Statement of Need.doc
DOC document 41 KB Posted
- Attached to
- B1000 Cubicle Stackers Federal contract opportunity
- Solicitation number
- FA4600_B1000_Cubicle_Stackers
About this file
This document is a combined synopsis and solicitation from the Department of the Air Force seeking proposals to install 15-inch stackers throughout Building B1000 at Offutt Air Force Base. The solicitation requires furnishing and installing approximately 6,150 single pane glass stackers on workstation panel walls to raise the minimum height to six feet throughout the building. Integrated stackers must be compatible with existing Allsteel Terrace brand modular furniture systems. The performance work statement is included on page 39. The solicitation is set aside entirely for small businesses under NAICS code 337214 with a size standard of 1,000 employees. Questions are due by September 9 and offers by September 14, with award anticipated on September 17. The contracting office contact is provided for any questions or offers pertaining to this requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1000 Combined Synopsis Solicitation.pdf | ||
| Questions and Answers.docx | DOCX document | |
| Statement of Need USSTRATCOM Cubicle Stackers.docx | DOCX document | |
| B1000 Combined Synopsis Solicitation.pdf | ||
| SCA WD.pdf | ||
| B1000 Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need Date: 17 June 2020 Project Title: Install 15 Inch Stackers Throughout B1000 Provide a proposal to furnish and install 15 inch Stackers raising the wall height of each workstation to a minimum of 6 feet throughout B1000 to create a safer, healthier environment for STRATCOM employees.
Proposal shall include:
a. Detailed Price Proposal.
b. Additional Electrical requirements (if any) are needed.
The work shall include:
1. Provide all products and labor to install approximately 6150 single pane glass, 15 inch stackers so that the panel walls around every workstation is at least 6 feet tall throughout B1000. Glass stacker features must integrate seamlessly into existing Allsteel Terrace® brand modular furniture systems as specified in Allsteel Terrace System Specifications dated 21 July 2019, GS-28F-0001V. Integrated glass stackers shall be of the same finish and form factor; glass stackers shall use or re-use existing Allsteel Terrace® brand components. Examples of components include Terrace® footed panel frames; stacking frames; top trim; painted radius trim; segment bars; horizontal stiffener supports; top stabilizer brackets; “L”, “T”, “X”, "S", “B”, and “C”-series connector kits; and much more. Allsteel specialized installation components are included in the attached Allsteel Terrace System® Specifications document (GSA reference document). Allsteel Terrace® brand furniture represent baseline modular furniture systems which are currently installed in all USSTRATCOM general office and administration spaces. Allsteel Terrace Systems furniture were previously purchased under U.S. Air Force Contract FA460016D0013.
2. Labor to return excess materials to B73.
3. All design labor to perform the above work items and send updated as-builts.
General Requirements:
Contractor will notify J4 to perform requested work. Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services and incidentals. No alterations, additions, or deletions shall be made unless by prior approval of the J4 Project Manager and the Contracting Officer. Contractor will ensure all installed furniture is operational. Work shall be completed in a neat, substantial and competent manner.