STATEMENT_OF_WORK.pdf

PDF 144 KB Posted

Attached to
REPLACE FIRE PUMP MOTOR FCC TERRE HAUTE Federal contract opportunity
Solicitation number
15B41823Q00000015
Issued by
Department of Justice Bureau of Prisons Federal Correctional Complex Terre Haute

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to replace the fire pump motor at the Federal Correctional Complex (FCC) in Terre Haute, Indiana.

The SOW requires the contractor to supply all parts, equipment, and labor to remove and replace the current John Deere or equivalent diesel engine associated with the pump station with the most similar appropriately sized modern equivalent. The contractor must provide a turnkey system that will integrate the jockey pump and control systems to be compatible with the new motor. The contractor will be responsible for a third-party NFPA flow testing upon completion and providing the test documents.

The related federal contract opportunity is Solicitation Number 15B41823Q00000015 for the "REPLACE FIRE PUMP MOTOR FCC TERRE HAUTE." This is a request for quote with a firm-fixed unit price contract type. The performance period is up to 120 calendar days after award. The acquisition has an estimated value under $250,000. A site visit is scheduled for May 14, 2024, and quotes are due by May 24, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE FIRE PUMP MOTOR FCC TERRE HAUTE, newest first.
File Type Posted
question and clarification.docx DOCX document
PRE BID SITE VISIT MINUTES SIGNED.pdf PDF
15B41824Q00000015.pdf PDF
wage rate.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project : 23Z4AS5 – Emergency Replace Fire Pump Motor

FCC Terre Haute has a requirement to Replace the Fire Pump Motor. This project will require the contractor to supply all parts, equipment, and labor to remove and replace the current John Deere or equivalent diesel engine (JOHN DEERE SN:PE4045N026799 MODEL:4045HF280) associated with the pump station with the most similar appropriately sized modern equivalent. The contractor shall supply a turnkey system that will integrate jockey pump, and controls systems that will be compatible with the new motor. Contractor will be responsible for a third party NFPA flow testing upon completion and supply the institution with documents of testing. Specifications for John Deere or equivalent to individual components will meet or exceed the following;

Engine Specifications:

Engine Type: 4 cylinder Compression (diesel) Compression Ratio: 19.0:1 Displacement – cu. In. (L) 275 (4.5) Engine Type 4 Stroke Cycle – Inline Construction Bore & Stroke – in. (mm) 4.19 x 5.00 (106 x 127) Aspiration Turbocharged

HP 86

Cooling Type: Liquid

Controller Specification:

AC: 120V/1hp/60hz

DC: 12VDC

Electrical Readings: Battery 1 & Battery 2 voltage, Battery 1 & Battery 2 charging amperage, charging mode Pressure Reading Continuous system pressure display, Cut-in and cut-out pressure reading Pressure and Event recorder: Pressure readings with date stamp, event recording with date stamp, Under regular maintained operation, event are store in memory for life of the controlled, Date viewable on operator interface display screen Pressure Sensing: Pressure transducer and run test solenoid valve assembly for fresh water application, Pressure sensing connection 1/2” Female NPT, Drain connection 3/8”, Rated and calibrated for 0-500psi working pressure, Externally mounted with protective cover Audible Alarm: Engine run, Main switch AUTO, Main switch in OFF, Main switch in HAND, Periodic test, c ranking cycle, AC Power available, Pump room temperature Operator Interface: Embedded microcomputer with software PLC logic and touch screen monitor

Jockey Pump Controller Specification:

Supply Voltage: 3 phase 200WAC to 600VAC 50/60Hz, 1phase – 110VAC to 240VAC, 50/60Hz Power Supply Output: Two 24VDC outputs

All Components will be tested for operability prior to technicians completing their work.