Questions (from potential vendor) and Answers (from technical review) Question:

“The conex it self Wind and Water Tight Painted? Or One Trip?

Steel and Wood floor?

Insulated 6’ roll-up doors? On one end or both ends?”

Answer:

1) Neither, per section 3.3 of the specification (General equipment requirements); “All material and parts comprising the system shall be new, of current design and manufacture, and shall not have been in prior service…”

2) Steel joist / framework with a wood sub floor over the top of it steel.

3) On one end, replace the standard doors with the 6’ roll-up, the other end remains a solid wall.