Statement of Need USSTRATCOM Cubicle Stackers.docx
DOCX document 23 KB Posted
- Attached to
- B1000 Cubicle Stackers Federal contract opportunity
- Solicitation number
- FA4600_B1000_Cubicle_Stackers
About this file
This combined synopsis and solicitation requests quotes to install cubicle stackers at a United States Air Force facility. The Air Force seeks to raise the wall height of existing cubicles to a minimum of six feet throughout building B1000 at Offutt Air Force Base. The contractor must provide all products, labor, and design work to install approximately 6,150 fifteen-inch glass stackers integrated with existing Allsteel Terrace modular furniture by 90 calendar days after award. Quotes are due by September 14, 2020. The anticipated award date is September 17, 2020. This requirement is set aside exclusively for small businesses in NAICS code 337214 with 1,000 or fewer employees. The contract is subject to Service Contract Labor Standards prevailing wage rates.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B1000 Combined Synopsis Solicitation.pdf | ||
| Questions and Answers.docx | DOCX document | |
| B1000 Combined Synopsis Solicitation.pdf | ||
| Statement of Need.doc | DOC document | |
| SCA WD.pdf | ||
| B1000 Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Need
Date: 17 June 2020 Project Title: Install 15 Inch Stackers throughout B1000
Provide a proposal to furnish and install 15 inch Cubical Stackers raising the wall height of each existing workstation to a minimum of 6 feet throughout B1000. The objective is to create a safer, healthier environment for USSTRATCOM employees.
Proposal shall include:
a. Detailed Price Proposal.
b. Additional Electrical requirements (if any) are needed.
The work shall include:
Provide all products and labor to install approximately 6150 single pane glass, 15 inch stackers so that the panel walls around every workstation is at least 6 feet tall throughout B1000. Glass stacker features must integrate seamlessly into existing Allsteel Terrace® brand modular furniture systems as specified in Allsteel Terrace System Specifications dated 21 July 2019, GS-28F-0001V. Integrated glass stackers shall be of the same finish and form factor; glass stackers shall use or re-use existing Allsteel Terrace® brand components. Examples of components include Terrace® footed panel frames; stacking frames; top trim; painted radius trim; segment bars; horizontal stiffener supports; top stabilizer brackets; “L”, “T”, “X”, "S", “B”, and “C”-series connector kits; and much more. Allsteel specialized installation components are included in the attached Allsteel Terrace System® Specifications document (GSA reference document). Allsteel Terrace® brand furniture represent baseline modular furniture systems which are currently installed in all USSTRATCOM general office and administration spaces. Allsteel Terrace Systems furniture were previously purchased under U.S. Air Force Contract FA460016D0013.
1. Labor to return excess materials to B73.
2. All design labor to perform the above work items and send updated as-built drawings.
Delivery and Installation Objectives:
Timely delivery and installation is imperative to USSTRATCOM mission success. Subject to negotiation and approval of the Contracting Officer, USSTRATCOM is targets a phased delivery approach with 100% of all cubical stackers delivered within 90 calendar days of contract award. Time phased deliveries allow for parallel time phased installation. USSTRATCOM delivery and installation objectives are as follows:
· QTY 2000 – Required Delivery Date (RDD): At Receipt of Order (ARO) + 30 days
· QTY 2000 – RDD: ARO + 60 days
· QTY 2150 – RDD: ARO + 90 days General Requirements:
Contractor will notify J4 to perform requested work. Project includes, but not limited to the following work elements. The contractor shall furnish all labor, equipment, materials, services and incidentals. No alterations, additions, or deletions shall be made unless by prior approval of the J4 Project Manager and the Contracting Officer. Contractor will ensure all installed furniture is operational. Work shall be completed in a neat, substantial and competent manner.
55th Civil Engineer Squadron