SPRRA116R0246.pdf

PDF 198 KB Posted

Attached to
TOOL KIT, ARMY AIRCRAFT
Solicitation number
SPRRA1-16-R-0246
Issued by

About this file

Solicitation SPRRA1-16-R-0246 TOOL KIT

View the file

Other files

File Type Posted
SPRRA116R0246-0004.pdf PDF
SPRRA116R0246-0003.pdf PDF
SPRRA116R0246-0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

SPRRA1-16-R-0246

X

2016MAY25

2016JUN27

DOA1

2016MAY25 SEE SCHEDULE

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

CARMEN L. SMITH

(256)876-7289

AHA

CARMEN.SMITH@DLA.MIL

1 84

X 1

X 4

X 17 X 18 X 19

X 22

X 24

X 29

X 61

X 62

X 72

X 83

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: CARMEN L. SMITH

Buyer Office Symbol/Telephone Number: AHA/(256)876-7289

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A-1. THIS REQUIREMENT IS 100% SMALL BUSINESS SET-ASIDE IN ACCORDANCE WITH FAR 6.203. ONLY OFFERS FROM SMALL BUSINESS FIRMS WILL BE

CONSIDERED.

A-2. THIS ITEM IS NOT A CRITICAL SAFETY ITEM (CSI) __ ___

A-3. PRODUCTION LOT TESTING IS NOT REQUIRED __ ___

A-4. FIRST ARTICLE TEST IS REQUIRED __

A-5. SNRR IS NOT REQUIRED __ ___

A-6. TAMMS-A IS NOT REQUIRED __ ___

A-7. IUID MARKINGS ARE NOT REQUIRED ___ ___

A-8. THIS IS A FIVE YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ), FIRM FIXED PRICE

A-9. THE GOVERNMENT INTENDS TO AWARD ONLY ONE CONTRACT AS A RESULT OF THIS SOLICITATION

A-10. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF EACH DELIVERY ORDER

A-11. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT

A-12. OFFERS SHALL BE SUBMITTED IN ACCORDANCE WITH FAR CLAUSE 52.215-1. FACSIMILE SUBMISSIONS ARE NOT AUTHORIZED. CONTRACTOR MAY EMAIL _______

OFFER TO CARMEN.SMITH@DLA.MIL OR MAIL TO:

DEFENSE LOGISTICS AGENCY

ATTN: CARMEN SMITH

DSCR-AHAC, BLDG 2501

REDSTONE ARSENAL, AL 35898-5280

A-13. THIS SOLICITATION INCLUDES PROVISIONS 52.215-9023, REVERSE AUCTION. SINCE A REVERSE AUCTION MAY BE CONDUCTED, OFFERORS ARE

ENCOURAGED TO ACCESS THE PROCUREX SITE AND REVIEW THE REVERSE AUCTION HELP TUTORIALS AT ://DLA/PROCUREX.COM TO LEARN MORE ABOUT HOW TO

PARTICIPATE IN AN AUCTION.

A-14. FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED

FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE

THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTOR'S RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION

AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMEMNDATION WITHOUT WRITTEN

DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN

PART, AS APPROPRIATE.

A-15. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: ___________________________________________________

TELEPHONE NUMBER: _______________________________________

FAX NUMBER: ____________________________________________

E-MAIL ADDRESS: ________________________________________

2 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A-16. DCMA ACO TO BE DETERMINED AT AWARD.

A-17. NOTICE : YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403 RELATIVE TO THE REQUIREMENTS FOR OBTAINING

CERTIFIED COST AND PRICING INFORMATION. IF THIS IS NOT CONSIDERED TO BE AN INDEPENDENTLY COMPETITIVE REQUIREMENT, YOU ARE REQUIRED TO

SUBMIT CERTIFIED COST AND PRICING DATA IF REQUESTED. FAILURE TO DO SO MAY RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE. ____________

A-18. IF THE OFFEROR HAS RECEIVED A CONTRACT OR PURCHASE ORDER FOR THE SAME NATIONAL STOCK NUMBERED ITEM SOUGHT UNDER THIS SOLICITATION

SUBJECT TO A FIRST ARTICLE TEST, THE OFFEROR MUST IDENTIFY THE CONTRACT NUMBER UNDER WHICH THE FIRST ARTICLE IS DUE AND THE DATE ON

WHICH THE FIRST ARTICLE IS DUE. THE CONTRACTING OFFICER WILL USE THIS INFORMATION IN MAKING A DETERMINATION AS TO WHETHER FIRST ARTICLE

CAN BE WAIVED FOR THE OFFEROR UNDER THE CURRENT SOLICITATION, OR ALTERNATELY, WHETHER A CONDITIONAL AWARD PENDING FIRST ARTICLE APPROVAL

CAN BE MADE UNDER THE CURRENT SOLICITATION. IF THE REQUESTED/REQUIRED DELIVERY FOR THE FAT REPORT/FA SHIP TIME CANNOT BE MET, OFFEROR(S)

SHALL PROVIDE A PROPOSED DELIVERY SCHEDULE WITH DETAILS EXPLAINING WHY THE REQUESTED/REQUIRED DELIVERY CANNOT BE MET. THE SUPPLIER SHALL

NOTIFY IN WRITING THE TESTING LAB, THE ENGINEERING SUPPORT ACTIVITY, AND THE CONTRACT ADMINISTRATOR WHEN TESTING REPORTS AND/OR

SHIPMENTS ARE SUBMITTED IAW CONTRACT REQUIREMENTS TO INCLUDE TRACKING INFORMATION.

CONTRACTOR FIRST ARTICLE TEST

Number of samples to be tested = ___1______ ___________

Deliver FOB: Destination

Inspection: Origin

Acceptance: Destination

BY: 168 (Delivery Date for First Article Test Report) _____

Ship To: Carmen Smith-Contract Specialist.

DLA Aviation -Huntsville

5201 Martim Road, Redstone Arsenal, AL 35898-7340 (With an information copy to the Administering Contracting Officer)

Delivery Schedule:

168 Days ARO: Contractor First Article test completed and Report Submission

30 Days: Government Review and Notification to Contractor

180 DAFAA: Delivery of Production Units

378 DARO

A-19. EXPORT CONTROL WARNING: ______________

THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET SEQ.)

OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES.

A-20. THE DRAWINGS/ TECHNICAL DATA PACKAGE (TDP) ARE AVAILABLE ON LINE. CONTRACTORS MUST BE AN EXPORT CONTROL CERTIFIED.

*** END OF NARRATIVE A0001 ***

3 84

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

This is a five year Indefinite Delivery Indefinite

Quantity (IDIQ) solicitation. Funds will be obligated/cited upon the issuance of each delivery order. The government will only be obligated to order the stated minimum quantity. The government is not obligated to issue any additional orders against this contract; however, the government reserves the right to order up to the maximum quantity.

The government has segregated the potential quantities into five years. However, this does not preclude exercising its rights under FAR 52.216-19 by ordering the maximum quantity specified in FAR

52.216-19(b)(1) at any time during the indefinite quantity period. The government's minimum quantity to be awarded simultaneously with the award of the basic contract is 227 each minimum or up to 1227 each maximum.

The initial delivery order will meet or exceed the minimum quantity at the first year pricing. The government's maximum quantity during the indefinite quantity period is 1227 each. The delivery order minimum order quantity is 30 each.

Prices quoted for each year will be valid for all quantities ordered during that ordering period.

The solicitation is for the supplies as detailed on the following pages. Offerors are cautioned to insure that offers are provided on all quantities.

Failure to propose all CLINS, will result in a determination of non-responsiveness.

Year 1 will be from date of award through day 365 days after receipt of order (DARO).

Year 2 will begin 366 DARO and end 730 DARO.

Year 3 will begin 731 DARO and end 1,095 DARO.

Year 4 will begin 1,096 DARO and end 1,461 DARO.

Year 5 will begin 1,462 DARO and end 1,826 DARO.

The contractor shall provide unit prices for each

CLIN below.

All references to F.O.B. origin throughout this solicitation apply only to all quantities ordered after the first ordering period.

The estimated (E) quantity listed herein does not commit the government to order that or any quantity above the minimum quantity.

(End of narrative A001)

4 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0001 TOOL KIT,ARMY AIRCRAFT

NSN: 5180-01-629-5027

Mfr CAGE: 81996

Mfr Part Number: 1060242A

0001AA PRODUCTION QUANTITY YEAR ONE WITH FIRST ARTICLE _______________________________________________

TEST 227 (E) EA $ $ ____ ______________ __________________

COMMODITY NAME: TOOL KIT,ARMY AIRCRAFT

CLIN CONTRACT TYPE:

Firm Fixed Price

APPROVED SOURCES:

100% SMALL BUSINESS SET ASIDE

THE GOVENMENT WILL EITHER AWARD CLIN 0001AA OR 0001AB

AND INTENDS TO MAKE ONE AWARD AS A RESULT OF THE

SOLICITATION.

First Article test time is 3 days. Units to be tested ______ are 1 each. Begin testing 150 days after contract _ award (DACA). End testing 153 DACA. First article test report is due 168 DACA. The government has 30 ___ days to approve/disapprove the test report.

GOVERNMENT TEST APPROVAL IS REQUIRED BEFORE SHIPMENT

OF PRODUCTION UNITS.

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 1060242A

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

MIL-STD-129 MARKINGS SHALL APPLY.

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [80] LB

LN [24.7] IN

WD [19.6] IN

DP [26.8] IN

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE

ISPM-15 COMPLIANT

Level of Preservation - Military / Level of Pack

- [A] in Accordance with:

5 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM

[00]

JV/CD [00] JVI/CT [0] JVII/UC [zz] JVII/IC

[00]

JIX/A/PK [F] JX/SM [25] JVIIIA/OPI [M]

Supplemental Information

BOX 1 OF 2; ZZ=PELICAN CASES; ANTI-PILFER TAPED;

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W62G2T) XU W1A8 DLA DIST SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY,CA,95304-5000

Deliveries will be made to W62G2T

XU W1A8 DLA DIST

SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY, CA, 95304-5000

DELIVERIES SHALL COMMENCE 378

DAYS AFTER RECEIPT OF ORDER.

(End of narrative F001)

0001AB YEAR ONE WITHOUT 1ST ARTICLE 250 EA $ $ ____________________________ ______________ __________________

COMMODITY NAME: TOOL KIT,ARMY AIRCRAFT

CLIN CONTRACT TYPE:

Firm Fixed Price

APPROVED SOURCES:

100% SMALL BUSINESS SET ASIDE

THE GOVENMENT WILL EITHER AWARD CLIN 0001AA OR 0001AB

6 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

AND INTENDS TO MAKE ONE AWARD AS A RESULT OF THE

SOLICITATION.

WITHOUT FIRST ARTICLE TEST: DELIVERIES WILL BEGIN 180

DAYS AFTER CONTRACT AWARD.

(End of narrative B001)

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 1060242A

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

MIL-STD-129 MARKINGS SHALL APPLY.

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [15.5] LB

LN [18] IN

WD [12] IN

DP [18] IN

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE

ISPM-15 COMPLIANT

Level of Preservation - Military / Level of Pack

- [A] in Accordance with:

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM

[00]

JV/CD [00] JVI/CT [0] JVII/UC [zz] JVII/IC

[00]

JIX/A/PK [F] JX/SM [25] JVIIIA/OPI [M]

Supplemental Information

BOX 1 OF 2; ZZ=PELICAN CASES; ANTI-PILFER TAPED;

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

7 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

FOB POINT: Destination

SHIP TO:

(W62G2T) XU W1A8 DLA DIST SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY,CA,95304-5000

Deliveries will be made to W62G2T

XU W1A8 DLA DIST

SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY, CA, 95304-5000

DELIVERIES SHALL COMMENCE 180

DAYS AFTER RECEIPT OF ORDER.

(End of narrative F001)

0002 TOOL KIT,ARMY AIRCRAFT

NSN: 5180-01-629-5027

Mfr CAGE: 81996

Mfr Part Number: 1060242A

0002AA PRODUCTION QTY YEAR TWO 250 EA $ $ _______________________ ______________ __________________

COMMODITY NAME: TOOL KIT,ARMY AIRCRAFT

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 1060242A

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

MIL-STD-129 MARKINGS SHALL APPLY.

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [15.5] LB

LN [18] IN

WD [12] IN

DP [18] IN

8 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE

ISPM-15 COMPLIANT

Level of Preservation - Military / Level of Pack

- [A] in Accordance with:

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM [00]

JV/CD [00] JVI/CT [0] JVII/UC [zz] JVII/IC [00]

JIX/A/PK [F] JX/SM [25] JVIIIA/OPI [M]

Supplemental Information

BOX 1 OF 2; ZZ=PELICAN CASES; ANTI-PILFER TAPED;

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

Deliveries will be made to W62G2T

XU W1A8 DLA DIST

SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY, CA, 95304-5000

DELIVERIES SHALL COMMENCE 180

DAYS AFTER RECEIPT OF ORDER.

(End of narrative F001)

0003 TOOL KIT,ARMY AIRCRAFT

NSN: 5180-01-629-5027

Mfr CAGE: 81996

Mfr Part Number: 1060242A

9 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0003AA PRODUCTION QTY YEAR THREE 250 EA $ $ _________________________ ______________ __________________

COMMODITY NAME: TOOL KIT,ARMY AIRCRAFT

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 1060242A

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

MIL-STD-129 MARKINGS SHALL APPLY.

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [15.5] LB

LN [18] IN

WD [12] IN

DP [18] IN

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE

ISPM-15 COMPLIANT

Level of Preservation - Military / Level of Pack

- [A] in Accordance with:

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM

[00]

JV/CD [00] JVI/CT [0] JVII/UC [zz] JVII/IC

[00]

JIX/A/PK [F] JX/SM [25] JVIIIA/OPI [M]

Supplemental Information

BOX 1 OF 2; ZZ=PELICAN CASES; ANTI-PILFER TAPED;

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

10 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

Deliveries will be made to W62G2T

XU W1A8 DLA DIST

SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY, CA, 95304-5000

DELIVERIES SHALL COMMENCE 180

DAYS AFTER RECEIPT OF ORDER.

(End of narrative F001)

0004 TOOL KIT,ARMY AIRCRAFT

NSN: 5180-01-629-5027

Mfr CAGE: 81996

Mfr Part Number: 1060242A

0004AA PRODUCTION QTY YEAR FOUR 250 EA $ $ ________________________ ______________ __________________

COMMODITY NAME: TOOL KIT,ARMY AIRCRAFT

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 1060242A

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

MIL-STD-129 MARKINGS SHALL APPLY.

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [15.5] LB

LN [18] IN

WD [12] IN

DP [18] IN

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE

ISPM-15 COMPLIANT

11 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Level of Preservation - Military / Level of Pack

- [A] in Accordance with:

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM

[00]

JV/CD [00] JVI/CT [0] JVII/UC [zz] JVII/IC

[00]

JIX/A/PK [F] JX/SM [25] JVIIIA/OPI [M]

Supplemental Information

BOX 1 OF 2; ZZ=PELICAN CASES; ANTI-PILFER TAPED;

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

Deliveries will be made to W62G2T

XU W1A8 DLA DIST

SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY, CA, 95304-5000

DELIVERIES SHALL COMMENCE 180

DAYS AFTER RECEIPT OF ORDER.

(End of narrative F001)

0005 TOOL KIT,ARMY AIRCRAFT

NSN: 5180-01-629-5027

Mfr CAGE: 81996

Mfr Part Number: 1060242A

0005AA PRODUCTION QTY YEAR FIVE 250 EA $ $ ________________________ ______________ __________________

12 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

COMMODITY NAME: TOOL KIT,ARMY AIRCRAFT

CLIN CONTRACT TYPE:

Firm Fixed Price

Description/Specs./Work Statement _________________________________

TOP DRAWING NR: 1060242A

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

IAW MIL-STD-2073-1 CODES, APPENDIX J

UNIT PACK: 001 INTERMEDIATE PACK: 000

LEVEL PRESERVATION: Military

LEVEL PACKING: A

MIL-STD-129 MARKINGS SHALL APPLY.

ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND

SIZE (INCHES):

WT [15.5] LB

LN [18] IN

WD [12] IN

DP [18] IN

ALL WOOD PACKAGING MATERIAL (WPM) MUST BE

ISPM-15 COMPLIANT

Level of Preservation - Military / Level of Pack

- [A] in Accordance with:

MIL-STD-2073-1 CODES, APPENDIX J

JI/A/MP [42] JII/CD [1] JIII/PM [00] JIV/WM

[00]

JV/CD [00] JVI/CT [0] JVII/UC [zz] JVII/IC

[00]

JIX/A/PK [F] JX/SM [25] JVIIIA/OPI [M]

Supplemental Information

BOX 1 OF 2; ZZ=PELICAN CASES; ANTI-PILFER TAPED;

(End of narrative D001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Origin

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

13 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

Deliveries will be made to W62G2T

XU W1A8 DLA DIST

SAN JOAQUIN

25600 S CHRISMAN ROAD

REC WHSE 57

TRACY, CA, 95304-5000

DELIVERIES SHALL COMMENCE 180

DAYS AFTER RECEIPT OF ORDER.

(End of narrative F001)

0006 FIRTST ARTICLE TEST REPORT 1 EA $ ** NSP ** $ ** NSP ** __________________________ ______________ __________________

COMMODITY NAME: TOOL KIT

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________

001 1 0168

FOB POINT: Destination

SHIP TO:

(SPRRA1) DLA AVIATION AT HUNTSVILLE, AL

DLR PROCUREMENT OPERATIONS (AH)

5201 MARTIN ROAD

REDSTONE ARSENAL,AL,35898-7340

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE

TESTED IS 1 EACH. BEGIN TESTING 150 DAYS AFTER

CONTRACT AWARD (DACA). END TESTING 153 DACA. FIRST

ARTICLE TEST REPORT DUE 168 DACA. THE GOVERNMENT

HAS 30 DAYS TO APPROVE/DISAPPROVE THE TEST REPORT.

14 84

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(End of narrative F001)

15 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

B-1 52.209-4000 BID ["]A["] REQUIRED (USAAMCOM) OCT/1992

In order to insure being considered responsive all bidders are required to insert a price for "Bid "A" First Article Approval -

Contractor Testing Required", notwithstanding that they may furnish the information indicated in the provision in Section L entitled

"First Article Approval: Alternate Offers/Bids/Quotes".

(End of Clause)

B-2 52.209-4710 PRODUCTION QUANTITY WITH FIRST ARTICLE - CONTRACTOR TESTING JUN/1997

(USAAMCOM)

A first article is required but is not being procured as a separate CLIN. CLIN 0001 includes one (1) each first article and contractor testing of the first article, in accordance with FIRST ARTICLE APPROVAL - CONTRACTOR TESTING, FAR 52.209-3 (ALTERNATE I). The first article, when accepted, will become part of the production quantity. See the first article approval clause for the first article test report delivery schedule.

Since the First Article, after acceptance, will be used as part of the production units, it shall not be subjected to environmental testing unless such testing is specifically identified on the documentation as acceptance testing that must be performed on all production units. First Article inspection, at a minimum, shall include evaluation of processes, material, any related certification, surface finish, dimensional and functional requirements of the contract, applicable specifications and drawings.

(End of Clause)

16 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

D-1 52.208-4700 WOOD PACKING MATERIALS REQUIREMENTS JUL/2007

A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).

B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures

(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and ouside of the United

States must meet ISPM 15 whenever WPM is used to ship DOD cargo.

(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD

HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement

Regulations (see http://www.alsc.org/).

(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.

C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.

D. Replacement Preservative for Pentachlorophenol

If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or

1.8 percent copper 8 quinolinolate.

(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated.

All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.

(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention

Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their

National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.

(End of Clause)

D-2 52.247-4700 BAR CODE MARKINGS (USAAMCOM) MAY/2014

Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -

Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.

(End of Clause)

17 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

HIGHER - - LEVEL CONTRACT QUALITY REQUIREMENT : ANSI/ISO/ASQ 9001:2008, AS 9100 OR EQUIVALENT, TAILORING: ALL PARAGRAPHS UNDER 7.3

(DESIGN AND DEVELOPMENT) DO NOT APPLY

Title Number Date Tailoring

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E-4 52.246-4003 CALIBRATION (USAAMCOM) JAN/2012

The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National

Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test

Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International

Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.

18 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

http://farsite.hill.af.mil/VFFARA.HTM or http://farsite.hill.af.mil/VFDFARA.HTM or http://farsite.hill.af.mil/VFAFARa.HTM

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

F-1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989

F-2 52.242-15 STOP-WORK ORDER AUG/1989

F-3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984

F-4 52.247-29 F.O.B. ORIGIN FEB/2006

F-5 52.247-34 F.O.B. DESTINATION NOV/1991

F-6 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999

F-7 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984

F-8 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984

F-9 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991

F-10 52.211-8 TIME OF DELIVERY JUN/1997

(a) The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 227 378 DARO

0001AB 250 180 DARO

0002AA 250 180 DARO

0003AA 250 180 DARO

0004AA 250 180 DARO

0005AA 250 180 DARO

The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.

OFFERORS PROPOSED DELIVERY SCHEDULE

ITEM NO. QUANTITY WITHIN DAYS

AFTER DATE OF

CONTRACT

0001AA 227 _____ DARO

0001AB 250 _____ DARO

0002AA 250 _____DARO

0003AA 250 _____DARO

0004AA 250 _____DARO

0005AA 250 _____DARO

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish

19 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the

Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the

Contractors date of receipt of the contract or notice of award by adding

(1) five calendar days for delivery of the award through the ordinary mails, or

(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.

(End of Clause)

52.246-9008 Inspection and Acceptance at Origin.

As prescribed in 46.503-90(b)(3), insert the following clause:

52.246-9008 INSPECTION AND ACCEPTANCE AT ORIGIN (NOV 2011)

(a) Inspection and acceptance are at origin.

(b) The point of acceptance will be the point of last inspection before shipment unless otherwise indicated by the offeror.

(c) The Offeror shall indicate below the location where supplies will be inspected:

Supplies:

Plant: ___________________________________

Commercial and Government entity (CAGE) code:__________________

Street: __________________________________

City/State/Zip: ______________________________

Applicable to contract line-item numbers(s) (CLIN(s)): __________________________________

(d) The Offeror shall indicate below the location where packaging will be inspected:

Packaging:

( ) Same as for supplies or, Plant: __________________________________ CAGE Code: ___________________

Street: _________________________________

City/State/Zip: _____________________________

Applicable to CLIN(s): ___________________________________________________

(e) For CLIN(s) described by manufacturer's name/code and part number:

(1) Contractor must present evidence of performance of all quality assurance requirements specified in the contract and ensure that item will serve its intended purpose by performing examinations and tests to determine (A) completeness of item, (B) absence of rust, contamination, or deterioration, (C) correct identification, (D) absence of any damage, and (E) compliance with preparation for delivery. If the Contractor is not the manufacturer of the supplies, evidence must be furnished to establish that the supplies were produced by the manufacturer.

(2) The word "manufacturer" means the actual manufacturer of each CLIN. The Governments Quality Assurance Representative may require that evidence be furnished establishing the name and address of the plant that manufactures each CLIN to ensure that a domestic product is being supplied.

(f) For CLIN(S) designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or

Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number (as specified in Defense Logistics Acquisition Directive (DLAD) 52.211-9000, Section I of the award). Any deviation from this number shall be cause for rejection of the item.

(g) Additional inspection requirements may be required, based on the evaluation of the surplus offer, by the procuring activity. Such additional requirements, if necessary, will be identified before the award.

(End of Clause)

*** END OF NARRATIVE F0001 ***

52.211-9020 Time of Delivery Accelerated Delivery (JUN 2008)

Unless otherwise authorized in the award, accelerated delivery is acceptable only if there is no additional cost or obligation to the

Government for accelerated delivery.

(End of Clause)

20 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE F0002 ***

21 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION G - CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

G-1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS MAY/2013

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

COMBO

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

ORIGIN/ORIGIN

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC TBD AT AWARD

Issue By DoDAAC SPRRA1

Admin DoDAAC TBD AT AWARD

Inspect By DoDAAC TBD AT AWARD

Ship To Code TBD AT AWARD

Ship From Code TBD AT AWARD

Mark For Code TBD AT AWARD

Service Approver (DoDAAC) N/A

Service Acceptor (DoDAAC) N/A

Accept at Other DoDAAC N/A

LPO DoDAAC N/A

DCAA Auditor DoDAAC TBD AT AWARD

Other DoDAAC(s) TBD AT AWARD

22 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the "Send Additional Email

Notifications" field of WAWF once a document is submitted in the system.

TBD AT AWARD

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

N/A

(2) For technical WAWF help, contact the WAWF helpdesk at 866-

618-5988.

(End of clause)

G-2 252.204-0001 LINE ITEM SPECIFIC: SINGLE FUNDING SEP/2009

(DFARS PGI)

The payment office shall make payment using the ACRN funding of the line item being billed.

(End)

23 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION H - SPECIAL CONTRACT REQUIREMENTS

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

H-1 52.243-4000 ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, MAR/2011

REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, &

SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS

1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.

2. Format.

a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.

b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.

c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form

523 (page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."

d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block

5 of the form.)

e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.

f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract

Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.

g. Classification of RFDs/RFVs.

(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance;

interchangeability; reliability; survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.

(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.

(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.

h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.

i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.

j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.

k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the

24 84

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Contractor and the Government.

l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.

m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the

Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.

n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.

o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub-sections entitled

"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.

3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).

One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution.