This is an Amendment of Solicitation (Standard Form 30) for a federal contract opportunity issued by DLA Land Warren for engine accessory generators. The solicitation (SPRDL1-24-R-0050) has been amended to: 1) update the Technical Data Package (TDP) link, 2) add Contract Line Item Number (CLIN) 0016 for First Article Test, and 3) extend the proposal due date to September 12, 2025.
The contract covers the procurement of generator, engine accessory items (NSN 2920-01-698-8166) with a guaranteed minimum quantity of 106 units and a maximum 5-year contract quantity of 553 units. The contract is structured with five ordering years, each with an estimated quantity ranging from 106-112 units. The Technical Data Package is source-controlled to CE Niehoff & Co (CAGE 76761), with a specific government part number 12594722 and manufacturer part number N1601-7. First Article Testing is required, with testing to be performed in accordance with specified drawing and quality conformance requirements, and contractors may request a waiver following the detailed provisions outlined in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AK16988166 REV A.pdf | ||
| SPRDL124R0050.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2025AUG12
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
DEREK RUTKOWSKI
EMAIL: DEREK.RUTKOWSKI@DLA.MIL
SPRDL1-24-R-0050
2024FEB02
X
X 2025SEP12 05:00pm
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 18
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: DEREK RUTKOWSKI
Buyer Office Symbol/Telephone Number: ZGAA/(385)591-0882
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. The purpose of Amendment 0001 to Solicitation SPRDL1-24-R-0050 is the following:
a. Update the Technical Data Package (TDP) Link within C.5 Technical Data Package Information'
b. Add CLIN 0016 'First Article Test' and all applicable FAT clauses.
c. Extend the proposal due date to COB September 12, 2025.
*** END OF NARRATIVE A0002 ***
2 18
SPRDL1-24-R-0050
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
IN THE FIRST FOUR DIGIT ITEM NUMBERS (CLINS) THAT
FOLLOW, THE NUMBERING SYSTEM THAT IS USED IS AS
FOLLOWS:
THE FIRST THREE DIGITS SIGNIFY THE ITEM. THE FOURTH
(LAST DIGIT) INDICATES THE CONTRACT YEAR, i.e., CLIN
0011 IS FOR THE FIRST ITEM - FIRST ORDERING YEAR,
CLIN 0012 IS FOR THE FIRST ITEM - SECOND ORDERING
YEAR, CLIN 0013 IS FOR THE FIRST ITEM - THIRD
ORDERING YEAR, ETC.
THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH
PART, SUCH AS FAT, TECHNICAL MANUALS, SERVICES,
OR TRAINING, WILL BECOME THE LAST ITEM NUMBER
IN NUMERICAL SEQUENCE FOR EACH ITEM, e.g.
0016 (5-YEAR LONG-TERM CONTRACT) OR 0014
(3-YEAR LONG-TERM CONTRACT).
THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE
SOLICITATION AND RESULTING CONTRACT:
FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF___________________
AWARD PLUS 364 DAYS.
SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS____________________
THROUGH 729 DAYS AFTER CONTRACT AWARD.
THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS___________________
THROUGH 1,094 DAYS AFTER CONTRACT AWARD.
FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095 DAYS____________________
THROUGH 1,459 DAYS AFTER CONTRACT AWARD.
FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460 DAYS___________________
THROUGH 1,824 DAYS AFTER CONTRACT AWARD.
NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL ORDER IS
THE PRICE FOR THE ORDERING YEAR IN WHICH THE ORDER IS
ISSUED. THE DELIVERY DATE DOES NOT DETERMINE THE
ORDERING YEAR.
The information presented below applies to Item No.
0011 Through 0015:
Guaranteed Minimum 106 Year Quantity (GMQ): 106 EACH
(This will be awarded at the time of the basic contract award)
Maximum 5 Year Contract Quantity: 553 EACH
ONLY THE GMQ IS GUARANTEED.
NOTE: EACH ORDERING YEAR QUANTITY IS AN ESTIMATE.
(End of narrative A001)
3 18
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0011 FIRST ORDERING YEAR EST. 106 EA $ $ ___________________ ______________ __________________
NSN: 2920-01-698-8166
COMMODITY NAME: GENERATOR, ENGINE ACCESSORY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 76761
Mfr Part Number: N1601-7
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12594722
DATE: 01-JUN-2023
The Technical Data Package (TDP) is Source Controlled to Contractor: CE Niehoff & Co, CAGE 76761, Government Part Number 12594722, Manufacturer Part Number N1601-7.
Approved Sources must meet the requirements of the
TDP.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
4 18
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0012 SECOND ORDERING YEAR EST. 111 EA $ $ ____________________ ______________ __________________
NSN: 2920-01-698-8166
COMMODITY NAME: GENERATOR, ENGINE ACCESSORY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 76761
Mfr Part Number: N1601-7
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12594722
DATE: 01-JUN-2023
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
5 18
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0013 THIRD ORDERING YEAR EST. 112 EA $ $ ___________________ ______________ __________________
NSN: 2920-01-698-8166
COMMODITY NAME: GENERATOR, ENGINE ACCESSORY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 76761
Mfr Part Number: N1601-7
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12594722
DATE: 01-JUN-2023
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
6 18
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0014 FOURTH ORDERING YEAR EST. 112 EA $ $ ____________________ ______________ __________________
NSN: 2920-01-698-8166
COMMODITY NAME: GENERATOR, ENGINE ACCESSORY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 76761
Mfr Part Number: N1601-7
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12594722
DATE: 01-JUN-2023
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
7 18
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0015 FIFTH ORDERING YEAR EST. 112 EA $ $ ___________________ ______________ __________________
NSN: 2920-01-698-8166
COMMODITY NAME: GENERATOR, ENGINE ACCESSORY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 76761
Mfr Part Number: N1601-7
Description/Specs./Work Statement _________________________________
TOP DRAWING NR: 12594722
DATE: 01-JUN-2023
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING NARRATIVE
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
8 18
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0016 FIRST ARTICLE TEST - SEPERATELY PRICED $ ______________________________________ __________________
SERVICE REQUESTED: FIRST ARTICLE TEST REPORT
CLIN CONTRACT TYPE:
Firm Fixed Price
A FIRST ARTICLE TEST REPORT IS REQUIRED IN ACCORDANCE
WITH THE CLAUSE ENTITLED "FIRST ARTICLE APPROVAL
CONTRACTOR TESTING", FAR 52.209-3
(End of narrative B001)
First Article Test is required. Waiver may be authorized; see waiver provision in Section L.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
9 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
ES6304
Notice Regarding First Article Test Sample
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 2 that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 0 that successfully passes all specified tests, less the destructive tests, if any, shall serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design, 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the Contractor will notify the Procuring Contracting Officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
************ End of Narrative ************
ES6333
Inspection and Acceptance First Article Approval
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(1) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with 12594722 rev C, note 5 where test samples are subjected to Group C production quality conformance testing to drawing notes 4A
(output current), 4E (overspeed), and 4F (endurance), 4G (shock), and 4H (vibration) as shown in table 4.A
(2) The First Article Test Report (FATR) shall be compiled by the Contractor to the Contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the Contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
************ End of Narrative ************
ES7019
Alternative to Lot Acceptance Sampling (including Statistical Process Control)
(a) Offerors are encouraged to propose a defect prevention strategy in lieu of lot acceptance inspection and testing requirements cited in the technical data package. The Government recognizes that industry has developed numerous prevention based strategies which result in reduced process variation and promote continuous process improvement initiatives. Use of alternatives to lot acceptance sampling can provide offerors the latitude of implementing prevention based programs that are suitable to their particular mode of operation.
Offerors are encouraged to submit their alternative proposals prior to award. Although the Government will entertain post award requests, there is no guarantee such requests will be accepted.
(b) Requests to use alternatives to lot acceptance sampling shall be provided to the Procuring Contracting Officer for review and
10 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
approval or disapproval. Such requests shall include:
(1) Identification of the specific inspections and tests to be reduced or eliminated.
(2) A description of your prevention based program. This should include such topics as a training program and the performance of audits.
(3) A description of the tools used to monitor and control the specific processes being evaluated. This should include such topics as criteria for determining out of control conditions and procedures to be used when an out of control condition is detected.
(4) The results of a process performance study, and if available, the results of a process capability study.
(5) For SPC data to be used as an alternative to lot acceptance sampling, the following conditions shall be met:
(i) The process is in a state of statistical control using Statistical Process Control (SPC) control chart methods.
(ii) Variable data: for Critical characteristics a CPK =/> 2.00 (or equivalent capability) is achieved; for Major characteristics a
CPK =/> 1.33 (or equivalent capability) is achieved.
(iii) Attribute data: for Critical Characteristics a process average of 100% of the product conforming to the specification; for
Major Characteristics a process average of 99.9937% of the product conforming to the specification.
(c) Proposals offered after award. The Contracting Officer is responsible for accepting or rejecting the alternate lot acceptance procedure submitted by the Contractor. The Contractor may submit an alternate lot acceptance procedure at any time during the performance of this contract. The Contracting Officer is responsible for accepting or rejecting the alternate procedure within 30 days of receipt. If the Government needs more time to evaluate the alternate procedure, the Contracting Officer shall notify the Contractor in writing, giving the reasons and the anticipated decision date. The Contractor may withdraw its proposal at any time prior to its incorporation by contract modification. Because offerors may withdraw their proposal at any time, the Contracting Officer's failure to timely accept or reject the proposal shall not constitute grounds for claim against the Government. Any proposed and accepted procedure must be incorporated by contract modification. If the alternate procedure is not accepted, the Contracting Officer shall provide the Contractor with written notification, explaining the reasons for rejection.
(d) Any equitable adjustment resulting from approval of an alternate lot acceptance procedure described in paragraph (c) above will be handled in accordance with the Changes clause of this contract.
(e) Until notification is received, the Contractor is required to perform under this contract in accordance with the requirements herein, including lot acceptance inspection and testing.
************ End of Narrative ************
ES7032
Notice Regarding First Article
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Procuring Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Procuring Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
************ End of Narrative ************
11 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
ES7345
Delegation of Authority for First Article Approval
The Defense Contract Management Agency (DCMA) Administrative Contracting Officer (ACO) is hereby delegated the authority to approve or disapprove the First Article Test Report submitted in accordance with this contract (FAR 52.209-3 First Article Testing- Contractor
First Article). Any reference to Procuring Contracting Officer (PCO) as it relates to the submission of, and approval/disapproval of the
FAT Report shall be deemed to mean the DCMA ACO. ACO approval will be predicated upon Quality Assurance Representative (QAR) acceptance of the FAT Report. ACO approval authorizes the Contractor to proceed with production.
************ End of Narrative ************
*Exception/Remarks for FAT: Vendor shall perform initial Generator System Quality Conformance (Group C)testing as detailed in Note 5 on drawing 19207-12594722, Rev C. Successful completion of this testing satisfies all First Article Testing (FAT) requirements for this spare parts contract. After the initial testing, periodic Generator System Quality Conformance (Group C) testing shall continue at the rate specified in Note 5 of drawing 19207-12594722, Rev C.
*** END OF NARRATIVE E0002 ***
12 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION F - DELIVERIES OR PERFORMANCE
F.3 Delivery Schedule for Delivery Orders
(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.
(b) DEFINITIONS:
(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.
(2) DELIVERY is defined as follows:
FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or
FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.
(c) The Government requires deliveries according to the following schedule on all orders:
(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE:
(i) If FAT is required, start deliveries 480 days after the delivery order date; and/or
(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, start deliveries 210 days after delivery order date.
(iii) You will deliver 106 units every thirty days.
(iv) You can deliver more units every thirty days at no additional cost to the government.
(d) Accelerated delivery schedule IS acceptable.
(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:
(1) CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE:
(i) If FAT is required, deliveries will start ___ days after the delivery order date; and/or
(ii) If FAT is not required; FAT is waived; or for subsequent delivery orders to be delivered after initial FAT approval with first delivery order, deliveries will start ___ days after delivery order date.
************ End of Narrative F.3 ************
*** END OF NARRATIVE F0001 ***
13 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION I - CONTRACT CLAUSES
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
I-1 ADDED 252.227-7013 RIGHTS IN TECHNICAL DATA--OTHER THAN COMMERCIAL PRODUCTS AND JAN/2025
COMMERCIAL SERVICES (JAN 2025)
I-2 ADDED 252.227-7037 VALIDATION OF ASSERTED RESTRICTIONS ON TECHNICAL DATA (JAN 2025) JAN/2025
I-3 ADDED 252.246-7001 WARRANTY OF DATA (MAR 2014) -- ALTERNATE II (MAR 2014) MAR/2014
I-4 CHANGED 52.209-3 FIRST ARTICLE APPROVAL -- CONTRACTOR TESTING (SEP 1989) -- ALTERNATE SEP/1989
I (JAN 1997) AND ALTERNATE II (SEP 1989)
(a) The Contractor shall test 2 unit(s) of Lot/Item 0011 as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 240 calendar days from the date of this contract to the ACO, and
Conract Specialist; Derek Rutkowski at derek.rutkowski@dla.mil marked "First Article Test Report: Contract No. __________________, Lot/Item No. ______". Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the
Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the
Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the
Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
(End of Clause)
14 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
K-1 ADDED 252.227-7017 IDENTIFICATION AND ASSERTION OF USE, RELEASE, OR DISCLOSURE JAN/2025
RESTRICTIONS (JAN 2025)
K-2 ADDED 252.227-7028 TECHNICAL DATA OR COMPUTER SOFTWARE PREVIOUSLY DELIVERED TO THE JUN/1995
GOVERNMENT
15 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
LS6309
Contract Price Reduction for Waiver of FAT (Separately Priced) - ALT I
(a) All offerors are required to insert an amount for 0016 which represents the full price for FAT.
(b) In addition, those offerors intending to request a waiver of the First Article approval requirement must comply with the requirements of the provision entitled PROVISION FOR WAIVER OF FIRST ARTICLE APPROVAL. (See elsewhere in this Section L.) If the successful Offeror requests and is granted a waiver, the dollar amount entered for 0016 will be deducted from the total quote or proposal amount. The remaining dollar amount will constitute the price at which award will be made.
************ End of Narrative ************
LS7304
Provision for Waiver of Required First Article Approval
(a) The requirement entitled FIRST ARTICLE APPROVAL in Section I of this solicitation may be waived by the Government, provided that the Offeror meets the conditions identified below.
(1) Offerors who intend to request a waiver or partial waiver of the First Article Test (FAT) must provide sufficient information in order for the Government to determine whether the request is to be approved. If the Offeror intends to request a waiver, a First Article Waiver Worksheet must be completed and submitted to the Government along with any supporting documentation. The worksheet can be found as an attachment/exhibit to the solicitation or by contacting the Contract Specialist on page 1.
The Offeror's request will not be considered if the worksheet and any supporting documentation is not submitted to the Government. The worksheet must be completed in its entirety. For those sections of the worksheet which do not apply, annotate with N/A (not applicable).
To substantiate or clarify information provided by the Offeror, the Government may request additional information
(2) Offerors should not assume that the FAT waiver request will be granted even if the completed worksheet and any supporting information is submitted to the Government.
(3) The worksheet and any additional supporting documentation is part of your quote/offer and must be submitted as part of the response to this solicitation on Company letterhead and signed by an agent of the Company.
(4) The Offeror may request a waiver for only a portion of the First Article Test, such as a vibration test or a salt water spray test, or the test on a component or subassembly of the procured item.
(5) The Offeror shall list specifically on the worksheet, by technical data package reference, that portion of the test requested to be waived. The references shall include but may not be limited to the following as applicable:
(i) Identification of the specification or standard along with the specific specification or standard paragraph(s)
(ii) Identification of the drawing with specific references to the drawing notes.
(iii) Identification of the Quality Assurance Provision (QAP), or Quality Assurance Requirement (QAR) or Supplemental
Quality Assurance Provision (SQAP) with specific references to the specific paragraph.
(6) Supporting documentation.
(i) The request for waiver must be accompanied by documentation in support of the request. The documentation may include information such as the following; (1) Copy of the Administrative Contracting Officer's (ACO's) or Procuring Contracting Officer's (PCO) letter approving a First Article Test report on a recent contract for the same or similar item. (2) Copy of a FAT report for the same or a similar item as that herein solicited. (3) Copy of an ACO or PCO letter approving a prior waiver request. (4) If the waiver request is based on similarity, a copy of the drawing/other appropriate technical requirements of the similar item.
(ii) If a copy of a FAT report is submitted in support of a request for waiver under this solicitation, the test report must have been approved and signed by an authorized representative of the Government.
(iii) The FAT report and all supporting documentation should be submitted by electronic media and should accompany the
Offeror's proposal. If the FAT report and supporting documentation cannot be transmitted by electronic media, the Offeror shall contact
16 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
the PCO for further instruction.
(b) Note that if a waiver is granted to the successful offeror, an accelerated delivery schedule will apply. See Section F of this solicitation.
(c) Note: Cost considerations shall apply for approving a waiver or a portion thereof of a FAT.
************ End of Narrative ************
*** END OF NARRATIVE L0002 ***
17 18
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION M - EVALUATION FACTORS FOR AWARD
MS6314
ALT I Evaluation Factors for First Article Test Requirement
(a) If the offeror submits a request for waiver of First Article Approval but fails to comply with the requirements of the provision entitled PROVISION FOR WAIVER, the requested waiver may not be granted. If the waiver is not granted, more favorable alternative offers of price or delivery, conditioned upon the granting of a waiver, will not be considered in the evaluation process
(b) DELIVERY:
(1) As specified in this solicitation, the Government reserves the right to waive the requirement entitled FIRST ARTICLE
APPROVAL. In the event of a waiver, the Government will compute a delivery schedule for the first delivery order issued by excluding all lead times that would be included if first article approval were required. However, in no event shall such accelerated delivery schedule for the first delivery order be considered as an evaluation factor for award, even if such schedule would be more advantageous to the Government. (Note that delivery orders subsequent to the first order shall have delivery schedules as specified in individual orders, or as specified in Section B or F herein, regardless of whether First Article Approval applied initially. Note further that, absent a waiver, the Government expects to require First Article Approval only once during the course of this contract--in conjunction with the first delivery order to be issued hereunder. However, the Government reserves the right to require additional first article testing if the Contractor (i) changes or moves the production facility at which the contract item is manufactured, or (ii) submits a significant configuration change in the form of an Engineering Change Proposal (ECP/VECP) or a Request for Deviation or Request for
Waiver (RFD/RFW), during or after performance on the first delivery order.)
(2) If an Offeror requests waiver of First Article Approval but takes exception to the resulting delivery schedule for the first delivery order as described above, the requested waiver will not be granted. In consequence, any award to that Offeror shall include all First Article Approval requirements, and the delivery schedule for the first delivery order shall include the appropriate first article lead times.
(c) PRICE EVALUATION FACTORS:
(1) As specified in this solicitation, the Government reserves the right to waive the requirement entitled FIRST ARTICLE
APPROVAL, and subtract the price of the proposed First Article Test (at Section B, Item 0016) from the proposal of offerors who elect to seek such a waiver. In the event that the offeror requests and receives a waiver of First Article Approval requirements, the price for such testing, as identified by the Offeror in Section B, Item 0016, shall be deducted from the total price otherwise cited for the materiel herein solicited. The offer will then be evaluated for award at the resulting alternate price.
(2) If the offeror requests a waiver of First Article Approval requirements, but fails to separately identify the cost of
First Article Testing in Section B, Item 0016 of this solicitation, the Government reserves the right to evaluate the offer based upon the price for all CLIN(s), including the First Article Testing (FAT) CLIN(s), and to require that offeror perform on the contract at such price whether or not the First Article requirement is waived, at no additional cost to the Government.
(3) If the offeror requests but is not granted a waiver of First Article Approval, evaluation for award will be based upon the full amount entered for all CLIN(s), including the First Article Testing (FAT) CLIN(s): the amount entered for item 0016 will not be deducted by the Government.
************ End of Narrative ************
*** END OF NARRATIVE M0002 ***
18 18
| SECTION A |
| SECTION B |
| SECTION E |
| SECTION F |
| SECTION I |
| SECTION K |
| SECTION L |
| SECTION M |
File details come from the government source that posted it. Updated .