SPRBL1-19-Q-0030_Attachment-0001.pdf
PDF 11 KB Posted
- Attached to
- SPRBL1-19-Q-0030 Federal contract opportunity
- Solicitation number
- SPRBL1-19-Q-0030
About this file
Solicitation SPRBL1-19-Q-0030_Attachment-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRBL1-19-Q-0030_Exhibit-A.pdf | ||
| SPRBL1-19-Q-0030.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchase Description #: A3357168 Rev A
CECOM CAGE: 80063
Approval Date: 3 June 2015
CECOM PURCHASE DESCRIPTION FOR
COMMERCIAL PATRIOT LOAD BANK U/W 15 kW & 30 kW 400 Hz TQGs
Portability Requirements:
1. Weight (Load Bank Only): Two-person lift, weighing less than 88 lbs.
2. Dimensions (Load Bank Only): Length of 2 ft. or less, Width of 1 ft. or less, Height of 2 feet or less.
3. Must come with storage and transport case.
4. Load Bank & Cables shall be contained in a Pelican brand case or equivalent with wheels and pull handles.
Power Load Capacity & Design Requirements:
1.208 VAC, 3-phase, 4-wire, 400 Hz:
a. Must be able to safely operate in a range of 200-230 VAC).
b. Must be a 4-wire configuration to include a neutral wire with a separate ground.
2. Must provide a minimum of 80 kW Resistive Load.
3. Must be able to increment the load in steps of 5 kW from zero to maximum load.
4. The first 5 kW load increment should be a 1 kW resolution.
5. Control and Blower Circuitry must run off of internal (generator provided) power and require no external power.
6. Must require no cool down period after load is dropped.
Environmental Requirements:
1. Must be designed to be dust resistant.
2. Must be designed to be shock resistant (Anti-shock).
3. Must be designed to be vibration resistant (Anti-vibration).
4. Must be designed for indoor/outdoor operation.
Paint Requirements:
1. Must be painted to best commercial practices to protect against corrosion.
Cable Requirements:
1. Must include a power cable which meets the following requirements:
a. Minimum 15 ft. length.
b. Built-in connector for connection with Load Bank.
c. Soldered pigtail leads for connection to the Generator Set Junction Box.
Instrumentation Requirements:
1. The load bank must contain the following instrumentation: Voltmeter, Ammeter, Frequency Meter, Power Indicator Lights, In-phase & Out-of-phase Indicators, and Circuit Protection.
Cooling Fan Operations:
1. Cooling Fan must be self-contained and operate from source power.
Safety Requirements:
1. 28 VDC Interlock Protection.
2. Thermal Overload Protection:
a. Load shall not be applied to the Load Bank if an exhaust temperature of 350 degrees F or greater is reached.
3. Circuit Breaker Protection:
a. Blower circuitry shall be protected from overcurrent conditions.
b. Control circuitry shall be protected from overcurrent conditions.
4. Tip-over Interlocks.
5. Improper Airflow Protection:
a. Load shall not be applied to the Load Bank if the blower is not functioning properly.