Statement_of_Work.pdf

PDF 3 MB Posted

Attached to
Paint and Replace Carpet Federal contract opportunity
Solicitation number
140P6422R0016
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to Paint and Replace Carpet, newest first.
File Type Posted
Site_Visit_Sign-in_Sheet_0002.pdf PDF
Sol_140P6422R0016_Amd_0002.pdf PDF
Questions_and_Answers_0001.pdf PDF
Sol_140P6422R0016_Amd_0001.pdf PDF
Plans_0001.pdf PDF
Past_Performance_Questionnaire.doc DOC document
Past_Performance_Questionnaire.pdf PDF
Drawings.pdf PDF
Sol_140P6422R0016.pdf PDF
Certification_of_Vaccination_Form.pdf PDF
Technical_Questionnaire.docx DOCX document
Bid_Schedule.xlsx XLSX spreadsheet
Bid_Schedule.pdf PDF
Wage_Determination.pdf PDF
Technical_Questionnaire.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Div. 1 V 5/1/2022 Page | 1

PERRY’S VICTORY &

INTERNATIONAL PEACE MEMORIAL

PUT IN BAY, OHIO

Replace Carpet and Paint Interior of Visitor Center

PMIS 232082

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

May 1, 2022

Page | 2

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 - Division 01 Short Form General Requirements

DIVISION 09 – Finishes

Section 099123 – Interior Painting Section 09 6800– Carpeting

PHOTOGRAPHS & DRAWINGS (Project photos and drawings are included in the last section of this document, as are site location and construction staging diagrams (including storage, dumpster and temporary toilet locations.)

Page | 3

SECTION 01 10 00

DIVISION 1 SHORT FORM GENERAL REQUIREMENTS

PART 1 – GENERAL

ITEM 1 - DESCRIPTION OF WORK

1.1 Background: Perry’s Victory & International Peace Memorials’ Visitor Center is in need of new carpet and paint throughout, including doors, trim, closet interiors and vaulted ceiling. Vinal covered walls in the exhibit area are excluded. Exhibits and vinal covered walls to be carefully covered during ceiling paint installation.

1.2 Work Covered by the Contract Documents:

A. Project Location:

a. Visitor Center, 180 Toledo Avenue, Put in Bay, Ohio 43456

NOTE: THE PROJECT SITE IS IN PERRY’S VICTORY AND INTERNAITONAL PEACE

MEMORIAL. THE PROJECT SITE IS ON SOUTH BASS ISLAND. ALL

TRANSPORTATION TO THE ISLAND IS VIA FERRY.

B. Work consists of: Painting approximately 14878 square feet of interior walls including doors and trim. Paint approximately 3941 square feet of ceiling including trusses. Remove and replace approximately 2,320 square feet of carpet in atrium, Theater, and bookstore.

Page | 4

1. Interior Painting:

a. Section includes surface preparation and the application of paint systems on the following interior substrates:

i. Drywall

ii. Steel and iron.

iii. Galvanized metal.

iv. Aluminum (not anodized or otherwise coated).

v. Wood (trim and interior vault ceiling and trusses)

2. Interior Tile Carpeting:

a. Removal and disposal of existing carpeting

b. Installation of modular carpet tile

C. All work will be performed under a single contract.

D. Period of performance: Work shall be completed within 180 calendar days after issuance of the

Notice to Proceed (NTP). Onsite work shall commence after Oct 15, 2022 once the visitor center closes to the General Public. No physical work is to be conducted on site prior to this date.

Project submittals and ordering of materials should commence after the issuance of the Notice to Proceed, so that materials will be in place and allow for the physical work on site to commence on or after Oct 15, 2022. Estimated award date and issuance of the Notice to Proceed is Aug/Sept 2022.

ITEM 2 - EXISTING UTILITIES

2.1 Existing Utilities: Notify Contracting Officer (CO), Contracting Officer’s Representative (COR) and utility companies to coordinate proposed locations, times for excavation and request location services prior to any digging operation.

2.2 Contractor shall be responsible for locating and preventing damage to known utilities. If contractor damage occurs, alert CO and COR as soon as safely possible, and repair utility at no additional expense to the Government. If damage occurs to an unknown utility, contact CO and COR as soon as safely possible.

2.3 Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated below:

2.3.1 Notify CO and COR not less than two business days in advance of proposed utility interruptions.

2.3.2 Hours for Utility Shutdowns: Shut downs shall not exceed 2 to 3 hours. Temporary provisions will be needed by the Contractor for periods longer than stated allowance or if required for critical systems as determined by COR.

Page | 5

ITEM 3 - CONTRACTOR’S USE OF PREMISES

3.1 Conduct of Operations: At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent. Those rules are to be found in the Superintendent’s Compendium.

A. No signs or advertisements (except those specified herein and as required for safety) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

B. Smoking is not permitted within any Federal building or within 25 feet of entrances, operable windows, or outdoor air intakes.

C. Public Use of Site: Contractor shall at all times conduct operations to ensure the least inconvenience to the public.

3.2 On-site work hours: Work shall be generally performed during normal business working hours of 8 a.m. to 5 p.m., Monday through Friday, except when otherwise indicated.

A. Work on Saturdays, Sundays, Federal holidays, early morning, or at night may not be performed without prior consent from the CO and COR. Submit requests for work outside of the stated normal business hours to the CO and COR for approval at least 48 hours in advance of the work.

The following Federal holidays are observed by the National Park Service:

New Year Day Martin Luther King, Jr’s Birthday Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

B. Note: Any of the above holidays falling on a Saturday will be observed on the preceding Friday;

holidays falling on Sunday will be observed on the following Monday. The specific day that each holiday is recognized for each year can be found at the following site: Federal Holidays (opm.gov).

3.3 Contractor Use of Site:

A. General: Contractor shall have limited use of the site for construction operations. Limit use of premises to construction area as shown on site plan. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Limits: This project involves the removal and replacement of interior carpeting and interior paint in the Visitor Center., storage and dumpsters are limited to the areas outlined on the site plan in

Page | 6

Photographs section of this document. All work is interior to the Visitor Center. The contractor is limited to the interior of the building and designated storage areas.

C. Driveways and Entrances: Keep driveways, access roads, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Schedule deliveries to minimize use of driveways and entrances.

D. Limit site disturbance, including building perimeters, dumpster, storage areas and shingle waste.

a. Dumpsters, toilets, waste and storage must be located on pavement as indicated on the site plan.

E. Utilities

a. General: N/A.

b. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Use resources wisely and minimize waste of water.

c. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations without any additional permit costs. Power may or may not meet your construction power tool requirements, provide generators if questionable. Use power in a resourceful manner and avoid excess power waste.

d. Toilets: Contractor provided for contracting personnel, sufficiently lighted and ventilated toilet facilities in weatherproof, sight proof, handicap accessible (if required), sturdy enclosures with privacy locks. Coordinate with COR for approved location if not shown on attached site plan.

F. Security and Protection facilities:

1. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with state and federal environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

3. Cleaning of Equipment: The Contractor shall ensure that prior to moving on to the Project Area, all equipment, is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Ensure that all equipment has been pressure washed and is free of exotic species prior to start-up of operations and moving of equipment to Project Area. Equipment shall be considered free of soil, seeds, and other debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools are not required.

4. Tree and Plant Protection: N/A

5. Pest Control: N/A

6. Site Enclosure Fence: N/A

7. Security Enclosure and Lockup: N/A

8. Temporary Enclosures: N/A

Page | 7

3.4 Storage - Staging Areas:

A. Confine Storage of materials and equipment to the project staging area noted on the plans/aerial. No cost specific storage and staging area’s may be discussed at the preconstruction briefing. See site location map in the appendix of this document for specific location.

3.5 Preservation of Natural Features: N/A

3.6 Hauling Restrictions: Contractor to verify path to site and meet state and county road requirements and height restrictions for all park work/access.

3.7 Housekeeping:

A. Keep project neat, orderly, and in a safe condition at all times.

a. Dispose of waste materials and recycling legally outside the park. The contractor shall not use park dumpsters

b. Address Recycling: Government goal is to salvage and recycle as much nonhazardous construction waste as possible. Use sustainable methods to extent possible during this project, recycling material as is probable with local means. Maintain accurate documentary records for submittal of all recycled materials used including fly ash and slag cement.

3.8 Occupancy Requirements for Buildings:

A. Existing Buildings:

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO or COR.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

c. Schedule space or area closures inside the Visitor Center for painting or carpet activities with the COR at least one week in advance so the park staff can accommodate the contractor needs to complete the work.

B. New Buildings/Existing Buildings Unoccupied: N/A

3.9 Photo Documentation: Contractor must provide existing condition, progress and completion photos. All photos shall be in focus, show maximum range of depth of field general photo and then close up detail photo as needed. Shall be in JPEG digital form and submitted electronically by email or via CD- R Archival Gold or DVD-R Archival Gold media with printed labels and 8 mega pixels minimum within 7 days from time of taken or as approved by COR.

Page | 8

A. Existing Condition Images:

Before starting construction, take color, dated, digital images of project site and adjacent property/roads/etc. that may be impacted by construction activity/traffic. Include existing items to remain or be salvaged from different vantage points and with context for location identification.

B. Construction Progress Images:

1. Document all sub-surface work/ trenches etc. prior to backfill with photos covering enough overall field view to show location and then zoom in for details. (Locations and dimensions shall also be noted on as built drawing set.)

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

C. Completion Images:

1. Document all completed work within scope of work.

2. Maintain organized index for photos with date, description, etc..

3. Additional images as needed when questions or emergency situations occur. Submit within 24 hours.

3.10 Fire and Life Safety: As a minimum, conduct one weekly 15 minute "toolbox" safety meetings.

These meetings shall be conducted by a foreman or supervisor and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the following week. Document and submit meeting minutes to the CO and COR within one day after the meeting and document the meetings on the daily reports.

A. Comply with the requirements of NFPA 241 (Standard for Safeguarding Construction, Alteration, and Demolition Operations). Take all necessary precautions to prevent fire during construction. Provide adequate ventilation during use of volatile or noxious substances.

B. Store and handle hazardous materials in accordance with manufacturer’s and OSHA 29CFR1926 Subpart D requirements 1926 | Occupational Safety and Health Administration (osha.gov). Maintain readily available, on site, MSDS/Safety Data Sheets (SDS) for each chemical.

i. Immediately report all spills of hazardous materials to the CO, COR and park.

ii. Maintain a spill emergency response kit.

iii. Train employees how to respond to a spill and use the emergency response kit.

3.11 Noise and Acoustics Management

A. Noise Control: Perform demolition, installation and clean-up operations to minimize noise.

Perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer or COR.

Page | 9

B. Repetitive and/or intermittent, high-level noise: Permitted only during Daytime.

1. Do not exceed the following dB(A) limitations at 50 feet:

Sound Level in dB(A) Time Duration of Impact Noise 70 More than 12 minutes in any hour 80 More than 3 minutes in any hour

2. Maximum permissible construction equipment noise levels at 50 feet:

EARTHMOVING dB(A) MATERIALS HANDLING dB(A) Compressors 75 Pneumatic Tools 80 Pumps 75 Saws 75 Generators 75 Vibrators 75

C. Ambient Noise:

1. Maximum noise levels (dB) for receiving noise area at property line shall be as follows:

a. Residential receiving area :

Daytime: 65 dB Nighttime: 45 dB

b. Commercial/Industrial receiving area:

Daytime: 67 dB Nighttime: 65 dB

ITEM 4 - COMMENCEMENT, PROSECUTION, AND COMPLETION

4.1 The Contractor shall commence work in accordance with the terms and conditions of the contract.

Contractor shall coordinate and incorporate long lead and delivery time items within the schedule.

ITEM 5 - EXAMINATION OF THE SITE

5.1 All bidders are urged to visit the job site and examine existing conditions before submitting bids.

Contractors will be accountable for understanding existing conditions. No cost changes for items viewable during site visit will be allowed.

Page | 10

ITEM 6 - ABBREVIATIONS

6.1 The list of abbreviations, standards and organizations which may be used in/referred within the Construction Specifications or Special Provisions, may be found linked from the listed page below. On the home page, follow the link under “Contracting and Procurement” labeled “NPS Reference Standards.”

https://www.nps.gov/orgs/1671/do-business-with-us.htm

ITEM 7 - ACCIDENT PREVENTION

7.1 Description: The work of this section consists of establishing and implementing an effective accident prevention program (APP) and providing a safe environment for all personnel and visitors.

7.2 Submittals:

A. Accident Prevention (Safety) Plan (APP): Submit a site specific accident prevention (safety) plan. The Plan shall be written to comply with OSHA and project requirements (a generic plan is not acceptable) including but not limited to the following:

1. Name and qualifications of responsible supervisor to carry out the program.

2. First aid and rescue procedures.

3. Training, both initial and continuing.

4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to provide for property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase, with a Job Hazard Analysis (JHA)/Job Safety Analysis (JSA), etc. A sample JHA template may be provided upon request.

5. Planning for possible emergency situations, such as cave-ins, earthquake, explosions, fires, floods, power outages, slides, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.

6. Contractor to identify nearest location of medical facility for emergencies

7. Recognition that work will be performed in remote areas with limited communication or cell phone coverage if applicable.

8. Supplemental hazard specific plans may be required IAW 29 CFR 1926 or 1910.

B. Meeting and Inspection Reports: Safety Meetings: As a minimum, conduct 15 minute

"toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite. Submit a report of safety meetings and inspections to CO and COR within one day after the meeting and document the meetings on the daily reports.

7.3 Qualification of Employees:

A. Ensure that employees are physically qualified to perform their assigned duties in a safe manner to include operators of vehicles and equipment. Provide operating instructions for all equipment.

Page | 11

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

7.4 Accident Reporting: The Contractor shall report all accidents to the CO and COR as soon as safely possible and assist the CO and COR and other officials as required in the investigation of the accident.

7.5 First Aid Facilities: Provide access to facilities for the number of employees and appropriate to the hazards associated with the types of ongoing construction work at the site.

7.6 Emergency Instructions: Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.

7.7 Personal Protective Equipment (PPE): It is the Contractor's responsibility to require all those working on or visiting the site to wear necessary protective equipment at all times.

A. PPE must meet requirements of applicable ANSI standards. Selection shall conform to OSHA 29CFR 1926 Subpart E.

B. A hard hat use area shall be designated by the Contractor. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.

C. All PPE will be serviceable at all times. At a minimum, maintain four sets of PPE including hard hats and all other Accident Prevention Plan required equipment.

7.8 Hazardous Materials: It shall be the responsibility of all operators and contractors, functioning within the park to properly cleanup, mitigate and remediate if necessary, all unauthorized discharges of hazardous materials or non-hazardous chemical and biological products released from fleet and/or other support vehicles or stationary sources. Response shall be consistent with guidelines established by federal, state and local regulations, and as outlined within the operator's Safety or Hazardous Materials Business Plan.

A. If a spill, leak or other release occurs, the operator shall as soon as possible, without impeding cleanup, notify the National Park Service Emergency Dispatch.

ITEM 8 - PRECONSTRUCTION CONFERENCE: If the Contracting Officer decides to conduct a preconstruction conference, the successful offeror will be notified and will be required to attend. The

Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed. See Item 9.1C below.

ITEM 9 - SUBMITTALS

9.1 General Submittal Procedures:

A. General: Prepare and submit submittals required by individual Technical Specification Sections. Types of submittals are indicated in individual specific sections.

1. CM-16 Transmittal Form: All submittals shall be transmitted via electronic email using

National Park Service form CM-16 form. The form will be provided by the Contracting

Page | 12

Officer. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Submit completed CM-16 forms to the CO and the COR

B. Submittal List: administrative required submittals are listed below in 9.1.C and does not include technical section submittal requirements included in each technical section.

C. Preconstruction Conference Submittal: Satisfactory evidence of liability insurance coverage and workman’s compensation, and any applicable bonds, must be submitted within 10 calendar days of Notice of Award. The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed may not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued. Contracting Officer will notify Contractor of tentative date for the Pre- Construction Conference:

1. Letter designating Project Superintendent.

2. Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention (Safety) Plan (see section 7 of this document).

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses (SF1413).

7. Quality Control Plan.

8. Waste Management Plan. The Park is located on an island and the contractor is responsible for the disposal of all construction debris and waste. State of Ohio regulations for the disposal of liquids must be strictly followed.

9.2 Shop Drawings, Product Data, and Samples: Contracting Officer will provide sample cover sheet.

A. Shop Drawings: Indicate all coordinating materials and work impacting the installation coordination, connection details, anchorage requirements, hardware locations, and installation details and locations.

1. Submit Shop Drawings according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and two full size hardcopy documents to COR.

B. Product Data: Provide component construction and specification data sheets, anchorage requirements and any other product specific data.

1. Submit Product Data according to Part 9.1 of this section to include one digital file (.PDF or .TIF) to COR.

C. Samples: Submit 2 color samples 4” x 6” minimum in size for all color and product selection. Paint samples shall be actual paint finish drawdown for all project colors.

1. Submit Samples CM-16 Transmittal Form according to Part 9.1 of this section to include one digital file (.PDF or .TIF) and physical samples of actual material to COR.

Page | 13

D. For submittals specified above, forward submittals to Contracting Officer and COR at least 15 days before need for approval (depends on length of project).

E. After approving submittals, Contracting Officer and/or COR will return one copy to the Contractor.

If submittals are not approved, Contracting Officer will return all copies to Contractor with reasons for rejection. Resubmit, identifying changes. Any work done before approval shall be at Contractor's own risk.

9.3 Approved Equals: If an item in this solicitation is identified as “brand name or equal” or lists more than 1 manufacturer, the description of the proposed item must reflect the characteristics and level of quality that will satisfy the Government’s needs as demonstrated by the salient physical, functional, or performance characteristics that “equal” products must meet and/or exceed that as specified in the solicitation or relevant specification.

A. For each item proposed as an “approved equal,” submit supporting data, including:

1. Drawings and samples as appropriate.

2. Comparison of the characteristics of the proposed item with that specified and with the salient characteristics provided.

3. Changes required in other elements of the work because of the substitution.

4. Name, address, and telephone number of vendor.

5. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.

B. A request for approval constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

C. Approved Equals will be evaluated and approved/disapproved during the submittal process.

9.4 Progress Reporting: The initial Construction Schedule and Schedule of Values are required a minimum of one week prior to the Preconstruction Conference. After the Notice to Proceed is issued and after on-site work begins, progress will be documented via daily logs and by providing an updated Construction Schedule and Schedule of Values when requested, but minimally with each pay application.

Submit digital copy electronically (PDF preferred) of all required documents. Construction Schedules are normally in bar chart form and indicate estimated starting and completion dates for each part of the work.

For a pay application to be reviewed and processed in a timely manner, the following information must either be submitted prior to or accompany submission of the pay application:

A. Daily/weekly progress reports during construction as part of the administration process.

Page | 14

B. Updated Schedule of Values: Breakdown each lump-sum item into component work activities used in the schedule, for which progress payments may be requested. The Schedule of Values will form the basis for payment. The work activities broken out within the schedule of values shall be integrated into and made a logical part of the construction baseline schedule submitted under this specification. The total costs for the component work activities shall equal the contract price for that lump-sum item. The Contracting Officer may request data to verify accuracy of dollar values. A sample Schedule of Values format may be provided upon request.

ITEM 10 – TEMPORARY SERVICES

10.1 It is the Contractor’s responsibility to provide temporary services, equipment, tools, and skilled labor as required for the chosen means and methods to perform the work in accomplishing this Contract.

ITEM 11 - PROJECT CLOSEOUT

11.1 Description: The work of this section consists of final cleanup, closeout submittals, final inspection procedures working toward Final Acceptance.

11.2 Cleaning: Remove all tools, equipment, surplus materials, and rubbish. Move attic stock to location coordinated with COR. At time of final inspection, project shall be thoroughly clean and ready for intended use. Inspector holds the right to reschedule if project is not ready for inspection.

11.3 Completion and Final Inspection: Contractor shall submit written certification of project completion and request a final inspection to the Contracting Officer and COR. The Contracting Officer or designee will make an inspection within 10 days of receipt of request or at a mutually agreeable time.

A. If the work is determined to be complete following the final inspection with minor comments, the

COR will prepare and provide the Contractor a Punch List noting outstanding items to be addressed.

B. If the work is not determined to be complete following the final inspection, the Contracting Officer will notify Contractor in writing, stating reasons. Contractor, after completing the work according to the Contract Documents, shall resubmit completion and request a new final inspection. Re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction contract clause.

C. Contractor shall complete the Punch List within 30 calendar days or a time directed by the CO.

D. Once Contractor completes all items of work on the Punch List and all contractually required items are accepted, Contracting Officer will issue Letter of Final Acceptance of Work and request the final pay application.

E. If the Contractor fails to complete the work within the time frame, the Contracting Officer may correct the work with an appropriate reduction in contract price or charge for re-inspection costs in accordance with the Inspection of Construction contract clause.

F. Disposition of any permits and warranties required by the specifications in this section.

Page | 15

11.4 Final Acceptance of the Work: After all punch list deficiencies have been corrected, a Letter of Final Acceptance will be issued. A Release of Claims document must be executed and submitted to the Contracting Officer before final payment can occur.

11.5 Warranties

A. Construction Warranty shall be based on date of final acceptance of the work and remain in effect for one year.

B. Provide all manufacturer warranty information of products installed organized by Division. All contact information, extent of coverage and conditions shall be clearly noted as well as date of overall final acceptance.

C. Information shall include operation and maintenance manuals for each warranted product.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXCUTION (NOT USED)

END OF SECTION

PEVI PMIS 232082 5/4/2022

TILE CARPETING 096813 Div. 9 V. 2021-10-18 Page | 16

SECTION 096813

TILE CARPETING

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. Project Location: Perry’s Victory and International Peace Memorial

B. Building(s) Name/Identifier: Visitor Center, 180 Toledo Avenue, 43456

1.2 SUMMARY

A. Section Includes:

1. Modular carpet tile.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For carpet tile installation, plans showing the following:

1. Columns, doorways, enclosing walls or partitions, built-in cabinets, and locations where cutouts are required in carpet tiles.

2. Carpet tile type, color, and dye lot.

3. Type of subfloor (retain existing)

4. Type of installation.

5. Pattern of installation.

6. Type, color, and location of edge, transition, and other accessory strips.

7. Transition details to other flooring materials.

C. Samples: For each exposed product and for each color and texture required.

1.5 INFORMATIONAL SUBMITTALS

A. Product test reports.

B. Sample warranty.

C. Product Data: For adhesives, indicating VOC content of 50 g/L or less.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance data.

Page | 17

1.7 QUALITY ASSURANCE

A. Installer Qualifications: Certified by the International Certified Floorcovering Installers Association at the Commercial II certification level.

1.8 WARRANTY

A. Special Warranty for Carpet Tiles: Manufacturer agrees to repair or replace components of carpet tile installation that fail in materials or workmanship within specified warranty period.

1. Warranty Period: 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 CARPET TILE-WALK OFF

A. Basis of Design: Basis of Design: Mohawk Group QL315 First Step II Tile

1. Products of other manufacturers in compliance with criteria are acceptable based on prior approval by Contracting Officer’s Representative (COR).

a. Acceptable Manufacturers:

1) J&J Industries

2) Interface

3) Mohawk

4) Tarkett (formerly Tandus-Centiva)

5) Other Approved Equals

B. Construction: Tufted.

C. Color: To match existing as selected by Contracting Officer’s Representative (COR) from manufacturer’s full range.

D. Fiber Type: Duracolor Premium Nylon.

E. Pile Characteristic: Loop.

F. Density: 6,739 oz./cu. yd.

G. Pile Thickness: 0.203 inches

H. Dye Method: Solution Dyed.

I. Stitches: 8.5 per inch.

J. Gauge: 5/32 (6.4 rows per inch of width).

K. Tufted Pile Weight: 38.0 oz/sq. yd.

L. Backing System: EcoFlex ICT consisting of polyester fabric primary backing, fiberglass scrim, pre-coat polymer and vinyl backing.

Page | 18

M. Size: 24 by 24 inches.

N. Applied Treatments:

1. Soil Release Treatment: Sentry Soil Protector

2. Stain Release Rating: GSA pass.

O. Sustainable Design Requirements:

1. Sustainable Product Certification: Gold level certification according to ANSI/NSF 140.

P. Performance Characteristics:

1. Appearance Retention Rating: Severe traffic, 3.5 minimum according to ASTM D7330.

2. Flammability: ASTM E 648 Class I (glue down)

3. Smoke Density: ASTM E 662 less than 450.

4. Electrostatic Propensity: Less than 3.5 kV according to AATCC 134.

2.2 CARPET TILE GENERAL

A. Basis of Design: Tarkett Aftermath II

1. Products of other manufacturers in compliance with criteria are acceptable based on prior approval by Contracting Officer’s Representative (COR).

a. Acceptable Manufacturers:

1) J&J Industries

2) Interface

3) Mohawk

4) Tarkett (formerly Tandus-Centiva)

5) Other approved equals

B. Construction: Patterned Loop

C. Color: As selected by Contracting Officer’s Representative (COR) from manufacturer’s full range.

D. Fiber Type: Dynex SD Nylon.

E. Density: 7,556 oz./cu. yd.

F. Total Thickness: 0.280 inches

G. Dye Method: 90% Solution Dyed / 10% Yarn Dyed

H. Stitches: 8.5 per inch.

I. Gauge: 5/64

J. Tuft Density: 108.8 tufts/ sq. in.

K. Face Weight: 17.0 oz/sq. yd.

Page | 19

L. Backing System: Modular ethos with Omnicoat Technology with synthetic non-woven primary backing.

1. Total Weight: 94.9 oz./sq. yd. +/- 5%

2. Delamination: No delamination per ASTM D3936

M. Size: 24 by 24 inches.

N. Applied Treatments:

1. Soil Release Treatment: Sentry Soil Protector

2. Stain Release Rating: GSA pass.

O. Sustainable Design Requirements:

1. Sustainable Product Certification: Platinum level certification according to

ANSI/NSF 140.

P. Performance Characteristics:

1. Appearance Retention Rating: Severe traffic, 3.5 minimum according to ASTM D5252.

2. Flammability (Flooring Radiant Panel: ASTM E 648 Class I (glue down)

3. Smoke Density: ASTM E 662 less than 450.

2.3 INSTALLATION ACCESSORIES

A. Trowelable Leveling and Patching Compounds: Latex-modified, hydraulic-cement-based formulation provided or recommended by carpet tile manufacturer.

B. Adhesives: Water-resistant, mildew-resistant, non-staining, pressure-sensitive type to suit products and subfloor conditions indicated, that comply with flammability requirements for installed carpet tile, and are recommended by carpet tile manufacturer for releasable installation.

1. Adhesives shall have a VOC content of 50 g/L or less.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Concrete Slabs:

1. Moisture Testing: Perform tests so that each test area does not exceed 1000 sq. ft.

(304.8 sq. m), and perform no fewer than three tests in each installation area and with test areas evenly spaced in installation areas.

a. Anhydrous Calcium Chloride Test: ASTM F1869. Proceed with installation only after substrates have maximum moisture-vapor-emission rate of 3 lb of water/1000

sq. ft. (1.36 kg of water/92.9 sq. m) in 24 hours.

b. Relative Humidity Test: Using in situ probes, ASTM F2170. Proceed with installation only after substrates have a maximum 75 percent relative humidity level measurement.

Page | 20

c. Perform additional moisture tests recommended in writing by adhesive and carpet tile manufacturers. Proceed with installation only after substrates pass testing.

B. Wood Subfloors: Verify that underlayment surface is free of irregularities and substances that may interfere with adhesive bond or show through surface.

C. Painted Subfloors: Perform bond test recommended in writing by adhesive manufacturer.

3.2 PREPARATION

A. General: Comply with the Carpet and Rug Institute's CRI 104 and with carpet tile manufacturer's written installation instructions for preparing substrates indicated to receive carpet tile.

B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions, to fill cracks, holes, depressions, and protrusions in substrates. Fill or level cracks, holes and depressions 1/8 inch (3 mm) wide or wider, and protrusions more than 1/32 inch (0.8

mm) unless more stringent requirements are required by manufacturer's written instructions.

C. Concrete Substrates: Remove coatings, including curing compounds, and other substances that are incompatible with adhesives and that contain soap, wax, oil, or silicone, without using solvents. Use mechanical methods recommended in writing by adhesive and carpet tile manufacturers.

D. Broom and vacuum clean substrates to be covered immediately before installing carpet tile.

3.3 INSTALLATION

A. General: Comply with the Carpet and Rug Institute's CRI 104, Section 10, "Carpet Tile," and with carpet tile manufacturer's written installation instructions.

B. Installation Method: As recommended in writing by carpet tile manufacturer.

C. Maintain dye-lot integrity. Do not mix dye lots in same area.

D. Maintain pile-direction patterns of ashlar with the pattern and texture all going in the same direction and the end joints staggered by ½ the width of the tiles as recommended in writing by carpet tile manufacturer.

E. Cut and fit carpet tile to butt tightly to vertical surfaces, permanent fixtures, and built-in furniture including cabinets, pipes, outlets, edgings, thresholds, and nosings. Bind or seal cut edges as recommended by carpet tile manufacturer.

F. Extend carpet tile into toe spaces, door reveals, closets, open-bottomed obstructions, removable flanges, alcoves, and similar openings.

G. Maintain reference markers, holes, and openings that are in place or marked for future cutting by repeating on carpet tile as marked on subfloor. Use nonpermanent, non-staining marking device.

H. Install pattern parallel to walls and borders.

I. Protect carpet tile against damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by carpet tile manufacturer.

PEVI 232082 May 6, 2022

INTERIOR PAINTING Div. 9 V. 2021-10-18 099123 Page | 21

SECTION 099123

INTERIOR PAINTING

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. Project Location: Perry’s Victory

B. Building(s) Name/Identifier: Visitor Center, 180 Toledo Avenue, Put in Bay, OHIO 43456

C. Section includes surface preparation and the application of paint systems on the following interior substrates:

1. Steel and iron.

2. Galvanized metal.

3. Aluminum (not anodized or otherwise coated).

4. Wood.

5. Gypsum board.

1.2 DEFINITIONS (Master Painters Institute-MPI)

A. Master Painters Institute (MPI) (http://www.specifypaint.us & http://paintinfo.com/)

B. MPI Gloss Level 1: Not more than five units at 60 degrees and 10 units at 85 degrees, according to ASTM D 523.

C. MPI Gloss Level 2: Not more than 10 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D 523.

D. MPI Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D 523.

E. MPI Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to ASTM D 523.

F. MPI Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D 523.

G. MPI Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D 523.

H. MPI Gloss Level 7: More than 85 units at 60 degrees, according to

ASTM D 523.

099123 Page | 22

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product. Include preparation requirements and application instructions.

1. Include Printout of current "MPI Approved Products List" for each product category specified, with the proposed product highlighted.

2. Include Safety Data Sheets (SDS).

B. Samples: For each type of paint system and in each color and gloss of topcoat.

1.4 QUALITY ASSURANCE

A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for materials and execution.

1. Contracting Officer’s Representative (COR) will select one surface to represent surfaces and conditions for application of each paint system.

a. Vertical and Horizontal Surfaces: Provide samples of at least 9 sq. m

(100 sq. ft.).

b. Other Items: COR will designate items or areas required.

2. Final approval of color selections will be based on mockups.

a. If preliminary color selections are not approved, apply additional mockups of additional colors selected by COR at no added cost to Owner.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. MPI Listing Manufacturers as shown on the MPI Approved Products Lists.

B. Products: Subject to compliance with requirements, provide product listed in the Interior Painting Schedule for the paint category indicated.

2.2 PAINT, GENERAL

A. MPI Standards: Products shall comply with MPI standards indicated and shall be listed in its "MPI Approved Products Lists."

B. Material Compatibility:

1. Materials for use within each paint system shall be compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

099123 Page | 23

2. For each coat in a paint system, products shall be recommended in writing by topcoat manufacturers for use in paint system and on substrate indicated.

C. Colors: As selected by Contracting Officer’s Representative (COR) from manufacturer's full range.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates and conditions, with Applicator present, for compliance with requirements for maximum moisture content and other conditions affecting performance of the Work.

B. Maximum Moisture Content of Substrates: When measured with an electronic moisture meter as follows:

1. Concrete: 12 percent.

2. Fiber-Cement Board: 12 percent.

3. Masonry (Clay and CMUs): 12 percent.

4. Wood: 15 percent.

5. Gypsum Board: 12 percent.

6. Plaster: 12 percent.

C. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

D. Proceed with coating application only after unsatisfactory conditions have been corrected.

1. Application of coating indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Comply with manufacturer's written instructions and recommendations in "MPI Maintenance Repainting Manual" applicable to substrates and paint systems indicated.

B. Remove hardware, covers, plates, and similar items already in place that are removable and are not to be painted. If removal is impractical or impossible because of size or weight of item, provide surface-applied protection before surface preparation and painting.

1. After completing painting operations, use workers skilled in the trades involved to reinstall items that were removed. Remove surface-applied protection if any.

099123 Page | 24

C. Clean substrates of substances that could impair bond of paints, including dust, dirt, oil, grease, and incompatible paints and encapsulants.

1. Remove incompatible primers and reprime substrate with compatible primers or apply tie coat as required to produce paint systems indicated.

D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces to be painted exceeds that permitted in manufacturer's written instructions.

E. Masonry Substrates: Remove efflorescence and chalk. Do not paint surfaces if moisture content or alkalinity of surfaces or mortar joints exceeds that permitted in manufacturer's written instructions.

F. Shop-Primed Steel Substrates: Clean field welds, bolted connections, and areas where shop paint is abraded. Paint exposed areas with the same material as used for shop priming to comply with SSPC-PA 1 for touching up shop-primed surfaces.

G. Galvanized-Metal Substrates: Remove grease and oil residue from galvanized sheet metal by mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently applied paints.

H. Aluminum Substrates: Remove loose surface oxidation.

I. Wood Substrates:

1. Scrape and clean knots, and apply coat of knot sealer before applying primer.

2. Sand surfaces that will be exposed to view, and dust off.

3. Prime edges, ends, faces, undersides, and backsides of wood.

4. After priming, fill holes and imperfections in the finish surfaces with putty or plastic wood filler. Sand smooth when dried.

3.3 APPLICATION

A. Apply paints according to manufacturer's written instructions and recommendations in "MPI Maintenance Repainting Manual."

1. Use applicators and techniques suited for paint and substrate indicated.

Brush and roller application is permitted. Spray is not permitted without written permission from the COR.

2. Paint surfaces behind movable equipment and furniture same as similar exposed surfaces. Before final installation, paint surfaces behind permanently fixed equipment or furniture with prime coat only.

3. Paint front and backsides of access panels, removable or hinged covers, and similar hinged items to match exposed surfaces.

099123 Page | 25

4. Do not paint over labels of independent testing agencies or equipment name, identification, performance rating, or nomenclature plates.

5. Primers specified in painting schedules may be omitted on items that are factory primed or factory finished if acceptable to topcoat manufacturers.

B. If undercoats or other conditions show through topcoat, apply additional coats until cured film has a uniform paint finish, color, and appearance.

C. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color breaks.

D. Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety and Security Work:

1. Paint the following work where exposed in equipment rooms:

a. Equipment

b. Pipe hangers and supports.

c. Metal conduit.

d. Plastic conduit.

e. Duct, equipment, and pipe insulation having cotton or canvas insulation covering or other paintable jacket material.

3.4 CLEANING AND PROTECTION

A. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

B. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by COR, and leave in an undamaged condition.

C. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

099123 Page | 26

INTERIOR GLOSS SCHEDULE

Area Gloss Level

Restrooms MPI Gloss Level 5:

Trim MPI Gloss Level 6:

Tier One MPI Gloss Level 5:

Tiers 2 & 3 MPI Gloss Level 1:

Bookstore and Ranger Desk

MPI Gloss Level 5:

Exhibit Ceiling MPI Gloss Level 1

Atrium Ceiling MPI Gloss Level 1

Atrium Beams MPI Gloss Level 3

Theatre Ceiling MPI Gloss Level 1

Restroom Ceilings MPI Gloss Level 1

Theater MPI Gloss Level 3-4

Closet and storage areas

MPI Gloss Level 1

099123 Page | 27

3.5 INTERIOR PAINTING SCHEDULE

A. Steel Substrates:

1. High-Performance Architectural Latex System MPI INT 5.1RR:

a. Prime Coat: Primer, alkyd, anti-corrosive, for metal, MPI #79.

Refer to Gloss Schedule

b. Topcoat: Latex, interior, high performance architectural (MPI Gloss

Level 3), MPI #139.

c. Topcoat: Latex, interior, high performance architectural (MPI Gloss

Level 4), MPI #140.

d. Topcoat: Latex, interior, high performance architectural, semi-gloss

(MPI Gloss Level 5), MPI #141.

PHOTO OF ATRIUM

INTERIOR SHOW THREE

LEVELS, LABLED TIERS.

EACH TIER RUNS FROM THE

TOP OF THE SOFIT DOWN TO

THE TIER BELOW, OR FOR

TIER ONE TO THE BASE

BOARDS.

099123 Page | 28

B. Galvanized-Metal Substrates:

1. High-Performance Architectural Latex System MPI INT 5.3J:

a. Prime Coat: Primer, galvanized, water based, MPI #134.

Refer to Gloss Schedule

b. Topcoat: Latex, interior, high performance architectural (MPI Gloss

Level 3), MPI #139.

c. Topcoat: Latex, interior, high performance architectural (MPI Gloss

Level 4), MPI #140.

d. Topcoat: Latex, interior, high performance architectural, semi-gloss

(MPI Gloss Level 5), MPI #141.

C. Wood Substrates: Glued-laminated construction.

1. Institutional Low-Odor/VOC Latex System MPI INT 6.1Q:

a. Prime Coat: Primer, latex, for interior wood, MPI #39.

b. Atrium Ceiling: Topcoat: Latex, interior, institutional low odor/VOC, flat (MPI Gloss Level 1), MPI #143.

c. Atrium Beams: Topcoat: Latex, interior, institutional low odor/VOC

(MPI Gloss Level 3), MPI #145.

d. Topcoat: Latex, interior, institutional low odor/VOC (MPI Gloss

Level 4), MPI #146.

D. Wood Substrates: Dressed Wood (trim, Architectural woodwork, Doors, Windows, and wood board paneling).

1. Institutional Low-Odor/VOC Latex System MPI INT 6.3V:

a. Prime Coat: Primer, latex, for interior wood, MPI #39.

b. Topcoat: Latex, interior, institutional low odor/VOC, gloss (MPI Gloss

Level 6), MPI #148.

c. Topcoat: Latex, interior, high performance architectural, semi-gloss

(MPI Gloss Level 5), MPI #141.

E. Wood Substrates: Wood paneling and casework.

1. Institutional Low-Odor/VOC Latex System MPI INT 6.4T:

a. Prime Coat: Primer,…