PAGE 1 OF

ORDER FOR SUPPLIES OR SERVICES

1. CONTRACT PURCH ORDER/AGREEMENT NO. 2. DELIVERY ORDER/CALL NO. 3. DATE OF ORDER/CALL

(YYYYMMMDD)

4. REQUISITION/PURCH REQUEST NO. 5. PRIORITY

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than 6) CODE 8. DELIVERY FOB

DESTINATION

OTHER

(See Schedule if other)

9. CONTRACTOR CODE FACILITY 10. DELIVER TO FOB POINT BY (Date) 11. X IF BUSINESS IS

SMALL

SMALL

NAME 12. DISCOUNT TERMS DISADVANTAGED

AND

ADDRESS

WOMAN-OWNED

13. MAIL INVOICES TO THE ADDRESS IN BLOCK

14. SHIP TO CODE 15. PAYMENT WILL BE MADE BY CODE MARK ALL

PACKAGES AND

PAPERS WITH

IDENTIFICATION

NUMBERS IN

BLOCKS 1 AND 2

16. DELIVERY/

CALL THIS DELIVERY ORDER IS ISSUED ON ANOTHER GOVERNMENT AGENCY OR IN ACCORDANCE WITH AND SUBJECT TO TERMS AND CONDITIONS OF ABOVE NUMBERED CONTRACT.

TYPE

OF

ORDER

PURCHASE

Reference your Oral Written Quotation ________________________ , Dated ________________.

____________________________ furnish the following on terms specified herein.

ACCEPTANCE. THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.

NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED

If this box is marked, supplier must sign Acceptance and return the following number of copies:

17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE

18. ITEM NO. 19. SCHEDULE OF SUPPLIES/SERVICE 20. QUANTITY

ORDERED/

ACCEPTED*

21.

UNIT

22. UNIT PRICE 23. AMOUNT

* If quantity accepted by the Government is 24. UNITED STATES OF AMERICA 25. TOTAL same as quantity ordered, indicate by X. 26.

If different, enter actual quantity accepted below DIFFERENCES quantity ordered and encircle. BY: CONTRACTING/ORDERING OFFICER 27a. QUANTITY IN COLUMN 20 HAS BEEN

INSPECTED RECEIVED ACCEPTED, AND CONFORMS TO CONTRACT EXCEPT AS NOTED ____________________________________________________

b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE c. DATE d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

(YYYYMMMDD) REPRESENTATIVE

e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 28. SHIP. NO. 29. D.O. VOUCHER NO. 30. INITIALS

PARTIAL

32. PAID BY 33. AMOUNT VERIFIED CORRECT FOR

f. TELEPHONE NUMBER g. E-MAIL ADDRESS

FINAL

31. PAYMENT 34. CHECK NUMBER

36. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT.

COMPLETE

a. DATE b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

PARTIAL

35. BILL OF LADING NO.

FINAL

37. RECEIVED AT 38. RECEIVED BY (Print) 39. DATE RECEIVED

40. TOTAL CON-

TAINERS

41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO.

DD FORM 1155, DEC 2001 PREVIOUS EDITION IS OBSOLETE.

SPRRA2-21-P-0002 2020OCT29 SEE SCHEDULE DOA2

SPRRA2

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

MICHAEL (CODY) ROMINE

EMAIL: MICHAEL.1.ROMINE@DLA.MIL

S2305A

DCMA DETROIT

35803 MOUND ROAD

STERLING HEIGHTS MI 48310

X

052B0

UNITY CABLE TECHNOLOGIES, INC

1811 ADAMS ST

TOLEDO, OH, OH 43604-5427

SEE SCHEDULE

X

X

See Block 15

SEE SCHEDULE

HQ0337

DFAS-COLUMBUS CENTER

NORTH ENTITLEMENT OPERATIONS

P.O. BOX 182317

COLUMBUS OH 43218-2317

X

X 2

SPRRA220Q0129

SEE CONTRACT ADMINISTRATION DATA

SEE SCHEDULE

STEVON WALKER

STEVON.WALKER@DLA.MIL (256)690-5713

2020OCT29 /SIGNED/ 2020OCT29

$62,999.85

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: MICHAEL (CODY) ROMINE

Buyer Office Symbol/Telephone Number: DLA-AVIATION/(256)924-7907

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

Type of Business: Small Disadvantaged Business Performing in U.S.

Surveillance Criticality Designator: B

Weapon System: Patriot

*** End of Narrative A0000 ***

A-1. THIS REQUIREMENT IS AWARDED TO UNITY DEFENSE CAGE CODE 052BO.

A-2. THIS REQUIREMENT IS IN SUPPORT OF THE M-D6 PATRIOT WEAPON SYSTEM.

A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED. ______

A-4. PRODUCTION LOT TESTING (PLT) IS REQUIRED

A-5. FIRST ARTICLE (FAT) IS NOT REQUIRED. ______

A-6. SERIAL NUMBERS ARE NOT REQUIRED. _______

A-7. SNRR MARKINGS ARE NOT REQUIRED. _______

A-8. TAMMS-A MARKINGS ARE NOT REQUIRED. _______

A-9. IUID MARKINGS ARE NOT REQUIRED. ________

A.10. RFID MARKINGS ARE NOT REQUIRED. _______

A-11. ARMS EXPORT CONTROL IS APPLICABLE. WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT

CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES.

A-12. FIT CHECK IS NOT REQUIRED. ______

A-13. THIS IS A ONE-TIME-BUY (OTB) FIRM FIXED PRICE EFFORT FOR PN: 13646750 .

A-14. CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: ANNETTE WRIGHT

TELEPHONE NUMBER: 419-322-4118

E-MAIL ADDRESS: info@unitydefense.com

A-15. DCMA ACO POINT OF CONTACT INFORMATION: TBD

NAME: Latonya D. Tatum

TELEPHONE NUMBER: (586) 446-1243

E-MAIL ADDRESS: latonya.d.tatum2.civ@mail.mil

A-16. FOR ALL POST AWARD INQUIRIES AND QUESTIONS PLEASE SUBMIT TO,

DLA HASV POST AWARD TEAM

7408 WAREHOUSE ROAD

REDSTONE ARSEANL, AL 35898

DLAHSVPostAwardTeam@dla.mil

2 27

SPRRA2-21-P-0002

UNITY CABLE TECHNOLOGIES, INC

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A-17. THIS CONTRACT IS A RESULT OF SPRRA2-20-Q-0129.

A-18. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF ORDER.

A-19. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.

A-20.FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED

FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN

PART, AS APPROPRIATE.

A-21. FAR CLAUSE 52.204-25 PROHIBITION FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT IS APPLICABLE TO THIS

CONTRACT.

*** END OF NARRATIVE A0001 ***

3 27

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 CABLE ASSEMBLY,FIBE

NSN: 6020-01-609-3422

Mfr CAGE: 18876

Mfr Part Number: 13646750

0001AA PRODUCTION LOT TEST-GOVERNMENT FACILITY 15 EA $ 4,199.99000 $ 62,999.85 _______________________________________ ______________ __________________

COMMODITY NAME: CABLE ASSEMBLY,FIBE

CLIN CONTRACT TYPE:

Firm Fixed Price

PRON: D10H0159D1 PRON AMD: 04 ACRN: AA

AMS CD: SM2B1100000

PSC: 6020

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

MIL-STD-129 MARKINGS SHALLAPPLY

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: B

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE ISPM-15

COMPLIANT

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT

(POUNDS) AND SIZE (INCHES):

WT[5.5] LN[18.0] WD[18.0]

DP[14.0]

THE FOLLOWING MIL-STD-2073-1 APP J CODES &

MIL-STD-129 SHALL APPLY:

JI/A/MP [41] JII/CD [1] JIII/PM [00]

JIV/WM [00] JV/CD [NA] JVI/CT [A]

JVII/UC [ED] JVII/IC [00] JIX/A/PK [F]

JX/SM [00] JVIIIA/OPI [M]

SUPPLEMENTAL INFORMATION:

COIL CABLE; CAP/CUSHION CONNECTORS

(End of narrative D001)

Inspection and Acceptance _________________________

4 27

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

INSPECTION: Origin ACCEPTANCE: Destination

Government Approval/Disapproval Days: 60

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

002 W31G3H02520900 W31P0W J 2

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 15 24-AUG-2021

FOB POINT: Destination

SHIP TO:

(W31P0W) SR HEADQUARTERS US ARMY AVIATION &

REDSTONE TECHNICAL TEST CENTER

COTTONWOOD RD BLDG 8022 MF 4500

REDSTONE ARSENAL,AL,35898-8052

CONTRACT/DELIVERY ORDER NUMBER ______________________________

SPRRA2-21-P-0002/0000

5 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

HIGHER - - - LEVEL CONTRACT QUALITY REQUIREMENT : ANSI/ISO/ASQ 9001:2015, AS 9100 OR EQUIVALENT, TAILORING: OPERATION REQUIREMENTS ONLY

(PARAGRAPH 8.1, 8.2, 8.4, 8.5, 8.6, AND 8.7)

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

6 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

2 52.242-15 STOP-WORK ORDER AUG/1989

3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

4 52.247-34 F.O.B. DESTINATION NOV/1991

5 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

6 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

7 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT ADMINISTRATION DATA

PRON/ PRON/

AMS CD/ AMS CD/

LINE MIPR/ OBLG JO NO/ OBLIGATEDLINE MIPR/ OBLG JO NO/ OBLIGATED

ITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNTITEM GFEBS ATA STAT ACCT ASSIGN ACRN AMOUNT_____ _________ _____ ___________ ____ _______________ _________ _____ ___________ ____ __________

0001AA D10H0159D1 2 AA $ 62,999.85

SM2B1100000

TOTAL $ 62,999.85

OBLIGATED OBLIGATED

ACRN ACCOUNTING CLASSIFICATION AMOUNTACRN ACCOUNTING CLASSIFICATION AMOUNT____ _________________________ ______________ _________________________ __________

AA 97 X4930AC9F 6X 26K6 S01021 W31G3H $ 62,999.85 __________________

TOTAL $ 62,999.85

LINELINE

ITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATIONITEM ACRN EDI/SFIS ACCOUNTING CLASSIFICATION_____ ____ _______________________________________ ____ __________________________________

0001AA AA 97 0X0X4930AC9F S01021 6X0000SM2B110000026K6 S01021 W31G3H

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

8 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

INVOICE/RECEIVING REPORT COMBO

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

TBD

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC HQ0337

Issue By DoDAAC SPRRA2

Admin DoDAAC S2305A

Inspect By DoDAAC S2305A

Ship To Code W31P0W

Ship From Code 052B0

Mark For Code N/A

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC N/A

Other DoDAAC(s) N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and

Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

DCMA ACO POC: Latonya D. Tatum latonya.d.tatum2.civ@mail.mil 586-446-1243

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

9 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SPECIAL CONTRACT REQUIREMENTS

REVISIONS TO DRAWINGS/PART NUMBERS__________________________________

(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the

Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.

If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.

(b) The contractor hereby verifies previous contractual submission of technical data:

Contract No.:_______________________________________________________ _______________________________________________________

Contractor:_________________________________________________________ _________________________________________________________

Explanation of Data Rights:_________________________________________ _________________________________________

(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.

(d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change

Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).

WOOD PACKING MATERIALS REQUIREMENTS___________________________________

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

"http://www.alsc.org/) "

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with

ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

10 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.

The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their

National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (GOVERNMENT SPECIFICATION)____________________________________________________________________

TEXT

The contractor shall comply with the higher-level quality standard titled Quality systems -- Model for quality assurance and design, development, production, installation and servicing, American National Standards Institute/American Society for Quality Control

(ANSI/ASQC), International Organization for Standardization (ISO) Q9001:2000, SAE AS9100, or a Department of Defense approved quality system Single Process Initiative (SPI). Contractor must identify below the title, number (if any), date, and tailoring (if any) of the specific system(s) that will be used to satisfy this requirement.

TITLE NUMBER DATE TAILORED

POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_________________________________________________________________

Preservation, packaging, packing and marking of supplies will be performed at the following location: (If other than the location set forth in block 9, page 1 of this purchase order):

TBD

PRODUCTION LOT TEST - GOVERNMENT TESTED_______________________________________

(a) The Contractor shall deliver 15 units of Lot/Item CLIN 0001AA within 300 calendar days from the date of this contract to the

Government at (W31P0W) PR W0H9 US ARMY AVIATION AND MISSILE COMMAND, REDSTONE TECHNICAL TEST CENTER, COTTONWOOD ROAD BLDG 8022 MF4500, REDSTONE ARSENAL, AL 35898-8052 for Production Lot Test (PLT). If the quantity required for PLT is less than the actual production quantity, the sample(s) to be shipped shall be selected at random during manufacture by the DCMA QAR. The shipping documentation shall contain this contract number and the Lot/Item identification. Copies of all available in-process documentation to include copies of

Instruction Letters, Inspection Sheets/records, Material Test Results, and Certificates of Compliance shall be included with the sample(s) shipment.

(b) PLT sample(s) must meet all the requirements of the Technical Data Package (TDP) and all other contractual requirements. If the entire lot is required for testing, delivery of the total quantity required herein shall be accomplished in no more than two (2) shipments. Delivery in one (1) shipment is desirable; however, when two (2) shipments are necessary, fifty percent (50%) or more of the total quantity shall be included in the first shipment, and the remaining quantity shall be included in the second shipment.

(c) The Contracting Officer will notify the Contractor, in writing, of the acceptance or rejection of the Production Lot Test sample(s). The notice of acceptance shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of rejection shall cite reasons for the rejection.

(d) If the PLT sample(s) is/are rejected, the Government may choose to have the contractor remedy the non-conformances found on the product by rework when appropriate, or require the contractor to provide newly manufactured product for inspection. The Contractor, upon

Government request, shall make any necessary changes to meet the requirements of this contract. The Contractor shall furnish any reworked or newly manufactured PLT sample(s) to the Government as appropriate, under the terms and conditions and within the time specified by the Government. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule and/or for any additional costs to the Government related to these inspection retests.

(e) The Government reserves the right to reject any lot in which one or more defective units of production are found. The Government, at its discretion, may elect to perform a 100 percent screen on a lot and accept only those items that are conforming to all contract requirements. Under no circumstances shall the Government accept or be obligated to accept known defective hardware as a part of any lot.

BAR CODE MARKINGS_________________

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC ASSEMBLIES______________________________________________________________________________

11 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

1. Notwithstanding any other provision contained in any part of this contract to the contrary, the minimum requirements/standards for soldering electrical and electronic assemblies shall be the non-military joint industry standard, ANSI/J-STD-001, Class 3. The revision of ANSI/J-STD-001 in effect on the effective date of the contract shall govern the hardware produced hereunder. A copy of ANSI/J-STD-001 may be obtained from the Institute for Interconnecting and Packaging Electronic Circuits (IPC), 2215 Sanders Road, Northbrook, IL, 60062-

6135, telephone number (847) 509-9700, fax number (847) 509-9798.

2. The contractor shall establish and maintain an electronic/electrical parts control program and shall maintain and make available to the Government records and data which will provide visibility and traceability of all parts used in the production of the equipment under this contract. This selection of parts shall not be construed to relieve the contractor of meeting specified performance of the end item in which the part is used.

3. The Technical Data Package (TDP) shall serve as the baseline Program Parts Selection List (PPSL) and the parts and sources listed therein are the standard parts and sources. A Non Standard Part is defined as a part or source other than that cited in the PPSL. When the contractor desires to use a part or source other than those cited in the PPSL, the change must be approved by the Government via a

Request for Deviation (RFD) as defined elsewhere in this contract. Failure on the part of the contractor to submit such RFDs may result in the replacement of the nonstandard part with the standard part by the Government at the contractors expense for all affected items.

4. The contractor shall provide objective evidence such as form, fit, function, and interchangeability data that shows the proposed part complies with the requirements of applicable parts documentation. The RFD shall detail the technical justification for the use of the part and advantages of the nonstandard part, if any. Compare the nonstandard part to the standard part whose characteristics are nearest to those required for the application. Include, when applicable:

a. Part Number and Source

b. Size and weight data.

c. Electrical and mechanical characteristics

d. Reliability (with data if requested)

e. Availability of the standard part (delivery schedules, still available etc.)

f. Supplemental data such as existing control drawings, specifications, vendor data sheets, and other pertinent data. Data need not be furnished for nonstandard parts covered by documents listed in the Department of Defense Index of Specifications and Standards

(DoDISS) or Standardized Military Drawings (SMD).

5. The Contractor shall maintain a Lead Free Control Plan (LFCP) and make available to the Government upon request. The requirement for a Lead Free Control Plan shall be flowed down to suppliers of equipment that may include lead-free materials. The LFCP shall follow the guidelines set forth in GEIA-STD-0005-1, "Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-

Free Solder" or its equivalent. In addition, the LFCP shall also include tin whisker mitigation plans in accordance with GEIA-STD-0005-

2, "Standard for Mitigating the Effects of Tin Whiskers in Aerospace and High Performance Electronic Systems" or its equivalent, at control level 2C or equivalent. The Contractor should include in the LFCP any special design considerations, manufacturing process controls, test and qualification requirements, quality inspection and screening, marking and identification, maintenance and repair processes, and other steps taken to mitigate risk.

6. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan and make available to the Government upon request. The Plan shall meet the requirements of SAE AS5553 for electronic items. The Contractor shall procure parts from original manufacturers or the original manufacturers franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP Operations Manual, SO300-BT-

PRO- 010.

ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, AND SPECIFICATION CHG NOTICE______________________________________________________________________________________________________________________________________

PREPARATION AND SUBMISSION INSTRUCTIONS_______________________________________

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), and Requests for Variance

(RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format. _______

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished

Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for

Class I ECPs.

12 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

b. Long Form Procedure: Class I changes to the CI require that DD Form 1692, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs, which meet the requirements of Class II ECPs, shall be prepared using DD Form 1692 (page

1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Priority", and Block 8 "Justification Codes."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFV. RFVs shall be prepared using DD Form 1694.

e. Each ECP and RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract Management

Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFV proposal.

f. Classification of RFVs.

(1) Major RFVs. RFVs written against CIs shall be designated as major when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability; reliability;

survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFVs. RFVs written against CIs shall be designated as critical when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFVs. RFVs written against CIs shall be designated as minor when the RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs f(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

g. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

h. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

i. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

j. Times allowed for technical decisions for ECP and RFV proposals will be worked out via mutual agreement between the Contractor and the Government.

k. The Contractor shall submit, concurrent with the ECP, a separate DD Form 1696, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.

l. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

m. The Contractor shall utilize DD Form 2617, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

n. The Contractor shall utilize DD Form 1695, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled

"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO). __________

One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, or RFVs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.

4. Distribution. ____________

a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft Word _______________________ is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Office of the Secretary of Defense Executive Services Directorate DoD Directives Division website

13 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(http://www.esd.whs.mil/DD/ ) via the DoD Forms menu. The forms are provided in fillable Adobe Acrobat Portable Document Format

(PDF). In order to access and use the forms, the user must have the "Adobe Acrobat" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO.

b. Hard Copy Distribution of Class I or II ECPs and RFVs, For each Class I or II ECP, or each RFV that the ACO determines to be in ______________________________________________________ compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SET

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-1335

c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the Contractor _______________________________ shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the

PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the

VEPM.

Aviation and Missile Research, Development, and Engineering Center

ATTN: RDMR-SEI

Redstone Arsenal, Al 35898-5000

Telephone: 256-876-8163

5. Alternate Format, Submittal, or Distribution Process. Proposals may be prepared in a different format, submitted using a different ____________________________________________________ submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.

6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution _____________________ of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The

Government will notify the Contractor in writing if a proposal is determined to be unacceptable.

(End of Clause)

*** END OF NARRATIVE H0001 ***

14 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT CLAUSES

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS JAN/2017

OR STATEMENTS

2 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS JUN/2020

3 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT/2018

4 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG/2020

5 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES JUL/2018

DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES

6 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH JUN/2020

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

7 52.211-5 MATERIAL REQUIREMENTS AUG/2000

8 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS APR/2008

9 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS OCT/2010

10 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS (PRB) JUL/2005

OTHER THAN PENSIONS

11 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND EQUIPMENT JUN/2020

12 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015

13 52.222-26 EQUAL OPPORTUNITY SEP/2016

14 52.222-50 COMBATING TRAFFICKING IN PERSONS JAN/2019

15 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING JUN/2020

16 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN/2008

17 52.232-1 PAYMENTS APR/1984

18 52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB/2002

19 52.232-11 EXTRAS APR/1984

20 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014) -- ALTERNATE I (APR 1984) APR/1984

21 52.232-25 PROMPT PAYMENT JAN/2017

22 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN/2013

23 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013

24 52.233-1 DISPUTES MAY/2014

25 52.233-3 PROTEST AFTER AWARD AUG/1996

26 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004

27 52.243-1 CHANGES--FIXED PRICE AUG/1987

28 52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT APR/1984

FORM)

29 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR/1984

30 52.253-1 COMPUTER GENERATED FORMS JAN/1991

31 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011

32 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013

33 252.204-7000 DISCLOSURE OF INFORMATION OCT/2016

34 252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT APR/1992

35 252.204-7006 BILLING INSTRUCTIONS OCT/2005

36 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING DEC/2019

37 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT MAY/2016

38 252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS DEC/2019

EQUIPMENT OR SERVICES

39 252.225-7041 CORRESPONDENCE IN ENGLISH JUN/1997

40 252.225-7048 EXPORT-CONTROLLED ITEMS JUN/2013

41 252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS FEB/2014

42 252.227-7014 RIGHTS IN NONCOMMERCIAL COMPUTER SOFTWARE AND NONCOMMERCIAL COMPUTER FEB/2014

SOFTWARE DOCUMENTATION

43 252.227-7015 TECHNICAL DATA--COMMERCIAL ITEMS FEB/2014

15 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

44 252.227-7016 RIGHTS IN BID OR PROPOSAL INFORMATION JAN/2011

45 252.227-7019 VALIDATION OF ASSERTED RESTRICTIONS--COMPUTER SOFTWARE SEP/2016

46 252.227-7025 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED MAY/2013

INFORMATION MARKED WITH RESTRICTIVE LEGENDS

47 252.227-7027 DEFERRED ORDERING OF TECHNICAL DATA OR COMPUTER SOFTWARE APR/1988

48 252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT MAR/2000

49 252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA SEP/2016

50 252.231-7000 SUPPLEMENTAL COST PRINCIPLES DEC/1991

51 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS DEC/2018

52 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006

53 252.232-7017 ACCELERATING PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS--PROHIBITION APR/2020

ON FEES AND CONSIDERATION

54 252.243-7001 PRICING OF CONTRACT MODIFICATIONS DEC/1991

55 252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS JUN/2013

56 252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC FEB/2019

57 52.219-29 NOTICE OF SET-ASIDE FOR, OR SOLE SOURCE AWARD TO, ECONOMICALLY MAR/2020

DISADVANGATED WOMEN-OWNED SMALL BUSINESS CONCERNS (DEVIATION 2020-

O0008)

(a) Definitions. As used in this clause--

"Economically disadvantaged women-owned small business (EDWOSB) concern" means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business (WOSB) concern eligible under the WOSB Program.

"Similarly situated entity" means a first-tier subcontractor, including an independent contractor, that--

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

"WOSB Program Repository" means a secure, Web-based application that collects, stores, and disseminates documents to the contracting community and SBA, which verify the eligibility of a business concern for a contract to be awarded under the WOSB Program.

(b) Applicability. This clause applies only to--

(1) Contracts that have been set aside for, or awarded on a sole source basis to, EDWOSB concerns;

(2) Part or parts of a multiple-award contract that have been set aside for EDWOSB concerns;

(3) Orders set aside for EDWOSB concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F); and

(4) Orders issued directly to EDWOSB concerns under multiple-award contracts as described in 19.504(c)(1)(ii).

(c) General.

(1) Offers are solicited only from EDWOSB concerns. Offers received from concerns that are not EDWOSB concerns will not be considered.

(2) Any award resulting from this solicitation will be made to an EDWOSB concern.

(3) The Contracting Officer will ensure that the apparent successful offeror has provided all required documents to the WOSB Program

Repository. The contract will not be awarded until all required documents are received.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, an EDWOSB concern agrees that in the performance of a contract assigned a NAICS code for--

16 27

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the prime contractors 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. Other direct costs are excluded to the extent they are not the principal purpose of the contract and cannot be obtained from small business concerns;