This solicitation requests proposals for 30mm entrance drum covers. The Defense Logistics Agency Aviation is seeking fixed price proposals for the production and delivery of entrance drum covers and associated data items. Offerors must submit pricing on the attached matrix by September 18, 2023. The incumbent contractors for this requirement are JEMCO and DJ Engineering. The total period of performance is five years consisting of an initial one-year basic ordering period followed by four one-year option periods. Proposals will be evaluated based on total evaluated price. Set-aside provisions require at least 50% domestic content for supplies and higher domestic content thresholds for other items.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PRICINGMATRIX_rev1.xlsx | XLSX spreadsheet | |
| SPRWA123R0025_0001.pdf | ||
| Question and Answers.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
SPRWA1-23-R-0025
X X
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 332993
8(A) SIZE STANDARD: 1,500
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE.
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
Submit proposals electronically to nathan.bergert@us.af.mil NLT 18 SEP 2023. Contact 5 days prior for DOD SAFE link.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) ( ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *120
RATING
N/A:A1
3. AWARD/EFFECTIVE DATE
SPRWA1
2. CONTRACT NUMBER
X
17.
ITEM NUMBER
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAYMENT DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES Ammunition (except Small Arms) Manufacturing
9. (Agency Use) Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.
18-SEP-2023 3:30PM
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
DLA PROCUREMENT OPERATIONS, DLA/AWB
235 BYRON ST STE 19A
BLDG 300 CP 478 926 4794
ROBINS AFB GA 31098-1670
BUYER: Christine O. Tomlinson christine.tomlinson@us.af.mil Phone: (478) 926- 9913
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
J
03 AUG 2023
STANDARD FORM 1447 (REV. 8/2016) BACK
NO RESPONSE FOR REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
DATE AND LOCAL TIME 18 SEP 2023 3:30 PM
SOLICITATION NUMBER SPRWA123R0025
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Christine O Tomlinson
DLA PROCUREMENT OPERATIONS, DLA/AWB
235 BYRON ST STE 19A
BLDG 300 CP 478 926 4794
ROBINS AFB GA 31098-1670
SPRWA1-23-R-0025
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
This request for proposal is being competed as a 100% set-aside for small business.
Award will be made utilizing full and open competition among all responsible small business sources. Offerors are advised to carefully review and complete all required fill-ins and follow all instructions found within the document. Proposals received that are determined inadequate will be eliminated from consideration for award.
This effort requires preaward source qualification. The small business sources approved for this buy are currently JEMCO (CAGE:721Z6) and DJ Engineering (CAGE: 0C7H8). Other qualified sources are Danko Arlington (CAGE: 26993) and Thomas Instrument (CAGE 5H860). Offerors who have not submitted an approved SAR package, or waiver (in accordance with Source Qualification Statement, Section C, as posted 10 AUG 2022 under Notice ID FD20602300074 on SAM.gov) for this current buy will be eliminated from consideration from award.
All clauses/provisions in this solicitation and resultant contract are important and the offeror shall ensure that it has reviewed and understands each one. Signing the face page of the solicitation acknowledges review and agreement for vendor acknowledgement of all provisions contained within.
Note 1: The Government intends to award a single Indefinite Delivery/Indefinite Quantity (IDIQ) Contract for the supplies specified herein. The total period of performance for the contract will not exceed five (5) years. The resultant contract will have one (1) 12-month basic ordering period, and four (4) twelve-month ordering periods.
Note 2: For the purposes of paragraph (b) of FAR 52.216-22, Indefinite Quantity, the contractual "minimum" shall be a value that equals the lowest final negotiated unit price for any awarded CLIN (dollars to be determined at time of award) and the contract maximum shall be a value equal to the estimated total contract quantity multiplied by the largest corresponding unit price for any pricing period (dollars to be determined at time of award.) See attached pricing matrix.
Note 3: FAR clause(s) 52.216-19 and 52.216-22 shall be updated at time of award to show actual dollar amounts, quantities, and/or dates reflecting negotiated contract terms and conditions at the time of award.
Note 4: Period of Performance for the contract will begin upon date of basic contract award announcement. Specific delivery dates shall be established subsequent to contract award.
Note 5: Transportation of items delivered hereunder shall be in accordance with DD Form 1653 attached to each delivery order issued hereunder.
Note 6: Items delivered hereunder shall be packaged in accordance with AFMC Form 158 and DD Form 2169 attached to each delivery order issued hereunder.
Note 7: All pricing and delivery information should be submitted on the attached Pricing Matrix.
Note 8: In the event only one offer is received, DFARS 215.371-3 will apply.
EVALUATION CRITERIA: The responsive responsible offeror with the lowest Total Evaluated Price (TEP) will be the awardee. Total evaluated price will be determined by extending the unit price by the estimated total contract quantity for each ordering period.
The sum of these calculations will determine the TEP. Please see attached Pricing Matrix for pricing submission.
30 MM ENTRANCE DRUM COVER
FIRST ARTICLE
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
2 EA SEE PRICING MATRIX
FA
First Article
30 MM ENTRANCE DRUM COVER
NSN: 1005005703715P/N: 05606/198F288
Associated Document(s) Line Item(s)
FD20602300074 0002
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
Type / Ship To PACRN Mark For
A FD2060 FIRST ARTICLE TEST
Type / Ship To Quantity (U/I) *ARO Written Notice of Award _ Req No / Pri
Required Delivery
A FD2060 2 EA *365 Calendar Days
Proposed Delivery
A FD2060 2 EA
SEE ATTACHED AFMC FORM 260 FOR DETAILED DELIVERY INSTRUCTIONS
30 MM ENTRANCE DRUM COVER
PRODUCTION
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA SEE PRICING MATRIX
NSN: 1005005703715
COVER, DRUM ENTRANCE
Manufacturer Part Number 05606 198F288 Associated Document(s) Line Item(s)
FD20602300074 0001
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) *ARO Written Notice of Award _ Req No / Pri
Required Delivery
A SW3119 20 EA *365 Calendar Days
Proposed Delivery
A SW3119 20 EA
DATA
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
LO
DATA
ELIN NUMBER DESCRIPTION
A001 Item Unique Identification (IUID) Marking Plan
A002 Item Unique Identification (IUID) Marking Activity and Verification Report
A003 First Article Qualification Test Plan & Procedures
DATA
A004 First Article Qualification Test Report
Associated Document(s) Line Item(s)
FD20602300074 0003
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Exhibit: A Quality Assurance: Standard Inspection
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: A FD2060
FD2060 SPECIAL HANDLING UNIT
FIRST ARTICLE TEST UNIT
455 BYRON ST
CP478 926 3817
ROBINS AFB GA 310981887
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A SW3119
DLA DISTRIBUTION WARNER ROBINS
455 BYRON STREET BLDG 376
ROBINS AFB GA 310981887
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)
(IAW FAR 9.3082)
Test criteria are as follows:
Lot/Item Government Test/Inspection Requirements 0001 (See Below)
Lot/Item Contractor Test/Inspection Requirements 0001 (See Below)
Contractor Testing Requirements 100% dimensional inspection, material composition, hardness testing, verification of finish, mag particle inspection, surface roughness, thread inspection of components required
Government Testing Requirements IAW drawing 198F288 and associated drawings and specifications.
Disposition of the First Article shall be as follows:
Lot/Item Approved 0001 Expended in testing 0001 Forwarded to: SUPPLY
Lot/Item Disapproved 0001 Returned to the contractor
0001 CONTRACTOR WILL PROVIDE PREPAID SHIPPING LABEL
(Applicable when a fixedprice contract is contemplated and it is intended that the contract require first article approval and that the Government will be responsible for conducting the first article test)
52.2462 INSPECTION OF SUPPLIESFIXEDPRICE (AUG 1996)
(IAW FAR 46.302)
(Applicable for supplies, services furnishing of supplies, fixedprice and exceeds the simplified acquisition threshold)
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(IAW FAR 46.311, DFARS 246.202-4(1))
(a) The Contractor shall comply with the higherlevel quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*
Title Number Date Tailoring *See Individual Line Item Schedule
(Applicable only if specified in the individual order/call issued hereunder)
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
(Applicable to the furnishing of supplies, services involving the furnishing of supplies, or research and development, when a fixedprice contract is contemplated and the contract amount is expected to exceed the simplified acquisition threshold)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503)
(Applicable to all orders issued hereunder)
Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
Item No(s): 0001, 0003
PART I THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-8 TIME OF DELIVERY (JUN 1997)
(IAW FAR 11.404(a)(2))
(a) The Government requires delivery to be made according to the following schedule:
DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
ANNOTATE YOUR PROPOSED DELIVERY, IF ANY, UNDER THE GOVERNMENT’S DELIVERY SET FORTH UNDER EACH ITEM IN THE
SCHEDULE.
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(Applicable when the Government desires delivery by a certain time but requires delivery by a specified later time, and the delivery schedule is to be based on the date of the contract)
52.211-8 TIME OF DELIVERY -- ALTERNATE III (APR 1984)
(IAW FAR 11.404(a)(2))
If the delivery schedule is to be based on the actual date the contractor receives a written notice of award, the contracting officer may be delete paragraph (b) of the basic clause. The time may be expressed by substituting "within days after the date of receipt of a written notice of award” as the heading for the third column of paragraph (a) of the basic clause.
(Applicable when the delivery schedule is to be based on the actual date the contractor receives a written notice of award)
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b))
(Applicable when fixedprice supplies are furnished)
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
(Applicable for supplies, services, or research and development)
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c))
(Applicable to fixedprice for supplies other than commercial or modifiedcommercial items)
PART I THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s).
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (standalone) and “Receiving Report” (standalone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant backup documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 8666185988.
(Applicable in solicitations and contracts or task or delivery orders, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial items, when 252.2327003 is used and none of the exceptions at 232.7002(b)(1) apply. See PGI 232.7004 for instructions on completing the clause)
PART II CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
52.202-1 DEFINITIONS (JUN 2020)
(IAW FAR 2.201)
(Applicable when the simplified acquisition threshold is exceeded)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
(Applicable when simplified acquisition threshold is exceeded, except for personal services and those between military departments or defense agencies and foreign governments that do not obligate any funds appropriated to the Department of Defense)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
(Applicable when simplified acquisition threshold is exceeded other than those for commercial items (see Parts 2 and 12))
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
(IAW FAR 3.503-2)
(Applicable when the simplified acquisition threshold is exceeded)
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
(IAW FAR 3.502-3)
(Applicable when the simplified acquisition threshold is exceeded)
(Applicable when noncommercial and the simplified acquisition threshold is exceeded)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
(Applicable when the simplified acquisition threshold is exceeded)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(JUN 2020)
(IAW FAR 3.808(b))
(Applicable over $150,000)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
(Applicable in all solicitations and resultant contracts other than personal services contracts with individuals)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
(Applicable to all solicitations and contracts)
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)
(IAW DFARS 203.570-3)
(Applicable when exceeding the simplified acquisition threshold (except for commercial items))
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(DEC 2022)
(IAW DFARS 203.970)
(Applicable to all solicitations and contracts)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
(IAW FAR 4.303)
(Applicable when the simplified acquisition threshold is exceeded)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
(IAW FAR 4.1403(a))
(Applicable over $30,000, unless not required to be reported in FPDS)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b))
(Applicable to solicitations that contain the provision at 52.2047, and resulting contracts)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
(IAW FAR 4.1804(c), FAR 12.301(d))
(Applicable when there is a requirement to be registered in SAM or to have a DUNS Number)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
(Applicable to all solicitations and contracts)
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(NOV 2021)
(IAW FAR 4.1903)
(Applicable to all solicitations and contracts, except COTs, when a contractor’s system may contain Federal contract information)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (NOV 2021)
(IAW FAR 4.2004)
(Applicable in all contracts and solicitations)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
(IAW 4.2105(b))
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
(Applicable to all orders issued hereunder)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (JAN 2023)
(IAW DFARS 204.7304(c))
(Applicable to all solicitations and contracts, including commercial except when solely for commercialofftheshelf items)
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (JAN 2023)
(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))
(Applicable to solicitations and contracts that involve litigation support services when 252.2047014 is not included)
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)
(IAW DFARS 204.2105(c))
(Applicable to all soliciations.)
252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (JAN 2023)
(IAW DFARS 204.7304(e))
(Applicable in all solicitations and contracts, task orders, or delivery orders, including those using FAR part 12 procedures for the acquisition of commercial items, except for those that are solely for the acquisition of COTS items)
252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)
(IAW DFARS 204.804-70)
(a) At the conclusion of all applicable closeout requirements of Federal Acquisition Regulation 4.804, the Government and Contractor shall mutually agree on the residual dollar amount remaining on the contract. Both the Government and Contractor agree to waive payment of any residual dollar amount of $1,000 or less to which either party may be entitled at the time of contract closeout.
(b) A residual dollar amount includes all money owed to either party at the end of the contract and as a result of the contract, excluding amounts connected in any way with taxation or a violation of law or regulation.
(c) For purposes of determining residual dollar amounts, offsets (e.g., across multiple contracts or orders) may be considered only to the extent permitted by law.
(Applicable in solicitations and contracts when the contracting officer intends to expedite contract closeout through the mutual waiver of entitlement to a residual dollar amount of $1,000 or less determined at the time of contract closeout)
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470, DFARS 212.301(f)(x))
(Applicable over $1,000,000)
52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)
(IAW FAR 9.206-2)
(a) Definition: "Qualification Requirement," as used in this clause, means a Government requirement for testing or other quality assurance demonstration that must be completed before award.
(b) One or more qualification requirements apply to the supplies or services covered by this contract. For those supplies or services requiring qualification, whether the covered product or service is an end item, the product, manufacturer, or source must have demonstrated that it meets the standards prescribed for qualification before award of this contract. The product, manufacturer, or source must be qualified at the time of award whether or not the name of the product, manufacturer, or source is actually included on a qualified products list, qualified manufacturers list, or qualified bidders list. Offerors should contact the agency activity designated below to obtain all requirements that they or their products or services, or their subcontractors or their products or services, must satisfy to become qualified and to arrange for an opportunity to demonstrate their abilities to meet the standards specified for qualification.
Item No Agency Name/Address
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror's Name ______________________________
Manufacturer's Name _________________________
Source's Name ______________________________
Item Name _________________________________
Service Identification _________________________
Test Number _______________________________ (to the extent known)
(d) Even though a product or service subject to a qualification requirement is not itself an end item under this contract, the product, manufacturer, or source must nevertheless be qualified at the time of award of this contract. This is necessary whether the Contractor or a subcontractor will ultimately provide the product or service in question. If, after award, the Contracting Officer discovers that an applicable qualification requirement was not in fact met at the time of award, the Contracting Officer may either terminate this contract for default or allow performance to continue if adequate consideration is offered and the action is determined to be otherwise in the Government's best interests.
(e) If an offeror, manufacturer, source, product, or service has met the qualification requirement but is not yet on a qualified products list, qualified manufacturers list, or qualified bidders list, the offeror must submit evidence of qualification prior to award of this contract. Unless determined to be in the Government's interest, award of this contract shall not be delayed to permit an offeror to submit evidence of qualification.
(f) Any change in location or ownership of the plant where a previously qualified product or service was manufactured or performed requires reevaluation of the qualification. Similarly, any change in location or ownership of a previously qualified manufacturer or source requires reevaluation of the qualification. The reevaluation must be accomplished before the date of award.
(Applicable when the acquisition is subject to a qualification requirement)
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))
(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
*Lot/Item ***Calendar Days Before Test **Quantity 0001 30 2
(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item ****Approval Days ELIN No.
0001 30 A004
FA Test Report Item ***Type/Location **Calendar Days
(Applicable to fixedprice and costreimbursement if first article approval is required and the contractor is required to conduct the first article testing)
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING -- ALTERNATE I (JAN 1997)
(IAW FAR 9.308-1(a)(2), FAR 9.308-1(b)(2))
(Applicable when the contractor is required to produce the first article and the production quantity at the same facility)
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING -- ALTERNATE II (SEP 1989)
(IAW FAR 9.308-1(a)(3), FAR 9.308-1(b)(3))
(Applicable the contractor is authorized to purchase material or to commence production before first article approval)
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))
(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests.
First Article Item **Quantity ***Calendar Days ****Type/Location
0001 2 365 AFD2060
(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article.
*Lot/Item **Approval Days ELIN No.
0001 45 A003
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(Applicable when fixedprice or costreimbursement, first article approval is required and the Government will be responsible for conducting the first article test)
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING -- ALTERNATE I (JAN 1997)
(IAW FAR 9.308-2(a)(2), FAR 9.308-2(b)(2))
(Applicable when the contractor is required to produce the first article and the production quantity at the same facility)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(NOV 2021)
(IAW FAR 9.409)
(Applicable when exceeding $35,000)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
(IAW FAR 9.104-7(c))
(Applicable to solicitations and contracts over $550,000 and contracts where the offeror has checked “has” in paragraph (b) clause 52.2097)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
(Applicable to all solicitations and contracts for the acquisition of products and services (including construction) unless waived
IAW FAR 9.1084)
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(MAY 2019)
(IAW DFARS 209.409)
(Applicable to solicitations and contracts with a value of $150,000 or more)
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.304)
(Applicable to supplies that are not commercial items)
52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)
(IAW FAR 15.209(b)(1))
(Applicable if negotiated and above the simplified acquisition threshold, except commercial items and utility services at public prices plus reasonable connection charge)
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h), AFFARS 53.15.209(h))
(Applicable when using uniform contract format that is not commercial or for construction)
52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)
(IAW FAR 15.408(f)(1))
(Applicable when negotiated and exceeding the simplified acquisition threshold)
52.216-18 ORDERING (AUG 2020)
(IAW FAR 16.506(a))
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from .
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) A delivery order or task order is considered ‘‘issued’’ when—
(1) If sent by mail (includes transmittal by U.S. mail or private delivery service), the Government deposits the order in the mail;
(2) If sent by fax, the Government transmits the order to the Contractor’s fax number; or
(3) If sent electronically, the Government either—
(i) Posts a copy of the delivery order or task order to a Government document access system, and notice is sent to the Contractor; or
(ii) Distributes the delivery order or task order via email to the Contractor’s email address.
(d) Orders may be issued by methods other than those enumerated in this clause only if authorized in the contract.
(Applicable to all orders issued hereunder)
52.216-19 ORDER LIMITATIONS (OCT 1995)
(IAW FAR 16.506(b))
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than , the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor
(1) Any order for a single item in excess of ;
(2) Any order for a combination of items in excess of ; or
(3) A series of orders from the same ordering office within days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.21621 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximumorder limitations in paragraph (b) of this section.
(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
(Applicable to all orders issued hereunder)
52.216-22 INDEFINITE QUANTITY (OCT 1995)
(IAW FAR 16.506(e))
(a) This is an indefinitequantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum." The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum."
(c) Except for any limitations on quantities in the DeliveryOrder Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period;
provided, that the Contractor shall not be required to make any deliveries under this contact after .
(Applicable to all orders issued hereunder)
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)
(IAW FAR 19.507(c))
(Applicable to all orders issued hereunder)
(Applicable when exceeding the simplified acquisition threshold, except for personal service contracts or when performance is entirely outside of the United States and its outlying areas)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (DEVIATION 2023-O0002)
(DEC 2022)
(IAW Deviation 2023-O0002, Revision 1)
52.219-13 NOTICE OF SET-ASIDE OF ORDERS (MAR 2020)
(IAW FAR 19.507(f)(1))
(Applicable to solicitations and contracts if an order or orders are to be set aside for any of the small business concerns identified in 19.000(a)(3))
52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2021-O0008) (FEB 2023)
(IAW Deviation 2021-O0008 Rev 1.)
(a) This clause does not apply to the unrestricted portion of a partial setaside.
(b) Definition. Similarly situated entity, as used in this clause, means a firsttier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business setaside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multipleaward contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a solesource basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;
(4) Orders expected to exceed the simplified acquisition threshold and that are—
(i) Set aside for small business concerns under multipleaward contracts, as described in 8.4055 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to small business concerns under multipleaward contracts as described in 19.504(c)(1)(ii);
(5) Orders, regardless of dollar value, that are—
(i) Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multipleaward contracts, as described in 8.4055 and 16.505(b)(2)(i)(F); or
(ii) Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multipleaward contracts, as described in 19.504(c)(1)(ii); and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding certain other direct costs and certain work performed outside the United States (see paragraph (e)(1)(i)), to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. The following services may be excluded from the 50 percent limitation:
(i) Other direct costs, to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service. Examples include airline travel, work performed by a transportation or disposal entity under a contract assigned the environmental remediation NAICS code 562910), cloud computing services, or mass media purchases.
(ii) Work performed outside the United States on awards made pursuant to the Foreign Assistance Act of 1961, or work performed outside the United States required to be performed by a local contractor.
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause–
[Contracting Officer check as appropriate.] [ ] By the end of the base term of the contract and then by the end of each subsequent option period; or [ ] By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph
(e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (OCT 2022)
(IAW FAR 19.309(c))
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a womenowned small business concern.
(4) Womenowned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]
(5) Economically disadvantaged womenowned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) and through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _______.]
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteranowned small business concern.
(7) [Complete only if the Contractor represented itself as a veteranowned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a servicedisabled veteranowned small business concern.
(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.
[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
[Contractor to sign and date and insert authorized signer’s name and title.]
(Applicable in solicitations and contracts exceeding the micropurchase threshold when the contract will be performed in the United States or its outlying areas)
52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (DEC 2022)
(IAW FAR 22.1505(b))
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
(IAW FAR 22.810(a)(1))
(Applicable when exceeding $10,000, except those exempted by FAR 22.807 (b) which includes those for work to be performed outside the U.S. by employees who were not recruited within the U.S.)
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
(IAW FAR 22.810(e))
(Applicable to all orders issued hereunder)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
(a) Definitions. As used in this clause “Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,’ and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1303(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor.
The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate of identify properly the parties and their undertakings.
(Applicable when the expected value is $150,000 or more except when work is performed outside the United States by employees recruited outside the United States or the Director, Office of Federal Contract Compliance Programs, has waived, in accordance with 22.1305(b), all of the terms of the clause)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
(IAW FAR 22.1408(a))
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .