SPRHA319R7000_______0003.pdf
PDF 120 KB Posted
- Attached to
- Milstar Electron Tubes
- Solicitation number
- SPRHA3-19-R-7000
About this file
This document is a combined Request for Information and Synopsis for an Indefinite Delivery Indefinite Quantity contract to procure electron tubes. The government anticipates awarding multiple contracts with five one-year ordering periods and estimates a minimum order quantity of 12 electron tubes and maximum of 60 tubes for NSN 5960-01-340-9485MZ. Interested parties should contact the identified point of contact by November 16, 2018. The contracting office is DLA Aviation at Hill Air Force Base. NAICS code is 334419 and destination will be cited on delivery orders. The justification is limited sources. Small businesses or others interested in subcontracting should contact Thales Components or L-3 Communications Electronics. The government does not plan to use commercial item procedures but will consider commercial items identified by November 15. Foreign participation is not permitted at the prime level. Responses must be in English and U.S. dollars.
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRHA319R7000_______0002.pdf | ||
| SPRHA319R7000_______0001.pdf | ||
| SPRHA319R7000.RTF | RTF text file | |
| SPRHA319R7000_A001FATP.pdf | ||
| SPRHA319R7000_A002FATR.pdf | ||
| SPRHA319R7000_PricingFormulaToolBidA.xlsx | XLSX spreadsheet | |
| SPRHA319R7000_C001CPP.pdf | ||
| SPRHA319R7000_EDR.pdf | ||
| SPRHA319R7000_SOW.pdf | ||
| SPRHA319R7000_A003PATP.pdf | ||
| SPRHA319R7000_EDL.pdf | ||
| SPRHA319R7000_MQR.pdf | ||
| SPRHA319R7000_A004PATR.pdf | ||
| SPRHA319R7000_PricingFormulaToolBidB.xlsx | XLSX spreadsheet | |
| Manufacturing_Qualification_Requirements.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
SPRHA3-19-R-7000-0003
3. EFFECTIVE DATE
3 JUL 2019
4. REQUISITION/PURCHASE REQ. NO.
FD20201900464
5. PROJECT NO (If applicable)
5960-01-340-9485 MZ
6. ISSUED BY CODE
DLA AVIATION - OGDEN, DLR PROCUREMENT OPS/AUB
6051 GUM LANE BLDG 1225
HILL AIR FORCE BASE UT 84056-5820
BUYER: Kristina Stump/DLA kristina.stump.1@us.af.mil Phone: (385) 519- 8209 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODESPRHA4
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
SPRHA319R7000
9B. DATED (SEE ITEM 11)
29-APR-2019
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 19-JUL-2019 4:00 PM
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
This acquisition is restricted to qualified sources (CAGE Codes 18778, 3B150, 40236 and 73293). Contractors desiring to become a qualified source must submit a qualification package. Please see clause 52.209-1 and the attached Manufacturing Qualification Requirement for additional details.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
SPRHA3-19-R-7000-0003
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to make the following changes:
1. Section B notes A-K are removed in their entirety.
2. Attachments "Pricing Formula Tool Bid A" and "Pricing Formula Tool Bid B" are removed.
3. The following clauses are removed: FAR 52.216-22, FAR 52.216-19, DFARS
252.216-7006, FAR 52.204-23
4. The following CLINs are removed: 1001, 1001AH, 1001AJ, 2001, 2001AH, 2001AJ, 3001, 3001AH, 3001AJ, 4001, 4001AH, and 4001AJ
5. Wide Area Workflow Payment Instructions DFARS 252.232-7006 has been updated
6. Quantities on CLIN 0001AF have increased from 10 Each to 58 Each
7. Quantities on CLIN 0001AJ have increased from 12 Each to 60 Each
This solicitation is extended to 19 July 2019.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Electron Tube
Item No.
NSN: 5960-01-340-9485 MZ
ELECTRON TUBE
Manufacturer Part Number
18778 RW4017-2
3B150 G265051-2
40236 RW4017-2
73293 947H2 Priority: R ROUTINE Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
IAW MIL-STD-130
First Article Test Plan
Bid A - First Article Required Item No.
0001AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
First Article Test Plan
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AA Quality Assurance: IAW DD 1423-1 (A001) Type / Ship To PACRN Mark For
B 1423 IAW DD 1423-1 (A001)
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
B 1423 1 LO *90 Calendar Days
First Article Test Plan
Bid A - First Article Required Proposed Delivery
B 1423 1 LO
Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will use Ship To code FB2029 when completing the receiving report.
Contractor will coordinate submission with contract administrator.
First Article Test Report
Bid A - First Article Required Item No.
0001AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
First Article Test Report
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: AB Quality Assurance: IAW DD 1423-1 (A002) Type / Ship To PACRN Mark For
B 1423 IAW DD 1423-1 (A002)
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
B 1423 1 LO *210 Calendar Days
Proposed Delivery
B 1423 1 LO
First Article testing is not permitted until the First Article Test Plan (0001AA) has been approved.
Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will
First Article
Item No.
0001AC
Firm Fixed Price Quantity U/I Unit Price Amount
2 EA
First Article
Bid A - First Article Required CLIN ACRN ACRN Total
0001AC AA
FIRST ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A W25G1V ORIGIN
Type / Ship To PACRN Mark For
A W25G1V PAB
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A W25G1V 2 EA *180 Calendar Days
Proposed Delivery
A W25G1V 2 EA
First Article testing is not permitted until the First Article Test Plan (0001AA) has been approved.
Approval of the First Article Test Report (0001AB) will constitute preliminary approval of the First Article. Following preliminary approval, contractor will ship First Article to W25G1V for final inspection/acceptance.
Production Acceptance Test Plan
Item No.
0001AD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Production Acceptance Test Plan
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW DD 1423-1 (A003) Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Production Acceptance Test Plan
Bid A - First Article Required Required Delivery
B 1423 1 LO *30 Calendar Days
Proposed Delivery
B 1423 1 LO
One approved Production Acceptance Test Plan will satisfy the requirement for all ordering periods.
Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will
Production Article Test Report
Item No.
0001AE
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Production Article Test Report
Inspection: Destination Acceptance: Destination Quality Assurance: IAW DD 1423-1 (A004) Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
B 1423 1 LO TBD
Proposed Delivery
B 1423 1 LO
Production testing is not permitted until the Production Test Plan (0001AD) has been approved.
Contractor shall deliver Production Acceptance Test Report NLT 7 days before shipping Production Article(s).
Contractor shall deliver a Production Acceptance Test Report for every production unit.
Production Articles
Bid A - First Article Required Item No.
0001AF
Firm Fixed Price Best Estimated Qty
U/I Unit Price
58 EA
CLIN ACRN ACRN Total
0001AF AA
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
A W25G1W ORIGIN
Type / Ship To PACRN Mark For A W25G1W PAB To be cited on order Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
A W25G1W 58 EA TBD
Proposed Delivery
A W25G1W 58 EA
Contractor shall deliver a Production Acceptance Test Report for every production unit.
Contractor not authorized to ship production assets until Engineering approves Production Test Report(s).
Bid B - First Article NOT Required Item No.
0001AG
Not Separately Priced Quantity U/I Unit Price
1 EA NSP
Production Acceptance Test Plan
Bid B - First Article NOT Required
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW DD 1423-1 (A003) Type / Ship To PACRN Mark For
B 1423 IAW DD 1423-1 (A003)
Type / Ship To Quantity (U/I) *ARO Each Individual
Order _ Req No / Pri
Required Delivery
B 1423 1 EA *30 Calendar Days
Proposed Delivery
B 1423 1 EA
One approved Production Acceptance Test Plan will satisfy the requirement for all ordering periods.
Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will
Production Article Test Report
Item No.
0001AH
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Production Article Test Report
Inspection: Destination Acceptance: Destination Quality Assurance: IAW DD 1423-1 (A004) Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
B 1423 1 LO TBD
Proposed Delivery
B 1423 1 LO
Production testing is not permitted until the Production Test Plan (0001AG) has been approved.
Contractor shall deliver Production Acceptance Test Report NLT 7 days before shipping Production Article(s).
Contractor shall deliver a Production Acceptance Test Report for every production unit.
Production Articles
Item No.
0001AJ
Firm Fixed Price Best Estimated Qty
U/I Unit Price
60 EA
CLIN ACRN ACRN Total
0001AJ AA
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Limitations of Liability: High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
A W25G1W ORIGIN
Type / Ship To PACRN Mark For A W25G1W PAB To be cited on order Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
A W25G1W 60 EA TBD
Proposed Delivery
A W25G1W 60 EA
Contractor shall deliver a Production Acceptance Test Report for every production unit.
Contractor not authorized to ship production assets until Engineering approves Production Test Report(s).
Counterfeit Prevention Plan
Item No.
Not Separately Priced Quantity U/I Unit Price
1 EA NSP
Data Counterfeit Prevention Plan Priority: R
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: IAW DD 1423-1 (C001) Type / Ship To PACRN Mark For
B 1423 IAW DD 1423-1 (C001)
Type / Ship To Quantity (U/I) *ARO Contract Req No / Pri
Required Delivery
B 1423 1 EA *30 Calendar Days
Proposed Delivery
B 1423 1 EA
Although the Ship To code for this line item is B1423, for WAWF purposes only, the contractor will
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: A W25G1V
TO
11 HAP ARNOLD BLVD BLDG 72
COST CENTER 5K370
TOBYHANNA PA 18466-5109
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: A W25G1W
W1BG UEF DIST DEPOT TOBYANNA
GIBBS AND FIFTH STREETS
WAREHOUSE 6 BAY 4
TOBYHANNA PA 18466-5059
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: B 1423
IAW DD FORM 1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION D
PACKAGING AND MARKING
ITEM IDENTIFICATION MARKING AND SHELF LIFE ITEM PROVISIONS (FEB 1998)
(IAW AFMCI 23-102 Chapter 6 Para 6.2.7.3) Requirements set forth below shall apply to any contract issued thereon and will take precedence over other inconsistent requirements herewith. All standards, bulletins, and publications referenced herein shall be of the issue in effect on the date of this document.
1. PHYSICAL MARKING OF ITEMS:
MIL-STD-130: Items shall be marked in accordance with MIL-STD-130. The National Stock Number (NSN), and when assigned, the Configuration Item Identifier (CII), serial number, and military type designation information shall be marked on major assemblies, units, groups, and sets. Special attention must be given to requirements governing the application of the actual manufacturer's Federal Supply Code for Manufacturers (FSCM) to the physical item. Items which are excluded in accordance with paragraph 1.1 of MIL-STD-130, Revision M, shall be marked in accordance with the appropriate document.
2. PACKAGE AND CONTAINER MARKING: Shipments will not be made until the NSN has been assigned, unless specifically authorized by the Contracting Officer.
MIL-STD-129/ASTM-D-3951:
a. Interior packages and shipping containers shall be marked in accordance with MIL-STD-129 when Military packing is specified and ASTM-D-3951 when commercial packaging is specified. The requirements of paragraph 2.h apply regardless of which packaging is utilized.
(1) Design manufacturer's name, trademark or manufacturer's code (from Cataloging Handbook H4-1 or H4-2), identifying number, and serial number, when applicable, shall be included in the identification marking.
(2) When applicable, the Air Force project designator code shall be included as the last line of the address marking and the project name related to the project code shall be marked in the clear on the exterior shipping container.
b. Tags and labels, when required, shall be contractor's tags or labels conforming to the requirements of MIL-STD-129 or as approved by the procuring activity. Contractor's forms which indicate serviceable condition shall not be any shade of green or red. Labels are authorized to be used on metal containers. Items requiring technical order (T.O.)
certification shall be annotated on inner and outer container tags or label with T.O. compliance.
c. When dummy containers are used in a unitized load, the dummy containers shall be clearly marked "DUMMY CONTAINER" and located in the load so that the marking will be plainly visible to receiving and storage personnel.
d. All interior packages and shipping containers for articles and materials classified as hazardous or restricted under provisions of Title 49, Code of Federal Regulations, or AFR 71-4/DLAM 4145.3/TM 38-250/NAVSUP PUB 505/MCO P
4030.19 shall be marked, regardless of exemption for mode of transportation, with proper shipping name of item;
flash point of all liquids having a flash point of 200 degrees F. or below; and percentage concentration of acids and corrosive liquids. In addition, the quantity of each hazardous or restricted material included in a container shall be annotated adjacent to the shipping name of the item, e.g., Acetic Acid (80% concentration) -- 1 qt.
e. On shipments of firearms regardless of mode of transportation, selected elements of identification and contractor data markings shall be omitted or obliterated in accordance with the requirements of MIL-STD-129 regarding sensitive items and packing lists shall be placed only inside the containers.
f. Special markings for packages and containers when specified on AFMC Form 158 shall be complied with as a part of
MIL-STD-129.
g. All special coated terneplate containers shall be marked with the legend "CAUTION--DO NOT REUSE AS FOOD
CONTAINERS."
h. Bar code markings in accordance with MIL-STD-129 shall apply to all units, intermediate and exterior containers for all items going into stock regardless of package size or levels of package specified (including commercial packaging). In addition to the NSN/NATO stock number, the exterior shipping container shall include the 13 digit contract number (plus, if applicable, the four digit call number). Excluded from Bar Code Marking are:
(1) Foreign Military Sales.
(2) Direct Vendor Delivery (DVD)/Government Furnished Equipment (GFE) shipments.
(3) Multipack Exterior Shipping Containers. (Unit and intermediate containers do require a bar coded NSN/NATO stock number. However, the next container (unit or intermediate) inside the multipack will also require a bar coded NSN/NATO stock number and contract number with call number, if applicable, in the lower right hand corner).
(4) All unpacked or uncrated items; e.g., vehicles, tires, etc.
i. Shipments of wheeled items weighing 2,000 pounds or more and scheduled for transportation by military aircraft will be marked with the individual axle weights in accordance with MIL-STD-129.
3. WARRANTED ITEMS: When the contract contains warranty requirements, warranty information shall be applied on containers and items as follows:
a. Container markings shall be as specified in MIL-STD-129. The period or conditions of the warranty shall be specifically stated, i.e., landings, flight hours, operating hours, days from shipping date, etc.
b. Items shall be marked in accordance with requirements of MIL-STD-130. Markings shall be located in a manner so as to be conspicuous to the person removing the item from service. When no deleterious effect or functional degradation is caused, the markings shall be black letters on yellow FED-STD-595 color 13655) background. The marking shall include the same period or condition required on the containers.
4. SHELF LIFE ITEMS
a. MARKING
(1) Shelf life items shall be marked in accordance with MIL-STD-129.
(2) Mark items controlled in MIL-STD-1523, or in specifications furnished as a part of the contract or purchase order, with the cure or assembly dates specified therein.
b. DELIVERY. Unless specified otherwise in the contract, shelf life items shall have a minimum of 90% of the "storage period" remaining at the time of delivery to the Government.
SHIPPING CONTAINER MARKING
All shipping containers shall be marked meeting the following criteria:
(a) MIL-STD-129 R, Standard Practice for Military Marking.
(b) Bar code format shall conform to bar code symbology Format 3 of 9, Code 39 as specified in MIL-STD-129 R.
(c) Additional marking and/or bar coding requirements exceeding those of MIL-STD-129 R , e.g., unit serial numbers, original equipment manufacturer’s (OEM) name, or OEM model number, as specified on the AFMC Form 158:
PACRN(s) Applicable
Additional Bar Coding or Marking Requirements (if applicable)
PAB Not Applicable
MILITARY PACKAGING AND MARKING
Items shall be packaged in accordance with MIL-STD-2073-1E, Standard Practice for Military Packaging. Shipping and storage markings shall be in accordance with MIL-STD-129R, Standard Practice for Military Marking.
PACRN QUP ICQ PS
MT
C D
PS
ML
WP
ML
CU
DU
C T
U C
I C
U C L
SM
PAB 001 000 41 1 00 EA NA A NV 00 B 17
WGT LGTH WDTH DPTH CUBE O
P I
43.00 33.0 13.0 14.5 3.599 M
PACRN PACK
LVL
PRES
LVL
SUPPLEMENTAL PACKAGING
PAB B MIL
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
FIRST ARTICLE TEST, CERTIFICATION AND DISPOSITION REQUIREMENTS (FEB 1998)
(IAW FAR 9.308-2)
Test criteria are as follows:
Lot/Item Government Test/Inspection Requirements 0001AC Nuclear Survivability, Environmental, Dimensional, Electrical, Government: NHA, MATE and
Terminal Insertion Testing
Lot/Item Contractor Test/Inspection Requirements 0001AC "TWTs For Milstar Use" Raytheon (cage 49956) drawings #G265051
Disposition of the First Article shall be as follows:
Lot/Item Approved 0001AC 2 First Articles total.1 Each will be expended in testing. 1 Each will be forwarded to supply.
Lot/Item Disapproved 0001AC 2 First Articles total. 1 Each will be expended in testing, residual components will be returned to contractor. 1 Each will be returned to the contractor.
(The above Clause/Provision has been modified.)
(Applicable when a fixed-price contract is contemplated and it is intended that the contract require first article approval and that the Government will be responsible for conducting the first article test)
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
(Applicable for supplies, services furnishing of supplies, fixed-price and exceeds the simplified acquisition threshold)
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(IAW FAR 46.311, DFARS 246.202-4(1))
(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*
Title Number Date Tailoring *See Individual Line Item Schedule
(Applicable only if specified in the individual order/call issued hereunder)
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
(Applicable to the furnishing of supplies, services involving the furnishing of supplies, or research and development, when a fixed-price contract is contemplated and the contract amount is expected to exceed the simplified acquisition threshold)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503) (Applicable to all orders issued hereunder)
Government Contract Quality Assurance Inspection and Acceptance will be at (Final):
[CONTRACTOR FILL-IN]
Item No(s): See schedule for items with the following code(s) listed below :
Inspection Code and Address:
Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
Item No(s): 0001AA, 0001AB, 0001AD, 0001AE, 0001AG, 0001AH, 0002
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b)) (Applicable when fixed-price supplies are furnished)
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1)) (Applicable for supplies, services, or research and development)
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c)) (Applicable to fixed-price for supplies other than commercial or modified-commercial items)
52.247-29 F.O.B. ORIGIN (FEB 2006)
(IAW FAR 47.303-1(c)) (Applicable when specifying f.o.b. origin)
(Not applicable to foreign government, foreign performance, or foreign contractor)
COMMERCIAL BILL OF LADING SHIPMENTS – CARRIER’S RATES
The contractor shall ensure that proposed carrier’s rates are equal to or better than rates available to the Government. Contact the transportation officer for this contract, as identified by the administrative contracting officer, for confirmation that the proposed carrier’s rates are no higher than those otherwise available to the government. List the shipping costs on the invoice to the government and attach a copy of the carrier’s billing. Failure to properly annotate the invoice and provide a copy of the carrier’s billing may result in those cost not being reimbursed or only partially reimbursed.
UNILATERAL AMENDED SHIPPING INSTRUCTIONS (ASIs), F.O.B. ORIGIN
(a) An ASI is a change to the shipping instructions of one or more units or shipment lots of a contract line item. Multiple ASIs for multiple contract line items may be issued under one document.
(b) Unilateral ASIs with changes only to the "Ship To and Mark For" instructions, issued 20 calendar days or more before the contract scheduled delivery date, shall be accepted by the Contractor at no change in contract price.
(c) All other ASIs, including those requiring a change to the "Ship To and Mark For" which are issued 19 days or less before the contract scheduled delivery date; and those for changes to the preservation, packaging, and packing requirements or the f.o.b.
point, shall be subject to the negotiation of an equitable adjustment under the contract.
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
____________________Combo______________________________________ Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
_________________See line item(s)__________________________________
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC See block 14 Issue By DoDAAC See block 7 Admin DoDAAC See block 12 Inspect By DoDAAC See Section B Ship To Code See Section B
Ship From Code See Section B Mark For Code See Section B Service Approver (DoDAAC) N/A Service Acceptor (DoDAAC) N/A Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
_______________________Not applicable_____________________________________
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
__________________ Not applicable_____________________________________________
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(The above Clause/Provision has been modified.)
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA TBD $0.00
ACRN TOTAL $ 0.00
TRANSPORTATION APPROPRIATION CHARGEABLE
The Transportation Allotment Identification (TAI) relates directly to the above ACRN(s). For example the TAI "TAA" is for the same line item(s) as ACRN "AA".
FMS TRANSPORTATION ALLOTMENT SHALL BE USED ONLY WHEN SHIPMENT ON GOVERNMENT BILL OF LADING IS AUTHORIZED
TAI ATAC FMS ALLOTMENT / NOTE
TAA To be cited on individual order
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
5352.201-9101 OMBUDSMAN (JUN 2016)
(IAW AFFARS 5301.9103)
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Michael Wood at 385 519 -8189 , FAX 000 000 -0000 , email michael.j.wood@dla.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(Applicable to all solicitations and contracts)
52.202-1 DEFINITIONS (NOV 2013)
(IAW FAR 2.201)
(Applicable when the simplified acquisition threshold is exceeded)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
(Applicable when simplified acquisition threshold is exceeded, except for personal services and those between military departments or defense agencies and foreign governments that do not obligate any funds appropriated to the Department of Defense)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
(Applicable when simplified acquisition threshold is exceeded other than those for commercial items (see Parts 2 and 12))
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
(IAW FAR 3.503-2)
52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
(IAW FAR 3.502-3)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(a))
(Applicable when noncommercial and the simplified acquisition threshold is exceeded)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(OCT 2010)
(IAW FAR 3.808(b))
(Applicable over $150,000)
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
(Applicable in all solicitations and resultant contracts other than personal services contracts with individuals)
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)
(IAW DFARS 203.570-3)
(Applicable when exceeding the simplified acquisition threshold (except for commercial items))
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(SEP 2013)
(IAW DFARS 203.970)
252.203-7004 DISPLAY OF HOTLINE POSTERS (OCT 2016)
(IAW DFARS 203.1004(b)(2)(ii)) (Applicable to acquisitions over $5.5 million, except for commercial items)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
(IAW FAR 4.303)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (OCT 2018)
(IAW FAR 4.1403(a))
(Applicable over $30,000, unless not required to be reported in FPDS)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b)) (Applicable to solicitations that contain the provision at 52.204-7, and resulting contracts)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
(IAW FAR 4.1804(c), FAR 12.301(d)) (Applicable when there is a requirement to be registered in SAM or to have a DUNS Number)
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(JUN 2016)
(IAW FAR 4.1903)
(Applicable to all solicitations and contracts, except COTs, when a contractor’s system may contain Federal contract information)
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b)) (Applicable to all orders issued hereunder)
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (OCT 2016)
(IAW DFARS 204.7304(c))
(Applicable to all solicitations and contracts, including commercial except when solely for commercial-off-the-shelf items)
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (MAY 2016)
(IAW DFARS 204.7403(c), DFARS 212.301(f)(ix))
(Applicable to solicitations and contracts that involve litigation support services when 252.204-7014 is not included)
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470, DFARS 212.301(f)(x))
(Applicable over $1,000,000)
52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)
(IAW FAR 9.206-2)
(b)
Item No Agency Name/Address
0001 DLA AVIATION - OGDEN
6051 GUM LANE BLDG 1225
HILL AIR FORCE BASE, UT 84056-5820
(385) 519-8209 kristina.stump.1@us.af.mil
(c) If an offeror, manufacturer, source, product or service covered by a qualification requirement has already met the standards specified, the relevant information noted below should be provided.
Offeror's Name _____________________________
Manufacturer's Name ________________________
Source's Name _____________________________
Item Name _________________________________
Service Identification _________________________
Test Number _______________________________ (to the extent known)
(Applicable when the acquisition is subject to a qualification requirement)
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))
(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
*Lot/Item ***Calendar Days Before Test **Quantity
0001AC 30 2
(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item ****Approval Days ELIN No.
0001AC 30
FA Test Report Item ***Type/Location **Calendar Days
0001AB B1423 210
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(The above Clause/Provision has been modified.)
(Applicable to fixed-price and cost-reimbursement if first article approval is required and the contractor is required to conduct the first article testing)
52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)
(IAW FAR 9.308-2(a)(1), FAR 9.308-2(b)(1))
(a) The Contractor shall deliver ** units(s) of Lot/Item * within *** calendar days from the date of this contract to the Government at **** for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.
First Article Item **Quantity ***Calendar Days ****Type/Location
0001AC 2 180 AW25G1V
(b) Within ** calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.
A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item **Approval Days ELIN No.
0001AC 30
(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, the Contractor—
(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and
(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.
(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.
(The above Clause/Provision has been modified.)
(Applicable when fixed-price or cost-reimbursement, first article approval is required and the Government will be responsible for conducting the first article test)
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(OCT 2015)
(IAW FAR 9.409)
(Applicable when exceeding $35,000)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY
MATTERS (OCT 2018)
(IAW FAR 9.104-7(c))
(Applicable to solicitations and contracts over $550,000 and contracts where the offeror has checked “has” in paragraph (b) clause 52.209-7)
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
(Applicable to all solicitations and contracts for the acquisition of products and services (including construction) unless waived
IAW FAR 9.108-4)
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(OCT 2015)
(IAW DFARS 209.409)
(Applicable to solicitations and contracts with a value of $150,000 or more)
52.210-1 MARKET RESEARCH (APR 2011)
(IAW FAR 10.003)
(Applicable to solicitations and contracts over $5.5 million for the procurement of items other than commercial items)
52.211-5 MATERIAL REQUIREMENTS (AUG 2000)
(IAW FAR 11.304)
(Applicable to supplies that are not commercial items)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b)) This is a rated order certified for national defense , emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
(Applicable to all rated orders)
(Does not apply to foreign contractors performing and buying supplies outside the United States) (Reference the Defense Priorities & Allocations System Manual)
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)
(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))
(a) Definitions. As used in this clause—
“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at http://www.acq.osd.mil/dpap/pdi/uid/iuid/equivalents.html .
“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at http://www.acq.osd.mil/dpap/pdi/uid/uii_types.html .
(c) Unique item identifier.
(1) The Contractor shall provide a unique item identifier for the following:
(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
See Schedule as Applicable
(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:
Contract Line, Subline, or Exhibit Line Item Number
Item Description
*Items less than $5000, which require UID, will be specifically identified in the schedule.
See Schedule as Applicable
(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).
(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).
(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.
(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:
(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .
(2) Embedded items shall be reported by one of the following methods—
(i) Use of the embedded items capability in WAWF;
(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or
(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.
(Applicable when delivery of one or more “items” as defined at 252.211-7003(c) is required)
252.211-7005 SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS
(NOV 2005)
(IAW DFARS 211.273-4)
(b) Offerors are encouraged to propose SPI processes in lieu of military or Federal specifications and standards cited in the solicitation. A listing of SPI processes accepted at specific facilities is available via the Internet at http://guidebook.dcma.mil/20/guidebook_process.htm (paragraph 4.2).
(d) (Offeror insert information for each SPI process)
SPI Process: _____________________________________________________
Facility: _________________________________________________________
Military or Federal Specification or Standard: ____________________________
Affected Contract Line Item Number, Subline Item Number, Component, or Element:
(Applicable when procuring previously developed items that exceed the micro-purchase threshold)
52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)
(IAW FAR 15.209(b)(1)) (Applicable if negotiated and above the simplified acquisition threshold, except commercial items and utility services at public prices plus reasonable connection charge)
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h), AFFARS 53.15.209(h)) (Applicable when using uniform contract format that is not commercial or for construction)
52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)
(IAW FAR 15.408(f)(1)) (Applicable when negotiated and exceeding the simplified acquisition threshold)
52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS
CONCERNS (DEVIATION 2019-O0003) (DEC 2018)
(IAW Deviation 2019-O0003)
52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (JAN 2018)
(IAW FAR 22.1505(b)) (Applicable for supplies that exceed the micro-purchase threshold)
52.222-20 CONTRACTS FOR MATERIALS, ARTICLES, AND EQUIPMENT EXCEEDING $15,000
(MAY 2014)
(IAW FAR 22.610)
(Not applicable to performance outside the United States)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
(IAW FAR 22.810(a)(1)) (Applicable when exceeding $10,000, except those exempted by FAR 22.807 (b) which includes those for work to be performed outside the U.S. by employees who were not recruited within the U.S.)
(Applicable over $10,000 only if workers were recruited within the United States)
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
(IAW FAR 22.810(e)) (Applicable to all orders…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .