SPRTA123R0123_______0001.pdf

PDF 37 KB Posted

Attached to
SUPPORT, TURBINE
Solicitation number
SPRTA1-23-R-0123
Issued by

About this file

This document is a solicitation amendment for support turbine parts. It extends the closing date from August 4, 2023 to February 12, 2024. The solicitation seeks bids for nickel alloy turbine support segments to be used by the Defense Logistics Agency Aviation. Bids are requested under two options, with Bid A requiring first article testing and Bid B not requiring first article testing. Bid A line items include first article test plans, reports, and exhibits to be delivered on various dates by May 2025. Bid B line items are for direct production quantities to be delivered by May 2025. Inspection and acceptance will utilize the Wide Area Workflow system. The selected contractor must meet ISO 9001-2008 quality standards.

View the file

Other files

File Type Posted
PACKAGING.pdf PDF
QUALIFICATION REQUIREMENTS.pdf PDF
EDL.pdf PDF
IUID.pdf PDF
SPRTA1-23-R-0123_FINAL.pdf PDF
TRANSPORTATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NO.

SPRTA1-23-R-0123-0001

3. EFFECTIVE DATE

10 JAN 2024

4. REQUISITION/PURCHASE REQ. NO.

FD20302301100 01

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DLA AVIATION AT OKLAHOMA CITY, OK

DLR PROCUREMENT OPERATIONS (AO)

3001 STAFF DRIVE

TINKER AFB OK 73145-3070

BUYER: James Headington/DLA/AOAA james.headington.1@us.af.mil Phone: (405) 855- 3535

7. ADMINISTERED BY (If other than item 6) CODESPRTA1

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

SPRTA123R0123

9B. DATED (SEE ITEM 11)

5-JUL-2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 12-FEB-2024 4:00 PM

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

FMS REQUIREMENT

See attached for amendment details.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

SPRTA1-23-R-0123-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to make the following changes to the subject solicitation:

First: Extend the closing date of this solicitation:

From: 4 August 2023

To: 12 February 2024

Second: All other terms and conditions shall remain unchanged under this solicitation.

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

INFO CLIN

Item No.

NSN: 2840-01-446-6205 NZ

SUPPORT, TURBINE

SUPPORT TURBINE 26" x 2", PREDOMINATE MATERIAL: NICKEL ALLOY, SEGMENTS SEAL AIR FLOW TO THE 2ND STAGE TURBINE.

Manufacturer Part Number 00518 4084713 52661 4084713 9Y765 4084713 Associated Document(s) Line Item(s)

FD20302201100 01 0001

Applicability: None ;

Buy American Act/Balance of Payments Program IUID Required: Yes

Note 1: Please provide one quote for either Bid "A" or "B" not both.

FIRST ARTICLE TEST PLAN

Bid A - First Article Required Item No.

0001AA

Firm Fixed Price Quantity U/I Amount

1 LO

CLIN ACRN ACRN Total

0001AA AA

First Article Test Plan

FIRST ARTICLE TEST PLAN IAW DD FORM 1423

Preliminary Inspection:

Final Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

FIRST ARTICLE TEST PLAN

Bid A - First Article Required Type / Ship To PACRN Mark For

First Article Test Plan Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

1 LO *30 Calendar Days Non-MilStrip

Proposed Delivery

1 LO

NOTE: INSPECTION AND ACCEPTANCE REPORTS WILL BE SUBMITTED USING WIDE AREA WORKFLOW

(WAWF).

FIRST ARTICLE TEST REPORT

Bid A - First Article Required Item No.

0001AB

Firm Fixed Price Quantity U/I Amount

1 LO

CLIN ACRN ACRN Total

0001AB AA

First Article Test Report

TEST REPORT IN ACCORDANCE WITH DD FORM 1423, ATTACHED HERETO.

Preliminary Inspection:

Final Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Type / Ship To PACRN Mark For

* FA8111 FIRST ARTICLE TEST MONITOR

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* FA8111 1 LO *120 Calendar Days Non-MilStrip

Proposed Delivery

* FA8111 1 LO

(WAWF)

BID A-FIRST REQUIRED (DESTRUCTIVE EXHIBIT)

Bid A - First Article Required Item No.

0001AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 EA

CLIN ACRN ACRN Total

0001AC AA

Note: This item will ship in place at the contractor's facility and will be held until the First Article Test Report is approved and the QAR has signed the WAWF receiving report confirming the first article has been accepted and can be invoiced for payment.

Note: This First Article is one of the requirements set forth in FAR Clause 52.209-3.

Note: The contractor may present this first article exhibit to the Government Quality Assurance Representative (QAR) for inspection and acceptance when the contractor has received the First Article Test Report Approval Modification from the Government Contracting Officer.

First Article - First Article to Be Destroyed

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A PLANT ORIGIN

Type / Ship To PACRN Mark For

A PLANT PAA FIRST ARTICLE MONITOR

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

A PLANT 1 EA *120 Calendar Days Non-MilStrip

Proposed Delivery

A PLANT 1 EA

(WAWF)

BID-A FIRST ARTICLE REQUIRED (NON-DESTRUCTIVE EXHIBITS)

Item No.

0001AD

BID-A FIRST ARTICLE REQUIRED (NON-DESTRUCTIVE EXHIBITS)

Bid A - First Article Required Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0001AD AA

NOTE: These First Article exhibits are the remaining two first articles required by FAR Clause 52.209-3. Do not ship these exhibits with the First Article Test Report. These two exhibits may be presented to the Government QAR for Inspection and Acceptance when the Contractor has received the First Article Test Report Approval Modification from the Government Contracting Officer.

First Article - Exhibits for Non-Destructive Testing

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

* DPK002 ORIGIN

Type / Ship To PACRN Mark For

* DPK002 PAA DPKA00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DPK002 2 EA 30 MAY 2025 DPKA5V20494955 / PRI: 02

Proposed Delivery

* DPK002 2 EA

NOTE: INSPECTION AND ACCEPTANCE REPORTS WILL BE SUBMITTED USING WIDE AREA WORKFLOW (WAWF)

NOTE 1: The quantity of First Article exhibits for Line Item 0001AD may be considered part of the contract quantity if the First Articles on Line Item 0001AE are approved by the Government as required by FAR Clause 52.209-3.

NOTE 2: These items will ship in place at the contractor's facility and will be held until the First Article Test Report has been reviewed and approved and the Government Quality Assurance (QAR) has signed the WAWF receiving report confirming the First Articles have been accepted and can be invoiced for payment.

NOTE 3: The contractor may present these First Article exhibits to the QAR for inspection and acceptance when the contractor has received the First Article Test Report Approval Modification data associated with that block.

NOTE 4: The First Articles offered must be manufactured at the facilities in which those items are to be produced under the contract ,or if the First Articles are a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered.

NOTE 5: The contractor SHALL NOT take any action on Line Item 0001AE until approval/disapproval is received for the First Article Units required in above line items.

NEW MANUFACTURED MATERIAL-FMS

Item No.

0001AE

Firm Fixed Price Quantity U/I Unit Price Amount

24 EA

CLIN ACRN ACRN Total

0001AE AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

* DPK002 ORIGIN

Type / Ship To PACRN Mark For

* DPK002 PAA DPKA00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DPK002 24 EA 30 MAY 2025 DPKA5V20494955 / PRI: 02

Proposed Delivery

* DPK002 24 EA

NOTE: INSPECTION AND ACCEPTANCE REPORTS WILL BE SUBMITTED USING WIDE AREA WORKFLOW (WAWF)

Item No.

0001AF

Firm Fixed Price

NEW MANUFACTURED MATERIAL-FMS

Bid A - First Article Required Quantity U/I Unit Price Amount

6 EA

CLIN ACRN ACRN Total

0001AF AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

* DPK002 ORIGIN

Type / Ship To PACRN Mark For

* DPK002 PAA DPKA00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DPK002 6 EA 30 MAY 2025 DPKA5V20494955 / PRI: 02

Proposed Delivery

* DPK002 6 EA

Bid B - First Article NOT Required Item No.

0001AG

Firm Fixed Price Quantity U/I Unit Price Amount

26 EA

CLIN ACRN ACRN Total

0001AG AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

* DPK002 ORIGIN

Type / Ship To PACRN Mark For

* DPK002 PAA DPKA00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DPK002 26 EA 30 MAY 2025 DPKA5V20494955 / PRI: 02

Proposed Delivery

* DPK002 26 EA

Item No.

0001AH

Firm Fixed Price Quantity U/I Unit Price Amount

6 EA

CLIN ACRN ACRN Total

0001AH AA

Production Article

PRODUCTION ARTICLE - SAME AS BASIC ITEM ABOVE

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

* DPK002 ORIGIN

Type / Ship To PACRN Mark For

* DPK002 PAA DPKA00

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

* DPK002 6 EA 30 MAY 2025 DPKC5420034965 / PRI: 02

Proposed Delivery

NEW MANUFACTURED MATERIAL-FMS

Bid B - First Article NOT Required

* DPK002 6 EA

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A PLANT

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

SHIP TO (FOREIGN MILITARY SALES)

TYPE/CODE: * DPK002

SUPPLEMENTAL ADDRESS CODE: DA2KCT

FMS CASE CODE/LOA: PK-D-KCT/001

MAPAC SHIP TO CODE: DPK002

MAPAC MARK FOR: DPKA00

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: * FA8111

SUPPLEMENTAL ADDRESS CODE: TBDTBD

FMS CASE CODE/LOA: GR-D-TBD/001

MAPAC SHIP TO CODE: FA8111

MAPAC MARK FOR: FA MONI

REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 9711X8242 .0002 4F X LC 5W CKCTPK 000000 00000 001000 503000 F03000 $0.00

PSR: I31169 FSR: 001054 DSR: 057004 CIN: F3YTBK3055A001

AB 9711X8242 .0002 4F X LC 5W CQANPK 000000 00000 001000 503000 F03000 $0.00

PSR: 947183 FSR: 097237 DSR: 293503 CIN: F3YTBK3055A001

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

REFERENCE:

AB PR: FD2030-22-01100-01

ACRN TOTAL $ 0.00

File details come from the government source that posted it. Updated .