SSN CO OMAD 300(67) Minuteman Missile Access Roads.pdf
PDF 266 KB Posted
- Attached to
- CO OMAD 300(67) Minuteman Missile Access Roads
- Solicitation number
- 6982AF22SS0015
About this file
This notice provides details regarding a pre-solicitation for the CO OMAD 300(67) Minuteman Missile Access Roads project. The project consists of grading, widening, regraveling, and reconditioning various aggregate surface roads totaling approximately 57 miles within Logan and Weld Counties, Colorado. It will provide access for transporting US Air Force Minuteman missiles. Interested small businesses, including HUBZone, woman-owned, 8(a), veteran-owned, and service-disabled veteran-owned small businesses, must express intent to bid and provide requisite certification documents by March 24, 2022 to be considered for a set-aside. Construction is anticipated to occur between August and November 2022, with an estimated price range of $5-10 million. The Department of Transportation Federal Highway Administration is the contracting agency.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS NOT A REQUEST FOR BID
PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS
SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Business Concerns (SBCs), HUBZone small businesses, Woman Owned Small Businesses (WOSBs), 8(a) small businesses, Veteran Owned Small Businesses (VOSBs) or Service Disabled Veteran-Owned Small Businesses (SDVOSBs) and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by fax to 720-963-3360 (Attn: Josephine Helms) for receipt by close of business (2 p.m. MST) on March 24, 2022:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a)-small business program. In the case of a VOSB or SDVOSB, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility – DO NOT SEND COPIES OF YOUR SAM PROFILE;
(3) Letter from bonding agent stating your firm’s capability to bond for a single project of $10 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the CO OMAD 300(67) project in which contractor performed (as the prime contractor) work in gravel road widening and regraveling. Experience in construction phasing, temporary traffic control, and timely completion of construction is required. State whether the firm was the prime contractor or subcontractor on the project. DO NOT SEND
INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
A Qualified HUBZone small business receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
mailto:CFLAcquisitions@dot.gov https://www.sam.gov/
PROJECT DESCRIPTION: CO OMAD 300(67) Minuteman Missile Access Roads project consists of multiple aggregate surface routes within Logan County & Weld County, Colorado and provides access to transportation of US Air Force Minuteman Missiles.
SCOPE OF WORK:
SCHEDULE A:
17 miles of linear grading, widening and regraveling of aggregate surface roads within 14 segments throughout Logan & Weld counties. Pipe culvert extensions and end sections in various locations within 14 segments.
Option X Fremont Lake Road:
17 miles of reconditioning and regraveling of aggregate surface roads within 6 segments throughout Logan & weld counties.
Option Y:
23 miles of reconditioning and regraveling of aggregate surface roads within 8 segments throughout Logan & weld counties.
SIGNIFICANT QUANTITIES:
• 17 miles of Linear Grading
• 230,000 tons of Aggregate Surface Course
• 38 miles of Aggregate Surface Reconditioning
• 370 linear feet of Pipe Culvert (18” to 24”)
• 115 linear feet of Elliptical Pipe Culvert (24” to 54”)
ANTICIPATED SCHEDULE:
Advertise: May 2022 Award: July 2022 Construction: August 2022 – November 2022
ESTIMATED PRICE RANGE: Between $5,000,000 and $10,000,000
CONSTRUCTION DURATION: Construction is anticipated between August 2022 and November 2022.