Statement of Work - 81 CS Antenna Repair and Maintenance.pdf
PDF 152 KB Posted
- Attached to
- 81 CS Antenna Tower Maintenance and Repair
- Solicitation number
- FA301021Q0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Information.pdf | ||
| Wage Determination - (06 August 2021).pdf | ||
| Solicitation - FA301021Q0022 - CO Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Repair all discrepancies associated with antennas at the following bldgs. 4330 Keesler Command Post and 4241 (35’ tower) behind the Fire Dept. The required work should be in compliance with industry standards. A report of the discrepancies at each location will be provide by 81 CS Transmission Systems Work Center.
The Contractor shall complete the following for the antenna at Bldg. 4241:
Properly re-secure all coaxial cables to tower
Inspect the RF coaxial surge protection grounding (PFAS) system and provide in writing any fix actions if discrepancies are identified
Add grounding kits to 15 cables and change out 1-hole lugs for 2-hole lugs
Add messenger cable support system
Remove bad antenna and associated line at top of tower
Identify and label cables (with brass tags and/or vinyl labels on both ends)
Upgrade ground bus bar to larger size, re-bond all ground lead connections with antioxidant, and install polyphasers to each cable
Cut off excessive bolt length on antenna stand-off bracket
Install (2) four port combiners in existing racks
All work is to be performed on the exterior of the building with the exception of tracing/labeling lines inside the building
The contractor shall complete the following for the antenna at Bldg. 4330:
Remove 22 unused antennas, masts, and cables
Clean up and reorganize remaining cables along rooftop and mount to building wall
Identify and label cables (with brass tags and/or vinyl labels on both ends)
Add grounding kits to 17 cables
Add ground bus bars at both entry ports and bond to existing roof ground system
Add entry port boots to both entry port;
• Add 12x12 or larger RF warning signs to building
• All work is to be performed on the exterior of the building with the exception of tracing/labeling lines inside the building
• All scrap cable/mast/antennas shall be recycled on base or left with customer
• All work can be performed on the roof from ladders and shall not require a man-lift
All quotes should include hardware, on-site service labor and travel expenses.