campground
1.0 INTRODUCTION
The National Park Service (NPS) Cape Hatteras National Seashore (CAHA) has a requirement to replace the roof Fee Kiosk at Oregon Inlet Campground with new structural standing seam metal roofing systems.
2.0 CONSTRUCTION SITE LOCATION
The Oregon Inlet Campground is located at 12001 NC Hwy 12, Nags Head NC 27959.
3.0 BACKGROUND AND EXISTING CONDITIONS
The contractor is required to verify existing conditions.
The Kiosk structure is a single story wood frame buildings constructed on timber pile foundations. The roof is a hip roof type with board ceiling/roof deck and cedar shake shingles and 2x10 exposed wooden facia. The roof overhangs the exterior walls measuring approximately 16”. The roof of the building measures approximately 35 ft x 20 ft, approximately 700 sf.
Replace Roofs on Comfort Stations & Showers, Oregon Inlet Campground Page 2
4.0 MAJOR WORK COMPONENTS
The contractor will provide all technical support, materials, tools, equipment, and manpower required complete the project.
The major work components are not meant to be an all-inclusive to do list for the project, but a list of the main items involved in the project. The contractor is responsible for verifying existing conditions. The contractor can use this list to assist with the bid process for this project. The major project components are listed below but are not limited to the following:
BASE BID:
A. The Contractor must submit for the government approval all products to be used on this project. Provide at least 21 days for government feedback / approval.
1. Specifically submit the new standing seam roofing system, including manufacturer’s recommendations for high wind application, testing, and installation instructions.
2. Erect temporary construction barriers to protect visitors, employees and restrict pedestrian access.
Kiosk:
B. Demo existing roofing. Included are all items down to the roof deck: shingles, drip edge, rain diverters, felt, vent boots, and flashing. Completely remove roofing nails.
Remove existing facia boards, approximately 110 LF.
C. Protect exposed roofs during demolition until new roof materials are applied.
D. Provide new 0.40 Aluminum mechanically seamed double lock style structural standing seam metal roofing. New roof shall have the following features:
1. Concealed galvalume or stainless steel fasteners. No fasteners shall be installed through the roof deck to be visible from inside the comfort station.
Fasteners may be visible through the roof deck in the showers.
2. Completely cover the roof deck.
3. Provide new roof vent boot from the same manufacturer as the new roof.
4. Provide rubber membrane underlayment on the entire roof deck,
5. At the skylight openings, provide new tongue and groove boards to cover the opening. New boards shall match the angle of the existing boards and be fastened with type 316 stainless steel fasteners to the existing rafters. New roof deck boards shall match the existing thickness of the existing adjacent roof deck boards. New deck boards shall extend to a rafter or other structural roof framing member to provide the same structural support as the rest of the roof deck.
6. Carpentry/Roofing/Framing work necessary to provide a new standing seam metal roof in place of the existing roof is included in this project.
7. New roof system must meet International Building Code/North Carolina Building Code for the wind rating of 120 mph at the project site. New Roofing must meet ASTM E1514 for Standing Seam Metal Roof Systems or
Replace Roofs on Comfort Stations & Showers, Oregon Inlet Campground Page 3 approved equal (Standard Specification for Structural Standing Seam Steel Roof Panel Systems (astm.org)).
8. New roof must be installed by a qualified roofing installed who has specific knowledge and experience installing the roof system for this project. Installer must have a certification from a metal roofing association, or an equivalent manufacturer’s training and experience program.
9. New roof installation methods shall meet the requirements of the manufacturer to obtain a 30-year material warranty, 20-year weather tightness warranty, 120 mph wind warranty (with no exclusions for named storms or gusts), 20-year fade and chalk resistance warranty.
10. Color shall be a hunter green shade as selected by the COR.
11. Provide rain diverter above main entrance to the comfort stations. Rain diverters shall be installed per manufacturer’s instructions and be fabricated by the same manufacturer as the standing seam roof panels
12. Plumbing vents shall include new rubber boots from the same manufacturer as the roofing system
13. Temporary roofing shall maintain the project roof as watertight and able to prevent leaks and damage to the building and structure until reroofing work is completed. Contractor shall ensure the projects roof is 100% watertight at the completion of work each day.
E. Provide new 2x10 pressure treated wood facia boards. Utilize a minimum of four fasteners at each rafter plus 2 fasteners. Pitch cut the top of the facia board to match the slope of the rafters and roof deck.
NOTES:
1. All carpentry work required to install the new roof system is included in this project.
2. Electrical work associated with disconnection and reconnection of the photocell is included.
3. Stainless Steel hardware must be type 316 stainless steel unless otherwise approved by the NPS.
4. The NPS follows the International Building Code (IBC). This project must meet the
IBC, and all federal, state, and local codes.
5. During construction at least one shower building and one comfort station shall be kept open for public for use.
Replace Roofs on Comfort Stations & Showers, Oregon Inlet Campground Page 4
(Figure 07 North Carolina Wind Zone diagram from Building Code showing Oregon Inlet Campground within the 120 mph wind zone)
5.0 SUBMITTALS
A. Product Data. The Contractor shall submit written documentation or color/product samples for materials identified in the Scope of Work.
1. Structural Standing Seam Roof System including fasteners.
2. Color Selection Sheet for Structural Standing Seam Roof
3. Hurricane Ties
4. Wood products
5. Rubber Boot material
B. Manufacturer requirements for Installer Qualifications C. All manufacturer operation and maintenance manuals, warranties, and cleaning instructions shall be submitted before final payment is made.