SPRDL116R0055-0001.pdf
PDF 13 KB Posted
- Solicitation number
- SPRDL116R0055
About this file
Amendment 0001 to solicitation SPRDL1-16-R-0055
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPRDL116R0055-0003.pdf | ||
| SPRDL116R0055-0002.pdf | ||
| SPRDL116R0055.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2016APR13
SPRDL1
DLA LAND WARREN
WARREN, MI 48397-5000
ARTHUR AIGELTINGER
EMAIL: ARTHUR.AIGELTINGER.CIV@MAIL.MIL
SPRDL1-16-R-0055
2016APR01
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 2
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: ARTHUR AIGELTINGER
Buyer Office Symbol/Telephone Number: ZGA/(586)282-3167
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. THE PURPOSE OF AMENDMENT 0001 TO SOLICITATION SPRDL1-16-R-0055 IS TO INCORPORATE THE FOLLOWING REVISIONS TO THE TDP:
A. Body, Trackshoe, P/N 12387877. Increase the area for marking of cage code, steel heat code, and die control number.
B. Body, Trackshoe, P/N 12387877, Allow removal of Note #9 and QAP Item 204 which requires stamping part number and cage code to container.
C. Body, Trackshoe, P/N 12387877, Allow change to tolerance and GD&T on drawing. Originally the Abrams used T-156 track. It was determined that this track was not sufficient for the vehicle weight. Then the T-158 track was developed to improve track life. This T-
158 track was latter developed further to reduce weight. The lighter track was then call T-158LL track and the original T-158 track was renamed T-158 Heavy track. The drawings for the T-158 Heavy track were modified into the T-158LL shoe body under the original 12348383 drawing. In 2003 the government pulled new part number for the T-158LL track to keep it separated from the T-158 Heavy track drawings.
For the new block drawing 12387877 the designer that created the drawing made changes from the 12348383 drawing and created several errors. This includes not placing tolerances on one dimension and having a + .000 +.030 on another dimension. They also changed the
GD&T from the 12348383 drawing to the 12387877 drawing. The original GD&T was how the track was originally qualified and how the forger manufactures the block.
D. Pad, Track Rubberized, P/N 12348368, Change sampling plan and testing procedures that are required in QAP#12348368 to requirements specified in MIL-DTL-11891G.
E. Block, Track Rubberized, P/N 12387878, Change sampling plan and testing procedures that are required in QAP#12387878 to requirements specified in MIL-DTL-11891G.
F. Pin, Rubberized, P/N 12387876, Change sampling plan and testing procedures that are required in QAP#12387876 to requirements specified in MIL-DTL-11891G.
G. Change in wedge torque values. The current assembly drawing revision B has not incorporated the updated torque levels. The current drawing specifies that the wedge bolt torque is to 350-410 FT-Ibs instead of 320-380 Ft-Ibs. Then drawing 12387880 was revised to revision B but drawing note 3 still has the torque of 320-380 Ft-Ibs.
H. Plate, P/N 12348367 Revision G, Allow general tolerance title block from Revision F drawing to apply to Revision G. This includes +/-0.03 tolerance on 2 decimal places and +/- 1 degree for angles. This tolerance block was left off this revision and is required for 5 dimensions on this print.
I. Pin, P/n 12348381 Revision D. Allow straightening of pin after induction heat treat and before second tempering with a limit of
.045 max straightening.
2. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT. THE CLOSING DATE REMAINS UNCHANGED AT 4 MAY 2016, 1:00
P.M.
*** END OF NARRATIVE A0001 ***
2 2
SPRDL1-16-R-0055 0001
SECTION A
File details come from the government source that posted it. Updated .