This pre-solicitation synopsis and attached statement of work describe a proposed firm fixed-price construction contract for painting and coating a 750,000 gallon water storage tank at the Federal Correctional Complex in Forrest City, Arkansas. The Bureau of Prisons seeks a contractor to provide all labor, materials, equipment and services to remove existing paint, prepare surfaces, and repaint the water tank over a 180-day performance period. Interested small businesses must be registered in SAM as less than 500 employees to qualify for this 100% small business set-aside. The estimated value is between $250,000 to $500,000. The solicitation will post on July 17, 2020 at beta.sam.gov and all amendments and updates will distribute through this site.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUREAU OF PRISONS
SOUTH CENTRAL REGION
FACILITIES SECTION
FEDERAL BUREAU OF PRISON
Chk'd by: ~ «l(;Nei!(
FCC FORREST CITY ----,.---------
750,000 Gallon Water Tower Repaint / _ \/_ A 41PPROVED
. . ~ TAPPROVED
SECTION 09800 - COATING & PAINTING FOR SIBEL WATER SfORAGE T,_m ');IA KE NOTI:D CHANGES
_RESUBMIT
PART 1 - GENERAL .. J}~
I.I SCOPE Date I/ /,</)- !;!, ?P l 4
· A. The contractor shall provide all labor, materials, equipment, tools, supervision, transportation, services, etc., required for paint removal, field preparation and repainting of one 750,000 gallon composite elevated storage tank as described herein. The scope of work shall include all interior and exterior metal surfaces and components on the storage tank.
· B. The elevated storage tank is located outside the secure perimeter, behind the Federal Prison Camp. During the course of this project, the institution will continue to receive domestic water supply through an existing tank-bypass service line.
l .2 REFERENCE SPEC[FICATIONS AND ST ANDA RDS
A. Without limiting the general aspects of other requirements of these specifiations, all surface preparation, coating and painting of interior and exterior surfaces and inspection shall conform to the applicable requirements of the Society for Protective Coatings, NACE International, ASTM (American Society for Testing and Materials), A WWA and the manufacturer's printed instructions.
1. ASTM (Amerian Society for Testing and Materials) ASTM D 520 Standard Specifiation for Zinc D ust Pigment ASTM D 4417 Standard Test Methods for Field Measurement of Surface
Profile of Blast Cleaned Steel
ASTME337
ASTMD2200
Standard Practice Test Method for Measuring Humidity with a Psychrometer Standard Methods of Evaluating Degree of Rusting on Painted Surfaces
2. ANSI (American National Standards Institute) ANSI/ ASC 29.4 Exhaust Systems Abrasive Blasting Operations -
Ventilation and Safe Practice ANSI/NSF Standard 61 Drinking Water Components
3. AWWA (American Water Works Association) AWWA D 102 Coating Steel Water Storage Tanks
4. Consumer Product Safety Act, Part 1303
5. NACE International NACE Publiation TPC2 Coatings and ~ for Immersion Service:
WATER TANK PAINTING
Chapter 1 Safety, Chapter Surface Preparation, Chapter 3 Curing, and Chapter 4 Inspection
09800-1
NACE Standard RP0287
NACE Standard RP0288
Field Measurement of Surface Pto6le of Abmsive Blast-Cleaned Steel Surfaces Using a Replica Tape Standard Recommended Pmctice, Inspection of Linings on Steel and Concrete
6. OSHA (Occupational S1lfety & Health Administmtion)
1915.35 Standards - 29 CFR- Painting
7. SSPC (Societf for Protective Coatings) SSPC-SP2 Hand Tool Cleaning SSPC-SP3 Power Tool Cleaning SSPCSPl 1 Power Tool Cleaning to Bue Metal SSPCPA-1 Shop, Field and Maintenance Painting SSPC-PA-2 Measurement of DJ:y Film Thickness with Magnetic Gages SSPC-PA-3 Guide to Safety in Paint Application SSPCGuide 12 • Guide fo.r Jllumination oflndusttial Painting Project SSPC VIS 1-89 Pictorial Surface Prepamtion Standards for Painting Steel
Surfaces SSPC Paint Spec 36 Two Component Weatherable Aliphatic Polyurethane
Topcoat, Performance-Based
8. SSPC/NACE Joint Standards SSPCSP5/NACE 1 White Metal Blast Cleaning SSPCSP6/NACE 3 Commen:ial Blast Cleaning SSPCSP7 /NACE 4 Bmsh-OffBlast Oeaoing SSPCSP10/NACE 2 Near-White Metal Blast Cleaning
1.4
The Contracting Representative's decision shall be final as the interpretation and and/or Conflict between any of the referenced specifications and standards contained herein
CONTRACTOR
A. The Contractor shall have three yeaa pmctical experience and successful bistmy in the application of specified product to surfaces of steel water tanks. Upon request, he shall substantiate this requirement by furnishing a list of refeiences and job completions.
B. The Contmctor shall submit with his bid a written statemen� by the coatings manufacturer stating that the Contmctor is &miliat with the materials specified and has women capable of perfomiing the WOik specified herein.
C. The pemonnel performing the work shall be knowledgeable and have the required experience and skill to adequately perfoan the wmk for this project, in acconiance with SSPC-PAl, "Shop, Field and Maintenance Painting91
1.5 QUALl'IY ASSURANCE
A. Geneml: �1¥ assumnc:e procedures and puctices shall be utilized to monitor all phases of sudace preparation, application and inspection throughout the duration of the �ject.
Pmcedures or practices not specifically defined herein may be utilized provided they meet remguized and accepted professional standards and are approved by the Contracting Officer Rrepresentative
WATER TANK.PAINTING 09800-2
BOP41950
Highlight
B. Surface Prepamtion: Surface preparation will be based upon compm:ison with: "Piccm:ial Surface Preparation Standmls for Painting Steel Surfaces: SSPC VIS 1-89", .ASTM D2200- 95, nstandard Methods of Evaluating Degree of Rus1ing on Painted Surfacesu, ASTM D 4417-91, Method A and/ or Method C or NACE Stmdard RP0287-87. In all cases the written standard shall take precedence over the visual standard. In addition, NACE Standatd SP017S.91, along with the Visual Comparator, shall be used to verify the surface prepantion of welds.
C. Application: No coating or paint shall be applied when: 1) the suaounding air tempemture or the tcmperatme of the surface to be coated or painted is below the minimum surface temperature for the products specified herein, 2) rain, snow, fog or mist is present, 3) the sur&ce temperature is less thm 5°F above the dew point, 4) the air tempetature is ~ to drop below the minimum temperature for the products spcdficd within m houm after application of coating. Dewpomt shall be meaamcd by use of an insttumcnt such as a Sling Psychtometer in conjunction with U.S. Department of Commm:c Weather Buteau Psychometric Tables. If any of the above conditions are pi:evalent, coating or painting shall be delayed or postponed until conditions are favotable. The day's coating or painting shall be completed in time to peanit the film sufficient dtying time prior to damage by atmospheric conditions.
D. Coating Thickness: Thickness of coatings and paint shall be measured checked accmding to the procedw:es outlined in SSPC-PA 2 "Measurement of Dry Film Thickness with Magnetic ~", May 2012 Edition. D.ty film thickness shall be a Level 2 as defincd in Paragraph 9.2, excepting that no single gsge reading shall be less than 80% of the specified my 61m thickness. Areas that fail to meet these criteria shall be corrected at no expense to the Owner. Use of an instrument such as a Tooke Gauge, precision groove gander, etc. is pemiitted if a destructive test is deemed necessa.ty by the Contmcting Officer and the total DFr is less than SO mils.
E. Holiday (Pinhole) Testing: The integrity of interior coated surfaces shall be tested for holidays m accomance with NACE Standard SP0188. For city films less than 20 ~ a non-destructive holiday detector shall not exceed 67.5 volts, nor shall destructive holiday detector exceed the voltage tee0mmet1ded by the manu&.ctmer of the c:oatiDg system. A solution of 1-ounce non-sudsing type wetting agent, such as Kodak Photo-Flo, and 1 gallon of tap water shall be used to perf~ the holiday testing. For coating thickness at 20 mils and greater, a high voltage Tinker & Rasor AP /W holiday tester shall be used. Contact coating manu&cturer for voltage .recommendations and cw:ing puametea.
All pinholes and/ or holidays shall be marked and tepaired in accomance with the manufactmers printed recommendations and mested. No pinholes or other meguJarities will be permittld in the final coating.
F. Inspection Devices: The contmctor shall furnish, until final acceptance of coating and painting is accepted, inspection devices m good working condition for detection of holidays and measurement of my film thickness of coating and paint. The Contmctor shall also fumish U.S. Department of Commeice, National Bureau of Stmdatds cerrlficd thickness calibmtion plates and/ or plastic shims, depending upon the thickness gauge used, to test the accuracy of my film thickness gauges and certified insttumentation to test the ac:cw:acy of holiday detectors. Dty film gauges and holiday de~tms shall be made available for the Contmcting Officer's use at all times until final acceptance of application. Holiday detection devices shall be opemted in the presence of the Contmcting Officer.
WATER TANK.PAINTING 09800-3
A. All materials shall be brought to the jobsite in original ·sealed containe:m. Tuey shall not be used until the Contmcting Officer has inspected the contep.ts and obtained data &om infmmation on containm or label Materials exceeding storage life recommended by the manufactmer shall be rejected.
B. All coatings and paints shall be stored in enclosed structures to protect them &om weather and excessive heat or cold. Flammable coatings and paints must be stmed to confonn with City, County, State and Fedeml safety codes for flammable coating or paint materials. At all times coatings and paints shall be protected &om freezing.
PART 2 - MATERIAIS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
I. Behr Process Corporation.
2. Tnemec Corporation
3. Sherwin-Williams Company <The}.
2.1 MATERIAL REQUIREMENTS
A. Materials submitted for this project shall meet the performance cluu:acterlstics listed below.
Testing shall be pmomied using the same surface p.tepamtion as specified for the coating sys~ unless specified otherwise herein. Test iq,orts shall be provided by the coating manu&cturer. Where questions arise, certified reports may be requested from the manu&ctw:er at no cost to the Owner.
B. Organic Zinc-Rich Primer
1. Adhesion: Minhnum 1,400 psi as per ASTM D4541, Type II Gage
2. Adhesion: Minimum 1,900 psi as per ASTM D4541, Type V Gage
3. Salt Fog. Minimum 10,000 hours as per ASTM Bl 17. No blistering, aackiog, delaminati.on or peeling. Not more than 1/16" .rust creep at scribe.
4. Minimum zinc load: 83% in the dried film
5. ~ Component
C. Two-Component Polyamide Epoxy
1. Adhesion: Minimum 1,500 psi as per ASTM D4541, Type II Gage
2. Adhesion: Minimum 1,800 psi as per ASTM D4541, Type V Gage
3. Salt Fog: Minimum 8,000 homs as per ASTM B117. No blistering, aac:king.
dela.minati.on or peeling. Not more than 1/8" .rust creep at scribe. (fwo coats)
4. Salt Fog: Minimum 10,000hours as per.ASTMB117. No blistea:in& aac:king.
dclamination or peeling. Not more than 1/8" rust creep at sea.be. (l'wo coats over mganic zinc-rich primer.)
5. Prohesion: Minimum 5,000 hams as per ASTM G85. No blistering. checkin& aacking, mating, delamination or peeling. No more than 1/8" .rusting at scribe.
6. Mix ratio shall be 1A:1B
D. Two-Component 80% Solids Amine Epoxy
WATERTANKPAINTING 09800-5
1. Adhesion: Minimum 1,600 psi as per ASTM D4541, Type II Gage
2. AdhesiOll! Minimum 1,800 psi as per ASTM D4541, Type V Gage
3. Salt Fog: Minimum 10,000 hours as per ASTM B117. No blisteting, cmcking.
deJaminarinn or peeling. Not more thiµi 3/16" rust aeep at scribe. (I'wo coats polyamide epoxy.) .
4. Salt Fog: Minimum 10,000 hours as per ASTM Bt 17. No blistering, aacking.
delamination or peeling. Not more than 1/16" rust aeep at sa:ibe. (l\vo coats over oiganic zinc-rich primer.)
5. Prohesion: Minimum 5,000 hours as per ASTM G85. No blisteting, checking, aacking, rusting, delamination or peeling. No more than 1/8" rusting at saibe.
6. Mix ratio shall be 2A:1B
B. Two-Component 100% Solids Amine Cured Epoxy
t. Adhesion: Minimum 1,900 psi as per ASTM D4541, Type II Gage, applied directly with no primer.
2. Adhesion: Minimum 2,400 psi as per ASTM D4541, Type V Gage, applied directly with DO primer.
3. Salt Fog: Minimum 9,000 hours as per.ASTMB117. No blistering, cracking, delamination or peeling, no rust aeep at sa:1be when tested over organic zinc-rich pmner.
4. Salt Fog: Minimum 9,000 hours as per ASTM Bl 17. No blistedng, cracking, deJarninatil)Jl or peeling, no rust creep at scribe. (I'wo coats.) .
5. Pmhesiott: Minimum X hours as per .AST.M G85. No blistmng. checking. mckiog, rusting, delamination or peeling. No more than 1/fl' rusting at scribe.
6. Cathodic Disbondment: Classification Group A with 0.000 disbonded equivalent drde diameter when tested as per ASTM GB (1.5 V), tested over SSPC-SPS prepared surface.
7. Humidity: Minimum 2,000 hours, no rusting, cracking, blistering when tested over oiganic zinc-rich primer as per .ASTM D4585.
8. Mix ratio shall be 1A:1B
F. Two-Component Aliphatic Polyurethane
1. Adhesion: Minimum 1,100 psi as per ASTM D4541, Type II Gage. CI'ested over oiganic zinc-rich primer.)
2. Adhesion: Minimum 1,800 psi as per ASTMD4541, Type V Gage. (rested over mganic zinc-rich primer.)
3. Salt Fog: Minimum 3,000 hours as per ASTM Bl 17. No blistering, aacking, delamination or peeling. Not more than 1/16" rust creep at scribe. (rested over oiganic zinc-rich primer.)
4. QUV Exposure: No more than 2. 7 DED FMCII (MacAdarn) color change after 2,000 how:s when tested as per ASTM D4587 (UV A-340 bulbs, Cycle 4: 8 hours UV /4 how:s condensation).
5. Prohesion: Minimum 15,000 hours as per ASTM G85. No blistering, checking.
cracking, rusting, dclamination or peeling. No more than 3/16" rusting at scribe.
(I'ested over epoxy primer.)
6. Humidey: Minimum 2,000 hours, no msting, aac:king, blistedng when tested over organic zinc-rich primer as per ASTM 04585.
7. Exterior &posure: No blistering, aackiog or chalking, not less than 86% gloss J.'etelltion after 500 MJ/m2 exposme as per .ASTM D4141, Method C. ·
8. Mix ratio shall be 4A:1B
WATER TANKPAINTINO 09800-6
G. Two-Component Fluoropolymer Polyurethane
1. Adhesion: Minimum 1,300 psi as per .ASTM D4541, Type ll Gage. (I"estEd over organic zinc-rich primer and aliphatic polyurethane coating.)
2. Adhesion: Minimum 1,900 psi as per .ASTM D4541, Type V Gage. (rested over organic zinc-rich primer and aliphatic polymetbane coating.)
3. Salt Fog: Minimum 10,000 hOUtS as per ASTM B117. No blistering. cmcking, delamination or peeling. Not more than 1/16" mst aeep at scribe. (I'ested over mganic zinc-rich primer.)
4. QUV Exposure: No more than 2.3 DED FMCll color change and not less than 93% gloss retention after 10,000 hours when tested as per ASTM D4587 (UV A-340 bulbs, Cycle 4: 8 how:s UV /4 hours condensation), avenge of five colors. (I'ested over two-component polyamide epoxy.)
5. Humidity: Minimum 3,000 hours, no msting. cracking, blistering as per ASl'M D4585. (I'ested over otganic zinc-rich primer.)
6. E.xterim Exposure: No blistering, aacking or c:ba1king, not less than 96% gloss retention and no more than 2.0 DED Hunter Lab Scale color change after 1,260 MJ/m2 exposure as per .ASTM D4141, Method C, avemge of five colms.
7. Weathering: Shall meet the reqwrements of ASTM D1014, Method C .
(EMMAQUA) with a minimum 99% gloss retention and not more than 0.25 DEmnn-sa color change (white) after a minimum of 1,500 'MJ/rw- (69,109 MJ/m?
total); a minimum 83% gloss retention and not more than 0.42 DEHuNma color change (white) after a minimum. of 3,500 MJ /rw-m2 (128,951 MJ /m?-total).
8. Mix ratio shall be 5A:1B
~ Two-Component Inoi:pnic Hybrid Water-Based F.poxy
1. Adhesion: Minimum 1,400 psi as per .ASTM D4541, Type V Gage, (two coats, SSPC-SPtO prep)
2. Adhesion: Minimum 1,100psi as per.ASTMD4541, Type VGage, (over orgmtlc zinc-rich primer, s.9>C-SP10 prep)
3. Salt Fog: Minimum 6,200 homs as per ASTM Bl t 7. No blistering, cracking, delaminarion or peeling. Not more than 3/16" mat creep at sc:tibe. (One coat, SSPC-SPtO ptep)
4. Immei:sion: Minimum 5,000 hOUtS in DI water as per ASTM D870. No blistering, cmcking, rusting, delamination, (over zinc-rich primer, SSPCSP10 Ft>)
5. Mix ratio shall be 1.A:lB
L Two-Component Hybrid Urethane
1. Adhesion: Minimum 1,800 psi as per ASTM D4541, Type Il Gage. (I'ested over two-component polyamide epoxy.)
2. Salt Fog: Minimum 6,000 houn as per AS1'.M Bt17. No blistemig, cracking, delamination or peeling. Not more than 1/16" rust creep at sa:1be. (I'ested over organic zinc-rich primer, two-component inoiganic hybrid water-based epoxy.)
4. QUV Exposure: No blistering, cracking chalkmg or delamination, no moi:e than
1.4 DED FMCil color change and not less than 83~/o gloss retention after 10,000 hOUIS when tested as per ASTM G53 (UV A-340 bulbs, 8 homs light, 4 hours dam).
(rested over two-component pofyamide epoxy.)
WATER TANK PAINTING 09800-7
5. Humidity: Minimum 2,000 houm, no tusting, aacking, blistering when tested over organic zinc-rich primer, two-oomponcnt polyamide epoxy intmnecliate as per
ASTMD4585.
6. Mix ratio shall be 4A:1B
J. Only those tbinneis listed on the coating manu&cturer's printed literature shall be used as specified by the coating manumcture%.
K.
L
Manu&ctuter's color charts shall be submitted to the Contracting Officer Representative at least 30 days prior to coating and/ or paint application. Genes:al Contractor and Painting Contractor shall cootdinate work so as to allow sufficient time (nomially seven to ten days) for paint to be delivered to the job site.
All coating products slwl be of a single manu&ctmer.
M. Selection of a manufacturer's color does not constitute acceptance of that manufacturer's products.
2.2 GENER.AL REQUIREMENTS
A. All materials shall be lead-free as defined by the Com,umer Product Safety Act, Part 1303.
B. All zinc dust pjgment contained in any zinc-rich matedal shall meet the requitcments of ASTM D 52.0 Type m with regard to zinc content and purity.
C. All materials for the interior wetted portion of the tank sha,11 meet the requirements of ANSI/NSF Standard 61 for potable water contact
D. All catalyzed polyurethane products shall meet the minimum requirements of SSPC Paint Specification Number 36, Level 3 Performance Level.
E. No products containing MOCHA shall be allowed.
F. No inorganic zinc primeis shall be peanitted on any interior portion of the tank.
23 MATERIAL PREPARATION
A. Mix and thin materials according to manufacturer's latest pti.nted instructions.
B. Do not use materials beyond manufacturer's recommended shelf life.
C. Do not use mixed materials beyond manufactw:er's recommended pot life.
D. Do not split kits of multi-component products.
24 TANK INTERIOR COATING SYSTEMS- wEI IED AREAS
A. Traditional Zinc/Epoxy System:
1. Weld Pi-eparation: Weld flux and spatter shall be removed by power·tool cleaning. Sharp projections shall be gtound to a smooth contour. All welds shall be grot111d to a smooth contour as per NACE Standas:d SPOl 78, Designation D.
WATER TANK.PAINTING 09800-8
2. Surface Prepu:ation: SSPC-SP10/NACB 2 Near-White Metal Blast Cleaning. An angular profile of 2.0 to 2.5 mils as per .ASTM D 4417, Method C or NACE Standard RP0287 is required.
3. Coating System:
Fmt Coat Organic Zinc-Rich Primer applied at 2.5 to 3.5 chy mils.
Stripe Coat Two-Component Polyamide Epoxy applied by brush to all weld seams, edges, comen, bolts, nuts and other difficult to coat areas.
Second Coat Two-Component Polyamide Epoxy applied at 4.0 to 6.0 dry mils.
Thi.rd Coat Two-Component Polyamide Epoxy applied at 4.0 to 6.0 chy mils.
TotDl chy film thickness shall be a minimum of 12.0 mils.
For cold weather applications, an accelerator approved by the ooating msnu&ctmer and certi6cd by ANSI/NSF Standard 61 may be submitted for use.
2.5 TANK INTERIOR COATING SYSTEMS - DRY AREAS
A. Zinc/Epoxy System:
1. Weld Prepamtion: Weld flux and spatter shall be removed by power tool cleaning. Shaq, projections shall be ground to a smooth contour. All welds shall be ground to a smooth contour as per NACE Standard SPOl 78, Designation D.
2. Surface Prepamtion: SSPCSPt0/NACE 2 Near-White Metal Blast Ceaning. An angular profile of 2.0 to 2.5 mils as per ASTM D 4417, Method C or NACE Standard RP0287 is required.
3. Coating System:
1st Coat Organic Zinc-Rich Primer applied at 2.5 to 3.5 my mils.
Stripe Coat Two-Component Polyamicle Epoxy applied by btush and scmbbed .into all weld seams. In addition to weld seams, all edges, comers, bolts, rivets, pits shall receive a sttipe coat.
2nd Coat Two-Component Polyamide Epoxy applied at 4.0 to 6.0 chy mils.
TotDl chy film thickness shall be a minimum of7.0 mils.
For cold weather applications, an accelerator appmved by the coating manufacturer may be submitted for use.
2.6 TANK EXfERIOR COATING SYSTEMS
A. Tb.tee-Coat Standam Urethane System:
WATER TANK.PAINTING 09800-9
1. Weld Ptepamtion: Weld flux and spatter shall be removed by power tool cleaning. Sharp projections shall be ground to a smooth contour. All welds shall be ground to a smooth contour as per NACE Standa1'd SP0178, Designation D.
2. Surface P.repamtion: SSPCSP6/NACB 3 Commercial Blast Oeaning. An angu1at profile of 1:5 to 2.5 mils as per ASTM D 4417, Method C or NACE Standa1'd RP0287 is requimL
3. Coating System:
1st Coat
2nd Coat
3rd Coat:
Organic Zinc-Rich Primer applied at 2.5 to 3.5 dry mils.
Two-Component Polyamide Epoxy applied at 4.0 to 6.0 dry mils.
(Two coats may be required if applied by roller.)
Two-Component Aliphatic Polyurethane applied at 3.0 to 5.0 dry mils, (Two coats may be required if applied by roller.)
Toml dry 61m thickness shall be a minimum of 1 t.0 mils.
For cold weather applicatiODS, an accelerator approved by the coating manu&.cturer may be submitted for use.
PART 3- EXECUTION
3.1 GENERAL
A. All sumce prcpuation, coating and painting shall confoDll to applicable standatds of the Society for Protective Coatings; NACE International and the manufacturer's printed instructions. Mataials applied to the sutface prior to the approval of the Contracting Officer Representative shall be removed and �applied to the satis&ction-of the Contracting Officer Representative at the expense of the ci:mtractor.
B. All woi:k shall be perfonned by skilled craftsmen qualified to perfmm the required wmk in a manner comparable with the best stmldards of pmctice. Continuity of peaonnel shall be coordinated wi� the Conb:3ding Officer.
C. 'The Contractor shall provide a supervisor at the wotk site during cleaning and application operations. 'The supervisor shall have the authority to sign change ordem, coordinate work and make decisions pettaining to the fulfillment of the contmct.
D. Dust, � oil, grease or any foreign matter that will affect the adhesion or dmability of the coating� paint must be removed by washing with dean rags dipped in an approved cleaning solvent and wiped dry with clean mgs.
E. Coating and painting systems include surface preparation, prime coa#ng and finish coatings.
Unless otherwise approved in wming by the Contracting Offic Representative, prime coating shall be field applied. Where prime coatings are shop app� the Contractor shall instruct suppliel:s to provide the prime coat compatible with the specified finish ooat. Any off-site wmk which does not conform to this specification, is subjected to damage during tr:ansportJ1tion, c:onstmction m insmllation shall be thmougbly cleaned and touch�-up in the field as
WATER TANKPAINTINO 09800-10
BOP41950
Highlight directed by the Contmding Officer. The Contractor shall use .repair p.rocedures which insure the complete protection of all adjacent primer. The specified tepair method and equipment may include wire-brushing, hand or power tool cleaning. or dty air bJast cleamng.
In order to prevent mjmy to surrounding painted sum~ blast cleaning may requite use of lower air pressute, smaller nozzle and/ or abrasive blast particles, or shorter blast nome distances &om surface shielding and masking. If damage is too emosive or uneconomical to touch-up, the entire item shall be blasted and then coated or painted as ditected by the Conttscting Officer.
F. The Contractor's coating and painting equipment shall be designed for application of materials specified and shall be maintained in fir:st class working condition. Compressoi:s shall have suitable traps and 6ltem to mnove water and oils 6:om the air. Contractor's equipment shall be subject to approval of the Conttacting Officer.
G. Application of the first coat shall follow immediately after surface prepamtion and cleaning and su:ipe coat, if applicable, before mst bloom occurs or the same day, whichever is less.
Any cleaned meas not .receiving first coat within this period shall be tecleaned prior to application of fust coat. Use of dehumidification equipment shall be fir:st teViewed by the Conttacting Officer and coatings manu&ctmer prior to deviating 6:om this provision.
H. Prior to assembly, all surfaces made inaccessible after assembly shall be pttpared as specified herein and shall receive the coating or paint system specified.
3.2 SURFACE PREPARATION
A. The b.test revision of the following surfiu:e preparation specifications of the Society for Protective Coatings (S&>q shall form a part of this speci.fic:ation. The trurnrnaries listed below are for informational pw:poses; consult the actual SSPC specification for full detail.
1. Solvent Cleaning (SSPC-SP1): Removal of oil, grease, soil and other contaminants by use of solver.its, emulsions, cleaning compounds, steam cleaning or similar matecials and methods which involve a solvent or cleaning action.
2. Hand Tool Oeanmg (S.5PCSP2): Removal of loose rust, loose mil scale and other detrimenml foreign matter to a degree specified by hand chipping, scraping, sanding and we-brushing
3. Power Tool Cleaning ~PC-SP3): Removal of loose rust, loose mil scale and other dettimenml foreign matter by power wire-brushing, power impact tools or power sandez:s.
4. White Metal BJast Oeaning (SSPCSPS/NACE No. 1): Air blast cleaning to a gray white uniform metallic color until each element of surface ates. is &ee of all visible residues.
S. Commetcia1 BJast Cleaning (SSPCSP6 NACE No. 3): Air blast cleaning until at least two-thu:ds of each element of sur&ce atea is free of all visible tesidues.
6. Btush-Off Blast Oeaning (SSPC-SP7 NACE No. 4): Air blast cleaning to remove loose mst, loose mil scale and other detrimental foreign matter to a dega:e specified.
WATER TANK.PAINTING 09800-11
7. Near-White Metsl Blast Cleaning (SSPCSP10 NACE No. 2): Air blast cleamng until at least 95% of each element of sur&c:e area is free of all visible residues.
8. Powu Tool Cleaning to Bare Metal (SSPC-SPt 1): .Differs &om �C-SP3 in that it requires more thorough cleaning and a sut&ce profile not less than 1 mil.
B. Slag, weld meml accumulation and spatters not removed by the Fabdcator, Erector or Instiller shall be removed by chipping and/ or grinding. All slwp edges shall be peened, ground or otherwise blunted as n:quired by the Contmcting Officer. All grinding and finishing of welds, edges, etc. shall be perfcmned prittt to solvent cleaning and abrasive blasting. Welds shall be prepared as per NACE Standatd SPOt 78 for all interior and exterior sur&ces:
1. Butt Welds: Shall be ground smooth and free of all defects, designation "D".
2. Lap Welds: Shall be ground smooth and blended. designarion "D".
3. Fillet Welded Tee Joint Shall be ground smooth and blended, designation "D".
C. F'teld blast cleaning far all sumces shall be by dry method unless otherwise directed. Blast nozzles shall be ventwi-'lfl)e nozzles with a minimum pressure at the nozzle of 90 psi.
D. Partide size of abtasives used in blast cleaning shall be that which will produce the specified sumce profile or in accotdance with .recommendations of the manufiu:turer of the specified coating or paint system to be applied.
If the pmfile of the blasted steel exceeds the profile specified above, the Contractor shall be xequired to do one or both of the following:
1. RebJast the surface using a finer aggregate in order to produce the xequired profile
2. Apply a thicker ptime coat, if possible given the Jimitations of the products being applied, in order to adequately cover the blast profile
E. Abtasive used in blast cleaning operations shall be new, washed, graded and free of contaminants that would interfere with adhesion of coating or paint and shall not be ieused unless specifically approved in writing.
F. During blast cleaning operations, caution shall be exercised to insure that existing coatings or paint are not exposed to abmsion &om blast cleaning.
G. The Contractor shall keep the area of his WOJ:k and the surrounding environment in a clean condition. He shall not pennit blasting matemls to accumulate as to constitute a nuisance or hazard to the accomplishment of the work, the operation of the ezisting facilities or to the swrounding environment.
H. Blast cleaned surfaces shall be cleaned prior to application of specified coatings or paint. All sur&ces shall be free of dust, dirt, and other residue resulting from the almsive blasting opera1ion. No coatings or paint shall be applied over damp or moist sur&ces.
I. Pitted areas on the tank interior shall be repaired by either filling with a 100% solids epoxy manufactured by the coating manufacturer and certified for use in potable water storage
WATER TANKPAJNTINO 09800-12
1Bnks as per ANSI/NSF Standard 61 or by welding. Epoxy filler shall be feathered smooth.
Filler shall be applied between the prime coat and succeeding coat. No pmtmsions or spatter will be allowed Pits deeper than 1/8" shall be filled by welding.
J. Specific Surface Preparation: Surface prepamtion for the specific system shall be as noted in Sections 2.04, 2.05 snd 2.06.
3.3 NON-VISIBLE CONTAMINANTS
A. Surface shall be checked in three locations for the presence of chlorides, free iron and sulfates. New tanks shall be tested prior to abrasive blasting, tanks being rehabilitated shall be tested prior to blasting. H blistets are present in mating tank, testing shall also be perfmmed after ahmsive blasting. These tests are an Iron Test (Pel+), Chlmide Test and Sulfate Test. Testing shall be cm:ied out as per SSPC Technology Guide 15 "Field Methods for Reb:ieval and .Analysis of Soluble Salts on Steel and Other Nonporous Substmtes". The maximum limits for these contaminants shall be:
1. The maximum level of chlorides is 3'l milligrams per square meter or 3 micrograms per square centimeter.
2. The maximum level of sul&tes is 100 milligrams pct square meter or 10 miaogr:ams per square centimeter.
3. The maximum level of ferrous ions (FeZ+) is 50 milligrams per square meter or 5 microgmms per square centimeter.
4. Conwnination levels above these limits will requite washing and tetesting in accordance with Item 2 (below) until the surface is under the allowable limits.
B. If testing shows amounts present in the test solution to be greater than the limits listed herein, the Contractor shall dean the surface of the entire tank interior with a 5,000 psi water blast with fine entrained abrasive until the levels in the test solutions are below the maximum acceptable level. Altemate cleaning methods may be allowed with prior approval of the Contracting Officer Representative Surface shall be reblasted as specified in 2.04 at no additional cost to the Owner.
C. Contractor shall provide a written statement &om paint manufacturer stating that the maximum acceptable levels are not less than those listed herein. Results of the testing shall be provided to the Owner befotc any coatings are applied.
D. The following test kits are approved for use on this project:
a. �d Chof"C'fest Kit
b. IcrA SCAT Test Kit
c. Test kits &om other vendors shall be submitted to the Contmcting Officer for prior approval before use.
E. When exterior coats are to be applied on subsequent days, or when the shroud is dropped between coats, the previously-applied coat of paint shall be thoroughly pressure-washed to remove any fallout and/ or salt that may have settled on the sw:facc.
WATER TANKPAJNTING 09800-13
3.4 APPLICATION, GENERAL
A. Coating and paint application shall confmm to the requirements of the Society fcx Protective Coatings Paint Application Specification SSPC-PAl, latest� for "Shop, Field and Maintenance Painting".
B. Thinning shall be permitted only as recommended by the manufacturer and approved by the Contracting Oficer Representative and utilizing the thinners stated in Sections 2.04, 2.05 and 2.06.
C. Each application of coating or-paint shall be applied�' &ee of bmsh muks, sags, .tuDS, with no evidence of pocx workrnaosbip. Care shall be exemsed to avoid lapping on glass ex batdwate. Coatings and paints shall be sharply cut to lines. Finished sumces shall be free from defects or blemishes.
D. Protective coverings or drop cloths shall be used to protect f1oms, fixtures and equipment.
Care shall be exercised to prevent coatings or paints from being spattered onto surmces which are not to be coated or painted. Report to the Cona:actiog Officer surfaces from which materials cannot be satisfactorily .removed.
E. When two coats of coating or paint are specified, where possible, the &st coat shall contain sufficient approved color additive to act as ao indicator of coverage or the two coats must be of contmsting color.
F. Film thickness per coat as specified in Sections 2.04, 2.05 and 2.06 are the minimum required. H roller application is deemed necessuy, the Contmctor shall apply additional coats as to achieve the specified thickness.
G. All material shall be as specified.
3.5 COATING SYSTEMS APPLICATION
A. After completion of surface prepamtion as specified for the specific system, materials shall be applied as noted in Sections 2.04, 2.05 and 2.06.
B. Care shall be taken so as to eliminate ovmpray and my spi:ay on the tank interior. Where such conditions are encountered, the smface shall be cleaned of all over spi:ay and my spray prior to the application of the succeeding coat.
C. Areas rendered inaccess1'ble after tmik erection such as the spaces between roof plates and iafters shall receive the full coating system prim to erection and/ or assembly.
D. Full prime coat may be applied directly over stripe coat while stripe coat is wet.
3.6 DISINFECTION
A. D.i.sinm:tion of interior surfaces shall be performed in the presence of the Contmcting Officer in accotdance with all the requirements of applicable AWWA Standards and .regulatory agencies.
B. Disinfection shall be perfomied after protective coatings have been applied to the interior surmces and allowed to tbmougbly cure.
WATER TANK PAINTING 09800-14