This is a solicitation for a power takeoff transmission. Key details include:
-
The solicitation is issued by the Defense Logistics Agency Land and Maritime and seeks bids for 50 units of a power takeoff transmission identified by national stock number, manufacturer cage code, and manufacturer part number. The procurement is set aside for small businesses.
-
Bids are due by the date and time specified on the cover page. The solicitation includes terms for delivery schedule, first article testing, inspection and acceptance, packaging and marking requirements, and other standard contract clauses. Pricing is fixed price.
-
The technical data package is available through the System for Award Management Contract Opportunities website and contains 10-50% purchased parts according to product drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRDL120R0143-0001.pdf | ||
| SPRDL120R0143-0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
SPRDL1-20-R-0143
X
2020MAR23
2020MAY15
DOA4
2020MAR23 SEE SCHEDULE
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
SHARON COLEMAN
(586)467-1172
ZGAC
SHARON.F.COLEMAN.CIV@MAIL.MIL
1 77
X 1
X 4 X 10
X 14 X 16 X 20
X 28
X 30
X 31
X 47
X 67
X 76
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: SHARON COLEMAN
Buyer Office Symbol/Telephone Number: ZGAC/(586)467-1172
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
A.4 Acknowledgment of Amendments________________________________
Acknowledge all the amendments you've received from us by identifying the amendment number and its issue date below:
Amendment Number Date
************ End of Narrative A.4 ************
A.6 Notice of Reverse Auction Provision_______________________________________
After receipt of proposals, the contracting officer will determine if a reverse auction will be conducted. However, the use of a reverse auction does not preclude additional methods of price and/or cost analysis.
If a reverse auction is held, Contractors must be registered in the reverse auction system in order to participate in the auction.
Additionally, the Contractor representative participating in the auction must have taken the on-line reverse auction training prior to the reverse auction. Registration, on-line training, and other information regarding the reverse auction can be found at
://dla.procurexinc.com . If a reverse auction is held and a Contractor that provided a proposal to the solicitation does not participate in the auction, the initially proposed price(s) will be considered and evaluated.
************ End of Narrative A.6 ************
A.8 Electronic Contracting Provision____________________________________
(a) Vendors should be aware that FedBizOpps (FBO) has moved to ://beta.SAM.gov and is now known as Contracting Opportunities.
(b) All DLA Land Warren solicitations will be publicized on the Contract Opportunities website (://beta.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or referenced with instructions in the solicitation.
(c) As directed in Section L of this solicitation, interested vendors shall submit a quote or proposal via email to the Contract _________
Specialist listed on the solicitation. The email shall include subject header: Proposal Submission SPRDL1-XX-X-XXXX (company name) on the solicitation.
(d) Requirements for tracking solicitations and submitting bid submissions:
1. Vendors must be registered for a beta.sam.gov account through https://login.gov in order to manage searches and track solicitations. Using the Contract Opportunities search function in beta.sam.gov, vendors will to be able to view the Solicitation and any modifications or amendments made by the Contract Specialist.
2 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
2. Vendors may Request Access to controlled documents such as the Technical Data Package (TDP). Interested vendors must request
TDPs via email to the Contracting Specialist as directed in Section C of this solicitation. __________
3. All bids and proposals must be submitted via email to the Contract Specialist on record. _________
(e) Note to offerors:
Please pay close attention to the solicitation closing date and time as stated on the cover page of this solicitation, local time (EST), for DLA Land Warren. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is Offeror's responsibility to ensure the proposal/quote is received by the Contract Specialist by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late.
Proposal/quote is defined to mean that ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
Solicitations may remain posted on beta.sam.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will need to send any late quotes, if applicable, directly to the Contract Specialist identified on the cover page of this solicitation.
(f) Any awards issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of our intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or
Pricing data/information. If you object to such release in the base contract or contract modifications, and you intend to submit an offer, notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for your objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at ://www.sba.gov/tools/local-assistance/ptac to locate a regional center.
************ End of Narrative A.8 ************
A.9 All or None Provision_________________________
Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.
(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.
(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION ARE INELIGIBLE FOR AWARD.
************ End of Narrative A.9 ************
*** END OF NARRATIVE A0002 ***
This Procurement is a Total Small Business Set-Aside.
The Technical Data Package (TDP) contains 10-50% purchased parts. Refer to the product drawings for details.
*** END OF NARRATIVE A0001 ***
3 77
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 POWER TAKEOFF,TRANS
NSN: 2520-01-463-5441
Mfr CAGE: 19207
Mfr Part Number: 12462900
This Procurement is a Total Small Business Set-Aside.
The Technical Data Package (TDP) contains 10-50% purchased parts. Refer to the product drawings for details.
(End of narrative A001)
0001AA Production Quantity 50 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: POWER TAKEOFF,TRANS
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: EH0C0313EH PRON AMD: 02
First article Test is required. Waiver may be authorized; see waiver provision in Section L.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGING CLAUSE FOR DETAILS
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in this order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
4 77
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
001 W52H099361750Z W562RM J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 47 0510
002 3 0515
FOB POINT: Destination
SHIP TO:
(W562RM) SU W0MC ARMY GENERAL SUPPLY
DLA DISTRIBUTION RED RIVER
HIGHWAY 82 WEST
TEXARKANA,TX,75507-5000
5 77
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001AB FIRST ARTICLE TEST REPORT 1 LO $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: POWER TAKE OFF, TRANSMISSION
CLIN CONTRACT TYPE:
Firm Fixed Price
FIRST ARTICLE TEST REPORT, PURSUANT TO THE
REQUIREMENTSS OF THE CLAUSE TITLED "FIRST ARTICLE
APPROVAL -CONTRACTOR TESTING".
THE PRICE FOR FIRST ARTICLE TESTING IN THE TOTAL
AMOUNT OF $_____________, IS INCLUDED IN THE TOTAL
AMOUNT(S) FOR ITEM 0001AA.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 0240
6 77
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0002 POWER, TAKE OFF, TRANSMISSION
NSN: 2520-01-463-5441
Mfr CAGE: 19207
Mfr Part Number: 12462900
This Procurement is a Total Small Business Set-Aside.
The Technical Data Package (TDP) contains 10-50% purchased parts. Refer to the product drawings for details.
(End of narrative A001)
0002AA UNEXERCISED OPTION QUANTITY 50 EA $ $ ______________________________ ______________ __________________
COMMODITY NAME: POWER, TAKE OFF, TRANSMISSION
CLIN CONTRACT TYPE:
Firm Fixed Price
OPTION QUANTITY,
PURSUANT TO THE CLAUSE ENTITLED OPTION FOR
INCREASED QUANTITY --- SEPARATELY PRICED LINE ITEM
(52.217-4001).
The quantity stated for the option CLIN DOES NOT Form a part of the basic contractual quantity. Part or all of it may, however, be added to the contract by exercise of the option clause, at the discretion of the Government.
The failure of the offeror to insert a unit price applicable to the option quantity shall mean that the offeror will supply all or any part of the option, if exercised by the Government, at the basic contract unit price, and the offer will be evaluated for award.
(End of narrative B001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
SEE PACKAGEING CLAUSE FOR DETAILS
LEVEL PRESERVATION: Military
LEVEL PACKING: A
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Inspection/Acceptance at origin means that you MUST contact the DCMA to arrange for a Government inspection BEFORE you ship the supplies called out in
7 77
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
the order. Failure to have the items inspected and accepted will result in their rejection at the destination. The rejected supplies will be returned to you at your expense.
(End of narrative E001)
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 47 0240
002 3 0245
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
8 77
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
9 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 Use of MIL-STD 1916_______________________
The Government will not accept lots whose samples submitted for acceptance contain nonconformances unless appropriately documented and approved by the contracting officer. The contractor shall use MIL-STD-1916, DOD Preferred Methods of Acceptance of Product. The
Verification Level (VL) shall be VL IV for major characteristics and VL II for minor characteristics. MIL-HDBK-1916 provides guidance on the use of MIL-STD 1916.
************ End of Narrative C.1 ********
C.5 Technical Data Package Information (Contract Opportunities in beta.sam.gov) Version________________________________________________________________________________________
The following Xd item applies to this solicitation:
[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.
[ ] 2. This solicitation contains one or more web-located TDPs. If multiple Contract Line Item Numbers (CLINS) are listed below, each one will have its own URL just under the CLIN listing. The URL will take you to that CLINs Web-located TDP. To access the TDP, you will have to copy or type the links URL to your web browser address bar at the top of the screen.
Note: To copy a link from a .pdf file, click on the Text Select Tool, then highlight the URL, copy and paste it into your browser, and hit the Enter key.
CLIN: N/A
TDP Link (URL): N/A
[X ] 3. The TDP for this solicitation resides within beta.sam.gov under the Contract Opportunities search function
(://beta.sam.gov ), and is associated with this solicitation number and can be accessed via this URL:
https://beta.sam.gov/opp/e993a8b819e54d47ae888ffcda1ef923/view
a. Log on to the beta.sam.gov website.
b. Enter your Marketing Partner Identification Number (MPIN).
c. Select Contract Opportunities in the search bar and search by solicitation number.
d. If solicitation is Export Controlled, select Verify MPIN.
(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec
2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..
(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.
(3) To obtain these TDPs, vendors and contractors must have a current DD 2345, Militarily Critical Technical Data
Agreement on file with Defense Logistics Information Service (DLIS).\~ If you are currently certified, your MPIN will be verified and you may proceed to the next step.\~ To obtain certification, login to the Joint Certification Program (JCP)
://public.logisticsinformationservice.dla.mil/PublicHome/jcp/default.aspx . Click on documents and follow instructions provided.\~ Processing time is estimated at six (6) to ten (10) weeks after receipt. Contract Opportunities will allow you to access export controlled TDPs once certification is confirmed.
(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor. Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.
e. If technical data is otherwise restricted, select Pending Access to controlled documents. This will generate an email to the Contract Opportunities system administrator at DLA Warren with all the information needed for them to grant you access.
Contract Opportunities will subsequently automatically generate an email stating when you have permission to view or download
10 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
TDP items. Allow 2 3 working days to complete this Contract Opportunities-TDP access/approval process through beta.sam.gov.
f. Only one individual in your company can request access to the Technical Data Package (TDP) for a solicitation. That individual must be registered as the Data Custodian, as identified in the JCP, and be granted approval to view the Technical
Data Package (TDP) for a solicitation. The Data Custodian MUST be registered for a beta.sam.gov account through ://login.gov
. Any individual(s) no longer with the company should be deleted. Questions related to registration in ://login.gov should be directed to ://login.gov/help/ . Questions related to accounts in beta.sam.gov should be directed to ://beta.sam.gov/help/
. Vendors are responsible for placing correct information in login.gov and beta.sam.gov accounts.
g. It is strongly suggested that you submit an access request and provide the contract specialist with the completed Use and
Non-Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.
[ ] 4. The Government requires a Use and Non-Disclosure Agreement (NDA) to be signed by the Data Custodian of your firm, as identified in the JCP, before access is granted to the technical data. The appropriate Agreement is titled N/A, and is:
[ ] available by emailing the contract specialist listed on page 1 of this solicitation.
[ ] available as an attachment to this solicitation.
Follow the instructions on the Agreement, and email it to the contract specialist at sharon.coleman@dla.mil. The contract specialist will notify the Contract Opportunities administrator upon receiving the NDA. The administrator will grant approval to view/download the
TDP. An email stating approval has been granted will be sent to the vendor. It can take up to 24 hours after approval before you are able to view the TDP. If you have any questions/problems viewing the TDP contact the contract specialist.
************ End of Narrative C.5 ************
C.11 Drawing Limitations________________________
(a) The drawings supplied with this contract are not shop or process drawings. They are engineering design drawings. They are ___ adequate to permit manufacture, and:
(1) depict the completed (item(s), and
(2) serve as the basis for inspection of the completed item(s).
(b) These drawings DON'T cover intermediate drawings/specifications or steps in the manufacturing process. As a result, even if you meet all the dimensions and tolerances specified in the engineering design drawing for each individual part, a cumulative unacceptable fit for the contract item could result.
(c) The Contractor is responsible for producing the shop or process drawings needed to cover intermediate steps in the _____________________________ manufacturing process.
(d) The Contractor is responsible for obtaining all specifications and drawings necessary to manufacture the items being solicited _____________________________ in accordance with the TDP including all incorporated specifications and drawings. Delivery delays are not excusable where the contractor asserts that it did not have a specification or drawing and has failed to request, in writing, the specification from either the Contracting Officer or Contract Specialist prior to the solicitation closing date.
(e) If you fail to produce an end item with a cumulative fit that conforms to Government drawings, specifications or other supplemental manufacturing documentation, you'll be responsible for correcting this condition at no additional cost to the Government and no delivery schedule extension.
************ End of Narrative C.11 ************
C.13 Configuration Control Engineering Changes_______________________________________________
(a) The contractor may submit Engineering Change Proposal(s) (ECPs) and Request for Variance(s) (RFVs) for the requirements in the
Government provided Technical Data Package (TDP). If a Value Engineering Change Proposal(s) (VECPs) clause is included on this contract, VECPs shall be submitted in the same manner as ECPs.
(1) ECPs - The contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all NORs necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The contractor shall not present any production items for acceptance that incorporate any change to the TDP or other baseline documentation until notified by the Government the ECP has been approved and incorporated in the contract.
11 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(i) Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD
Form 1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.
(ii) All ECPs submitted by the contractor will be routine priority unless otherwise justified. If the contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.
(2) RFVs - The contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre-production (formerly known as Request for Deviation (RFD)) or post-production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.
(b) Submission of requested changes - The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.
(c) Specifications - Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).
(d) Forms If any of the above listed forms are not included with the solicitation or contract, the contractor may locate forms on the
DOD Forms Website (://www.dtic.mil/whs/directives/forms/ ) or contact the contract specialist listed on page 1 of the solicitation or contract for copies of the forms.
************ End of Narrative C.13 ************
C.15 Acquisition of Manufacturers Part Number: Components_________________________________________________________
One or more of the drawings for part of the contract item set forth in the Schedule and in the Technical Data Package specify manufacturer's part numbers. Since complete Government technical data for such part or parts are not available, it is understood that the Contractor, by accepting this contract, agrees to furnish only the listed manufacturer's part number(s) for those components of the contract item, except as provided in the provision entitled NOTICE REGARDING "SOURCE-CONTROLLED" COMPONENTS. (In Section L or near the end of this solicitation.) It is further understood and agreed that references to manufacturer's part numbers herein shall be deemed to include all changes or revisions thereto which the approved manufacturer has made effective as of the first date of delivery of any of the items under this contract; provided, that no change or revision that affects the interchangeability (ability to be interchanged with ________ previous parts and to match with all mating parts when assembled) of the listed manufacturer's part shall be incorporated into the contract item without the prior written approval of the Procuring Contracting Officer
************ End of Narrative C.15 ************
C.18 Use of Class 1 Ozone Depleting Substances (CIODS)______________________________________________________
(a) Definitions.
(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean Air Act, (42 U.S.C. 7671a(a)), complete list provided at: ://www.epa.gov/ozone/science/ods/index.html .
(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.
(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that you can meet or produce only by the use of CIODS.
(b) No CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.
(a)\*()No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing
12 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
************ End of Narrative C.18 ************
*** END OF NARRATIVE C0001 ***
13 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D.5 Packaging Requirements (Specifications Standards)______________________________________________________
(a) The preservation, packing, and marking requirements for this contract/order shall be accomplished in accordance with the requirements in the specification/standard defined below.
(b) The following requirements shall apply:
(1) LEVEL OF PRESERVATION: Military
(2) LEVEL OF PACKING: A
(3) QUANTITY PER UNIT PACKAGE: 001
(4) SPECIFICATION/STANDARD: MIL-STD-2073-1
(c) The specification/standard cited is intended to give a clear and accurate description of the technical packaging requirements for the item being procured, including the procedure by which it can be determined that the requirements have been met. Specific instructions and/or tailoring of the specification/standard is detailed in the supplemental instructions below. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing and without affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO with copies to the ACO.
The government reserves the right to require testing to validate alternate industrial preservation methods, materials, blocking, bracing, cushioning, and packing.
(d) Marking:
(1) In addition to any special markings called out by the specification/standard above, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, including bar coding and Military Shipment Label (MSL). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive material will not identify the nature of the material. NOTE: Passive RFID tagging is required in all contracts that contain DFARS clause
252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see
://www.acq.osd.mil/log/sci/ait.html for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation Plan. When an item has Unique Item Identifier (UII) markings as indicated by the inclusion of contract clause DFARS 252.211-7006, refer to the DoD
Guide to Uniquely Identifying Items for development of the UII and MIL-STD-129, Revision R for UII package marking requirements.
Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.
(e) Heat Treatment and Marking of Wood Packaging Materials (WPM):
(1) In accordance with DOD 4140.625-M and the requirements of the International Standards for Phytosanitary Measures 15
(ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood
Packaging Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.
(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging
Material Policy and Wood Packaging Material Enforcement Regulations (see URL: ://www.alsc.org ). WPM heat treated wood using dielectric heating (treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL:
://www.alsc.org ). The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary certifications.
(3) Marking. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The ALSC approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens.
Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
(f) Hazardous Materials (As applicable):
(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be
14 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated.
(This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(2) When applicable, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:
- International Air Transport Association (IATA) Dangerous Goods Regulations
- International Maritime Dangerous Goods Code (IMDG)
- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49
- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO
P4030.19(I)/DLAM 4145.3(I) (for military air shipments).
(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(g) SUPPLEMENTAL INSTRUCTIONS: N/A
************ End of Narrative D.5 ************
*** END OF NARRATIVE D0001 ***
15 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
E.12 Notice Regarding First Article Test Sample_______________________________________________
(a) The approved first article items, as described elsewhere in this contract, consist of a quantity of 2 each that will be consumed or destroyed in testing. Any items consumed or destroyed in testing shall not be delivered as part of the contractually required quantity as set forth in the schedule. The cost of any items that are consumed or destroyed shall be included in the overall offer or contract price. A quantity of 2 each that successfully passes all specified tests, less the destructive tests, if any, SHALL NOT serve as a manufacturing standard for the remainder of the contract.
(b) A manufacturing standard is an item, which conforms to all technical performance requirements. A manufacturing standard will serve as 1) an aid in identifying configuration changes not controlled by the contractual design. 2) as an aid in identifying any process changes, or 3) as the approved workmanship sample, when required, unless alternate samples are submitted for specific characteristics by the Contractor and approved by the Government.
(c) The manufacturing standard will only be used to supplement contractual acceptance/rejection criteria for those process characteristics that require approved workmanship samples. For other characteristics, if configuration or process changes are identified in production units, the contractor will notify the contracting officer for disposition. Manufacturing items that serve as a manufacturing standard may be delivered as part of the contractual quantity with the last shipment made under this contract provided it meets all contractual requirements existing at time of delivery.
************ End of Narrative E.12 ************
E.13 Inspection and Acceptance First Article Approval_____________________________________________________
In addition to inspection requirements specified in applicable drawings and/or specifications, the following provisions shall apply to this contract:
(1) FIRST ARTICLE APPROVAL-CONTRACTOR TESTING: First Article Approval-Contractor Testing shall be performed in accordance with
Drawing 12462900/19207 dated 9/2917.
(2) The First Article Test Report (FATR) shall be compiled by the contractor to the contractor's own format. The FATR shall document the results of all inspections and tests (including supplier's and vendor's inspection records and certifications, when applicable). The FATR shall include actual inspections and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and Quality Assurance Provision (QAP) requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The FATR shall contain sufficient narrative content, technical data, illustrations or photographic evidence, and an objective determination by the contractor to allow the designated Government representative to determine that the First Article Test was successfully completed.
************ End of Narrative E.13 ************
E.18 Inspection and Acceptance Points - Origin______________________________________________
The Government's inspection and acceptance of the supplies offered under this contract/purchase order shall take place at ORIGIN.
Offeror must specify below the exact name, address, and CAGE of the facility where supplies to be furnished under this contract/purchase order will be available for inspection/acceptance.
INSPECTION POINT:
(Name) (CAGE)
(Address) (City) (State) (Zip)
ACCEPTANCE POINT:
(Name) (CAGE)
16 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Address) (City) (State) (Zip)
************ End of Narrative E.18 ************
E.25 Notice Regarding First Article___________________________________
(a) Notwithstanding the provisions for waiver of first article, an additional first article sample (or portion thereof) may be ordered by the Contracting Officer in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of one year, or (iii) whenever a change occurs in place of performance, manufacturing process, material used, drawing, specification or source of supply.
(b) When any of the conditions above occurs, the Contractor shall notify the Contracting Officer so that a determination can be made concerning the need for the additional first article sample (or portion thereof), and instructions can be provided concerning the submission, inspection, and notification of results.
(c) Costs of any additional testing and inspection resulting from conditions specified above shall be borne by the Contractor, unless the change was directed by the Government. Further, any production delays caused by additional testing and inspection will not be the basis for an excusable delay as defined in the default clause of this contract. Such delays shall not form the basis for adjustment in contract price or delivery schedule.
************ End of Narrative E.25 ************
E.26 Interchangeability of Components_____________________________________
(a) DESIGN CHANGES TO ITEMS NOT UNDER GOV'T DESIGN CONTROL. Once the Government accepts the first production test item, or ______________________________________________________ accepts the first end item you deliver, (whichever comes first) you must not make design changes to any item or part that is not under
Government design control.
(b) WHEN THE POLICY CAN BE WAIVED. The Procuring Contracting Officer (PCO) will consider waiving this policy at your request. If _____________________________ your request reaches the PCO after the first production item test has been performed, then we may conduct another first production test at your expense.
(c) PRODUCTION OR DELIVERY DELAYS. Any production or delivery delays caused by this retesting will not be the basis for: _____________________________
(1) an "excusable delay" as defined in the DEFAULT clause of this contract.
(2) be the basis for an increase in contract price or delivery schedule extension.
************ End of Narrative E.26 ************
E.31 Routing of Special Process Approvals_________________________________________
(a) The Technical Data Package for this contract contains one or more of the following specifications:
MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base
TT-C-490 Chemical Conversion Coatings and Pretreatment for Ferrous
Surfaces (Base for Organic
Coatings)
MIL-W-12332 Welding Resistance, Spot:
Weldable Aluminum Alloys
MIL-W-45210 Welding Resistance, Spot:
Weldable Aluminum Alloys
*Drawing 12479550 Ground Combat Vehicle Welding
Code - Steel
17 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
*Drawing 12472301 Ground Combat Vehicle Welding
Code - Aluminum
* If these drawings are not available with your procurement package, please contact the contract specialist on page 1.
(b) The specifications listed in paragraph 1 may require you to get approval from the Government prior to production for one or more special processes involved in producing the item. The following shall apply, unless stated elsewhere in the contract:
(1) You shall prepare the written procedures as the specification requires.
(2) Procedures requiring Government approval shall be routed to the Administrative Contracting Officer (ACO) for review and approval. If the ACO is unable to perform a review, the ACO shall forward the procedure to the Procuring Contracting Officer (PCO) for assistance in the review and approval process. The correct address for the PCO is on the face page of this contract.
(3) You shall cite (i) the contract number and (ii) the governing specification or standard on all procedures you submit for approval.
(4) The DCMA will provide a copy of their approval/rejection notices to the PCO.
(5) DCMA is required to qualify the processes of the major coating subcontractors used by the prime contractors.
************ End of Narrative E.31 ************
E.36 Delegation of Authority for First Article Approval_______________________________________________________
The DCMA Administrative Contracting Officer (ACO) is hereby delegated the authority to approve or disapprove the First Article Test
Report submitted in accordance with this contract (FAR 52.209-3 First Article Testing- Contractor First Article). Any reference to
Contracting Officer(PCO) as it relates to the submission of, and approval/disapproval of the FAT Report shall be deemed to mean the DCMA
ACO. ACO approval will be predicated upon QAR acceptance of the FAT Report. ACO approval authorizes the contractor to proceed with production.
************ End of Narrative E.36 ************
E.38 Requirements for Pretreatment and CARC Painted Material_____________________________________________________________
(a) Scope
(1) This clause applies to contracts requiring Chemical Conversion Coatings and Pretreatments for Metallic Substrates, Chemical
Agent Resistant Coating (CARC), and their related materials. The requirements in this clause clarify and supplement those in the contract, unless nullified elsewhere in the contract or through an approved Request for Deviation.
(2) Coating qualification, spot paint repair, and MIL-DTL-16232 Phosphate Coating, Heavy, Manganese or Zinc Base coatings are not within the scope of this clause.
(b) Definitions
(1) The contracting agency, appropriate agency, procuring authority, engineering authority, procuring agency, and procuring activity is the PCO or designee.
(2) The prime contractor is the company awarded this contract, and the subcontractors comprise all companies involved in providing coated parts to the prime contractor, including companies that apply the coatings.
(c) General Requirements Clarifications
(1) The government retains the right for onsite verification of the prime contractors and its subcontractors products, processes, procedures, and test reports.
(2) The prime contractor shall be responsible for itself and its subcontractors to produce and maintain detailed process control plans, process control data, pre-production approval testing, ongoing quality control & quality control testing, and test reports.
This information shall be available upon government request.
(3) The prime contractor shall immediately notify the PCO and the Defense Contract Management Agency (DCMA) of any failure to meet preproduction and production requirements.
(4) Each cleaning method shall be treated as a separate step in the process documentation.
(5) The Gage Repeatability and Reproducibility (Gage R&R) error shall be less than 30 percent for all process and product measurement systems.
(6) Products with hexavalent chromium, including but not limited to certain fastener finishes, shall not be used. Additionally, CARC topcoats containing siliceous additives to control gloss are prohibited.
(7) CARC primer and CARC topcoat shall not be applied directly to bare metal or plastic, except as provided for in MIL-DTL-53072.
(8) If the contract specifies application of CARC materials over a non-CARC coating, then both CARC primer and CARC topcoat are required. The complete coating system shall meet the requirements for CARC defined in TT-C-490.
(9) Neutral salt spray (NSS) testing shall not be used to validate compliance with materiel life cycle requirements; NSS is a
18 77
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
production quality test and does not predict field performance.
(d) Pre-Production Approval Clarifications
(1) Pre-production testing shall include:
(i) Thickness of each layer of the coating system;
(ii) Coating system adhesion;
(iii) Salt spray performance; and
(iv) For phosphate pretreatments, the phosphate coating weight, crystal size and shape, and scanning electron microscope photos of the phosphate coatings at 500x and 1000x magnification.
(2) Pre-production test samples shall be from the material used for production parts, pieces cut from production representative parts, or production representative parts. Standardized test coupons shall not be used.
(3) Nine samples shall be produced for the required testing and shall include: three cleaned and pretreated test samples, three samples with the complete paint system and, depending on the CARC paint system, either three samples with pretreatment plus primer or three samples with metal-rich primer plus primer.
(4) One or more ISO 17025 laboratories shall conduct pre-production testing on the nine test samples in accordance with (IAW) the applicable test method accreditations. The applicable ISO 17025 test method accreditations include ASTM B117 Salt Spray, ASTM B244
Thickness of Non-Conductive Coatings on Non-Magnetic Metals, ASTM B487 Measurement of Metal and Oxide Coating Thickness, ASTM B499
Thickness of Non-Conductive Coatings on Magnetic Metals, and ASTM D3359 Measuring Adhesion by Tape Test.
(5) Unless required elsewhere in the contract and specifications, the CARC coating system applied to hot and cold rolled steel shall meet a minimum of 336 hours neutral salt spray resistance IAW ASTM B117.
(6) Test procedures shall be submitted IAW the Contract Data Requirements List (CDRL) DI-NDTI-80603 documenting Pretreatment and
Chemical Agent Resistant Coating procedures when this CDRL is included in the contract.
(7) Test reports from the ISO 17025 accredited labs shall be submitted for Pretreatment and Chemical Agent Resistant Coating testing specified in paragraph (d)(4) of this clause IAW the Contract Data Requirements List (CDRL) DI-NDTI-80809 when this CDRL is included in the contract.
(e) Production Testing Clarifications