Exhibit A - CDRL List.pdf
PDF 2 MB Posted
- Attached to
- AN/APR-39C (V) Radar Detecting Set Federal contract opportunity
- Solicitation number
- SPRBL1-21-R-0010
About this file
This is a pre-solicitation notice for an indefinite-delivery/indefinite-quantity contract to provide hardware and services in support of the AN/APR-39C(V) Radar Detecting Set. The Defense Logistics Agency Land intends to issue a request for proposal for a five-year firm-fixed-price and cost-plus-fixed-fee IDIQ contract. Key requirements include hardware such as processors, multiplexers, and signal processing units with best estimated quantities provided. Services such as maintenance on multiplexers and signal processing units are also included with estimated quantities. The items support sustainment and function of the radar detecting set, which is manufactured for military use only. Northrop Grumman Systems Corporation is the original equipment manufacturer. The contract will be awarded under FAR Part 15 and will not be set aside for small businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A20 - SPRBL1-21-R-0010 Solicitation Amendment 0004 Final Version.pdf | ||
| A20 - SPRBL1-21-R-0010 Solicitation Amendment 0003 Final Version.pdf | ||
| A20 - SPRBL1-21-R-0010 Solicitation Amendment 0002.pdf | ||
| A20 - SPRBL1-21-R-0010 Solicitation Amendment 0001.pdf | ||
| Attach 0001 - Statement of Work (SOW).pdf | ||
| Attach 0002 - Performance Work Statement (PWS).pdf | ||
| Attach 0003 - DD Form 254.pdf | ||
| SPRBL1-21-R-0010 Solicitation Final Version.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
data_item: A010 title: SOFTWARE PRODUCT SPECIFICATION (SPS) sub: Software Product Specification auth: DI-IPSC-81441A ref: SOW 3.10 req_ofc: FCDD-ISP-NV dd250: LT appcode:
dist: D freq: ASREQ asof: Block 16 firstsub: 30DAC subsub: Block 16 addressee1: FCDD-ISP-NV draft1:
reg1: 1 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 1 total_repro: 0 remarks: The USG requires 45 days to review and approve/disapprove.
Contractor shall incorporate USG comments and deliver the updated documentation within 30 days.
Distribution Statement required. An Export Control Warning may also be required.
group:
total_price:
prep_name: JohnMcDonough,EngineerFCDDISPNV line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation remarksb:
Page2:
Reset:
2020-09-29T09:34:00-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date: 29SEP20 app_by: RobTyndall,BranchChiefFCDDISPNV
2020-10-07T14:57:57-0400
TYNDALL.ROBERT.CLEMENT.1525520010
app_date: 7 OCT 20
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A011 title: Contract Government Furnished Material (GFM) requisition and inventory report sub: Reporting of Government Inventory Held under Product Support Contractual Arrangements auth: DI-MGMT-82128 ref: SOW 3.11.5 PWS 4.4.5 req_ofc: CECOM dd250: LT appcode: N/A dist: E freq: QRTLY asof:
firstsub: see remarks subsub: see remarks addressee1: see Block 16 draft1:
reg1: 1 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 1 total_repro: 0 remarks:
Data required and identified in the requirements section of the DID 1-2.16 will be replaced with the following data specific to this Contract/Delivery Order:
National Item Identification Number (NIIN) Contract Number GFM is authorized under Delivery Order (DO) Number Open GFM Requisition Number Due-In Quantity Quantity Received Consumable GFM Yes/No Serviceable “A” Condition Transfer In Transfer In From Contract/DO number Serviceable “A” Condition Transfer Out Transfer Out to Contract/DO Number Sum Quantity Issued to Repair Line Sum Quantity Turn-In Missing Due-In Plant Clearance Shipped Quantity Total On-Hand (OH) Balance Serviceable “A” Condition OH Unserviceable “F” Condition OH and Condemned “H” Condition OH
Contractor shall provide a report electronically in .xls or .xlsx format.
Block 12: 30 days from executed modification adding this deliverable requirement
Block 13: Subsequent submissions shall be provided on the 15th of the month, unless the 15th is a weekend or holiday, in which case the report shall be delivered the next available business day.
Block 14: Distribution shall be made to the Contracting Officer's Representative official email address at the time of submission group:
total_price:
prep_name: John McDonough,Engineer, FCDDISPNV line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation remarksb:
Page2:
Reset:
2020-10-15T11:20:26-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date:
app_by: Rob Tyndall,BranchChief,FCDDISPN
2020-11-10T12:08:58-0500
TYNDALL.ROBERT.CLEMENT.1525520010
app_date: 10 NOV 20
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A012 title: GOVERNMENT PROPERTY INVENTORY REPORT sub:
auth: DI-MGMT-80441C ref: SOW 3.11.5 PWS 4.4.5 req_ofc: CECOM dd250: LT appcode: N/A dist: E freq: ANNLY asof: 0 firstsub: See Remarks subsub: See Remarks addressee1: See Block 16 draft1:
reg1: 1 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 1 total_repro: 0 remarks:
a) Contractors must provide to the COR a physical inventory plan demonstrating how the contractor will achieve a 100% physical inventory count of all material in the contractor’s custody over the shorter of the length of period of performance or 1 calendar year from the start of the period of performance.
Data required and identified in the requirements section of the DID Section 2, Content, will be replaced with the following specific to this Contract/Delivery Order:
National Stock Number (NSN) Manufacturer Part Number Item Name/Nomenclature Serial Number (if available) Quantity Unit of Measure Condition Code Storage Location Sub Location (if applicable) Date of Last Physical Inventory Quantity Counted at Date of Last Physical Inventory Quantity Adjusted (if applicable) Contractor shall provide a report electronically in .xls or .xlsx format on an annual basis.
Inventory records are subject to verification by the government. Contractor must maintain record of physical inventory counts performed to be provided in the event of an inspection. Notification of inspection will be coordinated through the Government Property Administrator or COR.
Block 13: Date of subsequent submission shall be 12 months from date of prior submission.
Block 14: Distribution shall be made to the Contracting Officer's Representative of record for this contract at time of submission. Deliverable shall be supplied in email to Contracting Officer's Representative official email address at the time of submission.
group:
total_price:
prep_name: John McDonough,Engineer, FCDDISPNV line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation remarksb:
Page2:
Reset:
2020-10-15T11:19:57-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date:
app_by: Robert Tyndall,Branch Chief,FCDDISP app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A001 title: Technical Report-Study/Services sub: Configuration Control auth: DI-MISC-80711A ref: SOW 3.1.5.3 PWS 3.2.3, 3.2.3.1, 3.2.4 req_ofc: FCDD-ISP-NV dd250: LT appcode:
dist: C freq: ASREQ asof: Block 16 firstsub:
subsub: Block 16 addressee1: FCDD-ISP-NV draft1:
reg1: 1 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 1 total_repro: 0 remarks: Data Item Description DI-MISC-80711A: Delete Block 10 instructions entirely and follow instructions in SOW found at para 3.1
The contractor shall prepare and submit Configuration Control Documents in accordance with the SOW section for Configuration Control (Para 3.2.) when a change to or departure from a contractual baseline document is deemed necessary.
Submit within 30 of notification. Upon receipt government has 30 days to review
Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project) or later. Alternate formats may be allowed subject to Government review and approval.
group:
total_price:
prep_name: JohnMcDonough,EngineerFCDDISPNV line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation remarksb:
Page2:
Reset:
2020-09-29T09:45:25-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date: 29SEP20 app_by: RobTyndall,BranchChiefFCDDISPNV
2020-10-07T16:12:54-0400
TYNDALL.ROBERT.CLEMENT.1525520010
app_date: 7 OCT 20
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A002 title: Report, Record of Meeting/Minutes sub: Technical Review Meetings auth: DI-ADMN-81505 ref: SOW 3.4 req_ofc: FCDD-ISP-NV dd250: LT appcode:
dist: C freq: ANNUAL asof: Block 16 firstsub:
subsub: Block 16 addressee1: FCDD-ISP-NV draft1:
reg1: 1 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 1 total_repro: 0 remarks: Data shall be submitted and exchanged electronically in Microsoft Office of applications (MS Word, Excel, Power Point, Access, and Project) or later. Alternate formats may be allowed subject to Government review and approval.
The government requires 30 days to provide comments.
group:
total_price:
prep_name: JohnMcDonough,EngineerFCDDISPNV line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation remarksb:
Page2:
Reset:
2020-09-29T09:44:31-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date: 29SEP20 app_by: RobTyndall,BranchChiefFCDDISPNV
2020-10-07T16:13:40-0400
TYNDALL.ROBERT.CLEMENT.1525520010
app_date: 7 OCT 20
Page:
of_pages:
app: Adobe Professional 8.0
DD FORM 1423-2, AUG 96
(2 Data Items)
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
TDP ________ TM _______ OTHER _________________________
11. AS OF DATE 13. DATE OF SUBSEQUENT
12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
Page ____ of ____ Pages
Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.
DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;
Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any
DD FORM 1423-2 (BACK), AUG 96
line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation data_item1: A003 title1: Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan sub1: DMP auth1: DI-MGMT-81948 ref1: SOW 3.8.3 req_ofc1: FCDD-ISP-NV dd250_1: DD appcode1: A dist1:
freq1: ASREQ asof1:
firstsub1: 30DAC subsub1: block 16 addr1_1: FCDD-ISP-NV draft1_1:
reg1_1: 1 repro1_1:
addr1_2:
draft1_2:
reg1_2:
repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
addr1_4:
draft1_4:
reg1_4:
repro1_4:
addr1_5:
draft1_5:
reg1_5:
repro1_5:
addr1_6:
draft1_6:
reg1_6:
repro1_6:
addr1_7:
draft1_7:
reg1_7:
repro1_7:
addr1_8:
draft1_8:
reg1_8:
repro1_8:
addr1_9:
draft1_9:
reg1_9:
repro1_9:
addr1_10:
draft1_10:
reg1_10:
repro1_10:
addr1_11:
draft1_11:
reg1_11:
repro1_11:
addr1_12:
draft1_12:
reg1_12:
repro1_12:
addr1_13:
draft1_13:
reg1_13:
repro1_13:
addr1_14:
draft1_14:
reg1_14:
repro1_14:
totaldraft1: 0 totalreg1: 1 totalrepro1: 0 rmks1: Draft to be submitted 30 DAC. Government comments or draft approval will occur 30 days after receipt or 15 days after the contract start of work meeting whichever occurs later. The DMSMS program processes shall be continually reviewed by the contractor and recommended improvements to the management plan shall be proposed at the next OWG meeting. Changes to the plan deemed by the contractor as critical need not wait for the next OWG. Revisions will be submitted as required. Government comments or revision approval will occur within 15 days after receipt.
Submit electronically in Microsoft Word (unless otherwise approved by the government).
group1:
totalprice1:
data_item2:
title2:
sub2:
auth2:
ref2:
req_ofc2:
dd250_2:
appcode2:
dist2:
freq2:
asof2:
firstsub2:
subsub2:
addr2_1:
draft2_1:
reg2_1:
repro2_1:
addr2_2:
draft2_2:
reg2_2:
repro2_2:
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr2_4:
draft2_4:
reg2_4:
repro2_4:
addr2_5:
draft2_5:
reg2_5:
repro2_5:
addr2_6:
draft2_6:
reg2_6:
repro2_6:
addr2_7:
draft2_7:
reg2_7:
repro2_7:
addr2_8:
draft2_8:
reg2_8:
repro2_8:
addr2_9:
draft2_9:
reg2_9:
repro2_9:
addr2_10:
draft2_10:
reg2_10:
repro2_10:
addr2_11:
draft2_11:
reg2_11:
repro2_11:
addr2_12:
draft2_12:
reg2_12:
repro2_12:
addr2_13:
draft2_13:
reg2_13:
repro2_13:
addr2_14:
draft2_14:
reg2_14:
repro2_14:
totaldraft2: 0 totalreg2: 0 totalrepro2: 0 rmks2:
group2:
totalprice2:
prep_by: JohnMcDonough,EngineerFCDDISPNV
2020-09-29T09:43:24-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date: 29SEP20 app_by: RobTyndall,BranchChiefFCDDISPNV
2020-10-07T14:00:08-0400
TYNDALL.ROBERT.CLEMENT.1525520010
app_date: 7 OCT 20
Page:
of_pages:
app: Adobe Professional 8.0
Reset:
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
Item 4; Clarification of submittal dates in Items 12 and 13;
conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the and does not require any substantial change to conform to Government requirements with regard to depth of content, format, otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation data_item1: A004 title1: DMSMS Life Cycle Management Data sub1: DMSMS BOM, Production & Sustainment auth1: DI-MGMT-82274 ref1: SOW 3.8.8 req_ofc1: FCDD-ISP-NV dd250_1: LT appcode1:
dist1:
freq1: SEMIA asof1:
firstsub1: 90DAC subsub1: Block 16 addr1_1: FCDD-ISP-NV draft1_1:
reg1_1: 1 repro1_1:
addr1_2:
draft1_2:
reg1_2:
repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
addr1_4:
draft1_4:
reg1_4:
repro1_4:
addr1_5:
draft1_5:
reg1_5:
repro1_5:
addr1_6:
draft1_6:
reg1_6:
repro1_6:
addr1_7:
draft1_7:
reg1_7:
repro1_7:
addr1_8:
draft1_8:
reg1_8:
repro1_8:
addr1_9:
draft1_9:
reg1_9:
repro1_9:
addr1_10:
draft1_10:
reg1_10:
repro1_10:
addr1_11:
draft1_11:
reg1_11:
repro1_11:
addr1_12:
draft1_12:
reg1_12:
repro1_12:
addr1_13:
draft1_13:
reg1_13:
repro1_13:
addr1_14:
draft1_14:
reg1_14:
repro1_14:
totaldraft1: 0 totalreg1: 1 totalrepro1: 0 rmks1: The government requires 30 days to provide comments or approve. Subsequent submissions to reflect changes or updates will be every 180 days thereafter with the exception that the government may elect to delay a submission in order to better synchronize it with an upcoming design, logistics or program review or OWG meeting (e.g., PDR, CDR, etc.).
The BOM will provide the following data elements from Table 1 of DI-MGMT-82274: Data Elements 1-3, 5-6, 9-12, 15, 17-19, 25-26, 30, 32, 45.
group1:
totalprice1:
data_item2:
title2:
sub2:
auth2:
ref2:
req_ofc2:
dd250_2:
appcode2:
dist2:
freq2:
asof2:
firstsub2:
subsub2:
addr2_1:
draft2_1:
reg2_1:
repro2_1:
addr2_2:
draft2_2:
reg2_2:
repro2_2:
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr2_4:
draft2_4:
reg2_4:
repro2_4:
addr2_5:
draft2_5:
reg2_5:
repro2_5:
addr2_6:
draft2_6:
reg2_6:
repro2_6:
addr2_7:
draft2_7:
reg2_7:
repro2_7:
addr2_8:
draft2_8:
reg2_8:
repro2_8:
addr2_9:
draft2_9:
reg2_9:
repro2_9:
addr2_10:
draft2_10:
reg2_10:
repro2_10:
addr2_11:
draft2_11:
reg2_11:
repro2_11:
addr2_12:
draft2_12:
reg2_12:
repro2_12:
addr2_13:
draft2_13:
reg2_13:
repro2_13:
addr2_14:
draft2_14:
reg2_14:
repro2_14:
totaldraft2: 0 totalreg2: 0 totalrepro2: 0 rmks2:
group2:
totalprice2:
prep_by: JohnMcDonough,EngineerFCDDISPNV
2020-09-29T09:40:46-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date: 29SEP20 app_by: RobTyndall,BranchChiefFCDDISPNV
2020-10-07T14:01:08-0400
TYNDALL.ROBERT.CLEMENT.1525520010
app_date: 7 OCT 20
Page:
of_pages:
app: Adobe Professional 8.0
Reset:
The public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the
Item 4; Clarification of submittal dates in Items 12 and 13;
conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the and does not require any substantial change to conform to Government requirements with regard to depth of content, format, otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation data_item1: A005 title1: DMSMS Life Cycle Management Data sub1: DMSMS Alerts auth1: DI-MGMT-82274 ref1: SOW3.8.9 req_ofc1: FCDD-ISP-NV dd250_1: LT appcode1:
dist1:
freq1: As Req'd asof1: Block 16 firstsub1: Block 16 subsub1: Block 16 addr1_1: FCDD-ISP-NV draft1_1:
reg1_1: 1 repro1_1:
addr1_2:
draft1_2:
reg1_2:
repro1_2:
addr1_3:
draft1_3:
reg1_3:
repro1_3:
addr1_4:
draft1_4:
reg1_4:
repro1_4:
addr1_5:
draft1_5:
reg1_5:
repro1_5:
addr1_6:
draft1_6:
reg1_6:
repro1_6:
addr1_7:
draft1_7:
reg1_7:
repro1_7:
addr1_8:
draft1_8:
reg1_8:
repro1_8:
addr1_9:
draft1_9:
reg1_9:
repro1_9:
addr1_10:
draft1_10:
reg1_10:
repro1_10:
addr1_11:
draft1_11:
reg1_11:
repro1_11:
addr1_12:
draft1_12:
reg1_12:
repro1_12:
addr1_13:
draft1_13:
reg1_13:
repro1_13:
addr1_14:
draft1_14:
reg1_14:
repro1_14:
totaldraft1: 0 totalreg1: 1 totalrepro1: 0 rmks1: Submit within 15 calendar days of discovering the DMSMS Issue.
The DMSMS Alert will provide the following data elements from Table 1 of DI-MGMT-82274: Data Elements 1-3, 11, 17-19, 44-50 & 52-53.
group1:
totalprice1:
data_item2:
title2:
sub2:
auth2:
ref2:
req_ofc2:
dd250_2:
appcode2:
dist2:
freq2:
asof2:
firstsub2:
subsub2:
addr2_1:
draft2_1:
reg2_1:
repro2_1:
addr2_2:
draft2_2:
reg2_2:
repro2_2:
addr2_3:
draft2_3:
reg2_3:
repro2_3:
addr2_4:
draft2_4:
reg2_4:
repro2_4:
addr2_5:
draft2_5:
reg2_5:
repro2_5:
addr2_6:
draft2_6:
reg2_6:
repro2_6:
addr2_7:
draft2_7:
reg2_7:
repro2_7:
addr2_8:
draft2_8:
reg2_8:
repro2_8:
addr2_9:
draft2_9:
reg2_9:
repro2_9:
addr2_10:
draft2_10:
reg2_10:
repro2_10:
addr2_11:
draft2_11:
reg2_11:
repro2_11:
addr2_12:
draft2_12:
reg2_12:
repro2_12:
addr2_13:
draft2_13:
reg2_13:
repro2_13:
addr2_14:
draft2_14:
reg2_14:
repro2_14:
totaldraft2: 0 totalreg2: 0 totalrepro2: 0 rmks2:
group2:
totalprice2:
prep_by: JohnMcDonough,EngineerFCDDISPNV
2020-09-29T09:39:45-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date: 29SEP20 app_by: RobTyndall,BranchChiefFCDDISPNV
2020-10-07T14:28:19-0400
TYNDALL.ROBERT.CLEMENT.1525520010
app_date: 7 OCT 20
Page:
of_pages:
app: Adobe Professional 8.0
Reset:
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A006 title: DMSMS Life Cycle Management Data sub: Case Management Reports auth: DI-MGMT-82274 ref: SOW 3.8.10.1 req_ofc: FCDD-ISP-NV dd250: LT appcode:
dist:
freq: ASREQ asof: Block 16 firstsub: Block 16 subsub: Block 16 addressee1: FCDD-ISP-NV draft1:
reg1: 1 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 1 total_repro: 0 remarks: Individual Cases will be established within 15 calendar days of submitting a DMSMS Alert. The initial report shall be submitted NLT 45 days after submitting the DMSMS alert and shall summarize the issue and describe the contractors proposed plan and time-line to resolve and close the case. Subsequent updates to the case report shall occur whenever there is: a change in status, cost, schedule, impact or in the proposed mitigation strategy.
The report shall contain:
The report will provide the following data elements from Table 1 of DI-MGMT-82274: Data Elements 1-3, 5, 11, 15, 17-19, 25-26, 30-41 & 44-52.
Data Element 34 shall include a description of the DMSMS issue and include all NHA's affected.
Data Element 37 shall include a summary of other mitigation strategies considered and why they were not pursued.
Data Element 38 shall be a proposed case implementation schedule identifying key events from the case approval (resolved) to completion (closed) for the mitigation strategy recommended.
Submit electronically in Microsoft Excel (unless otherwise approved by the government).
group:
total_price:
prep_name: JohnMcDonough,EngineerFCDDISPNV line_item:
exhibit:
xtdp: Off xtm: Off othercat: X system: AN/APR-39 C(V)1 System/Spare/Repair ctr_no:
contr: Northrop Grumman Systems Corporation remarksb:
Page2:
Reset:
2020-09-29T09:38:21-0400
MCDONOUGH.JOHN.ROBERT.III.1037281170
prep_date: 29SEP20 app_by: RobTyndall,BranchChiefFCDDISPNV
2020-10-07T14:31:35-0400
TYNDALL.ROBERT.CLEMENT.1525520010
app_date: 7 OCT 20
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .