Questions (from potential vendor) and Answers (from technical review) Question:
“The conex it self Wind and Water Tight Painted? Or One Trip?
Steel and Wood floor?
Insulated 6’ roll-up doors? On one end or both ends?”
Answer:
1) Neither, per section 3.3 of the specification (General equipment requirements); “All material and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service…”
2) Steel joist / framework with a wood sub floor over the top of it steel.
3) On one end, replace the standard doors with the 6’ roll-up, the other end remains a solid wall.