STATEMENT OF WORK.pdf

PDF 3 MB Posted

Attached to
PROVIDE TWO BULKHEAD SEAL REPLACEMENT ONBOARD THE NOAA SHIP FERDINAND HASSLER
Solicitation number
1333MK24Q0068
Issued by

About this file

This document is a Statement of Work (SOW) for the renewal of bulkhead seals on the NOAA Ship Ferdinand R. Hassler. The SOW describes the requirements to install two new, government-furnished bulkhead seals on the port and starboard propulsion shaftlines of the vessel. The period of performance is between July 21-24, 2024, and the work is to be performed at the ship's location in Norfolk, VA. The contractor will be responsible for removing the existing seals, installing the new seals, and facilitating any necessary inspections or testing. The contractor must also submit a condition report and final service report. The SOW references a related federal contract opportunity, solicitation number 1333MK24Q0068, which is a Request for Quotation (RFQ) for the bulkhead seal replacement. The RFQ is a small business set-aside, with a period of performance from June 10 to August 31, 2024, and a requested start date of July 21-24, 2024. The government will award a firm-fixed-price contract based on best value, considering availability, experience/past performance, and price.

View the file

Other files

File Type Posted
1333MK24Q0068_Amd_0001.pdf PDF
CLAUSES AND PROVISIONS.pdf PDF
Sol_1333MK24Q0068.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOAA Ship Ferdinand R. Hassler

Bulkhead Seal Renewal

Scope of Work

May, 2024

NOAAS Ferdinand R. Hassler Ship Information

Length (LOA) 37.7 m (123.7 ft)

Breadth At Main Deck 16.4 m (53.8 ft)

Breadth At Pontoon, Max 18.5 m (60.7 ft)

Depth 7.0 m (23 ft)

Draft, Max 3.95m (12.96 ft)

Displacement, Max 744.4 tonnes (732.6 long tons)

Gross Tonnage (ITC) 809

Hull Welded Steel

Norfolk, VA

1.0 SCOPE: This item describes the requirements to install two (2) new, GFE bulkhead seals on the port and starboard propulsion shaftlines.

1.1 The period of performance shall be between July-

21-2024 and July-24-2024.

1.2 Location of performance is 439 West York Street, Norfolk, VA 23510

1.3 Working hours are between 06:00 and 17:30.

Coordinate final service date(s) with PE no less than 1 weeks ahead of anticipated arrival as the ship’s schedule is subject to change.

1.3.1 If the Contractor desires to work outside of the normal working hours written permission must be provided by the Port Engineer no less than 12 hours in advance.

1.3.2 There will likely be some overlap with another contractor who is replacing and testing switchboards at this time. It is recommended that the KTR provide temporary lighting and extensions cords in the workspace, as it is feasible that there will be moments without power during switchboard testing. Power is available from the pier if necessary.

2.0 REFERENCES:

2.1 NOAA Hassler Bulkhead Seals - AE14570-A-Ø165

3.0 Government Furnished Equipment

3.1 QTY (2): Bulkhead Seal Ring

4.0 REQUIREMENTS:

4.1 Provide new, stainless steel hardware ISO of installation, in general accordance with 2.1. Provide misc. cleaners, grease and other consumables required for removal and installation.

4.2 Contractor shall be responsible for all rigging and machining, as required. There are limited padeyes in the machinery spaces, contractor may elect to install temporary padeyes and or beam clamps. Disturbed locations shall be restored to as-good or better condition than found.

4.3 Remove existing port and starboard bulkhead seals, located in space 5-28-2 and 5-28-1, respectively.

4.4 Install, machine and adjust as necessary new, GFE bulkhead seals in 5-28-2 and 5-28-1 in accordance with OEM recommendations and best practices.

4.5 Facilitate inspections and/or testing with the USCG and ABS following installation. NOAA will manage any costs associated with USCG and ABS separate from this contract.

4.6 Submit a condition found report to recommend additional materials or service deemed necessary and outside of this scope of work within 12 hours of findings. Change orders will be confirmed or denied by the Contracting Officer, only.

Norfolk, VA

4.7 Submit a final service report to the port engineer within 3 days of service visit.

5.0 QUALITY ASSURANCE:

5.1 As identified in section 4.0.

6.0 NOTES:

6.1 Coordinate dates and location with the Port Engineer, Alex

Chartier. He is the primary point of contact and can be reached at 228-281-3198 or alex.chartier@noaa.gov

6.2 Port bulkhead seal photos, existing

View from 5-28-2 View from 5-38-2

6.3 Starboard bulkhead seal photos, existing.

View from 5-28-1 View from 5-38-1

END OF SPECIFICATION

mailto:alex.chartier@noaa.gov

Date Name

Machined

Checked

Origin: Replaces: Replaced by:

Format

Espey Burgmann Article-No.:

Customer:

Code word:

Customer drawing

Scale Weight

Free size tolerances according to DIN ISO 2768-mKSubject to modifications and amendments.

Standard:

Rev.:

The reproduction, distribution and utilization of this document as well as the communication of its contents to others without explicid authorization is prohobited.

Offenders will be held liable for the payment of damages. All rights reserved in the event of the grant of a patent, utility model or design.

Bulkheadseal WD200ND

Shaft Seal ESPEY-Turbo

AE14570-A-Ø165

90-000092330

02.00

Giebel25.04.2007

ID:

DIN A2

1:1

A

A

O

,10

Rz6,3

O

30°

60° 6x

(=360°)

O

3 1 Hexagon head screw plug DIN908 G1/4 A4-Cu

2 1 Housing, compl. W14570+W14914-4-Ø165 AlMg3/A4-70

1 2 Seal ring, compl. W14570-1-Ø165,xx axially loaded E49/1.4571

Part Piece Titel Document number Material Mass

B

B

Section A-ASection A-A

Section B-BSection B-B

O

O

30.04.2007 Böhm

6x M12 customers supply bulkhead O bu lk he ad m ax

Wear protection min. 150HB

G1/4

Installation situation of the seal rings

Detail

-+maximum angle deviation for shaft position: 1,5°

15°

VT Halter Marine, Inc.

Vision Technologies Systems

REV. 2 NOT ISSUED DUE TO CONTRACT TERMINATION

File details come from the government source that posted it. Updated .