SPRBL1-19-Q-0030_Exhibit-A.pdf
PDF 272 KB Posted
- Attached to
- SPRBL1-19-Q-0030 Federal contract opportunity
- Solicitation number
- SPRBL1-19-Q-0030
About this file
Solicitation SPRBL1-19-Q-0030_Exhibit-A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRBL1-19-Q-0030.pdf | ||
| SPRBL1-19-Q-0030_Attachment-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A SPRBL1-19-Q-0030 Page 1 of 13 20 November 2018
TECHNICAL REQUIREMENTS
FOR
PATRIOT AMG SECONDARY SPARE PART.
(Load Bank, U/W 15 KW & 30KW 400 HZ)
NSN: 6150-01-486-6937
Exhibit A SPRBL1-19-Q-0030 Page 2 of 13
Scope. This Technical requirements Document (TRD) defines the efforts required to produce the products required by this solicitation in accordance with the Documents listed below. The items being purchased are entitled “Load Bank, U/W 15 KW & 30KW 400 HZ”.
Applicable Documents. The following documents are applicable to the extent cited.
Military and Federal Stds Document No. Document Title Applicability MIL-STD- 130 N Identification Marking of U.S. Military Property with Change 1 Required
Other DoD Documents
Document No. Document Title Applicability A3357168
CECOM Purchase Description for Commercial PATRIOT Load Bank U/W 15kW & 30 KW 400 TQGs
Required
Com’l Documents
Document No. Document Title Applicability ISPM Number 15 Regulation of Wood Packaging Material in
International Trade (2009) Required
EIA 649-A National Consensus Standard for Configuration Management
Referenced
ASTM D3951-10 Standard Practice for Commercial Packaging Required
Requirements. The contractor shall produce the items “Load Bank, U/W 15 KW & 30KW 400 HZ “. in the quantity set forth in Section B of the schedule in accordance with Documents listed above and this Technical Requirements.
Requirements for Configuration Control.
Configuration Baseline. The applicable Configuration Baseline (CB) for the listed Configuration Item (CI) is as follows:
CI CB
Load Bank, Electrical A3357168 (CECOM PD for Load Bank, U/W 15 KW & 30KW 400 HZ )
Configuration. Each CI, as developed/built and delivered, shall conform to the cited CB and (if applicable) all subsequent CB’s that will be made contractually binding by the Procuring Contracting Officer (PCO).
Configuration changes not directly effecting the configuration baseline do not require Government approval prior to incorporation, but must be documented by the contractor and shall be made available to the Government upon request. The contractor may use MIL-HDBK-61A as guidance for establishing a Configuration Management Program.
Exhibit A SPRBL1-19-Q-0030 Page 3 of 13
Departures from CB. No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with DI-MISC-80711A and are approved by the Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO. Configuration Control shall be effected by the Configuration Control Documents (CCDs) as follows:
Engineering Change Proposal (ECP) includes both the engineering change and the supporting documentation by which the change is described and suggested. An ECP describes changes to the CI and associated Government documents and data that are affected by the proposed engineering change.
A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, (one NOR per document) following approval of an ECP. The NOR is submitted as part of the
ECP.
A Specification Change Notice (SCN) is used to delineate the exact change(s) in a specification that will be distributed to users when the ECP is approved. The SCN is submitted as part of the ECP. The SCN is not used for a military or federal document, only a Request for Waiver can be used for those documents.
Value Engineering Change Proposal (VECP) is the same as an ECP except there are proposed cost savings for the program. The contractor shall follow the guidance in Section I of this contract for VECPs.
Request For Deviation (RFD). A RFD is a specific written authorization to depart from a particular requirement(s) of an item’s approved configuration documentation for a specific number of units or a specified period of time, either as an advance request or after the fact. The contractor shall identify the impact of the RFD on performance, operational readiness and logistics support of the affected CIs. The Government may require consideration for any RFD.
Contractor shall provide all supporting program or cost data with the CCD. The contractor shall uniquely and sequentially identify (including the use of the contract number) each ECP, VECP, NOR, SCN or RFD. The identification number should use less than 16 characters.
Identification of Authorized Personnel. The contractor shall identify to the PCO, Administrative Contracting Officer (ACO), and the technical office identified on the DD Form 1423 for DI-MISC-80711A, the name(s) of the official(s) of its organization who are authorized to submit CCDs 30 Days after Contract (DAC).
Exhibit A SPRBL1-19-Q-0030 Page 4 of 13
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0001 A TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Load Bank, U/W 15 KW &
30KW 400 HZ
TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Scientific and Technical Reports Configuration Control
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80711A Departure from CB RDER-PRP-G INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16 b. COPIES SECT. B
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A SEE ITEM 16
Reg
Repro
16. REMARKS:
Data Item Description DI-MISC-80711A: Delete Block 10 instructions entirely and follow instructions in “Requirements for Configuration Control”. The contractor shall prepare and submit Configuration Control Documents in accordance with the TRD section for Configuration Control when a change to or departure from a contractual baseline document is deemed necessary. All deliveries shall be in digital format. All digital files shall be provided in digital format readable by computers running Microsoft Office 2000. Alternative delivery media may be discussed with the Contracting Officer prior to delivery.
RDER-PRP-G
PCO
ACO
QAR
AMSEL-LC-LEO-E-ET
AMSEL-LC-LEO-E-AV*
* 1 COPY VECP ONLY.
15. TOTAL 0 6 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Mohammad Gani
RDER-PRP-G
Product Realization Engineer
11/14/2018 Mark Caringi
RDER-PRP-G
Chief, PRD Branch
11/14/2018
DD Form 1423-1, 1 Jun 90
Exhibit A SPRBL1-19-Q-0030 Page 5 of 13
Documentation. The contractor shall document by serial number each products configuration, applicable documentation, maintenance support requirements and spares in relation to the contractor’s configuration baseline. The data in use shall be available for government review and use.
Use of CB Data. The contractor shall assure that all necessary contractor’s activities have access to and use of the contractually specified configuration baseline(s), approved changes and departures, and effectivity data.
The data in use shall be available for government review and use.
Requirements for Item Marking (Gov't Detailed and/or Performance Design Items).
Part Number Marking. Each item delivered under contract, along with each assembly, sub assembly, and module, shall be legibly marked with the appropriate part number and manufacturer’s identification. Hardware such as screws, nuts, bolts, etc., need not be marked. The marking shall become permanently part of the item after it is applied, and can be applied using deformation, tag, rubber stamp with permanent characteristics, etc.
The marking shall not interfere with proper operation of the item, and shall have no deleterious effect on the item. Any item deemed unsuitable for marking as outlined herein shall be identified to the Contracting Officer for resolution as to marking requirement. This requirement may be entirely met by existing marking requirements contained within the drawings or specifications cited in this contract.
NSN Marking. In addition to the marking required by “Part Number Marking” above, each item on contract listed in Section B of the contract, shall be identified with its Government assigned NSN. The intent of this requirement is to ensure that using personnel can identify the circuit card or assembly when it is removed from its assembly, and when it is received from stock as a spare part. The marking can be on a paper label, placed in a location that will not harm the item. If guidance is necessary to implement this requirement, contact the Contracting Officer for guidance.
Serial Number Marking.
Any item or subassembly which contains a serialization requirement shall have serial numbers applied to each item in the place provided (generally on a nameplate/serial number plate). In addition the NSN, CAGE Code, Part Number and if space permits Contract Number shall also be applied. When applicable, the Unique Item Identification (UID) requirements, cited elsewhere in this TRD and contract, shall also apply.
The contractor shall maintain an accurate, current list of serial numbers for all manufactured items under this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or government representative at any time during the life of the contract and for a period of 3 years following the completion of the contract.
IUID Marking.
New items: The contractor shall provide IUID, or DoD recognized equivalent, for all items delivered with an acquisition cost of $5000 or more, or any Government or Contractor serial numbered items. For long term contracts, the Contractor shall implement IUID markings IAW MIL-STD-130N for any item that will exceed the $5,000.00 unit price for any range quantity or contract year. This requirement is effective throughout the life of this contract.
Exhibit A SPRBL1-19-Q-0030 Page 6 of 13
Commercial Markings. All other items shall have acceptable commercial markings that meet the guidelines in Department of Defense (DoD) Guide to Uniquely Identifying Itemshttp://www.acq.osd.mil/dpap/pdi/uid/index.html.
Permanency and Legibility. The IUID marking and identification plates, tags, etching, or labels when used on equipment, parts, assemblies, subassemblies, units, sets, groups, or kits shall be as permanent as the normal life expectancy of the item and be capable of withstanding the environment, test, cleaning, repair, and rebuild procedures specified for the item. Legibility shall be as required and verified for ready readability per MIL-
STD-130N.
Deleterious Effect. Marking of items shall be accomplished in a manner that will not adversely affect the life and utility of the item. Marking materials creating hazardous conditions shall not be used. Placement and choice of the marking shall not create hazardous conditions.
Mandatory Information Reporting for all items requiring IUID marking. The contractor shall include the National Stock Number (NSN), if the item has a NSN, the Serial Number marked on the item, if a Serial Number is marked on the item, the original part number, the current part number (only if not the same as the original part number), the current part number effective date (only if the current part number is used) and the USARMY as the SERVICE /AGENCY/COMMAND data element in the information reported to the IUID Registry, in addition to the information required to be reported to the IUID Registry by DFARS clause 252.211- 7003.
Wide Area Workflow (WAWF) users shall report this mandatory information to the IUID Registry by Direct submission via an X12 Ship Notice/Shipment and Billing Notice (856/857) transaction, an IUID XML transaction, an IUID flat file transaction or a WAWF IUID Material Inspection and Receiving Report/Combo UDF through the Global Exchange (GEX) Service, or manually, via the IUID Web Entry Site at http://www.bpn.gov/iuid. For WAWF users, these methods do not replace the current WAWF interaction, but are performed in addition to it after the shipment has been accepted to provide IUID data that cannot be provided via WAWF.
IUID Coding. IUID markings and readability requirements shall comply with MIL-STD-130N.
Symbology markings and the order of priority for marking the hardware shall be in accordance with MIL-STD 130N. First priority is the 2D data matrix symbol (machine readable) IUID is the minimum requirement when there are severe space limitations. The second priority is the human readable characters. The third priority is the Linear Bar Code.
If the technical data has not specified the marking location, markings shall be located such that they are visible during item use, provided that sufficient space is available, and does not interfere with equipment operations.
If items are not described by Government Product Technical Data (i.e. Commercial Items), the contractor shall submit diagrams showing placement and description of the IUID marking and applicable installation and processing instructions for government review and approval IAW with CDRL for DI-MISC-80711A and this
TRD.
http://www.acq.osd.mil/dpap/pdi/uid/index.html http://www.bpn.gov/iuid
Exhibit A SPRBL1-19-Q-0030 Page 7 of 13
Requirements for Packaging.
Military Packaging
DS7029 and/or DS7033 Preservation, Packing and Marking Instructions [E/IM: Identify if applicable and fill out table DS7029 - DS7033 below.] [KO/KS: If not applicable, remove this section.]
DS7029 - DS7033 LEGEND
Qty Quantity Prot Req Protection Required PGE-REF Packaging Reference (Military Standard) LPK Level of Packing QUP Quantity per Unit Pack ICQ Intermediate Container Quantity Pkg Reqmt Codes Packaging Requirement Codes when PKG-REF cites MIL-STD-2073 The below codes are for special markings:
PC Project Code WG Warranty/Guarantee SL Shelf Life BC Bar Code FMS Foreign Military Sales
DS7029 - DS7033
NSN Prot Req PKG-REF or SPI LPK QUP ICQ Special Markings
Pkg J. J J J J J J J J J Reqmt I. II. III. IV. V. VI. VII. VII.a IX X Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM) 6150-01-486-6937 Military MIL-STD-2073-1E A 001 - 10 1 00 ZZ* ZZ* Z* ZZ* - - - BC
• Z and ZZ = MANUFACTURER SUPPLIED CASE. SECURED TO PALLET W BANDING. PLASTIC STRETCH WRAP AROUND.
Exhibit A SPRBL1-19-Q-0030 Page 8 of 13
Wood Packaging Material (WPM) shall meet the requirements below.
Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSB).
All WPM shall meet the requirements of International Standards for Phytosanitary Measures (ISPM) Number 15, “Regulation of Wood Packaging Material in International Trade”. DoD shipments inside and outside of the United States shall meet the requirements of ISPM 15 whenever WPM is used to ship DoD cargo.
All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) (IAW) American Lumber Standard Committee (ALSC), Incorporated, Wood Packaging Material Program and WPM Enforcement Regulations (see http://www.alsc.org/).
All WPM shall include certification/quality markings IAW the ALSC standard. Markings shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ASLC approved DUNNAGE stamp.
Failure to comply with these requirements may result in refusal, destruction, or treatment of materials at the point of entry. The Government reserves the right to recoup from the contractor any remediation costs incurred by the Government.
http://www.alsc.org/
Exhibit A SPRBL1-19-Q-0030 Page 9 of 13
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0001 A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Load Bank, U/W 15 KW &
30KW 400 HZ
TBD TBD
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B001 Scientific and Technical Reports IUID Marking Diagram/Instructions
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MISC-80711A Para IUID Marking RDER-PRP-G INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION 14. DISTRIBUTION IN
DD ASREQ SEE ITEM 16 b. COPIES
SECT. B
8. APP CODE N/A 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A N/A SEE ITEM 16
Reg
Repro
16. REMARKS:
Item 4: Delete Block 10.2 of Data Item Description (DID) and prepare in accordance with the Statement of Work.
Item 12: Delivery of draft shall be 120 DAC. Government has 30 days to review/comment.
Item 13 Delivery of final shall be 30 days after receipt of Government comments. Government has 60 days to determine acceptance.
Contractor to submit DD250 upon acceptance of UID Marking Diagram/Instructions.
Item 14: All deliveries shall be in digital format. All digital files shall be provided in digital format readable by computers running Microsoft Office 2000. Alternative delivery media may be discussed with the Contracting Officer prior to delivery.
If the CDRL Data Deliverable is priced and is not NSP (Not Separately Priced), then an electronic DD Form 250 will be required via the Wide Area Workflow website in order for the contractor to receive payment for the data deliverable (see section G of the Contract). CDRLs that are NSP shall not use WAWF to notify the government. E-mail notification is required with any electronic submission.
RDER-PRP-G
15. TOTAL 1 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Mohammad Gani
RDER-PRP-G
Product Realization Engineer
11/7/2018 Mark Caringi
RDER-PRP-G
Chief, PRD Branch
11/7/2018
Exhibit A SPRBL1-19-Q-0030 Page 10 of 13
The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract.
Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the PCO or other Government representative at any time during the life of this contract. The contractor shall provide this list to the government at the end of the contract.
Correction of Noncompliant Equipment and Technical Data.
If this contract contains configuration control requirements, the contractor shall initiate the appropriate configuration control document to correct all affected drawings/specifications which conflict with or omit the marking requirements stipulated above.
If configuration control requirements do not apply and the equipment on order is defined by technical data which conflicts with or omits the marking requirements stated above, the contractor shall advise the PCO. Such advice shall list the number of each deficient drawing/specification and a brief description of the deficiency.
If the item on order is defined by existing Government technical documentation and such documentation is in conflict with the requirements of this TRD, production of equipment with revised markings shall not proceed until Government approval is received.
Government Purchase of Product/Technical Data.
Specifications. If the Government is procuring any equipment specification(s) on this contract, such specification(s) shall include a requirement to mark the appropriate items with IUID.
Drawings. If the Government is procuring engineering drawings or drawing revisions on this contract, the contractor shall include IUID marking requirements on each applicable drawing. Location shall be depicted on the pictorial and other details presented in the notes.
Pricing of IUID Requirements. All efforts required by this TRD and contract, including, but not limited to, the preparation of ECPs or notification of marking deficiencies, serial number data reporting at end of contract and the actual marking of hardware, will be included in the base contract price.
Requirements for Quality Assurance System. The contractor shall implement and maintain a Quality Assurance System for higher-level product integrity that meets or exceeds the requirements established below. These requirements are commonly accepted practices employed by industry in both national and international manufacturing environments.
Quality Approach. The contractor shall establish/maintain a quality approach to ensure higher-level product integrity and to satisfy contract or order requirements.
Initial Quality Planning. The contractor during the earliest practical phase of the contract shall conduct a complete review of the contract requirements to identify all the resources necessary for assuring product integrity.
Exhibit A SPRBL1-19-Q-0030 Page 11 of 13
Design. The contractor shall establish/maintain controls over the design process to ensure that contract requirements are satisfied.
Document Control. The contractor shall establish/maintain procedures that control the adequacy, completeness, currentness, and changes of all documents (work instructions, drawings, specifications, etc.).
Records. The contractor shall maintain and utilize all records required for effective operation of the quality approach. The quality approach shall ensure that these records are complete (including subcontractor records) and reliable.
Control of Purchases. The contractor shall ensure that all supplies and services purchased from suppliers conform to contract requirements. The contractor shall require that their subcontractors control the product integrity of their services and supplies.
Government Furnished Material (GFM). For all GFM received under this contract the contractor shall be responsible for conducting all necessary inspections, maintenance, and tests. The contractor shall be responsible for reporting all inspection results, maintenance actions, losses, and damage to the Government.
Materials Control. The contractor shall maintain controls over all materials and products throughout the manufacturing process. These controls shall enable the identification of materials that have passed inspection from those which have not. The contractor shall maintain records identifying the status and final destination of all materials/products.
Nonconforming Material. The contractor shall establish and maintain a system for controlling material that does not satisfy contract requirements, including procedures for its identification, segregation, and disposition (rework/repair, scrap, etc.).
Corrective Action. The contractor shall promptly detect nonconforming material and conditions adverse to product integrity. It shall then initiate the corrective actions required to satisfy contract requirements.
Manufacturing Operations/Process Controls. The contractor’s quality approach is responsible for assuring/monitoring that all manufacturing operations/processes are accomplished under controlled conditions.
Controlled conditions include documented work instructions (including workmanship), production equipment, special work environments, inspections/tests, work specifications, and approval/rejection criteria.
Inspection and Testing. The quality approach shall assure that all inspections and tests required satisfying contract or order requirements are conducted.
Measuring, Testing, and Inspection Equipment. The contractor shall provide and maintain gages (including production tooling used for inspection purposes) and other measuring and testing equipment to assure that products conform to contract requirements. These devices shall be calibrated against certified measurement standards that are traceable back to national/international standards.
Inspection and Test Status. The contractor shall maintain a system for the identification of the inspection and test status of all products throughout all stages of the manufacturing cycle.
Exhibit A SPRBL1-19-Q-0030 Page 12 of 13
Quality Audits. The contractor shall perform internal quality audits to verify the effectiveness of their quality approach.
Training Requirements. The contractor shall identify/provide for the training needs of their personnel performing quality functions.
Service. The contractor shall establish/maintain procedures for performing/verifying that contract service requirements are satisfied.
Statistical Quality Control and Analysis. The contractor shall establish/utilize statistical methods whenever appropriate to satisfy the contract or order requirements.
Continuous Process Improvement. The contractor shall monitor the effectiveness of their quality approach and continually improve quality processes.
Handling, Storage, Preservation, Packaging, and Shipping. The contractor shall establish/maintain procedures for handling, storage, preservation, packaging, and shipping to protect the quality of products and prevent damage, loss, deterioration, degradation or substitution of products.
Requirements for Final Inspection and Test . The contractor shall implement and maintain a Final Inspection and Test System that meets or exceeds the requirements established below. These requirements are commonly accepted practices employed by industry.
Quality System . The contractor shall establish/maintain an effective inspection and test system for final inspection and test of completed products.
Inspection and Testing Procedures . The contractor shall utilize documented procedures for final inspection and testing of finished products to ensure that all contract requirements are satisfied.
Inspection and Testing . The quality system shall assure that all final inspections and tests required satisfying contract requirements are conducted.
Records . The contractor shall maintain adequate records of final inspections and tests to demonstrate that the product satisfies contract requirements.
Measuring, Testing, and Inspection Equipment . The contractor shall provide and maintain gages (including production tooling used for inspection purposes) and other measuring and testing equipment to assure that finished products conform to contract requirements. These devices shall be calibrated against certified measurement standards that are traceable back to national/international standards.
Inspection and Test Status . The contractor shall maintain a system for the identification of the final inspection and test status of all products.
Nonconforming Material . The contractor shall establish and maintain a system for controlling material that does not satisfy contract requirements, including procedures for its identification, segregation, and disposition (rework/repair, scrap, etc.).
Exhibit A SPRBL1-19-Q-0030 Page 13 of 13
Corrective Action . The contractor shall promptly act to correct nonconforming materials and processes to preclude the recurrence of the problem and to satisfy contract requirements.
Training Requirements . The contractor shall identify/provide for the training needs of their personnel performing inspections and tests.
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
CDRL List
CDRL
Data Line No. DID Identification Title A001 DI-MISC- 80711A Scientific and Technical Reports – Configuration Control B001 DI-MISC- 80711A Scientific and Technical Reports – IUID Marking Diagram/Instructions
| Military Packaging |
| The contractor shall maintain an accurate, current list of IUIDs for all manufactured items on this contract. Dates of manufacture, substitutions, shop changes, etc. shall be included on this list. The list shall be available for inspection by the P... |
| CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1 |
| CDRL List |
File details come from the government source that posted it.