Tech Reqs for SPRBL120Q0045.pdf
PDF 198 KB Posted
- Solicitation number
- SPRBL1-20-Q-0045
About this file
This technical requirements document outlines specifications for the procurement of 36 Motor Assembly, Elevation units under a Special Emergency Procurement Authority justification. Key details include the National Stock Number, manufacturer's part number, and CAGE code for the required item. The document establishes the configuration baseline and part revisions for the AN/TSC-156 Phoenix system and its components. It specifies requirements for item unique identification marking, wood packing materials, quality assurance, inspection and testing in accordance with the contractor's procedures. The contractor must submit configuration management data using the DI-MISC-80711A data item description and notify the government of any departures from the contractual baseline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - SPRBL120Q0045.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit contract Identifying number Page 1 of 9 Issue: day month year
TECHNICAL REQUIREMENTS
Hardware Spares
Special Emergency Procurement Authority Justification (SEPA) buy For
Satellite Communications System AN/TSC-156D (Phoenix)
Exhibit contract Identifying number Page 2 of 9
TABLE OF CONTENTS
1.0 APPLICABLE DOCUMENTS
2.0 CONFIGURATION BASELINE
Configuration Baseline
2.1 Part Revisions
2.1.1 Configuration
2.1.2 Departures from Configuration Baseline
3.0 ITEM UNIQUE IDENTIFICATION (UID)
3.1 Unique Identification Marking
3.2 Unique Identification Marking Data Submission Guidance
4.0 PACKAGING
4.1 Wood Packing Material
4.2 Preservation, Packing and Marking Instructions
4.2.1 Part Number Marking
5.0 PERFORMANCE REQUIREMENTS
5.1 Inspection and Testing
5.2 Quality
5.3 Hardware Procurement Requirements
6.0 CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL A001: Configuration
Appendix A – NSNs for Procurement
Exhibit contract Identifying number Page 3 of 9
1.0 APPLICABLE DOCUMENTS
Military and Federal Standards MIL-STD-129R Military Marking for Shipment and Storage MIL-STD-130N Identification Marking of U.S. Military Property DED-STD-595 C(1) Colors used in Government Procurement
Military and Federal Specifications DFARS 252.211-7003 Item Identification and Valuation DFARS 252.211-7006 Passive Radio Frequency Identification AR 25 Information Assurance AR 381-12 Threat Awareness and Reporting Program AR 380-67 Information Management, Information Assurance AR 525-13 Antiterrorism AR 530-1 Operations Security DoD 8570.01 Baseline Certifications DoD 8570.01-M Baseline Certifications FAR 42.503 Post Award Conferences MIL-DTL-53039 C Coating, Aliphatic Polyurethane, Single Component, Chemical
Agent Resistant w/Amd 2 MIL-DTL-53072 D Chemical Agent Resistant Coating (CARC) System Application
Procedures and Quality Control Inspection
MIL-DTL-53072 D Coating, Water Dispersible Aliphatic Polyurethane, Chemical Agent Resistant
MIL-PRF-22750 F Coating, Epoxy, High-Solids MIL-DTL-287 H Waveguide Assemblies, Flexible, Twistable and Non-twistable
General Specification for
Other Documents None A 3286081 Tactical SHF Satellite Terminal (TSST) Specification, Specification
Number A3286081, dated 01 April 2003 A 3286082 Quad-Band Satellite Emulator (QBSE) Specification, Specification
Number A3286082, date 01 April 2003
A3329679 TACTICAL SHF SATELLITE TERMINAL (TSST)
SPECIFICATION AN/TSC-156D With Replacement FM Orderwire 23 June, 2011
SPI# AG 00000601 Special Packaging Instruction (when applicable) DLAD T/Q RP001 DLA Packaging Requirements for Procurement
Commercial Documents ASTM D 3951-15 Standard Practice for Commercial Packaging ANSI/ASQ 9001:2015 Quality Management Systems - Requirements ANSI/IEEE STD 200-1975 Electrical And Electronics Parts And Equipment Reference
Designations for electrical and electronics parts and equipment ISPM Number 15 Regulation of Wood Packaging Material in International Trade
(2009) NAS 3426 Electrical Harness-Cable Assemblies, Packaging Of'
Exhibit contract Identifying number Page 4 of 9
Security Documents None
2.0 CONFIGURATION BASELINE
This paragraph establishes contractor requirements for Configuration Management of a Part Number (PN) where the Government does not own a Performance Specification to define the Item.
Configuration Baseline. The Contractor’s Part Number (PN), as defined by the Contractor’s specifications, drawings, catalog page, etc., at the time of award of this contract, shall form the Configuration Baseline for this acquisition. The applicable Configuration Baseline (CB) for the listed Configuration Item (CI)/Computer Software Configuration Item (CSCI) is as follows:
CI/CSCI CB
AN/TSC-156
Phoenix
A3286082 Quad-Band Satellite Emulator (QBSE) Specification A3286081 Tactical SHF Satellite Terminal (TSST) Specification
Refer to Appendix A for all NSNs, which Government will procure on this SEPA buy to form the configuration base line.
2.1 Part Revisions
2.1.1 Configuration
Each CI (in Appendix A), as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO).
Configuration changes not directly affecting the configuration baseline must be documented by the contractor and shall sent to the Government.
2.1.2 Departures from Configuration Baseline
No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with CDRL A001 Configuration Management DI-MISC-80711A and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO. Configuration Control shall be achieved by the Configuration Control Documents (CCDs) as follows:
The Engineering Change Proposal (ECP) describes changes to the CI and associated Government documents and data that are affected by the proposed engineering change. The ECP includes both the engineering change and the supporting documentation by which the change is described and suggested.
An ECP is required for a major change. A major change is defined as any change that will impact any of the following conditions of the PN:
A. Overall performance and Form, Fit, Function and Interface (F3I) Characteristics.
B. Reliability, Maintainability and Survivability C. Electromagnetic Interference (EMI), air worthiness certification, or other pertinent requirement.
D. Safety
Exhibit contract Identifying number Page 5 of 9
E. Support, operational and training requirements F. Impact on Technical Manuals, Repair Parts and Special Tools Lists (RPSTLs), DMWRs, Provisioning
Parts List (PPL), etc.
G. Impact on Cost and/or Schedule. Impact on test equipment, and support equipment
A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, (one NOR per document) following approval of an ECP. The NOR is submitted as part of the
ECP.
A Specification Change Notice (SCN) is used to delineate the exact change(s) in a specification that will be distributed to users when the ECP is approved. The SCN is submitted as part of the ECP. The SCN is not used for a military or federal document, only a Request for Variance (RFV) can be used for those documents.
The Request for Variance (RFV) describes a departure from configuration documentation for a specific number of units or period of time. Contractor shall identify the impact of the RFV on performance, operational readiness and logistics support of the affected CIs. The Government may require compensation or consideration for any approved RFV.
The Contractor shall provide all supporting program data with the CCD. The contractor shall uniquely and sequentially identify (including the use of the contract number) each ECP, NOR, SCN or RFV. The identification number should use less than 16 characters.
3.0 ITEM UNIQUE IDENTIFICATION (UID)
The contractor shall implement item Unique Identification (UID) marking, as defined in MIL-STD-130-M and DoD Guide to Uniquely Identifying Tangible Items, Assuring Valuation, Accountability and Control of Government Property, Version 3.0, December 2, 2014. The two-dimensional item UID marking shall be incorporated into existing data plates, shall be machine-readable with common optical scanning devices, and be accompanied by the corresponding human readable markings when practical.
3.1 Unique Identification Marking
The contractor shall comply with DFARS 252.211-7003, Item Identification and Valuation to provide UID. UID markings shall be per the latest version of MIL-STD-130. UID markings are also required for embedded components in this contract. Guidance for UID Marking of embedded components shall be per the latest version of MIL-STD-130 and the https://www.acq.osd.mil/dpap/pdi/uid/ website. Refer to DFARS 252.211-7003 for additional requirements. The Contractor shall ensure that all delivered equipment meeting the UID criteria is marked and the applicable data is submitted to the DOD UID Repository.
The UID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item.
Legibility shall be as required and verified for ready readability per the latest version of MIL-STD-130N.
3.2 Unique Identification Marking Data Submission Guidance
The Contractor shall submit UID data via the Wide Area Work Flow (WAWF) Paperless Contracting Environment per the latest published guidance. The latest UID Data Submission guidance may be found at http://www.acq.osd.mil/dpap/sitemap.html.
Exhibit contract Identifying number Page 6 of 9
4.0 PACKAGING
All hardware items shall be packaged and marked in accordance with (IAW) ASTM D 3951-15, Standard Practice for Commercial Packaging. Level of Protection: Commercial, Level of Pack (LPK): Commercial, Quantity Unit Pack (QUP): 001. Marking shall be IAW MIL-STD-129R with change 4. Radio Frequency Identification (RFID) requirements shall be per clause DFARS 252.211-7006 of the contract.
4.1 Wood Packing Material
Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSB). All WPM shall meet the requirements of the International Standards for Phytosanitary Measures (ISPM) Number 15, "Regulation of Wood Packaging Material in International Trade". DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.
All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KDHT) IAW American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).
All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All DUNNAGE used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
DoD Components are defined as all entities, including Contractors that engage in logistical functions supporting elements of the U.S. Armed Forces. See DLAD T/Q RP001 DLA Packaging Requirements for Procurement.
Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the Contractor any remediation costs incurred by the Government. The Contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to maintain the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products
4.2 Preservation, Packing and Marking Instructions
4.2.1 Part Number Marking
Each item delivered under contract, along with each assembly, subassembly, and module, shall be legibly marked with the appropriate part number and manufacturer’s identification. Hardware such as screws, nuts, bolts, need not be marked. The marking shall become permanently part of the item after it is applied, and can be applied using deformation, tag, and rubber stamp with permanent characteristics or stencil. The marking shall not interfere with proper operation of the item, and shall have no deleterious effect on the item. Any item deemed unsuitable for marking as outlined herein shall be identified to the KO for resolution as to marking requirement. This requirement may be entirely met by existing marking requirements contained within the drawings or specifications cited in this Task order.
Exhibit contract Identifying number Page 7 of 9
5.0 PERFORMANCE REQUIREMENTS
Under this SEPA buy contract, the Contractor shall serve as the prime Contractor and shall procure all of the items as ordered by the Government in accordance with this Technical Requirements document.
5.1 Inspection and Testing
The contractor shall maintain a system for the identification of the process, inspection/test status of all NSNs in Appendix A. The contractor shall perform final Inspection and testing on all deliverables in accordance with the contractor's Inspection and Testing Procedures. These inspection reports shall be kept in the shipping container along with spare when shipped to all Branch of Government and depots where the NSNs will be installed to the configuration base line. A copy of these test recorded shall be delivered to Product realization (PRD) Engineer assigned to the terminal and to Contracting Officer Representative (COR) Item manager when the deliverables are shipped out to the Government. Equipment and facilities required for inspection and testing shall be the Contractor’s responsibility.
5.2 Quality
The Contractor shall comply with a higher-level quality management system such as the ANSI/ASQ 9001:2015 or AS9100, Quality Management Systems - Requirements, or equivalent in all production facilities involved in this contract. The Contractor shall provide and maintain a comprehensive quality assurance program within its producing/manufacturing facility which addresses Hardware and Software/Firmware Quality. The Contractor shall flow down all quality requirements to sub-Contractors as they apply to procured material and services. The Contractor may change to an alternate Quality Management System during the term of the contract as long as a written request is submitted and approved by the Government.
The Government reserves the right to examine or audit the contractor's Quality Management System and any manufacturing/production processes. The Contractor shall provide the Government the right to make such inspections and audits while the work is in process in order to provide confidence that the project complies with contractual requirements. The Contractor shall provide personnel and facilities to support Government's inspections and audits.
5.3 Hardware Procurement Requirements
The Contractor shall supply all items in accordance with the delivery schedule. Items shall be completed, packaged, shipped, and received at the specified ship to location. Supply Turnaround Time shall be from date of delivery order to the date the item arrives at the Government depot.
6.0 CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL Data Line No.
DID Identification Title
A001 DI-MISC 80711A Scientific and Technical Reports – Configuration Management
CDRL is on the next page.
Exhibit contract Identifying number Page 8 of 9
CDRL A001: Configuration
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
AN/TSC 156D (Phoenix)
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A001 Scientific and Technical Reports Configuration Management
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80711A Tech Requirements, sec 2.1.2 AMEL-LCC-NS
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
N/A N/A ASREQ BLOCK 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
BLOCK 16
Reg Repro
16. REMARKS:
Data Item Description DI-MISC-80711A: Delete block 10 instructions entirely and follow instructions in this Technical Requirements. AN/TSC 156D (Phoenix) Hardware Spares.
The Contractor shall prepare and submit a Request for Variance (RFV) for Government review in accordance with this Technical Requirements section for Configuration Management when there is a change or departure from a contractual baseline.
All RFVs for changes shall be submitted for Government review or notification within 5 business days of Contractor approval and prior to presentation of the product for acceptance, but not later than 30 calendar days, of any such product.
The Government shall review, accept, and/or comment on the draft submission in 30 calendar days. The Contractor shall incorporate changes and re-submit within 30 calendar days. The Government will have 30 calendar days to review, accept, or comment on the final submission.
Data shall be submitted and exchanged electronically in Microsoft Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to Government review and approval.
PCO
AMEL-LCC-NS
FCDD-ISP-CS
15. TOTAL 0 3 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Biruk Shiferaw
FCDD-ISP-CS
General Engineer November 4 2019
X Kate McDevitt
12 March 2019
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages
Exhibit contract Identifying number Page 9 of 9
APPENDIX A – NSNS FOR PROCUREMENT
Nomenclature NSN CAGE MFG PN
MOTOR ASSEMBLY, ELEVATION
(MOTOR,ALTERNATING CURRENT) 6105016050572
and 6401 40010990-002
File details come from the government source that posted it. Updated .