This is a Request for Proposal (RFP) document issued by the Orange Water and Sewer Authority (OWASA), a public entity in North Carolina, for the replacement of ten diesel stand-by generators at multiple wastewater lift station locations. The scope of work includes procurement of specified generators, permitting, installation of generator units, installation of new automated transfer switches as deemed necessary, start-up testing, commissioning, installation of electrical docking stations to facilitate auxiliary generator connections and load bank attachments, and removal and disposition of existing equipment. The project is divided into two phases: Phase I includes seven pump stations (Chapel Hill North, Countryside, Sherwood Forest, Manning Drive, Meadowmont #1, Rangewood, and Meadowmont #2) with an anticipated completion window between September 2026 and December 2027; Phase II includes three pump stations (Heritage Hills, Lake Ellen, and Oaks #3) with an anticipated completion window between January 2028 and December 2028. A mandatory pre-bid site walk is scheduled for August 26, 2026, with bids due on September 10, 2026, to be submitted to jkucera@owasa.org. Generator capacities range from 25 kilowatts to 125 kilowatts, with voltage/phase configurations of either 240V/3P/4W or 480V/3P/4W depending on location.

Proposals will be evaluated on four criteria: Similar Experience (10 points), Value Added Propositions (30 points), Project Schedule (10 points), and Proposed Price (50 points). The bid sheet requires contractors to provide lump-sum pricing for each lift station across defined line items including permitting, generator equipment, mobilization and installation, automated transfer switch installation, docking station installation, and demobilization with disposition of existing equipment. Contractors must meet minimum insurance requirements including $4,000,000 excess/umbrella liability, $1,000,000 general liability bodily injury and property damage, $1,000,000 auto liability, and $1,000,000 workers' compensation. The contractor must comply with federal provisions including Equal Employment Opportunity, Byrd Anti-Lobbying, no debarment certifications, Clean Air and Water Acts, Contract Work Hours and Safety standards, audit rights, and termination clauses. All work must be performed between 7:00 a.m. and 7:00 p.m., Monday through Friday, unless approved otherwise, and contractors are responsible for obtaining all necessary permits and scheduling inspections with the electrical utility and appropriate municipalities.

View the file

Other files

File Type Posted
Generator Replacements Addendum.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O r a n g e W a t e r a n d S e w e r A u t h o r i t y Our community’s trusted partner for clean water and environmental protection.

Enterprise Stand-by Generator Replacement Location:

Numerous Sewer Lift Stations

CIP: 378-14

Date: 8/17/2026 Bid Site Walk: 8/26/2026 Bids Due Date: 9/10/2026

Bids to be submitted to: OWASA (jkucera@owasa.org)

Scope of Work

GENERAL SCOPE: As part of an enterprise wastewater lift station stand-by generator replacement program, OWASA is soliciting RFP for replacement of 10 diesel stand-by generators along with ancillary electrical services to facilitate more streamlined operations and maintenance. The scope of work for this includes procurement of the specified generators, permitting, installation of generator, installation of a new automated transfer switch if deemed necessary by the bidder, start-up testing and commissioning. Additional ancillary services have been requested and include installation of an electrical docking station to both facilitate an auxiliary generator connection should the stand-by generator be down and a point for attachment of a load bank.

At each lift station the work includes:

Installing an appropriately sized docking station that will allow both efficient and quick connection of a portable emergency generator in the unlikely event the stand-by generator is down; and periodic connection of a load bank to the run the stand-by generator at least 80% load to prevent wet-stacking. Attachment 1 provides the Trystar variant of the type of docking station, but contractor may propose an equivalent if it performs the same function.

Contractor shall propose and elaborate on provisions for limited SCADA integration that will minimally include: Generator Status, Automatic Transfer Status, Fuel tank levels and power monitoring capabilities. To support this contractor shall articulate in the proposal how this will be provided (i.e. discrete contacts, analog signals, Modbus interface…etc.). OWASA is not looking for actual SCADA integration as this will be performed by others but looking for what inputs are readily available with proposed standard generator sets so that we may better evaluate the proposals.

Contractor is expected, as part of the proposal, to plan work to:

1. Remove current fuel from the existing generator, temporarily store on site, and then use that fuel in the new generator as well as “top off” the tank, if necessary, with fresh diesel fuel as recommended by the manufacturer. If there is excess fuel then Contractor shall notify OWASA and OWASA will remove the rest. Contractor shall provide the volume of fuel storage they are providing with the generator along with the anticipated hours it is expected to last at operational load.

2. Each generator provided shall come with a sound attenuating enclosure.

3. Contractor shall remove the former genset from the site and deliver it to a laydown yard to be specified by OWASA. The farthest it would be is at the OWASA quarry reservoir lay down yard located adjacent to 1807 NC-54 near the intersection of Bethel Hickory Grove Church Rd. (approximately 9 miles from Mason Farm WWTP).

The scope of work is split into 2 phases and indicate which generators are to be replaced and when:

Phase I: Anticipated to be completed between September 2026 and December 2027

Chapel Hill North PS (100 kw) Countryside PS (100 kw) Sherwood Forest PS (40 kw) Manning Drive PS (40 kw) Meadowmont #1 PS (40 kw) Rangewood PS (40 kw) Meadowmont #2 (25 kw)

Phase II: Anticipated to be completed between January 2028 and December 2028)

Heritage Hills PS (125 kw) Lake Ellen PS (80 kw) Oaks #3 PS (50 kw)

Additional details on the requested work are summarized on Attachment 2.

PERFORMANCE REQUIREMENTS:

General Generator Specifications

The Contractor will furnish and install a diesel fueled engine-generator sets that are to be used to provide standby power to operate the pump station in the event of an interruption of power from the utility. The set will be the product of one manufacturer, will be covered by a factory warranty and will be furnished through an authorized dealer responsible for warranty parts and service in the surrounding area of OWASA area for all equipment supplied under this specification. The individual gen sets will be new and Underwriters Laboratories, Inc. approved and labeled, where applicable.

The sets will be rated at least the kilowatt rating as listed on Attachment 2 @ 0.8 power factor for standby power service. The set will be capable of delivering full rated power from 0 degrees to 100 degrees F with all operating accessories.

The following information will be submitted for approval prior to manufacture/procurement of the unit:

1. Certified drawings of the unit and its foundation requirements, including the location and type of all external connections.

2. Complete literature describing all components to be furnished. Include a statement of the production status of all equipment to be furnished.

3. The name and location of authorized parts and service facilities.

Three full sets of documentation including operation and maintenance manuals, circuit wiring diagrams, commissioning/fault finding instructions, overhaul or shop manuals, and repair parts manuals will be provided with the engine-generator set. One set will remain with the engine-generator set and the other two will be turned over to OWASA.

The proposer shall describe in their proposal general information on each of the gensets such as:

Number of cylinders, engine displacement and operating speed Types of diesel fuel required or can be used with the unit Engine starting power (battery system) and how it will maintain charge.

A description of the engine cooling system, how it resists corrosion and how it resists freezing under very low temperatures.

The fuel tank system that will be supplied and related spill prevention features. The proposer shall articulate the type of fuel tank and show how the capacity meets the required run times as indicated in Attachment 2.

The proposer shall describe any value-added options in the proposal that serve maintenance efficiency and reduction in on-site maintenance time.

The proposer shall indicate how the unit provides minimal signals to be captured by OWASA’s SCADA system at each lift station. Minimal inputs should include fuel level, genset running, …………………..

The alternator will provide power at the voltage, phase and wire configuration as provided on Attachment 2. Frequency regulation will be 60 Hz +/- 0.8% for a constant load from no load to 100% load. Voltage regulation will be +/- 1.0% from no load to 100% load. The alternator will be a self-exciting, self-regulating, brushless type with fully interconnected damper windings. The alternator will be provided with a fully rated cooling system and sealed-for-life bearings. Alternator insulation will be class H.

The engine-generator set will be mounted on a heavy-duty steel base frame. The complete engine/alternator assembly will be enclosed in a sound attenuating enclosure rated for minimum 75 dba at 25 feet from the unit.

NOTES: Consideration should be made for the following:

1. The CONTRACTOR shall examine the site and become familiar with scope requirements and conditions affecting the work. A pre-bid site walk is scheduled for August 26, 2026.

2. The CONTRACTOR shall coordinate their work closely with the OWASA Wastewater Treatment Plant Team as well as Engineering Team for this project.

3. The CONTRACTOR shall be responsible for obtaining all necessary permits from the electrical utility and appropriate municipality and will be responsible for scheduling necessary inspections.

4. Work shall be performed from 7:00 a.m. to 7:00 p.m., Monday-Friday, unless a request for a change is approved.

5. The CONTRACTOR shall complete all work in accordance with applicable safety, environmental, and construction standards.

6. The CONTRACTOR shall meet insurance, safety, non-discrimination, and other standard requirements as defined in OWASA General Service Contract and Standard Conditions. A copy of such contract is provided at Attachment 3.

7. The CONTRACTOR will be responsible for site restoration in kind.

8. The CONTRACTOR will comply with the following Federal Provisions:

a. Equal Employment Opportunity

b. Byrd Anti-Lobbying

c. No Debarment

d. Clean Air and Water Acts

e. Contract Work Hours and Safety

f. Right to Audit

g. Termination Clause

Proposal Evaluation Criteria

a) Similar Experience [10 points] showing past projects that are similar in scope and complexity. Key points are to be associated with critical utility infrastructure, similar size and capacity. Each proposal shall include brief summary (one paragraph) of these projects.

b) Value Added Propositions [30 points] In describing your equipment and installation proposal, please describe the value added propositions for the proposed equipment, sequence of operations and how the proposal adds value to OWASA based on lower O&M costs, lower anticipated future downtime (i.e. availability of parts/service), SCADA integration capacity and commonality of components throughout genset sizing. Provide any other detailed information that will allow OWASA staff to distinguish your proposal from others that may be competing for this project.

c) Project Schedule [10 points] Provide a general implementation schedule that includes anticipated lead time for generator procurement, installation time and general sequence of each installation.

d) Proposed Price [50 points] Fill out the attached bid sheet per lift station install.

ATTACHMENT:

1. Trystar docking station literature

2. General and individual site information scope and specifications.

3. Example OWASA General Service Contract

4. Bid Sheet

Utility Engineer 8/13/2026

(SIGNATURE) (TITLE) (DATE)

Attachment 1

Trystar Information

Jonathan Kucera Cloud

Attachment 2

Generator Summary

Attachment 2

Phase Pump Station Name Address Exisitng Gen Set

Size (KW) Voltage/Phase

Minimum Genset Size Requested

(KW)

Peak Operational Load (KW)

Minimum Fuel to Run at Peak Operational Load (hrs)

Chapel Hill North 1898 Martin Luther King Blvd., Chapel Hill, 27517 105 480V/3P/4W 100 30 48

Countryside 838-840 Kenmore Rd., Chapel Hill, 27514 150 240V/3P/4W 100 30 48

Sherwood Forest 120 Friar Ln, Chapel Hill, 27517 50 480V/3P/4W 40 20 48

Manning Drive 701 Manning Dr. Chapel Hill, 27517 50 240V/3P/4W 40 20 48

Meadowmont #1 2001 E. Barbee Chapel Rd., Chapel Hill, 27517 50 480V/3P/4W 40 20 48

Rangewood 706 Shannon Dr. Chapel Hill, 27516 50 240V/3P/4W 40 20 48

Meadowmont #2 611 Meadowmont Ln., Chapel Hill, 27517 25 480V/3P/4W 25 20 48

Heritage Hills 604 1/2 Brandywine Rd. Chapel Hill, 27516 125 240V/3P/4W 125 60 72

Lake Ellen 1208-500 Martin Luther King Jr. Blvd.

Chapel Hill, 27517 100 480V/3P/4W 80 50 72

Oaks #3 224 Lancaster Dr. Chapel Hill, 27517 50 240V/3P/4W 50 30 48

Attachment 3

Example Service Contract

ORANGE WATER AND SEWER AUTHORITY

SERVICE CONTRACT

ORANGE COUNTY, NORTH CAROLINA

THIS CONTRACT is made, and entered into this the __ day of ______, 20__, by and between ORANGE WATER AND SEWER AUTHORITY, a public corporate subdivision of the State of North Carolina, (hereinafter referred to as “OWASA”, party of the first part and ___________, (hereinafter referred to as “CONTRACTOR”), party of the second part.

1. SERVICES TO BE PROVIDED AND AGREED CHARGES

CONTRACTOR hereby agrees to provide services and/or materials under this contract (hereinafter referred to collectively as “SERVICES”) pursuant to the provisions and specifications identified in “Attachment 1”. OWASA hereby agrees to pay for services at per unit prices contained in “Attachment 1” and pursuant to paragraph “3” of this contract. Attachment 1 is hereby incorporated by reference as if fully set out herein.

2. TERM OF CONTRACT

The term of this CONTRACT for services and supplies is from _______ to ___________.

3. PAYMENT TO CONTRACTOR

CONTRACTOR shall receive from OWASA a sum not to exceed $________ as full compensation for the provision of services. OWASA agrees to pay at the rates specified for services, satisfactorily performed, in accordance with this contract and Attachment 1. Unless otherwise specified, CONTRACTOR shall submit an itemized invoice to OWASA by the end of the month during which services are performed.

Payment will be processed promptly upon receipt and approval of the invoice by OWASA.

4. INDEPENDENT CONTRACTOR

OWASA and CONTRACTOR agree that CONTRACTOR is an independent contractor and shall not represent itself as an agent or employee of OWASA for any purpose in the performance of CONTRACTOR’S duties under this contract. Accordingly, CONTRACTOR shall be responsible for payment of all federal, state and local taxes as well as business license fees arising out of CONTRACTOR’S activities in accordance with this contract. For purposes of this contract taxes shall include, but not be limited to, Federal and State Income, Social Security and Unemployment Insurance taxes.

CONTRACTOR, as an independent contractor, shall perform said services in a professional manner, with reasonable care, and in accordance with the standards and practices applicable in the industry, including those recommended or required by professional organizations and licensing agencies of the industry.

5. INSURANCE AND INDEMNITY

The CONTRACTOR shall indemnify and hold harmless OWASA and its officials, agents, and employees from and against all claims, damages, losses, and expenses, direct, indirect, or inconsequential (including but not limited to fees and charges of engineers or architects, attorneys, and other professionals and costs related to court action or arbitration) arising out of or resulting from the performance of this Contract or the actions of the CONTRACTOR or its officials, employees, or contractors under this Contract or under the contracts entered into by the CONTRACTOR in connection with this Contract. This indemnification shall survive the termination of this agreement.

In addition, CONTRACTOR shall maintain, at its expense, the following minimum insurance coverage:

Excess/Umbrella Liability……………………………………………….................. $4,000,000 General Liability Bodily Injury Liability…………………………………………… $1,000,000 General Liability Property Damage Liability……………………………………… $1,000,000 Auto Liability Combined Single Limit Bodily Injury and Property Damage………. $1,000,000 Workers Compensation Statutory Limits Workers’ Compensation for employer’s liability and bodily injury by disease for each employe………………………………………………………… $1,000,000 Workers’ Compensation for disease for each employee policy limit...........................$1,000,000

CONTRACTOR shall have OWASA named as an additional insured on General Liability and Auto Liability on CONTRACTOR’S insurance policy.

CONTRACTOR shall furnish a certificate of insurance from an insurance company, licensed to do business in the State of North Carolina and acceptable to OWASA verifying the existence of any insurance coverage required by OWASA. The certificate will provide for sixty (60) days advance notice in the event of termination or cancellation of coverage.

6. HEALTH AND SAFETY

CONTRACTOR shall be responsible for initiating, maintaining, supervising and assuring compliance with all safety precautions and programs required by law or regulation, including but not limited to OSHA and all other regulatory agencies, while providing services under this contract.

7. NON-DISCRIMINATION IN EMPLOYMENT

CONTRACTOR shall not discriminate against any employee or applicant for employment because of age, sex, race, creed, national origin, or disability. CONTRACTOR shall take affirmative action to ensure that applicants are employed and that employees are treated fairly and legally during employment with regard to their age, sex, race, creed, national origin, or disability. In the event CONTRACTOR is determined by the final order of an appropriate agency or court to be in violation of any non-discrimination provision of federal, state or local law or this provision, this Contract may be canceled, terminated or suspended in whole or in part by OWASA, and CONTRACTOR may be declared ineligible for further OWASA contracts.

8. GOVERNING LAW

This contract shall be governed by and in accordance with the laws of the State of North Carolina.

All actions relating in any way to this contract shall be brought in the General Court of Justice in the County of Orange and the State of North Carolina.

9. TERMINATION OF AGREEMENT

This contract is subject to the availability of funds to purchase the specified services and may be terminated at any time during the term upon thirty (30) days written notice if such funds become unavailable.

This contract may be terminated, for cause, by the non-breaching party after notifying in writing the breaching party of a substantial failure to perform in accordance with the provisions of this contract and if the failure is not corrected within ten (10) days of the receipt of the notification. Upon such termination, the parties shall be entitled to such additional rights and remedies as may be allowed by relevant law.

This contract may be terminated by either party at any time during the term upon thirty (30) days written notice.

Termination of this agreement, either with or without cause, shall not form the basis of any claim for loss of anticipated profits by either party.

10. SUCCESSORS AND ASSIGNS

CONTRACTOR shall not assign its interest in this contract without the written consent of OWASA. CONTRACTOR has no authority to enter into contracts on behalf of OWASA.

11. COMPLIANCE WITH LAWS.

CONTRACTOR represents that it is in compliance with all Federal, State, and local laws, regulations or orders, as amended or supplemented. The implementation or this contract will be carried out in strict compliance with all Federal, State, or local laws regarding discrimination in employment.

12. NOTICES

All notices which may be required by this contract or any rule of law shall be effective when received by certified mail sent to the following addresses:

OWASA

PURCHASING DEPARTMENT

400 JONES FERRY ROAD

CARRBORO, NORTH CAROLINA, 27510

(Vendor Address)

13. AUDIT RIGHTS

For all services being provided under this contract, OWASA shall have the right to inspect, examine, and make copies of any and all books, accounts, invoices, records and other writings relating to the performance of said services. Audits shall take place at times and locations mutually agreed upon by both parties, although CONTRACTOR must make the materials to be audited available within one (1) week of the request for them.

14. OWASA NOT RESPONSIBLE FOR EXPENSES

OWASA shall not be liable to CONTRACTOR for any expenses paid or incurred by CONTRACTOR unless otherwise agreed in writing.

15. EQUIPMENT

CONTRACTOR shall supply, at its sole expense, all equipment, tools, materials, and/or supplies required to provide contracted services unless otherwise agreed in writing.

16. E-VERIFY

CONTRACTOR shall comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Further, if CONTRACTOR utilizes a subcontractor, CONTRACTOR shall require the subcontractor to comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes.

17. ENTIRE AGREEMENT

This Agreement and the attached documents labeled “Attachment A” and “Attachment B” shall constitute the entire understanding between OWASA and CONTRACTOR. There are no written or unwritten understandings or agreements between the parties, except as expressed herein, nor have any representations not contained herein been made to induce the execution of this Agreement. This Agreement shall supersede all prior understandings and agreements relating to the subject matter hereof and may be amended only by written mutual agreement of the parties.

18. HEADINGS.

The subject headings of the paragraphs are included for purposes of convenience only and shall not affect the construction or interpretation of any of its provisions. This agreement shall be deemed to have been drafted by both parties and no purposes of interpretation shall be made to the contrary.

OWASA CONTRACTOR

Title: Title:

This instrument has been preaudited in the manner required by the Local Government Budget and Fiscal Control Act.

Title: Director of Finance and Customer Service

Attachment 4

Bid Sheet

Phase Pump Station Item Decription Qty Unit Unit Price Total

All Project Management 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

-$ Phase 1 Subtotal

Phase 1

Chapel Hill North

Chapel Hill North Subtotal

Countryside

Countryside Subtotal

Rangewood

Rangewood Subtotal

Meadowmont #2

Meadowmont #2 Subtotal

Sherwood Forest

Subtotal

Manning Drive

Manning Drive Subtotal

Meadowmont #1

Meadowmont #1 Subtotal

Phase Pump Station Item Decription Qty Unit Unit Price Total

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Permitting 1 LS -$ -$

Generator Set (equip) 1 LS -$ -$

Mobilize and install generator 1 LS -$ -$

Install new ATS 1 LS -$ -$

Install docking station 1 LS -$ -$

Demobilization and disposition of existing 1 LS -$ -$

Phase 2 Subtotal

Contract Total

Phase 2

Heritage Hills

Heritage Hills Subtotal

Lake Ellen

Lake Ellen Subtotal

Oaks #3

Oaks#3 Subtotal